CN108150208A - A kind of construction method of tunnel total bolt support - Google Patents

A kind of construction method of tunnel total bolt support Download PDF

Info

Publication number
CN108150208A
CN108150208A CN201810043014.XA CN201810043014A CN108150208A CN 108150208 A CN108150208 A CN 108150208A CN 201810043014 A CN201810043014 A CN 201810043014A CN 108150208 A CN108150208 A CN 108150208A
Authority
CN
China
Prior art keywords
tunnel
anchor
slurry
anchor cable
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810043014.XA
Other languages
Chinese (zh)
Inventor
徐永良
周德军
卢茂才
陶友祝
王涛
邵山
彭辉
丁庆维
童猛
姜志明
张辉
蔡乐乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Donghua Ouke Mine Support Equipment Co Ltd
Original Assignee
Huainan Donghua Ouke Mine Support Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Donghua Ouke Mine Support Equipment Co Ltd filed Critical Huainan Donghua Ouke Mine Support Equipment Co Ltd
Priority to CN201810043014.XA priority Critical patent/CN108150208A/en
Publication of CN108150208A publication Critical patent/CN108150208A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts

Abstract

The invention discloses a kind of construction methods of tunnel total bolt support, include the following steps, 1) fixation of anchor pole;2) anchoring face whitewashing;3) anchoring face maintenance;4) slip casting slurry makes;5) slip casting;6) tunnel conserves.The present invention carries out grouting and reinforcing to broken country rock, and broken country rock is made, which to form multilayer arch, increases pressure-proof and snap-resistent, extends the length of service in tunnel, reduces maintenance rate and reduce labor intensity, saved cost.

Description

A kind of construction method of tunnel total bolt support
Technical field
The present invention relates to laneway support method, more particularly to a kind of construction method of tunnel total bolt support.
Background technology
At present, in the supporting of underworkings, mostly using the synthesis of anchor net, U-shaped canopy and whitewashing, to realize to tunnel Supporting.Not only technique is cumbersome for this support pattern, and difficulty of construction is big, and labor intensity is big, and waste of materials influences construction speed And work efficiency, cost are high, and due to being frequently present of broken high stress country rock and country rock crack around tunnel, rubble not by Solidification is got up, and be easy to cause roof fall side falling accident, in turn results in life injury.
Invention content
The technical problems to be solved by the invention are to provide a kind of construction method of tunnel total bolt support, are come using this method Broken country rock is freezing together by supported laneway, and arch pressure-resistent ring is formed around tunnel, carrier is become supporting body, is become Passive protecting is active support, improves supporting effect.
To achieve the above object, the present invention provides following technical solution:A kind of construction method of tunnel total bolt support, packet Include following steps:
1) drills out the anchoring of anchor pole or anchor cable according to the design requirement of roadway support in the breaking surrounding rock around tunnel Hole, anchor pole or anchor cable use hollow anchor pole or anchor cable;
2) anchor pole or anchor cable are installed in anchor hole by, and apply pretightning force to anchor pole or anchor cable, make anchor pole or anchor cable tight Gu in anchor hole;
3) makes the slurry of grouting, while slurry is made, by pressurize pipeline by the slip casting end of anchor pole or anchor cable It is connected with grouting pump;
4) is after slurry completes, and by grouting pump slip casting into anchor pole or anchor cable, slurry is filled with broken around tunnel In the gap of broken country rock so that the fractured rock around tunnel is freezing together, and forms arch pressure-resistent ring;
5) carries out supporting maintenance after the breaking surrounding rock solidification around tunnel to the medial surface in tunnel.
Preferably, it is solid on the outer ring of the breaking surrounding rock around tunnel when anchor pole or anchor cable are fixed in anchor hole Surely upper metal mesh and billet, billet are fixed on the outer peripheral surface of the fractured rock around tunnel, and metal mesh is set on steel pad The outside of plate.
Preferably, after metal mesh is fixed, gunite is carried out around tunnel, the slurry receives inorganic speed for long rice Solidifying injection composite mortar, after gunite around tunnel, to being conserved around tunnel, after slurry desiccation, slurry is in lane Road surface forms one layer of sealant.
Preferably, the slip casting slurry of the making in step 3) receives mining inorganic reinforcing composite mortar for long rice.
Preferably, long rice receive it is mining it is inorganic reinforce composite mortar formula be, ash concrete 20-90%, wollastonite powder 1-20%, Sulphate aluminium cement 1-40%, slag powders 1-20%, water-reducing agent 0.5-1% and plastic expansion agent 0.5-1%.
Using above-mentioned technical proposal, the present invention is first carried out at reinforcing the country rock around tunnel using anchor pole or anchor cable Reason, then the slip casting into the crack of country rock by anchor pole or anchor cable so that heavily stressed breaking surrounding rock is freezing together, and forms multilayer Arch structure is combined, so as to expand effective carrying range of supporting construction, the globality and bearing capacity of supporting construction is improved, reaches Improve the purpose of the reinforcing laneway of high stress breaking surrounding rock.The present invention carries out grouting and reinforcing to broken country rock, makes broken enclose Rock, which forms multilayer arch, increases pressure-proof and snap-resistent, extends the length of service in tunnel, reduces maintenance rate and reduces labor intensity, saved into This.
Specific embodiment
Embodiment 1
The invention discloses a kind of construction method of tunnel total bolt support, in big cross section, area of stress concentration, pressure is big, edge It is with obvious effects in the high roadway support of Kong Liu lanes, repair rate, it can also be used to the supporting in electromechanical chamber crosspoint, permanent openings.
The specific method for protecting support step of the present invention is as follows:
1) drills out the anchoring of anchor pole or anchor cable according to the design requirement of roadway support in the breaking surrounding rock around tunnel Hole, anchor pole or anchor cable use hollow anchor pole or anchor cable.
2) anchor pole or anchor cable are installed in anchor hole by, and apply pretightning force to anchor pole or anchor cable, make anchor pole or anchor cable tight It is Gu fixed on the outer ring of the breaking surrounding rock around tunnel when anchor pole or anchor cable are fixed in anchor hole in anchor hole Upper metal mesh and billet, billet are fixed on the outer peripheral surface of the fractured rock around tunnel, and metal mesh is set on billet Outside.
3) is after metal mesh is fixed, and carries out gunite around tunnel, and the slurry receives inorganic rapid hardening spray for long rice Composite mortar is penetrated, after gunite around tunnel, to being conserved around tunnel, after slurry desiccation of whitewashing, slurry is in lane Road surface forms one layer of sealant.By the sealant good airproof performance that is formed of whitewashing, surfacing, smooth, intensity is big, on the one hand The appearance around tunnel is improved, the opposing party improves integer support intensity, and the sealant is in subsequent anchor shaft anchor cable slip casting When, sealing function can be played to slip casting slurry, pressurize when realizing to the slip casting of country rock crack.
4) makes the slurry of grouting, while slurry is made, by pressurize pipeline by the slip casting end of anchor pole or anchor cable It is connected with grouting pump.The slip casting slurry of making receives mining inorganic reinforcing composite mortar for long rice, long rice receive it is mining inorganic plus Gu the formula of composite mortar is, ash concrete 20-90%, wollastonite powder 1-20%, sulphate aluminium cement 1-40%, slag powders 1- 20%th, water-reducing agent 0.5-1% and plastic expansion agent 0.5-1%, the slip casting slurry produced using the formula, have ungauged regions, The advantages of microdilatancy, high fluidity, permeability are by force, resistance to compression grade is high.
5) is after slurry completes, and by grouting pump slip casting into anchor pole or anchor cable, slurry is filled with broken around tunnel In the gap of broken country rock so that the fractured rock around tunnel is freezing together, and forms arch pressure-resistent ring.
6) carries out supporting maintenance after the breaking surrounding rock solidification around tunnel to the medial surface in tunnel.
The present invention carries out consolidation process, then pass through anchor pole or anchor using anchor pole or anchor cable to the country rock around tunnel first Rope slip casting into the crack of country rock so that heavily stressed breaking surrounding rock is freezing together, and multiple layer combination arch structure is formed, so as to expand Effective carrying range of big supporting construction improves the globality and bearing capacity of supporting construction, reaches to improve high stress and crush and enclose The purpose of the reinforcing laneway of rock.The present invention carries out grouting and reinforcing to broken country rock, and broken country rock is made, which to form multilayer arch, to be increased Pressure-proof and snap-resistent extends the length of service in tunnel, reduces maintenance rate and reduces labor intensity, has saved cost.
What has been described above is only a preferred embodiment of the present invention, it is noted that for those of ordinary skill in the art For, without departing from the concept of the premise of the invention, various modifications and improvements can be made, these belong to the present invention Protection domain.

Claims (5)

1. a kind of construction method of tunnel total bolt support, which is characterized in that include the following steps:
1) drills out the anchor hole of anchor pole or anchor cable, anchor according to the design requirement of roadway support in the breaking surrounding rock around tunnel Bar or anchor cable use hollow anchor pole or anchor cable;
2) anchor pole or anchor cable are installed in anchor hole by, and apply pretightning force to anchor pole or anchor cable, are fastened on anchor pole or anchor cable In anchor hole;
3) makes the slurry of grouting, while slurry is made, by pressurize pipeline by the slip casting end of anchor pole or anchor cable with noting Stock pump connects;
4) is after slurry completes, and by grouting pump slip casting into anchor pole or anchor cable, what slurry was filled with around tunnel broken encloses In the gap of rock so that the fractured rock around tunnel is freezing together, and forms arch pressure-resistent ring;
5) carries out supporting maintenance after the breaking surrounding rock solidification around tunnel to the medial surface in tunnel.
2. the construction method of tunnel total bolt support according to claim 1, which is characterized in that fixed by anchor pole or anchor cable Metal mesh and billet are fixed when in anchor hole, on the outer ring of the breaking surrounding rock around tunnel, billet is fixed on The outer peripheral surface of fractured rock around tunnel, metal mesh are set on the outside of billet.
3. the construction method of tunnel total bolt support according to claim 2, which is characterized in that after metal mesh is fixed, Carry out gunite around tunnel, the slurry receives inorganic rapid hardening for long rice and sprays composite mortar, branch of whitewashing around tunnel After shield, to being conserved around tunnel, after slurry desiccation, slurry forms one layer of sealant on tunnel surface.
4. the construction method of tunnel total bolt support according to claim 3, which is characterized in that making in step 3) Slip casting slurry receives mining inorganic reinforcing composite mortar for long rice.
5. the construction method of tunnel total bolt support according to claim 4, which is characterized in that long rice receives mining inorganic reinforcing The formula of composite mortar is, ash concrete 20-90%, wollastonite powder 1-20%, sulphate aluminium cement 1-40%, slag powders 1-20%, Water-reducing agent 0.5-1% and plastic expansion agent 0.5-1%.
CN201810043014.XA 2018-01-17 2018-01-17 A kind of construction method of tunnel total bolt support Pending CN108150208A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810043014.XA CN108150208A (en) 2018-01-17 2018-01-17 A kind of construction method of tunnel total bolt support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810043014.XA CN108150208A (en) 2018-01-17 2018-01-17 A kind of construction method of tunnel total bolt support

Publications (1)

Publication Number Publication Date
CN108150208A true CN108150208A (en) 2018-06-12

Family

ID=62461684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810043014.XA Pending CN108150208A (en) 2018-01-17 2018-01-17 A kind of construction method of tunnel total bolt support

Country Status (1)

Country Link
CN (1) CN108150208A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775252A (en) * 2018-07-26 2018-11-09 淮南矿业(集团)有限责任公司 The supporting construction and method for protecting support in Deep Soft Rock tunnel
CN116044462A (en) * 2023-04-03 2023-05-02 山东能源集团西北矿业有限公司 Anchoring posture control method of anchor rod

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101509386A (en) * 2009-03-24 2009-08-19 于守东 Composite support anchor rod and construction method thereof
CN102733832A (en) * 2012-07-05 2012-10-17 大同煤矿集团有限责任公司 Support method for extra-thick broken coal seam employing nest anchored ropes
CN103075170A (en) * 2013-01-14 2013-05-01 中国矿业大学 Method for controlling surrounding rock deformation of gateway subjected to repeated overhead mining by using hollow grouting anchor cable
CN103422869A (en) * 2013-08-22 2013-12-04 山东科技大学 Jet grouting and anchoring comprehensive construction method of soft rock tunnel
CN104030629A (en) * 2014-06-26 2014-09-10 中国地质大学(武汉) Reinforcing slurry for semi-rigid base and grouting method of reinforcing slurry
CN104879149A (en) * 2014-12-31 2015-09-02 龙口矿业集团有限公司 Bolt-grouting support method for roadway in three-soft high-stress region
CN105350993A (en) * 2015-10-08 2016-02-24 河南理工大学 Tunnel full-section anchor cable and beam injection combined supporting technology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101509386A (en) * 2009-03-24 2009-08-19 于守东 Composite support anchor rod and construction method thereof
CN102733832A (en) * 2012-07-05 2012-10-17 大同煤矿集团有限责任公司 Support method for extra-thick broken coal seam employing nest anchored ropes
CN103075170A (en) * 2013-01-14 2013-05-01 中国矿业大学 Method for controlling surrounding rock deformation of gateway subjected to repeated overhead mining by using hollow grouting anchor cable
CN103422869A (en) * 2013-08-22 2013-12-04 山东科技大学 Jet grouting and anchoring comprehensive construction method of soft rock tunnel
CN104030629A (en) * 2014-06-26 2014-09-10 中国地质大学(武汉) Reinforcing slurry for semi-rigid base and grouting method of reinforcing slurry
CN104879149A (en) * 2014-12-31 2015-09-02 龙口矿业集团有限公司 Bolt-grouting support method for roadway in three-soft high-stress region
CN105350993A (en) * 2015-10-08 2016-02-24 河南理工大学 Tunnel full-section anchor cable and beam injection combined supporting technology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775252A (en) * 2018-07-26 2018-11-09 淮南矿业(集团)有限责任公司 The supporting construction and method for protecting support in Deep Soft Rock tunnel
CN116044462A (en) * 2023-04-03 2023-05-02 山东能源集团西北矿业有限公司 Anchoring posture control method of anchor rod

Similar Documents

Publication Publication Date Title
CN109372556B (en) Sandwich arch suitable for high-stress soft rock tunnel surrounding rock support and construction method
CN102002956B (en) Multi-level fully-closed reinforcement technology of exposed fault zone of excavated side slope
CN105178981A (en) Total-section closed type deep-shallow coupling yielding, bolting-grouting and supporting method for incompact and fractured soft-rock roadway
CN108019222A (en) A kind of tunnel lining structure filled using haydite and construction method
CN106593467A (en) Supporting method for underground soft rock roadway of coal mine
CN108005675A (en) The dynamic superposition coupling supporting method and supporting construction in a kind of fault belt tunnel
CN107246273A (en) Deep tunnel wire rope net rubber concrete spraying support structure and its construction method
CN105113434B (en) On remove supporting construction and construction method across operation highway spandrelless arch bridge framing
CN101144386A (en) Disposable flexible template device and construction method thereof
CN208280965U (en) Coal mine deep well tunnel smooth surface concrete spraying support structure
CN106523003A (en) Rigid-flexible coupling energy absorbing support technology suitable for deep mining roadway
CN102562093A (en) Full-length anchoring supporting method with intensive resin anchor rod and anchor-shotcrete net
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN108150208A (en) A kind of construction method of tunnel total bolt support
CN109736850A (en) A kind of tunnel shell arch combination strength bearing structure and its construction method
CN209704587U (en) A kind of tunnel shell arch combination strength bearing structure
CN204875812U (en) Broken alternating layers formula composite rock matter side slope high pressure of soft or hard washes plants anchor and recharges and synthesize ecological protective structure
CN104863382A (en) Roof panel reinforcing method
CN108547636B (en) A kind of double-shielded TBM combined bolting and shotcrete structure and its construction method
CN108999196A (en) In-network processing construction method for supporting between a kind of stake
CN109931077A (en) Support system and its construction method for Segment rehabilitation
CN109468943B (en) The anti-ejection system of vertical prestressed reinforcement and its construction method with function of seismic resistance
CN210977516U (en) A scour protection energy release composite support structure for rock burst mine tunnel
CN210317324U (en) Underground works struts antiknock integrated composite construction
CN205100993U (en) Ore removal level drift section supporting construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180612