CN108152578A - Taiwan area intelligent electric energy meter power-off event active reporting and analysis method - Google Patents

Taiwan area intelligent electric energy meter power-off event active reporting and analysis method Download PDF

Info

Publication number
CN108152578A
CN108152578A CN201711350536.6A CN201711350536A CN108152578A CN 108152578 A CN108152578 A CN 108152578A CN 201711350536 A CN201711350536 A CN 201711350536A CN 108152578 A CN108152578 A CN 108152578A
Authority
CN
China
Prior art keywords
power
node
information
event
electric energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711350536.6A
Other languages
Chinese (zh)
Other versions
CN108152578B (en
Inventor
宋晓林
贺云隆
舒杰红
刘柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen D-Link Reaches Science And Technology Co Ltd
Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd
Original Assignee
Shenzhen D-Link Reaches Science And Technology Co Ltd
Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen D-Link Reaches Science And Technology Co Ltd, Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd filed Critical Shenzhen D-Link Reaches Science And Technology Co Ltd
Priority to CN201711350536.6A priority Critical patent/CN108152578B/en
Publication of CN108152578A publication Critical patent/CN108152578A/en
Application granted granted Critical
Publication of CN108152578B publication Critical patent/CN108152578B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/061Details of electronic electricity meters
    • G01R22/068Arrangements for indicating or signaling faults

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Telephonic Communication Services (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention discloses a kind of taiwan area intelligent electric energy meter power-off event active reporting and analysis method, and communication unit is powered using the super capacitor in high-speed dual mode communication unit in 60 seconds after power failure and carries out active reporting by the power-off event of communication unit generation intelligent electric energy meter using the expansion in the wireless interconnected intercommunication Extended Protocol of micropower.Carrier zero crossings phase identification technology in situation combination dual mode communication unit is reported to judge the place phase of power failure intelligent electric energy meter according to the practical power failure of taiwan area, using concentrator stop powering on event, disconnected phase event provides rational analysis method, accurately judge that full court area has a power failure, certain mutually has a power failure, certain building (unit) has a power failure and single (number) family power-off event, and then the active repairing for electric company provides technical support.

Description

Taiwan area intelligent electric energy meter power-off event active reporting and analysis method
Technical field
The invention belongs to intelligent electric meter technical field, more particularly to a kind of taiwan area intelligent electric energy meter power-off event active reporting And analysis method.
Background technology
Australian SGSPAA companies utilize the super capacitor in intelligent electric meter in intelligent electric meter dead electricity rear support 15 seconds, profit Intelligent electric meter outage information is reported into Outage Management Systems with " last one breath ", the timely repairing for distribution operation maintenance personnel provides Technical support improves power supply reliability, reduces failure and continue the security risk caused by the person and equipment, reduces client Complaint.At present although the intelligent electric meter in China has battery, but the battery only supports power cut-off recording function, it is impossible to complete intelligence electricity The active reporting of table power-off event, if you need to realize that the function needs the transformation and upgrade in terms of carrying out software and hardware to original intelligent electric meter (changing table), therefore can not be achieved intelligent electric meter power-off event active reporting function by existing intelligent electric meter.
Invention content
The purpose of the present invention is to provide a kind of taiwan area intelligent electric energy meter power-off event active reporting and analysis method, with solution Certainly above-mentioned technical problem.
When power-off event occurs in intelligent electric energy meter, the communication module of intelligent electric energy meter detects intelligence by hardware interface Supply voltage that can be between electric energy meter and communication module is 0V, and communication module maintains work using the electricity of super capacitor storage, raw Into the power-off event of the intelligent electric energy meter, and using micropower radio channel in the intelligent electric energy meter power-off event information active Offer the communication module of concentrator, the communication module of concentrator is by the interface with concentrator by the power failure thing of the intelligent electric energy meter Part is transmitted to concentrator, is finally uploaded to power information acquisition system by wireless public network by concentrator.
To achieve these goals, the present invention adopts the following technical scheme that:
Taiwan area intelligent electric energy meter power-off event active reporting and analysis method, including:
Certain single/number family power-off event report method:Have a power failure for certain single/number family, only collected comprising specified nodal information In the data structure of grouping, increase the path data field that a specified nodal information is collected;Network management center creates specify information When the node of collection sends information collection message grouping, information is collected path node message in message grouping and is also created simultaneously It builds;The information is collected message and is grouped in when being transmitted by specified path, it is all belong to information collect message grouping by way of it is all in Intermediate node all collects message grouping to information of passing by and carries out pressure parsing;If the information that information of passing by collects message grouping is collected Less than node, information collection stand-by period, i.e. information collect the new round data acquisition for being grouped the node that passes by packet time value twice Have not timed out, then message of passing by parsing node will directly pass by information collect message grouping continue propagate down;If pass by information The information of collection message grouping collects packet time value, and more than node, information collection stand-by period, then message of passing by parsing save twice Point will pack the information locally acquired, and mark the acquisition information block by local node ID, once the acquisition letter of low-level nodes The grouping of breath system by local node pass by passback when, the packaged information block that acquires of the node will directly be mounted in and pass by back It passes in message grouping;
Intelligent electric meter power failure report method in blocks:It is reported in the data structure of packet using specified node is only included, it is attached Add a specified path data field for reporting node;Centroid to it is specified node is reported to send reporting message grouping when, Path node message is also piggybacked simultaneously in the grouping of its reporting message sends;It is all belong to reporting message grouping by way of mediant All reporting message grouping of passing by is parsed according to acquisition node;If local node resident message needs reported data, pass by Message parses node other than the message grouping that will pass by continues to transmit, and also to carry this node reports information;If this Ground node resident message does not need to reported data, then message of passing by parsing node directly puts logical reporting message grouping and passes by;
Analysis method:According to the type that information is reported judge power failure.
Further, in certain single/number family power-off event report method, record neighbor node is added at electric energy meter module end and is stopped Electricity reports the function of information:All electric energy meter module ends can all record the status information that received neighbor node power failure reports; When neighbor node serves as the routing relay node for the active reporting that shuts off power in emergency, neighbor node is tight its neighbor node of record Emergency stop power information reports to Centroid along band.
Further, analysis method:
1) single user electric energy meter has a power failure
Single user electric energy meter reports power-off event without other electric energy meters in lower 5 minutes of concentrator, directly judges the electric energy meter For effective power-off event;
2) single-phase more family electric energy meters have a power failure
The affiliated phase of electric energy meter is first looked at, then checks whether the concentrator reports disconnected phase event if it is same-phase, if Not disconnected phase event then judges this several pieces of electric energy meters power failures and there are power-off conditions for doubtful other ammeters of the phase;If there is disconnected phase thing Part, then judge electric energy meter have a power failure and the phase other ammeters there are power-off conditions;
3) the more family electric energy meters of multiphase have a power failure
The affiliated phase of electric energy meter is first looked at, then checks whether the concentrator reports power-off event if it is leggy;If There is no concentrator that power-off event does not occur, then judge this several pieces of electric energy meters power failures and there are power failure feelings for doubtful other ammeters of the phase Condition;If there is concentrator that power-off event occurs, judge that full court area has a power failure;
4) concentrator power-off event
There is power-off event to report if there is concentrator that intelligent electric meter under power-off event and concentrator occurs, judge that full court area stops Electricity.
Further, telecommunication circuit is set in electric energy meter, and carrying out certain single/number family power-off event by telecommunication circuit reports It is reported with intelligent electric meter in blocks power failure.
Relative to the prior art, the invention has the advantages that:The present invention is directed to the power loss event of intelligent electric energy meter Active reporting problem, it is proposed that a kind of new to be changed without intelligent electric energy meter electric energy meter power loss event can be realized reporting electricity consumption in time The method of information acquisition system main website.This method utilizes the super capacitor in high-speed dual mode communication unit after power failure in 60 seconds Communication unit is powered and the expansion in the wireless interconnected intercommunication Extended Protocol of micropower is utilized to be generated by communication unit The power-off event of intelligent electric energy meter carries out active reporting;It is reported in situation combination dual mode communication unit according to the practical power failure of taiwan area Carrier zero crossings phase identification technology judges the place phase of power failure intelligent electric energy meter, using concentrator stop power on thing Part, disconnected phase event provide rational analysis method, accurately judge that full court area has a power failure, certain mutually has a power failure, certain building (unit) stops Electricity and single (number) family power-off event, and then the active repairing for electric company provides technical support.
Description of the drawings
Fig. 1 is the structure diagram of electric energy meter telecommunication circuit;
Fig. 2 reports schematic diagram for certain single (number) family power-off event;
Fig. 3 reports schematic diagram for intelligent electric meter in blocks power failure.
Specific embodiment
1:Dual mode communication unit increases super capacitor and capacitance type selecting
Using super capacitor reporting fault method after power failure proposed by the invention, exactly utilizing can make due to having a power failure suddenly It can not work into whole equipment, so the emphasis of HardwareUpgring, which is detection at once, has a power failure and increase super capacitor energy-storage, it is desirable that 60 second working time can be maintained after power-off, be related to electric energy meter communication module increase on the basis of original circuit power failure detection and Super capacitor energy-storage, is related to the change of original power supply circuit, and the electrical schematic diagram of specific transfer portion is as shown in Figure 1:
Electric energy meter communication module power failure reports circuit operation principle in the present invention:
In Fig. 1, it is 5.2V that 12V power supplys turn DC chips U100 decompressions through DC, and (electric current is prevented through Schottky diode D109 Reversely), current-limiting resistance R127, R158 is connected to super capacitor C134 anodes, and charging current is limited to 100mA, power-fail detection circuit It is followed by single-chip processor i/o mouth being judged by R159 and R160 partial pressures, after ammeter powers off, U100 ends are exported as 0V, super electricity Hold C134 to be powered module through D110, while single-chip processor i/o mouth detects that U100 outputs are 0V, is thus judged as low level It reports immediately.
Assuming that normal working voltage is 4.7V, minimum 2.95V, super capacitor maintains average current 40mA to put Electricity (emission current 100mA, receives electric current 30mA, transmitting-receiving duty ratio is 10:1).The value that super capacitor can be calculated is:
C=(Vwork+Vmin) It/ (Vwork2-Vmin2)
Wherein, C (F):The nominal capacity of electrochemical capacitance;
Vwork(V):Normal working voltage
Vmin(V):End operating voltage;
t(s):Continuous working period is required in circuit;
I(A):Load current;
It is computed:Hold time 10s when, need the super capacitor of capacity 0.23F, hold time 20s when, need capacity The super capacitor of 0.46F, hold time 30s when, need the super capacitor of capacity 0.69F.
According to the size and price of capacitance, select 1.5F capacitances, pressure resistance 5.5V super capacitor, dimensions is 18.75*5mm, can be put into the communication unit of state's net type formula specification, and dual mode communication unit can actually be maintained to work 65 second time.
2:Certain single (number) family power-off event report method
In the case that single (number) family of proposed by the invention certain has a power failure, wherein safety at power cut, power failure scene and influence user Quantity see the table below:
Serial number Safety at power cut before table Influence electricity consumption quantity (family) Power failure scene
1 Electric energy meter inlet wire failure or tripping One family, more families of dispersion Single (number) family has a power failure
Have a power failure for certain single (number) family, multi-layer network intermediate node information fast collecting method proposed by the invention, It is exactly using in the data structure originally only comprising specified nodal information collection grouping, increases a specified nodal information and collect Path data field.When network management center creates the node transmission information collection message grouping that specify information is collected, information is received Path node message is also created simultaneously in collection message grouping.Once the information is collected message and is grouped in by a specified path biography When defeated, it is all belong to information collect message grouping by way of all intermediate nodes, be required for pass by information collect message grouping carry out Force parsing.If the information that information of passing by collects message grouping collects packet time value less than node information collection twice waiting Between, i.e., information is collected the pass by new round data acquisition time of node of grouping and is not arrived, then message of passing by parsing node directly incited somebody to action Border information collects message grouping and continues to propagate;If the information collection packet time value that information of passing by collects message grouping is more than Information collection stand-by period, then message of passing by parse the information that node locally acquires packaging, and by local node to node twice ID marks the acquisition information block, once low-level nodes acquisition information system grouping by local node pass by return when, the section Packaged acquisition information block will be directly mounted in passback message grouping of passing by point.So among this multi-layer network Nodal information fast collecting method is a kind of predefined paths node information synchronization collection mode, and specified nodal information collection mode An only special case of this method.
It is described as follows:
In order to ensure the success rate of outage information upload, add in record neighbor node power failure and notifies at electric energy meter module end The function of breath, i.e., all modules can all record the status information that received neighbor node power failure reports.At this moment, even if some is saved Point reports failure 3 times, as long as its exigency report information is recorded by neighbor node, when neighbor node also function as it is other have promptly stop During the routing relay node of electric active reporting, the neighbor node information that the node of record can be shutted off power in emergency reports to center along band Node.Its schematic diagram is as shown in Figure 2:
In figure, when 1 reported data of node, adjacent node 2 and 3 all records 1 uploaded state, when on the needs of node 2 Count off according to when information can be reported to be reported to Centroid with band node 1, so as to ensure to report intelligent electric meter power-off event Percentage of head rice.
3:Intelligent electric meter power failure report method in blocks
In the case that certain building (unit) proposed by the invention has a power failure, wherein safety at power cut, power failure scene and influence is used Amount amount see the table below:
It is proposed by the present invention to carry reporting message group technology in batches for the power-off condition of this type, exactly utilize Originally it is only reported in the data structure of packet comprising specified node, an additional specified path data field for reporting node. Centroid to it is specified node is reported to send reporting message grouping when, path node message is also simultaneously in reporting message grouping It is piggybacked and sends.In this way it is all belong to reporting message grouping by way of intermediate data acquisition node be required for the reporting message that passes by Grouping is parsed.If local node resident message needs reported data, message of passing by parses node in addition to the message that will pass by Grouping continues transmission and goes down outside, and also to carry this node reports information;If local node resident message does not need to count off It only needs directly to put logical reporting message grouping according to, then message of passing by parsing node and pass by, so this incidentally routing algorithm It is a kind of predefined paths section node messages transmission mode, and specified node resident message reports a spy of only this method Example.Illustrate as shown in Figure 3:
Tu Zhong buildings 2 power off suddenly, then the node 3 in this building starts first to report, and node 2 records shape after receiving 3 report State, because node 2 will also report, node 2 simultaneously reports the state in the state and node 3 of itself, and final node 1 is received After the data reported to node 2, the reported data of itself is added, such three nodes report process can be on 1 time Completion is offered, efficiency is reported so as to improve.
4:Taiwan area intelligent electric meter power-off event comprehensive analysis method
1) single user electric energy meter has a power failure
Single user electric energy meter reports power-off event without other electric energy meters in lower 5 minutes of concentrator, directly judges the electric energy meter For effective power-off event.
2) single-phase more family electric energy meters have a power failure (with reference to the disconnected phase event of concentrator)
The affiliated phase of electric energy meter is first looked at, then checks whether the concentrator reports disconnected phase (voltage time if it is same-phase Road is abnormal) event, if not disconnected phase event, judge this several pieces of electric energy meters power failures and there are power failure feelings for doubtful other ammeters of the phase Condition;If there is disconnected phase event, judge electric energy meter have a power failure and the phase other ammeters there are power-off conditions.
3) the more family electric energy meters of multiphase have a power failure
The affiliated phase of electric energy meter is first looked at, then checks whether the concentrator reports power-off event if it is leggy;If There is no concentrator that power-off event does not occur, then judge this several pieces of electric energy meters power failures and there are power failure feelings for doubtful other ammeters of the phase Condition;If there is concentrator that power-off event occurs, judge that full court area has a power failure.
4) concentrator power-off event
If there is concentrator to occur there is polylith intelligent electric meter to there is power-off event to report under power-off event and concentrator, judge complete Taiwan area has a power failure.

Claims (4)

1. taiwan area intelligent electric energy meter power-off event active reporting and analysis method, which is characterized in that including:
Certain single/number family power-off event report method:Have a power failure for certain single/number family, only collecting grouping comprising specified nodal information Data structure in, increase the path data field that a specified nodal information is collected;Network management center creates specify information and collects Node send information collect message grouping when, information collect message grouping in path node message be also created simultaneously;It should Information is collected message and is grouped in when being transmitted by specified path, it is all belong to information collect message grouping by way of all middle nodes Point all collects message grouping to information of passing by and carries out pressure parsing;If the information that information of passing by collects message grouping collects grouping Less than node, information collection stand-by period, i.e. information collect the new round data acquisition time for being grouped the node that passes by time value twice Do not arrive, then message of passing by parsing node will directly pass by information collect message grouping continue propagate down;If information of passing by is collected The information of message grouping collects packet time value and is more than node information collection stand-by period twice, then message of passing by parsing node will The information locally acquired is packed, and the acquisition information block is marked by local node ID, once the acquisition information system of low-level nodes Grouping by local node pass by passback when, the node it is packaged acquire information block disappear passback of passing by directly is mounted in In breath grouping;
Intelligent electric meter power failure report method in blocks:Using only being reported in the data structure of packet comprising specified node, one is added A specified path data field for reporting node;Centroid to it is specified node is reported to send reporting message grouping when, thereon Path node message is also piggybacked simultaneously in report message grouping sends;It is all belong to reporting message grouping by way of intermediate data adopt Collection node all parses reporting message grouping of passing by;If local node resident message needs reported data, message of passing by For parsing node other than the message grouping that will pass by continues to transmit, also to carry this node reports information;If local section Point resident message does not need to reported data, then message of passing by parsing node directly puts logical reporting message grouping and passes by;
Analysis method:According to the type that information is reported judge power failure.
2. according to the method described in claim 1, it is characterized in that, in certain single/number family power-off event report method, in electric energy meter Module end adds in the function that record neighbor node power failure reports information:All electric energy meter module ends can all record received neighbours The status information that node power failure reports;When neighbor node serves as the routing relay node for the active reporting that shuts off power in emergency, neighbours Its neighbor node of record information of shutting off power in emergency is reported to Centroid by node along band.
3. according to the method described in claim 1, it is characterized in that, analysis method:
1) single user electric energy meter has a power failure
Single user electric energy meter reports power-off event without other electric energy meters in lower 5 minutes of concentrator, directly judges the electric energy meter to have Imitate power-off event;
2) single-phase more family electric energy meters have a power failure
The affiliated phase of electric energy meter is first looked at, then checks whether the concentrator reports disconnected phase event if it is same-phase, if not having Disconnected phase event then judges this several pieces of electric energy meters power failures and there are power-off conditions for doubtful other ammeters of the phase;If there is disconnected phase event, Judge electric energy meter have a power failure and the phase other ammeters there are power-off conditions;
3) the more family electric energy meters of multiphase have a power failure
The affiliated phase of electric energy meter is first looked at, then checks whether the concentrator reports power-off event if it is leggy;If no Power-off event does not occur for concentrator, then judges this several pieces of electric energy meters power failures and there are power-off conditions for doubtful other ammeters of the phase;If There is concentrator that power-off event occurs, then judge that full court area has a power failure;
4) concentrator power-off event
There is power-off event to report if there is concentrator that intelligent electric meter under power-off event and concentrator occurs, judge that full court area has a power failure.
4. according to the method described in claim 1, it is characterized in that, set telecommunication circuit in electric energy meter, pass through telecommunication circuit Certain single/number family power-off event is carried out to report to have a power failure with intelligent electric meter in blocks and report.
CN201711350536.6A 2017-12-15 2017-12-15 Method for actively reporting and studying and judging power failure events of intelligent electric energy meter in transformer area Active CN108152578B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711350536.6A CN108152578B (en) 2017-12-15 2017-12-15 Method for actively reporting and studying and judging power failure events of intelligent electric energy meter in transformer area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711350536.6A CN108152578B (en) 2017-12-15 2017-12-15 Method for actively reporting and studying and judging power failure events of intelligent electric energy meter in transformer area

Publications (2)

Publication Number Publication Date
CN108152578A true CN108152578A (en) 2018-06-12
CN108152578B CN108152578B (en) 2020-06-09

Family

ID=62467363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711350536.6A Active CN108152578B (en) 2017-12-15 2017-12-15 Method for actively reporting and studying and judging power failure events of intelligent electric energy meter in transformer area

Country Status (1)

Country Link
CN (1) CN108152578B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109253752A (en) * 2018-09-18 2019-01-22 中国电力科学研究院有限公司 Judgment method and system are interrupted in a kind of energy supply of measuring equipment
CN109327242A (en) * 2018-10-29 2019-02-12 国网北京市电力公司 The recognition methods in the affiliated platform area of electric energy meter and device
CN109444802A (en) * 2018-10-26 2019-03-08 山东德源电力科技有限公司 Intelligent electric meter detection method and device, equipment, medium
CN109557498A (en) * 2018-12-21 2019-04-02 中国电力科学研究院有限公司 A kind of electric energy meter stops the processing method of telegram in reply event
CN110082618A (en) * 2019-04-16 2019-08-02 国网湖南省电力有限公司 A kind of optimization method of area's power-off event concentrator active reporting
CN110087196A (en) * 2019-04-26 2019-08-02 深圳芯珑电子技术有限公司 A kind of micropower wireless network power failure report method
CN110244163A (en) * 2019-06-20 2019-09-17 国网湖南省电力有限公司 Stop send a telegram in reply event hierarchy intelligence analysis method and device in a kind of area
CN110515030A (en) * 2019-09-03 2019-11-29 国网青海省电力公司电力科学研究院 A kind of simulation detection system automating power failure reporting functions
CN110673079A (en) * 2019-08-23 2020-01-10 北京中电飞华通信股份有限公司 Platform district end sensing system and method
CN113313930A (en) * 2021-05-17 2021-08-27 南京林洋电力科技有限公司 Terminal power failure data reporting method
CN115276005A (en) * 2022-09-26 2022-11-01 广东电网有限责任公司中山供电局 Power failure event active reporting analysis method and system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008140316A (en) * 2006-12-05 2008-06-19 Chugoku Electric Power Co Inc:The Operation support system
CN103532837A (en) * 2012-09-26 2014-01-22 深圳市友讯达科技发展有限公司 Node information collection method, network system and nodes
CN104749473A (en) * 2015-04-21 2015-07-01 国家电网公司 Testing method capable of simulating field power utilization information collecting terminal power failure events
CN105590430A (en) * 2014-10-23 2016-05-18 国家电网公司 Multipath micropower wireless meter reading method and multipath micropower wireless meter reading system
CN105866527A (en) * 2016-03-18 2016-08-17 武汉盛帆电子股份有限公司 Intelligent electric energy meter with power failure event reporting function and application system thereof
CN106656312A (en) * 2016-11-17 2017-05-10 天津大学 Light packet switching network multi-link fault protection method with high average node degree
CN107490706A (en) * 2017-08-15 2017-12-19 国网重庆市电力公司电力科学研究院 A kind of novel intelligent electric energy meter based on super capacitor power supply

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008140316A (en) * 2006-12-05 2008-06-19 Chugoku Electric Power Co Inc:The Operation support system
CN103532837A (en) * 2012-09-26 2014-01-22 深圳市友讯达科技发展有限公司 Node information collection method, network system and nodes
CN105590430A (en) * 2014-10-23 2016-05-18 国家电网公司 Multipath micropower wireless meter reading method and multipath micropower wireless meter reading system
CN104749473A (en) * 2015-04-21 2015-07-01 国家电网公司 Testing method capable of simulating field power utilization information collecting terminal power failure events
CN105866527A (en) * 2016-03-18 2016-08-17 武汉盛帆电子股份有限公司 Intelligent electric energy meter with power failure event reporting function and application system thereof
CN106656312A (en) * 2016-11-17 2017-05-10 天津大学 Light packet switching network multi-link fault protection method with high average node degree
CN107490706A (en) * 2017-08-15 2017-12-19 国网重庆市电力公司电力科学研究院 A kind of novel intelligent electric energy meter based on super capacitor power supply

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
JESÚS GARCÍA PRADO等: "《Adopting smart meter events as key data for low-voltage network operation》", 《IEEE》 *
贺云隆等: "《电能表掉电和集中器停/上电事件测试方法研究》", 《陕西电力》 *
高新等: "《基于ML610Q496掉电事件采集器的设计》", 《电测与仪表》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109253752A (en) * 2018-09-18 2019-01-22 中国电力科学研究院有限公司 Judgment method and system are interrupted in a kind of energy supply of measuring equipment
CN109444802B (en) * 2018-10-26 2020-12-11 山东德源电力科技股份有限公司 Intelligent electric meter detection method and device, equipment and medium
CN109444802A (en) * 2018-10-26 2019-03-08 山东德源电力科技有限公司 Intelligent electric meter detection method and device, equipment, medium
CN109327242A (en) * 2018-10-29 2019-02-12 国网北京市电力公司 The recognition methods in the affiliated platform area of electric energy meter and device
CN109327242B (en) * 2018-10-29 2022-05-10 国网北京市电力公司 Identification method and device for transformer area of electric energy meter
CN109557498A (en) * 2018-12-21 2019-04-02 中国电力科学研究院有限公司 A kind of electric energy meter stops the processing method of telegram in reply event
CN110082618A (en) * 2019-04-16 2019-08-02 国网湖南省电力有限公司 A kind of optimization method of area's power-off event concentrator active reporting
CN110087196A (en) * 2019-04-26 2019-08-02 深圳芯珑电子技术有限公司 A kind of micropower wireless network power failure report method
CN110244163A (en) * 2019-06-20 2019-09-17 国网湖南省电力有限公司 Stop send a telegram in reply event hierarchy intelligence analysis method and device in a kind of area
CN110244163B (en) * 2019-06-20 2022-03-11 国网湖南省电力有限公司 Intelligent stage-level studying and judging method and device for power failure and recovery events of transformer area
CN110673079A (en) * 2019-08-23 2020-01-10 北京中电飞华通信股份有限公司 Platform district end sensing system and method
CN110673079B (en) * 2019-08-23 2021-12-14 北京中电飞华通信股份有限公司 Platform district end sensing system and method
CN110515030A (en) * 2019-09-03 2019-11-29 国网青海省电力公司电力科学研究院 A kind of simulation detection system automating power failure reporting functions
CN113313930A (en) * 2021-05-17 2021-08-27 南京林洋电力科技有限公司 Terminal power failure data reporting method
CN115276005A (en) * 2022-09-26 2022-11-01 广东电网有限责任公司中山供电局 Power failure event active reporting analysis method and system

Also Published As

Publication number Publication date
CN108152578B (en) 2020-06-09

Similar Documents

Publication Publication Date Title
CN108152578A (en) Taiwan area intelligent electric energy meter power-off event active reporting and analysis method
CN102841293B (en) Fault positioning system for 10kV power distribution network circuit
CN209167449U (en) Telegraph circuit in a kind of power failure applied to HPLC carrier communication module
CN112816917B (en) Transformer impact monitoring device
CN202939301U (en) Remote monitoring diagnosis system of electric energy metering device
CN203149067U (en) On-line monitoring device for medium-voltage overhead line of distribution network
CN109687590A (en) A kind of be classified stops send a telegram in reply report method, system
CN101860442A (en) Exchanger, power supply device and method for realizing power-down remote-end alarm
CN104678348A (en) Remote monitoring and diagnosing method for electric energy metering device with high efficiency
CN103887876A (en) Power distribution network monitoring management system based on 3G communication technology
CN102842962A (en) Power energy information management system
CN206193157U (en) Fault indicator and distribution lines fault location system suitable for low temperature environment
CN207264576U (en) Bandwidth carrier collector
CN104714206A (en) Remote monitoring and diagnosing method for electric energy metering device capable of finding faults timely
CN201134689Y (en) Circuit breaking time-delaying work circuit for mining high-voltage protector
CN108519503A (en) Intelligent electric energy meter based on NB-IOT communications
CN201918003U (en) Wireless low-voltage meter-reading monitoring concentrator
CN201682327U (en) Leakage protector remote control system
CN104656050A (en) Manpower-saving remote monitoring and diagnosing method for electric energy metering device
CN104614700A (en) Remote monitoring and diagnosing method for electric energy metering device with good real-time performance
CN202421844U (en) Monitoring and managing system for oil engine
CN201682328U (en) Intelligent control terminal of leakage protector remote control system
CN210380379U (en) Power failure fault automatic monitoring device for power supply system
CN211266589U (en) Power supply device of distribution network terminal and distribution network terminal
CN202455140U (en) Device for realizing large-capacity battery pack by adopting small-capacity batteries connected in parallel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant