CN108163582A - A kind of mobile dress ore deposit platform and its dress ore deposit method - Google Patents
A kind of mobile dress ore deposit platform and its dress ore deposit method Download PDFInfo
- Publication number
- CN108163582A CN108163582A CN201711273513.XA CN201711273513A CN108163582A CN 108163582 A CN108163582 A CN 108163582A CN 201711273513 A CN201711273513 A CN 201711273513A CN 108163582 A CN108163582 A CN 108163582A
- Authority
- CN
- China
- Prior art keywords
- dress
- dress ore
- ore deposit
- bottom plate
- deposit platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G69/00—Auxiliary measures taken, or devices used, in connection with loading or unloading
- B65G69/28—Loading ramps; Loading docks
- B65G69/30—Non-permanently installed loading ramps, e.g. transportable
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2201/00—Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
- B65G2201/04—Bulk
- B65G2201/045—Sand, soil and mineral ore
Abstract
The present invention provides a kind of mobile dress ore deposit platforms and its dress ore deposit method, the platform to be made of dress ore bucket, supporting rack and idler wheel.The flexible slide plate of dress ore bucket side installation, bottom is provided with drawhole;The flexible slide plate is made of, and positioned by location hole two slide plate superpositions;Support frame as described above is welded to form by section bar;Support frame as described above is welded and fixed with dress ore bucket.Four idler wheels are respectively arranged in the bottom of bracket upright post, and are mounted on locking device on each idler wheel.The dress ore deposit method is to fill ore deposit platform by movable type to run on tramroad, appointed place is reached to match after scraper, and harrowed ore to dress ore deposit platform by flexible slide plate, it is put into the mine car of lower section by bottom discharging mouth, ore deposit platform will be filled after situation by, which treating, arranges recycling.The present invention realizes the recycling of mobile dress ore deposit platform, further improves the safety of production operation.
Description
Technical field
The invention belongs to Underground Metallic Mines mining technique fields, and in particular to a kind of mobile dress ore deposit platform and its dress ore deposit
Method.
Background technology
In the more slow mine in the slanting angle of ore body, back production is mainly carried out using open-stope method, and most of mine is using electricity
Rake carries out the haulage of ore, and the ore under being adopted using scraper is packed into dress ore deposit platform, is transferred in mine car by filling ore deposit platform,
Earth's surface is finally transported by mine car.
The pattern of selection dress ore deposit mesa base ore removal is particularly significant for ore drawing in stope, the key of even more entire mining technology
Place.So selection will dominate the production cost of entire stope, back production peace whether filling the bottom structure pattern of ore deposit platform rationally
It full property and adopts and cuts quantities etc..
In tradition is applied, still there are many mines to continue to use the patterns such as wooden funnel, wooden ore removal platform progress ore removal,
Due to being influenced by subsurface environment, wood materials are easy to be corroded, so as to cause deformation provide miner people and bring sternly
The security risk of weight.Moreover, wood materials itself are perishable, yielding, can not reuse, increase the maintenance in later stage into
This.
Invention content
Defect present in for the above-mentioned prior art, the present invention provides a kind of mobile dress ore deposit platform and its dress ore deposit sides
Method realizes the recycling of mobile dress ore deposit platform, further improves the safety of production operation.With reference to Figure of description, sheet
The technical solution of invention is as follows:
A kind of mobile dress ore deposit platform, the platform are made of dress ore bucket, supporting rack and idler wheel;
The dress ore bucket is made of three dress ore bucket side plates, a dress ore bucket bottom plate and a flexible slide plate;Wherein two
A dress ore deposit side plate is vertically welded in the front and back end of dress ore bucket bottom plate, and another packaged ore deposit side plate is vertically welded in the one of dress ore bucket bottom plate
Side, the flexible slide plate are hinged on the opposite side for filling ore bucket bottom plate by hinge, and the slide plate that stretches is along the side of dress ore bucket bottom plate along certainly
By overturning;
Two dress ore bucket side plates positioned at dress ore bucket bottom plate front and back end are right-angled trapezium, and the trapezoidal hypotenuse of the two is located at and stretches
Contracting slide plate side, three packaged ore bucket side plates form " tuft " shape structure with dress ore bucket bottom plate;In the dress ore bucket bottom plate
Centre position is provided with the drawhole of rectangle;
The flexible slide plate is made of two slide plates, and the tablets of two pieces of slide plates is overlapped up and down, and the sides of two pieces of slide plates is along edge strip
It is set in together, two slide plates is enable to be slided along side is opposite, same center is provided in the tablet lap position of two pieces of slide plates and determines
Position hole;
Support frame as described above is welded to form by rack beam, bracket upright post, stent fixed beam and bottom plate fixed beam;The branch
Frame crossbeam has four, is welded and fixed respectively along the bottom surrounding of dress ore bucket bottom plate;The bracket upright post has four, is located at respectively
Four corner positions of dress ore bucket bottom plate are vertically arranged, and be welded and fixed respectively with the rack beam of corresponding position;The branch
Frame fixed beam has two, is horizontally placed on respectively between two bracket upright posts of dress ore bucket bottom plate both sides, and is erected respectively with branch
Column is welded and fixed;The bottom plate fixed beam has two, is arranged in parallel along dress ore bucket bottom base plate front-rear direction, bottom plate fixed beam two
End is welded and fixed respectively with rack beam;
There are four the idler wheels, is respectively arranged in the bottom of bracket upright post, in addition, as shown in the figure, on each idler wheel
Locking device is installed.
Using the mobile dress ore deposit method for filling ore deposit platform, specific dress ore deposit method is as follows:
The first step:By movable type dress ore deposit platform along car-haul track, the corresponding position in mountain pass is moved to, and adjust
Movable type fills ore deposit platform angle to facilitate electric scraper discharging;
Second step:Smooth upper mountain pass position simultaneously rotates the flexible slide plate of mobile dress ore deposit platform outward, and by flexible cunning
Plate is placed at mountain pass, adjusts the length of flexible slide plate, and fix two pieces of sledge displacements of flexible slide plate using bolt;
Third walks:After the position of formula dress ore deposit platform to be moved and angle adjustment determine, the locking device on idler wheel is locked, it will
The position of entire dress ore deposit platform is fixed, and dress ore deposit platform is prevented to be moved forward and backward;
4th step:By two round logs it is horizontal dress ore deposit platform front and back support crossbeam both sides, make the position of dress ore deposit platform more
Firm stable, to prevent during electric scraper discharging, there is situation about swaying forwards and backwards in dress ore deposit platform;
5th step:Start mine car to be moved to below dress ore deposit platform along track, stop after the drawhole with filling ore bucket is corresponding,
Start scraper, by the ore in going up a hill from flexible slide plate scraping to the dress ore bucket of dress ore deposit platform in, ore then being put from dress ore bucket
Mine mouth is transferred in mine car;
6th step:After stope mining, recycle mobile dress ore deposit platform, by mobile dress ore deposit platform be moved to other positions with
Standby rear use.
Compared with prior art, the beneficial effects of the present invention are:
Apparatus of the present invention are safe and reliable, and operation is simple, make full use of recyclable, moveable feature:It is adopted at some
After the back production of field, directly the device is carried out to next stope to be adopted reusing.Wooden material is also replaced using ferrous material
Material, reduces the maintenance times of funnel, while ore drawing efficiency greatly improves, increases the safety of operation.
Description of the drawings
Fig. 1 is the mobile overall structure diagram for filling ore deposit platform of the present invention;
Fig. 2 is the mobile bottom roller structure diagram for filling ore deposit platform of the present invention;
Fig. 3 is the structure diagram of the mobile scalable slide plate for filling ore deposit platform of the present invention;
In figure:
1- fills ore bucket side plate;2- drawholes;3- fills ore bucket bottom plate;4- bottom plate fixed beams;
5- stent fixed beams;6- bracket upright posts;7- rack beams;8- idler wheels;
9- stretches slide plate;10- hinges;11- locking devices;
The first slide plates of 901-;The second slide plates of 902-;903- location holes.
Specific embodiment
For the present invention is further explained the technical solution, with reference to Figure of description, specific embodiment of the invention is such as
Under:
As shown in Figure 1, the invention discloses a kind of mobile dress ore deposit platform, the platform is mainly by dress ore bucket, supporting rack
And idler wheel composition;
The dress ore bucket is made of dress ore bucket side plate 1, dress ore bucket bottom plate 3 and flexible slide plate 9;It is square to fill ore bucket bottom plate 3
Shape plank, the dress ore bucket side plate 1 have three pieces, are fixed respectively with dress 3 vertical welding of ore bucket bottom plate, wherein two packaged ore deposit side plates 1
The front and back end of dress ore bucket bottom plate 3 is welded on, another packaged ore deposit side plate 1 is welded on the side of dress ore bucket bottom plate 3, the flexible slide plate
9 are hinged on the opposite side of dress ore bucket bottom plate 3 by hinge 10, and flexible slide plate 9 can be along the side of dress ore bucket bottom plate 3 along freely turning over
Turn.Wherein, the two packaged ore bucket side plates 1 positioned at 3 front and back end of dress ore bucket bottom plate are right-angled trapezium, and the trapezoidal hypotenuse of the two is located at
Flexible 9 side of slide plate, the dress ore bucket side plate 1 of two pieces of right-angled trapeziums is opposite and is arranged in parallel, positioned at the dress ore deposit side of dress ore bucket bottom plate 3
Plate 1 is rectangle, and is vertically arranged with other two packaged ore deposit side plates 1, and three packaged ore deposit side plates 1, which are welded to one another, to be fixed together;Three pieces
It fills ore bucket side plate 1 and forms " tuft " shape structure with dress ore bucket bottom plate 3.It is provided in the centre position of the dress ore bucket bottom plate 3
The drawhole 2 of rectangle.
As shown in figure 3, the flexible slide plate 9 is made of the first slide plate 901 and the second slide plate 902, first slide plate 901
It is similar with 902 structure of the second slide plate, it is made of one flat plate and two sides along edge strip, first slide plate 901 and second
The side of slide plate 902 uses square opening section bar along edge strip, wherein, the side of the first slide plate 901 is more than second along edge strip internal diameter size and slides
The side of plate 902 is located at along edge strip outer diameter, the tablet of the second slide plate 902 below the tablet of the first slide plate 901, the second slide plate
902 two sides are sleeved on the side of the first slide plate 901 along edge strip along edge strip, the second slide plate 902 and the first slide plate 901 along
Side forms sliding pair along opposite slide of edge strip, to realize the flexible of flexible slide plate 9;In the first slide plate 901 and the second slide plate 902
Location hole 903 is provided on tablet, when the 902 opposite slip of the first slide plate 901 and the second slide plate, and the two location hole 903 overlaps
When, bolt is inserted into the location hole of the two and realizes that the two limiting is fixed.
In above-mentioned dress ore bucket, dress ore bucket side plate 1, dress ore bucket bottom plate 3 and flexible slide plate 9 use steel plate of the thickness for 10mm
It is made, the size of the dress ore bucket bottom plate 3 is 2.0m × 1.5m, and the size of the drawhole is 0.8m × 0.6m
Support frame as described above is welded to form by rack beam 7, bracket upright post 6, stent fixed beam 5 and bottom plate fixed beam 4;Institute
Stating rack beam 7 has four, respectively along the bottom surrounding setting of dress ore bucket bottom plate 3, and is welded to one another fixation;The branch erects
Column 6 has four, and four corner positions for being located at dress ore bucket bottom plate 3 respectively are vertically arranged, and respectively with the stent of corresponding position
Crossbeam 7 is welded and fixed;The stent fixed beam 5 has two, and two branch for being horizontally placed on 3 both sides of dress ore bucket bottom plate respectively erect
Between column 6, and it is welded and fixed respectively with bracket upright post 6;The bottom plate fixed beam 4 has two, along before and after 3 bottom of dress ore bucket bottom plate
Direction is arranged in parallel, and avoids the position of drawhole 2, and 4 both ends of bottom plate fixed beam are welded and fixed respectively with rack beam 7.
In above-mentioned supporting rack, the rack beam 7, bracket upright post 6, stent fixed beam 5 and bottom plate fixed beam 4 use
The mental sections section brace such as I-steel or square opening steel.
Welding or bolted side is respectively adopted between the dress ore bucket bottom plate 3 and rack beam 7 and bottom plate fixed beam 4
Formula is fixed.
There are four the idler wheels 8, is respectively arranged in the bottom of bracket upright post 6, in addition, as shown in Fig. 2, in each idler wheel 8
On be mounted on locking device 11, after idler wheel 8, which will entirely fill ore deposit platform, brings to suitable position, open locking device 11 will roll
Wheel 8 is locked, to prevent dress ore deposit platform from car slipping situation occur.
The invention also discloses a kind of dress ore deposit method using above-mentioned mobile dress ore deposit platform, detailed process is as follows:
The first step:By movable type dress ore deposit platform along car-haul track, the corresponding position in mountain pass is moved to, and adjust
Movable type fills ore deposit platform angle to facilitate electric scraper discharging;
Second:Smooth upper mountain pass position simultaneously rotates the flexible slide plate 9 of mobile dress ore deposit platform outward, and by flexible cunning
Plate is placed at mountain pass, adjusts the length of flexible slide plate, and slide the first slide plate 901 and second of flexible slide plate using bolt
Plate 902 is fixed;
Third portion:After the position of formula dress ore deposit platform to be moved and angle adjustment determine, the locking device on idler wheel 8 is locked
11, the position of entire dress ore deposit platform is fixed, dress ore deposit platform is prevented to be moved forward and backward;
4th:By two round logs it is horizontal dress ore deposit platform front and back support crossbeam 7 both sides, make the position of dress ore deposit platform more
Firm stable, to prevent during electric scraper discharging, there is situation about swaying forwards and backwards in dress ore deposit platform;
5th step:Start mine car to be moved to below dress ore deposit platform along track, stop after the drawhole 2 with filling ore bucket is corresponding
Only, start scraper, by the ore in going up a hill from flexible slide plate scraping to the dress ore bucket for filling ore deposit platform, ore is then from dress ore bucket
Drawhole is transferred in mine car;
6th step:After stope mining, recycle mobile dress ore deposit platform, by mobile dress ore deposit platform be moved to other positions with
Standby rear use.
Claims (2)
1. a kind of mobile dress ore deposit platform, it is characterised in that:
The platform is mainly made of dress ore bucket, supporting rack and idler wheel;
The dress ore bucket is made of three dress ore bucket side plates (1), a dress ore bucket bottom plate (3) and a flexible slide plate (9);Its
In two dress ore deposit side plates (1) be vertically welded in the front and back end of dress ore bucket bottom plate (3), another packaged ore deposit side plate (1) is vertically welded in
The side of ore bucket bottom plate (3) is filled, the flexible slide plate (9) is hinged on the opposite side of dress ore bucket bottom plate (3) by hinge (10), stretched
Contracting slide plate (9) is along the side of dress ore bucket bottom plate (3) along free overturning;
Two dress ore bucket side plates (1) positioned at dress ore bucket bottom plate (3) front and back end are right-angled trapezium, and the trapezoidal hypotenuse of the two is located at
Flexible slide plate (9) side, three packaged ore bucket side plates (1) form " tuft " shape structure with dress ore bucket bottom plate (3);In the dress
The centre position of ore bucket bottom plate (3) is provided with the drawhole (2) of rectangle;
The flexible slide plate (9) is made of two slide plates, and the tablets of two pieces of slide plates is overlapped up and down, and the sides of two pieces of slide plates is along edge strip set
It is fitted together, two slide plates is enable to be slided along side is opposite, same centralized positioning is provided in the tablet lap position of two pieces of slide plates
Hole;
Support frame as described above is by rack beam (7), bracket upright post (6), stent fixed beam (5) and bottom plate fixed beam (4) welding group
Into;The rack beam (7) has four, is welded and fixed respectively along the bottom surrounding of dress ore bucket bottom plate (3);The bracket upright post
(6) have four, respectively be located at dress ore bucket bottom plate (3) four corner positions be vertically arranged, and respectively with the branch of corresponding position
Frame crossbeam (7) is welded and fixed;The stent fixed beam (5) has two, is horizontally placed on the two of dress ore bucket bottom plate (3) both sides respectively
Between root bracket upright post (6), and it is welded and fixed respectively with bracket upright post (6);The bottom plate fixed beam (4) has two, along dress ore deposit
Bottom sheet (3) bottom front-rear direction is arranged in parallel, and bottom plate fixed beam (4) both ends are welded and fixed respectively with rack beam (7);
There are four the idler wheels (8), is respectively arranged in the bottom of bracket upright post (6), is mounted on locking on each idler wheel (8)
Device (11).
2. using the mobile dress ore deposit method for filling ore deposit platform as described in claim 1, it is characterised in that:
Specific dress ore deposit method is as follows:
The first step:By movable type dress ore deposit platform along car-haul track, the corresponding position in mountain pass is moved to, and adjust movement
Formula fills ore deposit platform angle to facilitate electric scraper discharging;
Second step:Smooth upper mountain pass position simultaneously rotates the flexible slide plate (9) of mobile dress ore deposit platform outward, and by flexible slide plate
It is placed at mountain pass, adjusts the length of flexible slide plate, and fix two pieces of sledge displacements of flexible slide plate using bolt;
Third walks:After the position of formula dress ore deposit platform to be moved and angle adjustment determine, the locking device on idler wheel (8) is locked
(11), the position of entire dress ore deposit platform is fixed, dress ore deposit platform is prevented to be moved forward and backward;
4th step:Two round logs are horizontal in the both sides of dress ore deposit platform front and back support crossbeam (7), and the position for making dress ore deposit platform is more firm
Gu stablizing, to prevent during electric scraper discharging, there is situation about swaying forwards and backwards in dress ore deposit platform;
5th step:Start mine car to be moved to below dress ore deposit platform along track, stop after the drawhole (2) with filling ore bucket is corresponding,
Start scraper, by the ore in going up a hill from flexible slide plate scraping to the dress ore bucket of dress ore deposit platform in, ore then being put from dress ore bucket
Mine mouth is transferred in mine car;
6th step:After stope mining, recycle mobile dress ore deposit platform, mobile dress ore deposit platform is moved to other positions in case after
With.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711273513.XA CN108163582B (en) | 2017-12-06 | 2017-12-06 | Movable ore loading platform and ore loading method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711273513.XA CN108163582B (en) | 2017-12-06 | 2017-12-06 | Movable ore loading platform and ore loading method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108163582A true CN108163582A (en) | 2018-06-15 |
CN108163582B CN108163582B (en) | 2020-03-31 |
Family
ID=62525183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711273513.XA Active CN108163582B (en) | 2017-12-06 | 2017-12-06 | Movable ore loading platform and ore loading method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108163582B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110641926A (en) * | 2018-06-26 | 2020-01-03 | 常州信息职业技术学院 | Carrying device |
CN112109787A (en) * | 2020-09-04 | 2020-12-22 | 中船黄埔文冲船舶有限公司 | Universal transfer plate |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87100375A (en) * | 1987-01-20 | 1987-07-15 | 吴振虎 | Strip caving open stopping method and equipment |
CN201071228Y (en) * | 2007-08-08 | 2008-06-11 | 刘祥宝 | Expansion car loading slide track |
WO2013098834A1 (en) * | 2011-09-21 | 2013-07-04 | Janak Shanghvi | Loading apparatus for a freeze dryer |
CN203593350U (en) * | 2013-11-26 | 2014-05-14 | 江苏金鹰量刃具有限公司 | Mobile telescopic workpiece transmission table |
CN204606498U (en) * | 2015-04-30 | 2015-09-02 | 西华大学 | A kind of liftable moves bottled water bracing frame |
CN204980141U (en) * | 2015-08-28 | 2016-01-20 | 江阴市汇通包装机械有限公司 | Convey little table |
-
2017
- 2017-12-06 CN CN201711273513.XA patent/CN108163582B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87100375A (en) * | 1987-01-20 | 1987-07-15 | 吴振虎 | Strip caving open stopping method and equipment |
CN201071228Y (en) * | 2007-08-08 | 2008-06-11 | 刘祥宝 | Expansion car loading slide track |
WO2013098834A1 (en) * | 2011-09-21 | 2013-07-04 | Janak Shanghvi | Loading apparatus for a freeze dryer |
CN203593350U (en) * | 2013-11-26 | 2014-05-14 | 江苏金鹰量刃具有限公司 | Mobile telescopic workpiece transmission table |
CN204606498U (en) * | 2015-04-30 | 2015-09-02 | 西华大学 | A kind of liftable moves bottled water bracing frame |
CN204980141U (en) * | 2015-08-28 | 2016-01-20 | 江阴市汇通包装机械有限公司 | Convey little table |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110641926A (en) * | 2018-06-26 | 2020-01-03 | 常州信息职业技术学院 | Carrying device |
CN112109787A (en) * | 2020-09-04 | 2020-12-22 | 中船黄埔文冲船舶有限公司 | Universal transfer plate |
Also Published As
Publication number | Publication date |
---|---|
CN108163582B (en) | 2020-03-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108163582A (en) | A kind of mobile dress ore deposit platform and its dress ore deposit method | |
CN102168572A (en) | Waste filling supporting bracket | |
CN103552800B (en) | Large-scale can-like equipment shift method | |
CN203223239U (en) | Roadway advance timbering support used for assisting machine to move | |
CN209276914U (en) | A kind of battery truck runway sleeper of shield tunnel construction | |
CN106321135B (en) | A kind of advance support system and method for protecting support for bolting with wire mesh | |
CN104909270B (en) | Rope rolling rack, mountable and demountable gantry crane, and loading and unloading method | |
CN206655698U (en) | Preliminary bracing stand operation chassis after a kind of tunnel tunnel face excavates | |
CN106285749B (en) | A kind of improved advance support body and application method | |
CN103216252A (en) | Roadway advanced supporting supports capable of assisting machinery to move | |
CN203269298U (en) | Side dump skip gangue turning device for inclined shaft, and inclined shaft lifting system | |
CN202832586U (en) | Hydraulic support dismantling device | |
CN106246212B (en) | A kind of corollary apparatus and application method for being used for traditional advance timbering sliding advance of support | |
CN105293090B (en) | Mining telescopic boom dumping plough | |
CN209413323U (en) | A kind of Construction of High-rise movable material platform | |
RU2403391C1 (en) | Mechanised support for steep beds | |
RU123065U1 (en) | MOUNT MOUNT FOR WORK IN WORKS SAVED FOR RE-USE | |
CN203114308U (en) | Gantry self-propelled anchoring and supporting machine | |
CN208616694U (en) | A kind of extension operating platform for tunnel belt feeder | |
CN207583385U (en) | A kind of running gear of laying a railway track certainly of tunnel lining trolley | |
CN205330705U (en) | Car is strutted to monomer | |
CN214403587U (en) | Anchor withdrawing operation auxiliary platform | |
CN206346750U (en) | A kind of TBM Multifunctional materials transporter | |
CN205714220U (en) | Lining trolley integral translation adjusting means | |
CN106121700A (en) | The improved structure of a kind of advance timbering and shifting frame method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 130012 nanhu road, Jilin, Changchun, No. 6760 Patentee after: CHANGCHUN GOLD RESEARCH INSTITUTE Co.,Ltd. Address before: 130012 nanhu road, Jilin, Changchun, No. 6760 Patentee before: CHANGCHUN GOLD Research Institute |
|
CP01 | Change in the name or title of a patent holder |