CN108155595A - Cable duct of substation intelligent patrol system - Google Patents

Cable duct of substation intelligent patrol system Download PDF

Info

Publication number
CN108155595A
CN108155595A CN201711373205.4A CN201711373205A CN108155595A CN 108155595 A CN108155595 A CN 108155595A CN 201711373205 A CN201711373205 A CN 201711373205A CN 108155595 A CN108155595 A CN 108155595A
Authority
CN
China
Prior art keywords
inspecting robot
cable
clouds
cable duct
substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711373205.4A
Other languages
Chinese (zh)
Inventor
金叶欢
卢天健
赵阳
俞博文
姚紫嫣
丁虹引
金欧
潘盼
卢家龙
陈思宇
徐凡
郑回宫
李露莎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Linghai Power Supply Co Ltd
State Grid Corp of China SGCC
Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Zhejiang Linghai Power Supply Co Ltd
State Grid Corp of China SGCC
Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Linghai Power Supply Co Ltd, State Grid Corp of China SGCC, Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Zhejiang Linghai Power Supply Co Ltd
Priority to CN201711373205.4A priority Critical patent/CN108155595A/en
Publication of CN108155595A publication Critical patent/CN108155595A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines

Abstract

The invention discloses a kind of cable duct of substation intelligent patrol systems,Inspecting robot including the intelligent track being installed on above cable duct of substation and on intelligent track,The inspecting robot includes housing and the cradle head of two degrees of freedom extended downwardly from housing,The cradle head of two degrees of freedom is equipped with infrared camera and infrared radiation thermometer,Equipped with the power supply powered for the inspecting robot and the GPS positioning system for being automatically positioned the inspecting robot position in the housing,Wherein,Network high in the clouds sends patrol route and tour time information to intelligent track,The tour video of infrared camera acquisition is automatically uploaded to network high in the clouds,Infrared radiation thermometer calculates the surface temperature of cable and is automatically uploaded to network high in the clouds by measuring the infrared intensity that cable emits,Inspecting robot real time position is automatically uploaded to network high in the clouds by GPS positioning system.The present invention facilitates tour, and can find and record in time hidden danger defect, and cable fault is avoided to lead to power outage.

Description

Cable duct of substation intelligent patrol system
Technical field
The present invention relates to electric inspection process technologies, and in particular to cable duct of substation intelligent patrol system.
Background technology
Cable duct is the indispensable infrastructure of power grid, and cable is directed not only to power transmission in ditch, further relates to relay guarantor It the equipment such as protects, automatically control, communicate, measure and measures, be the nerve center of power grid, once cable breaks down, not only check Processing work difficulty is big, the time is long, it is also possible to relay protection or control loop be made to fail, the expansion that causes the accident even damages main set It is standby, it cannot resume production for a long time.Therefore, strengthen the status monitoring to cable duct and management, find cable hidden danger, protection in time Cable is injury-free, there is very important meaning to electric power netting safe running.
At present, there is many problems in use for cable duct, main as follows:
(1) cable fault causes the accident impacts such as power failure very big.Power transformation station cable furrow width is usually no more than 0.8 meter, deeply Up to 1.5 meters, up to tens of rice or even hundreds of meters, external environment is complicated, and rain erosion, toy bite cable, cause cable Damage, leads to equipment fault Frequent Accidents, substation is caused to have a power failure, and great inconvenience is brought to resident living and enterprise's production, It is serious to cause huge economic loss.
(2) cable duct patrol is important but difficult.Substation equipment patrol inspection is the most important work of power transformation operation maintenance personnel One of make, wherein the walkaround inspection work to cable duct inner cable equipment is most difficult to carry out, and because cable duct is often located in the ground, ditch Interior narrow space, operation maintenance personnel are frequently necessary to opening cable cover (weight 35-45kg) and the cable machinery in ditch are observed, see Whether the dangerous situations such as damaged, short circuit sparking are had.
(3) it finds and record hidden danger defect difficulty is big.It was found that after defect, operation maintenance personnel needs rely in narrow space Minicam is shot.The defects of due to insufficient space and insufficient light is difficult to careful observation cable machinery situation, fortune The apparent degree that dimension personnel are shot using camera also tends to be difficult to for analyzing defect, especially during night inspection, In the case of insufficient light, even if operation maintenance personnel carries flashlight, cooperation camera uses, and also tends to effectively to observe and remember The hidden danger situation of the cable machinery in cable duct is recorded, this causes very big difficulty to the discovery of cable machinery hidden danger, and also this is to fortune The work of dimension personnel brings very big inconvenience.
Invention content
Just it is to provide one for the deficiency and limitation, the technical problems to be solved by the invention of current cable duct status monitoring Kind of cable duct of substation intelligent patrol system automatically walk can monitor in narrow, complicated cable duct, and in real time record and The situation maked an inspection tour and found during cable duct is uploaded, so as to fulfill to the actual motion state of cable duct and the prison of running environment It surveys.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:Cable duct of substation intelligent patrol system, packet Include the intelligent track being installed on above cable duct of substation and the inspecting robot on intelligent track, the intelligence rail Road is connected with inspecting robot and network high in the clouds using wireless communication, and the intelligent track, which is equipped with, connect simultaneously band with inspecting robot The transmission line that dynamic inspecting robot is moved along intelligent track, the inspecting robot include housing and are extended downwardly from housing Cradle head of two degrees of freedom, the cradle head of two degrees of freedom are equipped with infrared camera and infrared radiation thermometer, and interior be equipped with of the housing is The power supply of inspecting robot power supply and the GPS positioning system for being automatically positioned the inspecting robot position, wherein, network high in the clouds Patrol route and tour time information are sent to intelligent track, the tour video of infrared camera acquisition is automatically uploaded to network cloud End, infrared radiation thermometer calculate the surface temperature of cable and are automatically uploaded to net by measuring the infrared intensity that cable emits Inspecting robot real time position is automatically uploaded to network high in the clouds by network high in the clouds, GPS positioning system.
Preferably, power transformation operation maintenance personnel accesses network high in the clouds by mobile phone app or webpage, checks that infrared camera acquires Tour video, cable temperature information and inspecting robot real time position.
It preferably, will be by GPS positioning system certainly if the cable temperature that infrared radiation thermometer senses is more than given threshold Dynamic record sites of heat generation, while alarm is sent out to webpage backstage or mobile phone app by network high in the clouds, remind power transformation O&M people Member.
Preferably, the power supply includes accumulator and the wireless charging module for accumulator charging, cable duct of substation Wireless charging transmitting module is installed in fixed position, when inspecting robot is moved to fixed position, wireless charging transmitting mould Block will charge automatically by wireless charging module for accumulator.
Preferably, the cradle head of two degrees of freedom is by two right-angled intersection servos controls.
Preferably, the transmission line of the intelligent track be carrier chain/conveyer belt, the inspecting robot by hanging ring with it is defeated Chain/conveying band connection is sent, the carrier chain/conveyer belt is driven by orbit motor, and the orbit motor is controlled by controller, described Controller is set with patrol route, the controller timing controlled orbit motor operation, so that inspecting robot completion timing, fixed Point is maked an inspection tour.
Preferably, the inspecting robot is also equipped with smoke sensor device.
The technical solution adopted by the present invention replaces artificial progress cable duct patrol by inspecting robot, wherein, intelligent track It can make an inspection tour inspecting robot completion timing, fixed point, infrared camera is by perceiving the change in location of infrared energy, Ke Yishi Existing dynamic object intelligence tracking function, its movement locus, track up can be captured, and maked an inspection tour after detecting mobile object automatically The tour video of journey shooting will be automatically uploaded to network high in the clouds, and power transformation operation maintenance personnel can also pass through mobile phone app or webpage control Camera processed observes the situation of cable whenever and wherever possible.Infrared radiation thermometer can not contact target and by measure cable emit it is red External radiation intensitometer calculates the surface temperature of cable, and all temperature informations can all be automatically recorded in network high in the clouds, if sensing Cable temperature is more than that given threshold will record sites of heat generation automatically by gps alignment systems, while to webpage backstage or hand Machine app sends out alarm, reminds power transformation operation maintenance personnel.Therefore the inspecting robot can be autonomous in narrow, complicated cable duct Walking, and by by high-definition camera, infrared radiation thermometer, realizing to the complete of the actual motion state of cable duct and running environment Face monitors, and tour personnel need to only check online makes an inspection tour video and cable temperature record, you can completes to the complete of cable duct of substation Orientation is maked an inspection tour, and situations such as facilitating tour, and can finding and record in time hidden danger defect, avoid cable fault causes to have a power failure Etc. accidents.
Description of the drawings
The invention will be further described with reference to the accompanying drawings and detailed description:
Fig. 1 is the system principle diagram of inspecting robot;
Fig. 2 is power supply wireless charging module schematic diagram;
Fig. 3 is the partial structural diagram of inspecting robot;
Fig. 4 is the structure diagram of chain;
Fig. 5 is the exterior chain plate structure schematic diagram of chain.
Specific embodiment
Cable duct of substation intelligent patrol system, including the intelligent track being installed on above cable duct of substation and installation Inspecting robot on intelligent track, the intelligent track are connected with inspecting robot with network high in the clouds using wireless communication, The intelligent track is equipped with and the transmission line that inspecting robot is moved along intelligent track, network cloud is connect and driven with inspecting robot It holds to intelligent track and sends patrol route and tour time information, intelligent track drives inspecting robot to be moved along intelligent track.
As shown in figures 1 and 3, the inspecting robot is equipped with arm processor, the infrared photography being connect with arm processor First 101, infrared radiation thermometer 102, communication module 103, memory 104, test interface circuit 105, further include the storage being powered Battery 106, the inspecting robot include housing 10 and the cradle head of two degrees of freedom 100 extended downwardly from housing, and described two certainly Infrared camera 101 and infrared radiation thermometer 102 are equipped with by degree holder, the cradle head of two degrees of freedom is by two right-angled intersection rudders Machine controls.Communication module 103, memory 104, test interface circuit 105 and accumulator 106 are installed in housing, separately Outside, the GPS positioning system for being automatically positioned the inspecting robot position is equipped in the housing, wherein, infrared camera acquisition It makes an inspection tour video and is automatically uploaded to network high in the clouds, infrared radiation thermometer calculates cable by measuring the infrared intensity that cable emits Surface temperature and be automatically uploaded to network high in the clouds, inspecting robot real time position is automatically uploaded to network by GPS positioning system High in the clouds.
Power transformation operation maintenance personnel accesses network high in the clouds by mobile phone app or webpage, checks the tour of infrared camera acquisition Video, cable temperature information and inspecting robot real time position.If the cable temperature that infrared radiation thermometer senses is more than setting Threshold value, will record sites of heat generation automatically by GPS positioning system, while by network high in the clouds to webpage backstage or mobile phone App sends out alarm, reminds power transformation operation maintenance personnel.
As shown in Fig. 2, accumulator uses wireless charging, the power supply of the inspecting robot in addition to above-mentioned accumulator, is gone back Including the wireless charging receiving module to charge for accumulator, cable duct of substation is equipped with wireless charging transmitting mould in fixed position Block, when inspecting robot is moved to fixed position, wireless charging transmitting module will be automatically by wireless charging receiving module Accumulator charges, and boost module, charging and protection module are equipped between wireless charging receiving module and accumulator.
The transmission line of the intelligent track is carrier chain/conveyer belt, and the inspecting robot passes through hanging ring and carrier chain/defeated Band connection is sent, the carrier chain/conveyer belt is driven by orbit motor, and the orbit motor is controlled by controller, the controller It is set with patrol route, the controller timing controlled orbit motor operation, so that inspecting robot completion timing, fixed point are patrolled Depending on.
With reference to shown in figure 4 and Fig. 5, in the present embodiment, transmission line, which uses, includes single carrier chain 20, the single conveying Chain includes the axis pin of outer plate in the inner plate being arranged in pairs and connection both sides, axis pin housing between the inner plate of both sides There is roller, sleeve is also arranged between the roller and axis pin, outer plate is equipped on the outside of adjacent two inner plate.In addition, in order to hang Inspecting robot is filled, suspension installing plate 201 is added in single carrier chain side, hole for hoist is equipped on suspension installing plate, uses It is connect in the hanging ring with inspecting robot.Hang installing plate 201 and include side plate and the straight panel vertical with side plate, the side plate with it is outer Chain board stacking and fixation.Certainly it will be appreciated by persons skilled in the art that carrier chain can also use the similar fashions such as conveyer belt It replaces.
Those skilled in the art can install sensor additional on the inspecting robot as needed, to monitor more environment Situation, such as smoke sensor device can be installed, for monitoring the imflammable gas concentration such as methane in cable duct, set temperature humidity Sensor is used to monitor environment temperature and humidity in cable duct.To realize to the complete of the actual motion state of cable duct and running environment Face monitors.
The information that the inspecting robot is monitored by memory storage further, by communication module, carries out wireless The information monitored for receiving the control information of network high in the clouds transmission, and can be sent to network high in the clouds by communication, be realized latent In hidden danger and the timely processing of alert, hidden danger and alert are eliminated in budding state, Redeem large economic loss.
Outside above preferred embodiment, the present invention also has other embodiments, and those skilled in the art can be according to this hair It is bright to make various changes and modifications, without departing from the spirit of the present invention, should all belong to defined in claims of the present invention Range.

Claims (7)

1. cable duct of substation intelligent patrol system, which is characterized in that including the intelligent rail being installed on above cable duct of substation Road and the inspecting robot on intelligent track, the intelligent track is with inspecting robot with network high in the clouds using wireless Communication connection, the intelligent track are equipped with and the transmission that inspecting robot is moved along intelligent track are connect and driven with inspecting robot Line, the inspecting robot include housing and the cradle head of two degrees of freedom that is extended downwardly from housing, on the cradle head of two degrees of freedom It is fixed equipped with the power supply powered for the inspecting robot and automatically in the housing equipped with infrared camera and infrared radiation thermometer The GPS positioning system of the position inspecting robot position, wherein, network high in the clouds sends patrol route and tour time to intelligent track Information, the tour video of infrared camera acquisition are automatically uploaded to network high in the clouds, what infrared radiation thermometer was emitted by measuring cable Infrared intensity calculates the surface temperature of cable and is automatically uploaded to network high in the clouds, and GPS positioning system is by inspecting robot Real time position is automatically uploaded to network high in the clouds.
2. cable duct of substation intelligent patrol system according to claim 1, which is characterized in that power transformation operation maintenance personnel passes through Mobile phone app or webpage access network high in the clouds, check tour video, cable temperature information and the tour of infrared camera acquisition Robot real time position.
3. cable duct of substation intelligent patrol system according to claim 1, which is characterized in that if infrared radiation thermometer senses The cable temperature arrived is more than given threshold, will record sites of heat generation automatically by GPS positioning system, while pass through network high in the clouds Alarm is sent out to webpage backstage or mobile phone app, reminds power transformation operation maintenance personnel.
4. cable duct of substation intelligent patrol system according to claim 1, which is characterized in that the power supply includes electric power storage Pond and the wireless charging module for accumulator charging, cable duct of substation are equipped with wireless charging transmitting mould in fixed position Block, when inspecting robot is moved to fixed position, wireless charging transmitting module will be electric power storage automatically by wireless charging module It charges in pond.
5. cable duct of substation intelligent patrol system according to claim 1, which is characterized in that the cradle head of two degrees of freedom By two right-angled intersection servos controls.
6. cable duct of substation intelligent patrol system according to claim 1, which is characterized in that the biography of the intelligent track Defeated line is carrier chain/conveyer belt, and the inspecting robot passes through hanging ring and carrier chain/conveying band connection, the carrier chain/conveying Band is driven by orbit motor, and the orbit motor is controlled by controller, and the controller is set with patrol route, the controller Timing controlled orbit motor is run, so that inspecting robot completion timing, fixed point are maked an inspection tour.
7. cable duct of substation intelligent patrol system according to claim 1, which is characterized in that the inspecting robot is also Smoke sensor device is installed.
CN201711373205.4A 2017-12-19 2017-12-19 Cable duct of substation intelligent patrol system Pending CN108155595A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711373205.4A CN108155595A (en) 2017-12-19 2017-12-19 Cable duct of substation intelligent patrol system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711373205.4A CN108155595A (en) 2017-12-19 2017-12-19 Cable duct of substation intelligent patrol system

Publications (1)

Publication Number Publication Date
CN108155595A true CN108155595A (en) 2018-06-12

Family

ID=62467655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711373205.4A Pending CN108155595A (en) 2017-12-19 2017-12-19 Cable duct of substation intelligent patrol system

Country Status (1)

Country Link
CN (1) CN108155595A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108724145A (en) * 2018-07-03 2018-11-02 武汉奋进智能机器有限公司 A kind of robot inspection tour system
CN109581131A (en) * 2019-01-22 2019-04-05 宁波市电力设计院有限公司 A kind of transformer fault detection device based on infrared imagery technique
CN113381511A (en) * 2021-06-02 2021-09-10 深圳市莱达四维信息科技有限公司 Online intelligent inspection system of transformer substation
CN113517651A (en) * 2021-09-14 2021-10-19 国网山东省电力公司莒县供电公司 Wireless sensor type cable trench comprehensive early warning device and method
CN114047749A (en) * 2021-10-22 2022-02-15 国网河北省电力有限公司检修分公司 Cable trench inspection system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101254593A (en) * 2008-04-11 2008-09-03 山东电力研究院 Vision navigated converting station patrolling robot
CN203812088U (en) * 2013-12-04 2014-09-03 国家电网公司 Transformer station cable trench tour monitoring system
CN104820423A (en) * 2015-03-13 2015-08-05 华北电力大学 Remote control cable trench intelligent patrol car
CN104991558A (en) * 2015-07-03 2015-10-21 国家电网公司 Cable trench automatic inspection device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101254593A (en) * 2008-04-11 2008-09-03 山东电力研究院 Vision navigated converting station patrolling robot
CN203812088U (en) * 2013-12-04 2014-09-03 国家电网公司 Transformer station cable trench tour monitoring system
CN104820423A (en) * 2015-03-13 2015-08-05 华北电力大学 Remote control cable trench intelligent patrol car
CN104991558A (en) * 2015-07-03 2015-10-21 国家电网公司 Cable trench automatic inspection device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108724145A (en) * 2018-07-03 2018-11-02 武汉奋进智能机器有限公司 A kind of robot inspection tour system
CN109581131A (en) * 2019-01-22 2019-04-05 宁波市电力设计院有限公司 A kind of transformer fault detection device based on infrared imagery technique
CN109581131B (en) * 2019-01-22 2024-01-09 宁波市电力设计院有限公司 Transformer fault detection device based on infrared imaging technology
CN113381511A (en) * 2021-06-02 2021-09-10 深圳市莱达四维信息科技有限公司 Online intelligent inspection system of transformer substation
CN113517651A (en) * 2021-09-14 2021-10-19 国网山东省电力公司莒县供电公司 Wireless sensor type cable trench comprehensive early warning device and method
CN113517651B (en) * 2021-09-14 2021-12-10 国网山东省电力公司莒县供电公司 Wireless sensor type cable trench comprehensive early warning device and method
CN114047749A (en) * 2021-10-22 2022-02-15 国网河北省电力有限公司检修分公司 Cable trench inspection system
CN114047749B (en) * 2021-10-22 2023-11-10 国网河北省电力有限公司检修分公司 Cable trench inspection system

Similar Documents

Publication Publication Date Title
CN108155595A (en) Cable duct of substation intelligent patrol system
CN205377160U (en) Inspection robot for cable tunnel
CN210233046U (en) Rail mounted utility tunnel patrols and examines robot and system
CN103823438B (en) Rail polling robot system
CN107014433A (en) A kind of intelligent O&M cruising inspection system in hydroelectric power plant and its method
CN107368083A (en) A kind of crusing robot and crusing robot system
CN108388194A (en) Railway machine room intelligent robot inspection system and its method
CN102967294B (en) Device for detecting and alarming tilting of pole tower
CN207884188U (en) Industrial enterprise's workshop tunneltron corridor switchgear house robot used for intelligent substation patrol
CN108262736A (en) Indoor intelligent crusing robot and system
CN108335468A (en) A kind of cable monitoring system
CN109048913A (en) A kind of rail polling robot ring shooting camera
CN103523676A (en) Real-time monitoring and pre-warning system for security risks of gantry crane operation of metro shield tunnel and working method of system
CN105353266A (en) Underground cable fault monitoring system and underground cable fault monitoring method
CN212750048U (en) Pipe gallery monitoring and alarming system based on Internet of things
CN107239072A (en) A kind of outdoor automatic tour inspection system
CN104632274A (en) Mining safety monitoring patrolling robot
CN111857178A (en) Unmanned aerial vehicle system for safety inspection of construction site of building construction
CN208314500U (en) Environmental monitoring system
CN204984484U (en) Colliery ventilation remote monitering system
CN110211339A (en) A kind of intelligent prewarning monitoring system and method for taking precautions against natural calamities based on cloud platform
CN207782276U (en) Cable duct of substation intelligent patrol robot
CN110933593B (en) Safety prevention and control system based on UWB technology
CN203812055U (en) Track inspection robot system
CN113246152A (en) Intelligent inspection robot for underground substation for mine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination