CN108156047A - Server admin control system - Google Patents

Server admin control system Download PDF

Info

Publication number
CN108156047A
CN108156047A CN201611108551.5A CN201611108551A CN108156047A CN 108156047 A CN108156047 A CN 108156047A CN 201611108551 A CN201611108551 A CN 201611108551A CN 108156047 A CN108156047 A CN 108156047A
Authority
CN
China
Prior art keywords
unit
server
supply unit
support plate
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611108551.5A
Other languages
Chinese (zh)
Other versions
CN108156047B (en
Inventor
林振仁
吴陈宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitac Computer Shunde Ltd
Mitac International Corp
Original Assignee
Mitac Computer Shunde Ltd
Mitac International Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitac Computer Shunde Ltd, Mitac International Corp filed Critical Mitac Computer Shunde Ltd
Priority to CN201611108551.5A priority Critical patent/CN108156047B/en
Publication of CN108156047A publication Critical patent/CN108156047A/en
Application granted granted Critical
Publication of CN108156047B publication Critical patent/CN108156047B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/50Testing arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0805Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
    • H04L43/0817Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking functioning

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Environmental & Geological Engineering (AREA)
  • Automatic Analysis And Handling Materials Therefor (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

A kind of server admin control system, applied to a work system.The work system is respectively provided with the testing jig of multiple test spaces, two second supply units and multiple supply units comprising a workbench, one first supply unit, two.Every one second supply unit includes the second transmission module.The server admin control system include multiple server units, it is multiple multiply carry put, multiple supply units and a central server control device for including a control unit.By the control unit control first supply unit drive it is each multiply to carry to put be moved on corresponding second transmission module, and can automate dispense it is each multiply carry put and can by each server unit independently be sent into or remove correspondence the test space.Furthermore coordinate each supply unit that can multiply any second connection unit for carrying and putting with each and combined to form the modularized design of electrical connection, and each server unit can be supplied electricity to and tested in the corresponding test space, it is time saving and effectively improve testing efficiency.

Description

Server admin control system
Technical field
The invention relates to a kind of server management systems, particularly relate to a kind of server admin for test jobs Control system.
Background technology
All it is by huge number generally during server performs burn in process (Burn-in and Run-in Test) The server to be measured of amount is unidirectionally automatically fed into test section, and by manually every server is connected with the mains and connect one by one by the gross Upper test signal line, and the device to be serviced is made to reach with central test server and is connect, and assigned by central test server Test instruction is to the server, and the server performs test instruction and carries out test jobs, and then verifies the service The software of device and the efficiency of hardware.However, through manually the server is connected with the mains and test signal line, when expending very much Between and waste of manpower.Furthermore it usually performs burn in process needs to take a long time, and since server is unidirectionally to send by the gross Enter test section, so must treat that after the completion of whole server tests test section could be sent out by the gross, although central test server can The test status of the server is monitored, but as it has been found that having the server of test errors or authentication failed or because of artificial careless mistake Cause wiring error that can not test, the server of test crash also therefrom can not be removed the test space and place in real time by manager Reason still needs to wait for other servers and completes test jobs, do not meet cost-effectiveness and waste time, pole need to inquire into improvement.
Invention content
Therefore, the purpose of the present invention is providing a kind of server admin control system for effectively improving testing efficiency.
Then, server admin control system of the present invention, applied to a work system.It is flat that the work system includes a job The first supply unit that platform, one are set on the workbench, two are set on the workbench and single positioned at first conveying The second supply unit on the testing jig of two opposite sides of member and the two setting testing jigs.Each testing jig includes multiple surveys Try space.Every one second supply unit is set on corresponding testing jig and be located in the test space second including multiple Transmission module.The server admin control system includes:
Multiple server units, each server unit are set to including a server unit and one on the server unit Recognition unit;
It is multiple to convey multiplying to carry and putting for the server unit, it is each multiply to carry to put be movably arranged at first conveying On unit, and including one to the bearing server unit and be movably arranged on first supply unit multiply support plate, One, which is set to this, multiplies on support plate and is set to this with the first connection unit combined for server unit electrical connection, two and multiply load In two opposite sides of plate and this is set to toward the second connection unit of the direction of neighbouring testing jig extension and one multiply support plate respectively Conductive unit that is interior and being electrically connected first connection unit with second connection unit formation, it is each to multiply support plate movably It is set on first supply unit and can be driven and be moved to by first supply unit any of second supply unit On second transmission module, and it is driven by corresponding second transmission module and is moved in the corresponding test space;
One is set to the reading device on the workbench and to read the recognition unit of the server unit;
Multiple to be set on the testing jig and be located at the supply unit in the test space respectively, each supply unit is located at In the corresponding test space and it can be combined to form electrical connection with each any second connection unit for carrying and putting that multiplies;
It is multiple to be set on the testing jig and be located at the arrangement for detecting in the test space respectively, each arrangement for detecting to It detects to carry multiplying in the corresponding test space and put;And one controlling work system running with managing the server unit Central server control device, including one controlling the second of first supply unit and second supply unit the transmission The control unit and a processing unit being electrically connected with the control unit of module movement, the processing unit can be filled with the detecting It puts and reading device communication connection, the server unit is incorporated into respectively described to be multiplied on support plate and be sequentially placed in this Moved on first supply unit of work system, when it is each multiply support plate and move closer to the reading device when, which reads The data of the recognition unit of each server unit and the data of the read recognition unit is reached into the processing unit, and The processing unit generates a dis-tribution model according to the data of the data cooperation arrangement for detecting of each recognition unit and reaches this Control unit, the dis-tribution model have the test space corresponding to each server unit, which performs the dispatching mould Formula and sequentially control first supply unit drive it is each multiply support plate be moved to corresponding second supply unit second transmission mould On block, and the direction that controls corresponding second transmission module toward the corresponding test space is mobile and be moved to each support plate that multiplies pair The test space answered, and each wherein one second connection unit for carrying and putting that multiplies is made to be combined with corresponding supply unit, and make every One first connection unit can supply electricity to corresponding server unit, at this point, the processing unit can multiply carry and put first with each Connection unit communication connection and the processing unit transmit a test instruction through first connection unit to corresponding server list Member, and then make each server unit that can perform test instruction in the corresponding test space.
In some embodiments, the server unit of each server unit has a power supply serial connection port and a signal Serial connection port, each the first connection unit for carrying and putting that multiplies have one to be combined for the power supply serial connection port of any server unit First connecting portion and one for any server unit signal serial connection port combine second connecting portion, it is each multiply carry The conductive unit put have an electrical connecting piece for connecting the first connecting portion and second connection unit and a connection this The signal connector of two connecting portions and second connection unit, each supply unit are combined including one with second connection unit Combining unit, an electric power transfer unit being set on the combining unit and one be set on the combining unit and connect should The signal transmission unit of the processing unit of central server control device, when the combining unit of each supply unit is somebody's turn to do with corresponding Second connection unit combines and forms electrical connection, which transmits test instruction and led from the signal transmission unit toward corresponding The signal connector of electric unit and second connecting portion through first connection unit and corresponding signal serial connection port are to corresponding Server unit, and then make each server unit that can perform test instruction in the corresponding test space.
In some embodiments, the server unit of each server unit has a power supply serial connection port and a signal Serial connection port, each the first connection unit for carrying and putting that multiplies have one to be combined for the power supply serial connection port of any server unit First connecting portion and one may connect on the signal serial connection port of any server unit and can be controlled with the central server The wireless signal receiver of the processing unit communication connection of device, it is each multiply carry the conductive unit put have a connection this first The electrical connecting piece of connecting portion and second connection unit, each supply unit include one and the second any connection unit knot The combining unit of conjunction and one be set to electric power transfer unit on the combining unit, when each supply unit combining unit with Corresponding second connection unit combines and forms electrical connection, which can transmit test instruction through first connection unit Wireless signal receiver to corresponding server unit, and then make each server unit that can be held in the corresponding test space Row test instruction.
In some embodiments, complete when the test instructs and can send a removal information when each server unit performs To the processing unit of the central server control device, and the processing unit generates a corresponding output mode and reaches the control Unit, the output mode have the test space corresponding to the server unit of required removal, which performs the output Second transmission module of pattern and corresponding second supply unit of control drives the corresponding support plate that multiplies toward first supply unit Direction is mobile and the supply unit is made to be detached with corresponding second connection unit, and this is made to multiply support plate and is moved to the first conveying list It member and then this is multiplied to carry to put removes the workbench with corresponding server unit;When each server unit performs the test Instruction does not complete and when the error occurs, can send the removal information to the processing unit of the central server control device, and is somebody's turn to do Processing unit generates the output mode and reaches the control unit, which performs the output mode and control corresponding the Second transmission module of two supply units drives the corresponding direction for multiplying support plate toward first supply unit mobile and makes the power supply Device is detached with corresponding second connection unit, and this is made to multiply support plate and be moved to first supply unit and then multiply to carry by this and is put The workbench is removed with corresponding server unit.
In some embodiments, also comprising multiple radio transmitting devices being respectively arranged on the server unit, often One radio transmitting device is storing the test data of corresponding server unit and reach the central server control device Processing unit.
In some embodiments, which includes an input section, an execution section, a deferent segment, multiple first Conveyor module and multiple second conveyor modules, first conveyor module is controllably from the input section toward the side of the deferent segment To rotation, second conveyor module can controllably be moved toward the direction of any second supply unit, the survey of the testing jig Space is tried respectively positioned at two opposite sides of the execution section of first supply unit, second transmission of every one second supply unit Module be respectively provided with it is multiple to drive it is each multiply support plate movement rot, it is each multiply support plate be sequentially placed in this first conveying In the input section of unit, and first conveyor module drive it is each multiply support plate arrive through the reading device execution section movement, Multiply before support plate is moved to the corresponding test space when each, which sequentially controls described the second of first supply unit Conveyor module drives each support plate that multiplies to be moved on the second transmission module of corresponding second supply unit, and controls corresponding the Each support plate that multiplies is moved to corresponding survey by the rot of two transmission modules toward the direction rotation of the corresponding test space Space is tried, and each wherein one second connection unit for carrying and putting that multiplies is made to be combined with corresponding supply unit.
In some embodiments, it completes to hold with each server unit when the test instructs when each server unit performs Row test instruction does not complete and when the error occurs, which generates the corresponding output mode and reach the control list Member, the control unit perform the output mode and control the second transmission module drive of second supply unit is corresponding to multiply support plate Direction toward first supply unit is mobile and the supply unit is made to be detached, and this is made to multiply support plate with corresponding second connection unit It is moved in the execution section of first supply unit, which controls first conveying of first supply unit simultaneously Module rotates and drives and corresponding multiply support plate and be moved to the deferent segment by the execution section, and then this is multiplied to carry and is put and corresponding clothes Business device device removes the workbench.
In some embodiments, which is also set on the workbench comprising one and by the central server control The stopping unit of the control unit control of device processed, the stopping unit can controllably be pierced by first supply unit including multiple Execution section and to stop the stopper for multiplying support plate movement.
The beneficial effects of the present invention are:The dis-tribution model is performed by the control unit and sequentially controls first conveying Unit drives each support plate that multiplies to be moved on the second transmission module of corresponding second supply unit, and controls corresponding second to pass The direction of dynamic model block toward the corresponding test space it is mobile and make it is each multiply carry wherein one second connection unit put with it is corresponding The clever thought that supply unit combines, and can automate to dispense and each multiply support plate, and reach and each server unit can be independently sent into Or remove the corresponding test space.Furthermore coordinate each supply unit that can multiply any second connection unit for carrying and putting with each With reference to the modularized design of formation electrical connection, and make first connection unit that can supply electricity to corresponding server unit and each clothes Business device unit can perform test instruction in the corresponding test space, artificial complicated wiring operation is not necessary to, when effectively saving Between with improve testing efficiency.
【Description of the drawings】
Fig. 1 is a block schematic diagram, illustrates that the first embodiment of server admin control system of the present invention is applied to a job family On system;
Fig. 2 is an elevational schematic view, aids in illustrating Fig. 1;
Fig. 3 is an enlarged diagram, is illustrated in the first embodiment, and a server unit and one multiplies the marriage relation for carrying and putting;
Fig. 4 is a schematic elevation view, is illustrated in the first embodiment, which, which multiplies to carry to put with this, coordinates the job family The transmission relationship of system;
Fig. 5 is a schematic elevation view, aids in illustrating Fig. 4;
Fig. 6 is a schematic elevation view, is illustrated in the first embodiment, which, which multiplies to carry to put with this, coordinates the job family The transmission relationship of system;And
Fig. 7 is a block schematic diagram, illustrates that the second embodiment of server admin control system of the present invention is applied to the job family On system.
【Specific embodiment】
Refering to Fig. 1, Fig. 2 and Fig. 3, the first embodiment of server admin control system 20 of the present invention, applied to a work system 10.The work system 10 includes the first supply unit 12, two setting that a workbench 11, one is set on the workbench 11 In the testing jig 13 and two of two opposite sides on the workbench 11 and positioned at first supply unit 12, the testing jig is set The second supply unit 14 on 13.Each testing jig 13 includes multiple test spaces 131.It is defeated that first supply unit 12 includes one Enter section 121, one and perform section 122, a deferent segment 123, multiple first conveyor modules 124 and multiple second conveyor modules 125.Institute It states the first conveyor module 124 controllably to rotate from the input section 121 toward the direction of the deferent segment 123, the second conveying mould Block 125 can controllably be moved toward the direction of any second supply unit 14.The test space 131 of the testing jig 13 distinguishes position In two opposite sides of the execution section 122 of first supply unit 12.Every one second supply unit 14 is set to correspondence including multiple Testing jig 13 on and the second transmission module 141 in the test space 131, every one second transmission module 141 have Multiple rots 142.
Each support plate 31 that multiplies sequentially is placed in the input section 121 of first supply unit 12, and the first conveying mould Block 124 drive it is each multiply support plate 31 through the reading device 4 and the execution section 122 that arrives moves, when each support plate 31 that multiplies is moved to pair Before the test space 131 answered, which sequentially controls 125 band of the second conveyor module of first supply unit 12 It moves each support plate 31 that multiplies to be moved on the second transmission module 141 of corresponding second supply unit 14, and controls corresponding second Each support plate 31 that multiplies is moved to the corresponding test space by transmission module 141 toward the direction rotation of the corresponding test space 131 131, and make it is each multiply carry wherein one second connection unit 33 for putting 3 and combined with corresponding supply unit 5.
The server admin control system 20 includes multiple server units 2, multiple conveying the server unit 2 Multiply to carry and put 3, one and be set to reading on the workbench 11 and to read the recognition unit 22 of the server unit 2 Device 4, multiple supply units 5 for being set on the testing jig 13 and being located at respectively in the test space 131, multiple settings In being located at the arrangement for detecting 6 and one in the test space 131 on the testing jig 13 and respectively controlling the work system Central server control device 7 of 10 runnings with managing the server unit 2.
Each server unit 2 includes a server unit 21 and one is set to identification list on the server unit 21 Member 22.Each server unit 21 has a power supply 211 and one signal serial connection port 212 of serial connection port.
It is each multiply to carry put 3 and be movably arranged on first supply unit 12, and including one to the bearing service It device unit 21 and is movably arranged at the support plate 31, one that multiplies on first supply unit 12 and is set to this and multiplies on support plate 31 and use For the first connection unit 32, two that the server unit 21 electrical connection combines be set to this multiply in two opposite sides of support plate 31 and The second connection unit 33 and one extended respectively toward the direction of neighbouring testing jig 13 be set to this multiply in support plate 31 and by this The conductive unit 34 that one connection unit 32 is electrically connected with second connection unit 33 formation.
Each support plate 31 that multiplies is movably arranged on first supply unit 12 and can be passed by first supply unit 12 It moves and is moved on any second transmission module 141 of second supply unit 14, and by corresponding second transmission module 141 It is driven and is moved in the corresponding test space 131.Every one first connection unit 32 has one for any server unit 21 Power supply serial connection port 211 combine first connecting portion 321 and one for any server unit 21 signal serial connection port 212 second connecting portions 322 combined.It is each multiply carry the conductive unit 34 for putting 3 and connect the first connecting portion 321 and institute with one The electrical connecting piece 341 and one for stating the second connection unit 33 connects the second connecting portion 322 and second connection unit 33 Signal connector 342.
Each supply unit 5 be located in the corresponding test space 131 and can with it is each multiply carry put 3 any second and connect Unit 33 is combined to be formed and is electrically connected, and the combining unit 51, one combined including one with second connection unit 33 is set to the knot The electric power transfer unit 52 and one on unit 51 is closed to be set on the combining unit 51 and communicate connection central server control The signal transmission unit 53 of the processing unit 72 of device 7.Each arrangement for detecting 6 is detecting in the corresponding test space 131 Multiply to carry and put 3.In this present embodiment, each arrangement for detecting 6 hides the aspect of formula sensor for light, and each arrangement for detecting 6 is to detect It surveys to carry multiplying in the corresponding test space 131 and puts 3 and multiply support plate, but not limited to this, as long as each arrangement for detecting 6 can be detected Go out each server unit 2 with it is corresponding multiply to carry put whether 3 have in each test space.
The central server control device 7 includes a control unit 71 and a processing being electrically connected with the control unit 71 Unit 72.The control unit 71 is controlling first conveyor module 124, the second conveyor module of first supply unit 12 124 rotate with the second transmission module 141 of second supply unit 14.The processing unit 72 can with the arrangement for detecting 6 and The communication of reading device 4 connection.
Refering to Fig. 1, Fig. 2 and Fig. 4, in use, first by the power supply serial connection port 211 of each server unit 21 and the letter Number serial connection port 212 respectively in connection in it is each multiply carry the first connecting portion 321 for putting 3 and the second connecting portion 322, and make every One server unit 2 with it is corresponding multiply carry put 3 completions combine.Then, each support plate 31 that multiplies sequentially is placed in the work system In the input section 121 of 10 the first supply unit 12, and first conveyor module 124 sequentially drive it is each multiply support plate 31 toward should The direction movement of reading device 4, when it is each multiply support plate 31 and move closer to the reading device 4 when, which reads each clothes The data of the recognition unit 22 of business device device 2 and the data of the read recognition unit 22 is reached into the processing unit 72, And the processing unit 72 coordinates the data of the arrangement for detecting 6 according to the data of each recognition unit 22 and generates a dis-tribution model simultaneously Reach the control unit 71.In this present embodiment, which has the test space corresponding to each server unit 21 131, specifically, which communicates connection with the arrangement for detecting 6 and learns and moved into for the server unit 2 The test space 131 position, and coordinate the reading device 4 communication connection and learn the sequence of the server unit 2, The processing unit 72, which is ranked to generate the dis-tribution model and reach the control unit 71, carries out follow-up delivery operation.
Then, which performs the dis-tribution model and sequentially controls the described first defeated of first supply unit 12 Send module 124 that each support plate 31 that multiplies is driven to be moved to the execution section 122, and each ought multiply support plate 31 and sequentially be moved to corresponding survey Before trying space 131, it is each which sequentially controls second conveyor module 125 of first supply unit 12 to drive The direction for multiplying support plate 31 toward corresponding second supply unit 14 is mobile and is moved on corresponding second transmission module 141.It refers to Fig. 1, Fig. 2 and Fig. 5, then come, which controls the rot 142 of corresponding second transmission module 141 past corresponding The test space 131 direction it is mobile and each support plate 31 that multiplies is moved in the corresponding test space 131, and make each to multiply load Wherein one second connection unit 33 of device 3 is combined with corresponding supply unit 5.In this present embodiment, the first conveying mould Block 124, second conveyor module 125 can drive each support plate 31 that multiplies to move with the rot 142 for the aspect of rotating wheel Dynamic, but not limited to this.
Refering to Fig. 1, Fig. 2 and Fig. 4, herein it is noted that the work system 10 is also set to the workbench comprising one The stopping unit 15 controlled on 11 and by the control unit 71 of the central server control device 7.The stopping unit 15 includes more A execution section 122 that can be controllably pierced by first supply unit 12 and to stop the stopper for multiplying the movement of support plate 31 151.In this present embodiment, each server unit 2 is that have sequentially to be moved into the execution section 122, and the control unit 71 execution the dis-tribution model can control according to priority first conveyor module 124 drive it is each multiply support plate 31 movement make it is corresponding Before server unit 2 is moved to the required test space 131 entered, the control unit 71 controls the stopper 151 to wear at this time Go out first supply unit 12 and stop respectively and this for entering the corresponding test space 131 is multiplied into support plate 31 with still treating below instantly It is moved along multiplying support plate 31 to described in the corresponding test space 131.Then, the control unit 71 control first conveying is single Second conveyor module 125 of member 12 is rotated toward corresponding second supply unit 14, and corresponding survey will be entered instantly by driving This of examination space 131 multiplies support plate 31 and is moved on the second transmission module 141 of corresponding second supply unit 14.Come again, control Corresponding second transmission module 141 toward the corresponding test space 131 direction rotation and by this multiply support plate 31 be moved to it is corresponding The test space 131, and this is made to multiply the combining unit for carrying wherein one second connection unit 33 for putting 3 and corresponding supply unit 5 51 combine.Then, which controls corresponding second conveyor module 125 and corresponding second rotated instantly Transmission mould stops operating, and after 151 retraction of stopper, and first conveyor module 124 is made to rotate and will treat below The described of the corresponding test space 131 is moved to multiply support plate 31 and be moved along.
Come again, when the combining unit 51 of each supply unit 5 is electrically connected with corresponding second connection unit 33 with reference to formation It connects, one test instruction of the processing unit 72 transmission is from the signal transmission unit 53 toward the signal connector of corresponding conductive unit 34 342 and the second connecting portion 322 through first connection unit 32 and corresponding signal serial connection port 212 to corresponding server list Member 21, and then make each server unit 21 that can be instructed in performing the test in the corresponding test space 131.Pass through each power supply The combining unit 51 of device 5 and cooperation it is each multiply carry second connection unit, the 33 modular Integration Design for putting 3, only Being bonded to each other can make corresponding server unit 21 power on and be reached with the processing unit 72 of the central server control device 7 It is connected into network communication, and performs test instruction, be not required to manually carry out complicated wiring operation, streamline operation is with saving Manpower.In this present embodiment, which transmits fraction of the test instruction through network communication connection through corresponding letter Number serial connection port 212 to corresponding server unit 21 baseboard management controller(Baseboard Management Controller, BMC)(It is not shown), and carry out subsequent test jobs.In this present embodiment, which is with nothing Line or wired network aspect carry out communication connection, and the not another label of schema is with distinguishing.
Refering to Fig. 1, Fig. 2 and Fig. 6, then, completed when the test instructs or when each when each server unit 21 performs The execution test instruction of server unit 21 does not complete and when the error occurs, each server unit 21 can all send removal letter Breath and by corresponding signal serial connection port 212 through corresponding second connecting portion 322 to the signal transmission unit 53, and reach in this Entreat the processing unit 72 of server control device 7.And the processing unit 72 generates a corresponding output mode and reaches the control Unit 71.The output mode has the test space 131 corresponding to the server unit 21 of required removal, which holds Second transmission module 141 of the row output mode and corresponding second supply unit 14 of control drives the corresponding support plate 31 that multiplies toward should The direction movement of first supply unit 12, and the combining unit 51 of the supply unit 5 is made to divide with corresponding second connection unit 33 From, and this is made to multiply support plate 31 and is moved to first supply unit 12, then this is driven to multiply support plate 31 by first conveyor module 124 It is moved toward the direction of the deferent segment 123, and then this is multiplied to carry and puts 3 and removes the workbench 11 with corresponding server unit 2. At this point, manager can by follow-up server unit 2 to be tested with it is corresponding multiply carry and put 3 completions combination after, and be positioned over this After in the input section 121 of first supply unit 12, corresponding test will be sent into according to the automatic cover of flow and method of above-mentioned dispatching Space 131, has to set in the flow and details of dispatching and has been described in detail, and does not repeat separately herein.
It changes for sentence, has terminated or when every when the execution completion test instruction of each server unit 21 represents test jobs The execution test instruction of one server unit 21, which does not complete and mistake occurs, represents test jobs the interruption ends, this two kinds of situations Lower corresponding each server unit 21 can all send the removal information to the processing unit 72, and the processing unit 72 is allowed to obtain The server unit 2 and the processing unit 72 removed required for knowing coordinates the data of the dis-tribution model and knows the required clothes removed 131 position of the test space of business device device 2.Then, it the processing unit 72 and then generates corresponding output mode and reaches the control Unit 71 processed, the control unit 71 perform the output mode and control corresponding second supply unit 14 and first supply unit 12, and then this is multiplied to carry and puts 3 and removes the workbench 11 with corresponding server unit 2.It is exactly the service in simple terms Device device 2 leads to the situation of test the interruption ends during the test, if there is testing completion or test crash, through at this Reason unit 72 generates corresponding output mode and 71 row of the control unit output mode and controls second supply unit 14 With the running of first supply unit 12, the server unit 2 of required removal can just be removed to the workbench 11, and in real time Follow-up server unit 2 to be measured is filled, not only save the time and promotes testing efficiency.
The dis-tribution model is performed by the control unit 71 and first supply unit 12 is sequentially controlled to drive and each multiplies load Plate 31 is moved on the second transmission module 141 of corresponding second supply unit 14, and controls corresponding second transmission module 141 Direction toward the corresponding test space 131 it is mobile and make it is each multiply carry wherein one second connection unit 33 for putting 3 with it is corresponding The clever thought that supply unit 5 combines, and can automate to dispense and each multiply support plate 31, and reach can be by 2 independence of each server unit Remove the corresponding test space 131.
Furthermore coordinate each supply unit 5 combining unit 51 can with it is each multiply carry any second connection unit for putting 3 33 combine formed electrical connection modularized designs, and make first connection unit 32 can supply electricity to corresponding server unit 21 and Each server unit 21 can be not necessary to artificial complicated wiring operation in performing test instruction in the corresponding test space 131 With avoiding artificial careless mistake, the time is effectively saved with improving testing efficiency.
It should be particularly noted that, the server admin control system 20 is also respectively arranged at the server dress comprising multiple Put the radio transmitting device 8 on 2, each radio transmitting device 8 to store the test data of corresponding server unit 21 and Reach the processing unit 72 of the central server control device 7.When each server unit 21 performs the data of test instruction Corresponding radio transmitting device 8 can be stored in, convenient for manager's follow-up management and analysis of data, and each radio transmitting device 8 Can with 72 connecting communication of processing unit, and make the processing unit 72 effectively control the test situation of each server unit 2 with As a result, the removal information transmitted by also can designing each server unit 21 according to actual demand certainly is permeable corresponding wireless Transmitting device 8 reaches the processing unit 72 and carries out subsequent removal operation.In this present embodiment, the radio transmitting device 8 For the aspect of carry-on access device (USB Dongle), but not limited to this.
Please refer to Fig. 2 and Fig. 7, the second embodiment system of server admin control system 20 of the present invention, substantially with this first Embodiment is identical, and different places is:The server unit 21 of each server unit 2 has a power supply serial connection port 211, And a signal serial connection port 212, it is each multiply carry the first connection unit 32 for putting 3 with one for any server unit 21 The first connecting portion 321 and one that power supply serial connection port 211 combines may connect to the signal serial connection port of any server unit 21 On 212 and the wireless signal receiver 323 connected can be communicated with the processing unit 72 of the central server control device 7.It is each Multiply and carry the conductive unit 34 for putting 3 and connect the electrically connected of the first connecting portion 321 and second connection unit 33 with one Part 341, each supply unit 5 are set to this including a combining unit 51 and one combined with the second any connection unit 33 Electric power transfer unit 52 on combining unit 51.
It is electrically connected when the combining unit 51 of each supply unit 5 combines to be formed with corresponding second connection unit 33, it should Processing unit 72 transmits the test and instructs the wireless signal receiver 323 through first connection unit 32 to corresponding server list Member 21, and then make each server unit 21 that can be instructed in performing the test in the corresponding test space 131.It to be illustrated Be, through it is each multiply carry the wireless signal receiver 323 of the first connection unit 32 for putting 3 and be incorporated into corresponding server unit On 21 signal serial connection port 212 and the design connected can be communicated with the processing unit 72, be not necessary to that physical signal biography is additionally configured Defeated mechanism can just receive the test that be assigned of the processing unit 72 through each wireless signal receiver 323 and instruct and make pair The server unit 21 answered performs test instruction, is not necessary to that physical signal transmission mechanism additionally is configured, and effectively simplifies server pipe Manage the entity installation exercise of control system 20.Certainly, each server unit 21 is performed when completing test instruction or when each Server unit 21 performs test instruction and does not complete and when the error occurs, can pass through corresponding wireless signal receiver 323 and pass Corresponding removal information is sent out to the processing unit 72.In this present embodiment, each wireless signal receiver 323 is wireless network The aspect of memory access is received, and is connected with Wi-Fi signal and the processing unit 72 communication, but not limited to this.It can also be according to reality Border use demand, by it is each multiply carry the first connection unit 32 for putting 3 and design with power line telecommunication function (HomePlug AV devices) module aspect, more simplify hardware configuration operation.
In conclusion server admin control system 20 of the present invention, controls first conveying single by the control unit 71 Member 12 drives each support plate 31 that multiplies to be moved on corresponding second transmission module 141, and can automate dispense it is each multiply support plate 31, And reach and the corresponding test space 131 independently can be sent into or removed to each server unit 2.Furthermore each power supply is coordinated to fill The modularized design for carrying any second connection unit 33 for putting 3 and being combined formation and being electrically connected can be multiplied with each by putting 5, and can be supplied electricity to Each server unit 21 and test instruction is performed in the corresponding test space 131, is not necessary to artificial complicated wiring operation, The time is effectively saved with improving testing efficiency.
Above in conjunction with attached drawing to the present invention specific embodiment and embodiment elaborate, but cannot with restriction The scope of the present invention, the impartial modification and transformation made in scope of the present invention patent, should all belong to patent of the present invention In the range of.

Claims (8)

1. a kind of server admin control system, applied to a work system, which includes a workbench, a setting In on the workbench the first supply unit, two be set on the workbench and two opposite positioned at first supply unit The second supply unit on the testing jig of side and the two setting testing jigs, each testing jig includes multiple test spaces, each Second supply unit includes multiple the second transmission modules being set on corresponding testing jig and in the test space, It is characterized in that:The server admin control system includes:
Multiple server units, each server unit are set to including a server unit and one on the server unit Recognition unit;
It is multiple to convey multiplying to carry and putting for the server unit, it is each multiply to carry to put be movably arranged at first conveying On unit, and including one to the bearing server unit and be movably arranged on first supply unit multiply support plate, One, which is set to this, multiplies on support plate and is set to this with the first connection unit combined for server unit electrical connection, two and multiply load In two opposite sides of plate and this is set to toward the second connection unit of the direction of neighbouring testing jig extension and one multiply support plate respectively Conductive unit that is interior and being electrically connected first connection unit with second connection unit formation, it is each to multiply support plate movably It is set on first supply unit and can be driven and be moved to by first supply unit any of second supply unit On second transmission module, and it is driven by corresponding second transmission module and is moved in the corresponding test space;
One is set to the reading device on the workbench and to read the recognition unit of the server unit;
Multiple to be set on the testing jig and be located at the supply unit in the test space respectively, each supply unit is located at In the corresponding test space and it can be combined to form electrical connection with each any second connection unit for carrying and putting that multiplies;
It is multiple to be set on the testing jig and be located at the arrangement for detecting in the test space respectively, each arrangement for detecting to It detects to carry multiplying in the corresponding test space and put;And
One, to control central server control device of the work system running with managing the server unit, uses including one With control control unit that the second transmission module of first supply unit and second supply unit moves and one with the control The processing unit of unit electrical connection processed, which can connect with the arrangement for detecting and reading device communication, described Server unit be incorporated into respectively it is described multiply moved on the first supply unit on support plate and be sequentially placed in the work system, When it is each multiply support plate and move closer to the reading device when, which reads the data of the recognition unit of each server unit And the data of the read recognition unit is reached into the processing unit, and the processing unit is according to the data of each recognition unit Coordinate the data of the arrangement for detecting and generate a dis-tribution model and reach the control unit, which has each service The test space corresponding to device unit, the control unit perform the dis-tribution model and first supply unit are sequentially controlled to drive often One, which multiplies support plate, is moved on the second transmission module of corresponding second supply unit, and controls corresponding second transmission module toward right The direction of the test space answered is mobile and each support plate that multiplies is moved to the corresponding test space, and makes each its that carry and put of multiplying In one second connection unit combined with corresponding supply unit, and make every one first connection unit that can supply electricity to corresponding server Unit, at this point, the processing unit can communicate connection and processing unit transmission one with each the first connection unit for carrying and putting that multiplies Test is instructed through first connection unit to corresponding server unit, and then makes each server unit can be in corresponding survey It tries to perform test instruction in space.
2. server admin control system according to claim 1, it is characterised in that:The server of each server unit Unit has an a power supply serial connection port and signal serial connection port, it is each multiply the first connection unit for carrying and putting have one for The first connecting portion and one that the power supply serial connection port of any server unit combines are connected for the signal of any server unit The second connecting portion that port combines, each conductive unit for carrying and putting that multiplies have one to connect the first connecting portion and the described second company The electrical connecting piece of order member and the connection second connecting portion and the signal connector of second connection unit, Mei Yi electricity Source device is set to the power transmission list on the combining unit including a combining unit combined with second connection unit, one Member and one be set on the combining unit and connect the central server control device processing unit signal transmission unit, Electrical connection is formed when the combining unit of each supply unit is combined with corresponding second connection unit, processing unit transmission should Test instruction is from the signal transmission unit toward the signal connector of corresponding conductive unit and through the second of first connection unit Connecting portion, to corresponding server unit, and then makes each server unit can be in corresponding survey with corresponding signal serial connection port It tries to perform test instruction in space.
3. server admin control system according to claim 1, it is characterised in that:The server of each server unit Unit has an a power supply serial connection port and signal serial connection port, it is each multiply the first connection unit for carrying and putting have one for First connecting portion and one that the power supply serial connection port of any server unit combines may connect to the signal of any server unit On serial connection port and the wireless signal receiver connected, Mei Yicheng can be communicated with the processing unit of the central server control device Carrying the conductive unit put has one to connect the first connecting portion and the electrical connecting piece of second connection unit, each power supply Device is set to the power transmission on the combining unit including a combining unit combined with the second any connection unit and one Unit forms electrical connection, the processing unit when the combining unit of each supply unit is combined with corresponding second connection unit It can transmit the test and instruct the wireless signal receiver through first connection unit to corresponding server unit, and then make each Server unit can perform test instruction in the corresponding test space.
4. the server admin control system according to any one of Claims 2 or 3, it is characterised in that:When each service Device unit performs when completing test instruction and can send a removal information to the processing unit of the central server control device, And the processing unit generates a corresponding output mode and reaches the control unit, which has the service of required removal The test space corresponding to device unit, the control unit perform the second of the output mode and corresponding second supply unit of control Transmission module drives the corresponding direction for multiplying support plate toward first supply unit mobile and makes the supply unit and corresponding second Connection unit detach, and make this multiply support plate be moved to first supply unit so that this is multiplied carry put and corresponding server fill It puts and removes the workbench;When each server unit perform the test instruction do not complete and when the error occurs, the shifting can be sent Go out information to the processing unit of the central server control device, and the processing unit generates the output mode and reaches the control Unit, which performs the output mode and the second transmission module drive of corresponding second supply unit of control is corresponding The direction for multiplying support plate toward first supply unit is mobile and the supply unit is made to be detached, and make this with corresponding second connection unit Multiply support plate and be moved to first supply unit and then multiply this to carry to put and remove the workbench with corresponding server unit.
5. the server admin control system according to any one of Claims 2 or 3, it is characterised in that:Also comprising multiple The radio transmitting device being respectively arranged on the server unit, each radio transmitting device is storing corresponding server The test data of unit and the processing unit for reaching the central server control device.
6. server admin control system according to claim 4, it is characterised in that:It is defeated that first supply unit includes one Enter section, one perform section, a deferent segment, multiple first conveyor modules and multiple second conveyor modules, first conveyor module by Control ground is rotated from the input section toward the direction of the deferent segment, and second conveyor module controllably can be toward any second conveying The direction movement of unit, the test space of the testing jig are located at two opposite sides of the execution section of first supply unit respectively, Second transmission module of every one second supply unit be respectively provided with it is multiple to drive it is each multiply support plate movement rot, Each support plate that multiplies sequentially is placed in the input section of first supply unit, and first conveyor module drives and each multiplies support plate The execution section that arrives through the reading device moves, and multiplies before support plate is moved to the corresponding test space when each, the control unit according to Sequence controls second conveyor module of first supply unit that each support plate that multiplies is driven to be moved to corresponding second supply unit The second transmission module on, and the rot of corresponding second transmission module is controlled to turn toward the direction of the corresponding test space It is dynamic and each support plate that multiplies is moved to the corresponding test space, and make it is each multiply carry wherein one second connection unit put with it is right The supply unit answered combines.
7. server admin control system according to claim 6, it is characterised in that:When each server unit has performed When being instructed into the test with each server unit perform the test instruction do not complete and when the error occurs, the processing unit generate The corresponding output mode and the control unit is reached, which performs the output mode and control second supply unit The second transmission module drive the corresponding direction for multiplying support plate toward first supply unit mobile and make the supply unit with it is corresponding The separation of the second connection unit, and this is made to multiply support plate and is moved in the execution section of first supply unit, the control unit is simultaneously First conveyor module of first supply unit is controlled to rotate and the corresponding support plate that multiplies is driven to be moved to this by the execution section Deferent segment, and then this is multiplied to carry to put and removes the workbench with corresponding server unit.
8. server admin control system according to claim 6, it is characterised in that:The work system is also comprising a setting In on the workbench and by the stopping unit that the control unit of the central server control device controls, which includes Multiple execution sections that can be controllably pierced by first supply unit and to stop the stopper for multiplying support plate movement.
CN201611108551.5A 2016-12-06 2016-12-06 Server management control system Active CN108156047B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611108551.5A CN108156047B (en) 2016-12-06 2016-12-06 Server management control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611108551.5A CN108156047B (en) 2016-12-06 2016-12-06 Server management control system

Publications (2)

Publication Number Publication Date
CN108156047A true CN108156047A (en) 2018-06-12
CN108156047B CN108156047B (en) 2021-05-25

Family

ID=62469824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611108551.5A Active CN108156047B (en) 2016-12-06 2016-12-06 Server management control system

Country Status (1)

Country Link
CN (1) CN108156047B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005069974A (en) * 2003-08-27 2005-03-17 Fujitsu Ltd Abnormality-notifying method in burn-in system, and the burn-in system
CN102129403A (en) * 2010-01-14 2011-07-20 鸿富锦精密工业(深圳)有限公司 Burn-in test method of embedded equipment
US20120327461A1 (en) * 2011-06-22 2012-12-27 Canon Kabushiki Kaisha Image forming apparatus, method for controlling same, and storage medium
CN103327060A (en) * 2012-03-19 2013-09-25 富士施乐株式会社 Information processing apparatus and information processing method
CN103383285A (en) * 2013-07-01 2013-11-06 上海理工大学 Temperature field measuring machine for working parts of servo type machine tool
CN104345231A (en) * 2013-07-24 2015-02-11 爱德万测试公司 High speed tester communication interface between test slice and trays

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005069974A (en) * 2003-08-27 2005-03-17 Fujitsu Ltd Abnormality-notifying method in burn-in system, and the burn-in system
CN102129403A (en) * 2010-01-14 2011-07-20 鸿富锦精密工业(深圳)有限公司 Burn-in test method of embedded equipment
US20120327461A1 (en) * 2011-06-22 2012-12-27 Canon Kabushiki Kaisha Image forming apparatus, method for controlling same, and storage medium
CN103327060A (en) * 2012-03-19 2013-09-25 富士施乐株式会社 Information processing apparatus and information processing method
CN103383285A (en) * 2013-07-01 2013-11-06 上海理工大学 Temperature field measuring machine for working parts of servo type machine tool
CN104345231A (en) * 2013-07-24 2015-02-11 爱德万测试公司 High speed tester communication interface between test slice and trays

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁伟伟,印朝辉,王兵,张鹏程,穆瑞芬: "基于无线自组网的载荷位移双端测量系统设计", 《计算机与数字工程》 *

Also Published As

Publication number Publication date
CN108156047B (en) 2021-05-25

Similar Documents

Publication Publication Date Title
KR102137850B1 (en) Automated interface apparatus and method for use in semiconductor wafer handling systems
CN106055373A (en) Automatic batch upgrading device and method for unmanned aerial vehicle firmware
CN103190210A (en) Component matching method, and component mounting system
CN106653097A (en) Test system for FLASH chips
CN107934520A (en) One kind automation feed system, method and storage device
CN105830551A (en) Component mounting line management device
CN103481230A (en) Tool and operation method thereof
CN107690759A (en) The monitoring method of optical module, optical mode block system and optical module
CN104202105A (en) Bluetooth device testing method and system
CN102565750A (en) Detecting method and system for electric energy meter work bin information
CN205487265U (en) Equipment operation board
CN104281142B (en) A kind of method and its system of automobile off-line test
CN104155882B (en) A kind of automatic gear-box control unit method for refreshing and system
CN113976940A (en) Drilling equipment and drilling method
CN101840223B (en) System and method for controlling production line
CN104175313A (en) Circuit board test monitoring system and method
EP3893621B1 (en) Machine management system for substrate-working machines
TWI598609B (en) Server Management Control System
CN104108257B (en) Modular card certificate production equipment
CN108156047A (en) Server admin control system
US7069105B2 (en) Process module for a handling station, handling station and procedure for the line-up of a handling station
CN102556438B (en) Not-full packing method and system of electric energy meter workbin
CN106646329A (en) Automatic detection device for buzzer of single-phase electric energy meter
CN106465513A (en) Configuring a plurality of sensor devices of a structure
KR101044531B1 (en) Apparatus and Method for checking and downloading terminal using multi interface

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant