CN109736850A - A kind of tunnel shell arch combination strength bearing structure and its construction method - Google Patents

A kind of tunnel shell arch combination strength bearing structure and its construction method Download PDF

Info

Publication number
CN109736850A
CN109736850A CN201910161192.7A CN201910161192A CN109736850A CN 109736850 A CN109736850 A CN 109736850A CN 201910161192 A CN201910161192 A CN 201910161192A CN 109736850 A CN109736850 A CN 109736850A
Authority
CN
China
Prior art keywords
layer
anchor bar
arch
tunnel
strength
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910161192.7A
Other languages
Chinese (zh)
Other versions
CN109736850B (en
Inventor
肖同强
翟俨伟
许磊
李宝富
韩小光
陈恒光
张凤琴
尹士花
李振峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201910161192.7A priority Critical patent/CN109736850B/en
Publication of CN109736850A publication Critical patent/CN109736850A/en
Application granted granted Critical
Publication of CN109736850B publication Critical patent/CN109736850B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

A kind of tunnel shell arch combination strength bearing structure, including tunnel, the section on tunnel top is semicircular arch or skene arch, country rock outside tunnel is followed successively by the country rock outside the country rock within the scope of relaxation zone and relaxation zone within the scope of 1m from inside to outside, the inner wall of country rock within the scope of relaxation zone is provided with branch protective case, and the country rock outside the country rock and relaxation zone within the scope of relaxation zone within the scope of 1m is internally provided with supporting arch.The invention also discloses the construction methods that a kind of tunnel shell encircles combination strength bearing structure.The present invention effectively prevents the loss of strength of country rock in relaxation zone, and forms strong anchoring bearing structure within the scope of relaxation zone and its outside 1m, significantly improves improving stability of surrounding rocks in roadway, and relaxation zone is effectively inhibited to extend to deep;Effectively prevent cracking and the destruction of concrete spray coating;Guarantee is provided steadily in the long term for roadway surrounding rock.

Description

A kind of tunnel shell arch combination strength bearing structure and its construction method
Technical field
The invention belongs to mine engineering roadway surrounding rock control technical fields, and in particular to a kind of tunnel shell arch combination strength is held Carry structure and its construction method.
Background technique
With the development of colliery tunnel support technology, suspension roof support, cable bolting and grouting reinforcement technique become coal mine The cost-effective support form in tunnel.In deep high stress and under the conditions of complicated mining induced stress, Popularization And Development is high-strength in recent years Anchor pole high pretightening force support technology achieves good supporting effect in application at the scene, but under the conditions of weak surrounding rock, still Occur large area spray-up cracking, supporting construction fracture tearing, country rock continue the tunnels unstable phenomenons such as rheology, to find out its cause, lead Have the following problems: 1. concrete spray coating is relatively thin, and rigidity and flexible deficiency cannot resist the moderate finite deformation of country rock, cause There is phenomena such as spray-up cracking, metal mesh tearing;2. roadway support intensity wretched insufficiency, bearing capacity of the wall rock loss is serious, causes Extend relaxation zone to country rock deep, until anchoring bearing structure fails and tunnel unstability occurs;3. by traditional support idea It influences, anchor rod strength, pretightning force, support density etc. are not up to corresponding requirements, cause initial deformation that cannot effectively control, and increase Later maintenance difficulty is added.
Summary of the invention
The present invention in order to solve shortcoming in the prior art, provide a kind of tunnel shell arch combination strength bearing structure and Its construction method, it is intended to " tough concrete-shell " and " high-strength anchoring Load -carring arch " be formed by supporting for arched tunnel, the two In conjunction with formation " shell arch combination strength bearing structure ", effectively solve that existing in the prior art " concrete spray coating cracking, anchoring are held Carry structural failure, roadway deformation be difficult to control " etc. technical problems.
In order to solve the above technical problems, the present invention adopts the following technical scheme: a kind of tunnel shell arch combination strength carrying knot Structure, including tunnel, the section on tunnel top are semicircular arch or skene arch, and the country rock outside tunnel is followed successively by loosening from inside to outside The country rock outside the country rock in range and relaxation zone within the scope of 1m is enclosed, the inner wall of the country rock within the scope of relaxation zone is provided with supporting Shell, country rock outside the country rock and relaxation zone within the scope of relaxation zone within the scope of 1m are internally provided with supporting arch;
The branch protective case is the tough coagulation with a certain toughness formed by the bolt-mesh-spurting supporting of three layers of high-strength high pretightening force Soil cursting, branch protective case include three layer concrete spray-ups and three batches of the first high strength anchor bars being embedded in inside three layer concrete spray-ups Nut fastening section, three-layer metal net compress metal mesh and connect the girder steel of the first high strength anchor bar and the outer end of the first grouted anchor bar Portion, nut fastening section, three-layer metal net and the girder steel of three batches of the first high strength anchor bars correspond to mating setting and pour respectively pre-buried Inside three layer concrete spray-ups, every layer concrete jetting thickness is 80 ~ 120mm, the overall thickness of tough concrete-shell is 240 ~ 360mm;
Supporting arch is by the Bolt net and jet of three layers of high-strength high pretightening force within the scope of relaxation zone and its within the scope of the 1m of outside The high-strength anchoring Load -carring arch of formation in country rock, supporting arch include the country rock and the first slip casting anchor anchored by the first high strength anchor bar The slip casting section setting of the country rock that bar is reinforced, the Anchor Agent anchoring section and free segment and grouted anchor bar of three batches of the first high strength anchor bars exists In the country rock of supporting arch.
The bottom plate of arched tunnel carries out active branch using several the second high strength anchor bars and the second grouted anchor bar grouting and reinforcing Shield forms the closed active support structure for roadway's sides, top semi-circular arch and bottom plate.
It is high-strength greater than 500MPa's that first high strength anchor bar and the second high strength anchor bar are all made of diameter 22mm or more, yield strength Left hand thread steel anchor rod and the attachment to match with its intensity;First high strength anchor bar and the second high strength anchor bar use high pretightening force Installation, prefastening torque require to reach 300 ~ 500N.m, pre-tighten force request and reach 50 ~ 100kN;The metal mesh is diamond shape iron wire Net, the girder steel are reinforcing bar ladder beam, and the concrete spray coating is not less than 42.5 normal silicate using strength grade Cement;The injecting paste material that first grouted anchor bar and the second grouted anchor bar use be strength grade for 42.5 normal silicate Cement, ratio of mud 1:2, while water-reducing agent is added to improve the permeability of slurries.
The arch that the shell arch combination strength bearing structure is formed using high-intensitive, high density anchor pole and grouting and reinforcing Shape bearing structure, spacing × array pitch of every layer of first high strength anchor bar is 900 in the bolt-mesh-spurting supporting of three layers of high-strength high pretightening force × 900mm, for three layers of bolt-mesh-spurting supporting all after the completion of construction, spacing × array pitch of the first high strength anchor bar is 300 × 300mm;The One high strength anchor bar uses anchorage length for the extensible bolting of 1000 ~ 1500mm, wherein relatively stable other than being anchored at relaxation zone enclose Length in rock is not less than 1000mm;First high strength anchor bar meet " three footpaths mate " anchor principle: bolt diameter, bore diameter and Resin anchoring agent diameter is respectively 22mm, 28mm and 23mm.
The slip casting of first grouted anchor bar should lag third layer concrete spray coating for a period of time, the injected hole of the first grouted anchor bar Between the arrangement of array pitch should be according to injecting paste material property, country rock physics classroom teaching and cranny development situation, grouting pressure and existing The slurries spread condition of field test is comprehensive to be determined.
A kind of construction method of tunnel shell arch combination strength bearing structure, includes the following steps,
(1) according to the productive geological conditions of roadway engineering, drift section chooses the preferable stalk Semicircular arched of stability, and uses Theory analysis and method for numerical simulation rationally determine the cross dimensions of arched tunnel;
(2) crustal stress, mining induced stress and roadway surrounding rock structure and its rock mechanics parameters are based on, using method for numerical simulation, Determine the form and size of tunnel surrounding wall rock loosening ring;
(3) based on cross-section shape of roadway and size, surrouding rock stress condition, wall rock loosening ring form and size, reasonable lane is determined Road supporting intensity and supporting parameter carry out " shell arch combination strength carries " Surrounding Rock Control construction: to lane in time after tunnel excavates Road two is helped to encircle with top semi-circular, and it is pre- to carry out three layers of high-strength height using " the first high strength anchor bar, metal mesh, girder steel, gunite concrete " The bolt-mesh-spurting supporting of clamp force, the length of three batches of the first high strength anchor bars should be anchored to the stable region 1m or more other than relaxation zone;
(4) after the completion of to roadway's sides and top semi-circular arch construction, using the second high strength anchor bar and the second grouted anchor bar to tunnel Bottom plate carries out active support, and carries out concrete hardening processing to bottom plate;
The Specific construction process of step (3) is,
Tunnel carries out first layer combination supporting, sequence of construction after excavating in time are as follows: in roadway's sides and top semi-circular arch paving first Layer metal mesh, extension first layer girder steel --- install first first high strength anchor bar and implement high pretightening force --- injection first layer are mixed Solidifying soil spray-up;
After first layer concrete spray coating is completed and solidified, implement second layer combination supporting, sequence of construction are as follows: in first layer coagulation Native spray-up lateral wall paving second layer metal net hangs second layer girder steel --- and installation the first high strength anchor bar of second batch simultaneously implements high preload Power --- injection second layer concrete spray coating;
After second layer concrete spray coating is completed and solidified, implement third layer combination supporting, sequence of construction are as follows: in second layer coagulation Native spray-up lateral wall paving third layer metal mesh hangs third layer girder steel --- and installation the first high strength anchor bar of third batch simultaneously implements high preload Power --- injection third layer concrete spray coating, third layer concrete ejection complete third layer combination branch after completing and solidifying Shield;
After completing third layer combination supporting, certain time is lagged, when wall-rock crack is relatively developed, using the first grouted anchor bar pair Country rock in roadway's sides and top semi-circular arch relaxation zone carries out grouting and reinforcing.
By adopting the above technical scheme, the invention has the following advantages: 1. " shell arch combination bearing structure " includes arch Tunnel, branch protective case and supporting arch, by implementing this technology, effectively prevent the loss of strength of country rock in relaxation zone, and loosening Strong anchoring bearing structure is formd within the scope of circle and its outside 1m, improving stability of surrounding rocks in roadway is significantly improved, effectively inhibits pine Moving-coil is extended to deep;2. the implementation of technical solution through the invention is formd tough with certain thickness and certain toughness Concrete-shell, rigidity and it is flexible mention significantly high, effectively prevent cracking and the destruction of concrete spray coating;3. skill through the invention The implementation of art scheme significantly improves supporting intensity, initial pretightening force and the working resistance in tunnel, significantly improves " shell arch group Close bearing structure " ability of tunnel initial deformation and long-term rheology is resisted, guarantee is provided steadily in the long term for roadway surrounding rock.
Detailed description of the invention
Fig. 1 is tunnel shell arch combination strength bearing structure schematic diagram;
Fig. 2 is tunnel shell arch combination strength bearing structure partial enlarged view;
In figure, 1 is tunnel, and 2 be branch protective case, and 3 encircle for supporting, and 4 be first layer concrete spray coating, and 5 be second layer concrete spray coating, 6 be third layer concrete spray coating, and 7 be first first high strength anchor bar, and 8 be the first high strength anchor bar of second batch, and 9 be third batch first High strength anchor bar, 10 be the nut fastening section of the first high strength anchor bar, and 11 be the first layer metal net in first layer concrete spray coating, 12 It is the third layer metal mesh in third layer concrete spray coating for the second layer metal net in second layer concrete spray coating, 13,14 are First layer girder steel in first layer concrete spray coating, 15 be the second layer girder steel in second layer concrete spray coating, and 16 be third layer Third layer girder steel in concrete spray coating, 17 be the first grouted anchor bar, and 18 be the outer end of the first grouted anchor bar, and 19 be loosening Circle, 20 be the country rock within the scope of relaxation zone, and 21 be the country rock within the scope of 1m outside relaxation zone, and 22 be the anchoring of the first high strength anchor bar Agent anchoring section, 23 be the free segment of the first high strength anchor bar, and 24 be the slip casting section of the first grouted anchor bar, and 25 be the second high strength anchor bar, 26 be the second grouted anchor bar.
Specific embodiment
As depicted in figs. 1 and 2, a kind of tunnel shell of the invention arch combination strength bearing structure, including tunnel 1, tunnel 1 The section on top is semicircular arch or skene arch, the country rock outside tunnel 1 be followed successively by from inside to outside country rock 20 within the scope of relaxation zone, The inner wall of country rock 21 outside relaxation zone and relaxation zone within the scope of 1m, the country rock 20 within the scope of relaxation zone is provided with branch protective case 2, The supporting that is internally provided with of country rock 21 outside country rock 20 and relaxation zone within the scope of relaxation zone within the scope of 1m encircles 3;
The branch protective case 2 is the tough coagulation with a certain toughness formed by the bolt-mesh-spurting supporting of three layers of high-strength high pretightening force Soil cursting, branch protective case 2 include three layer concrete spray-ups and three batches of the first high strength anchor bars being embedded in inside three layer concrete spray-ups Nut fastening section 10, three-layer metal net, compress metal mesh and connect the first high strength anchor bar girder steel and the first grouted anchor bar 17 Outer end, nut fastening section, three-layer metal net and the girder steel of three batches of the first high strength anchor bars correspond to it is mating setting and pour respectively It builds and is embedded in inside three layer concrete spray-ups, every layer concrete jetting thickness is 80 ~ 120mm, the overall thickness of tough concrete-shell For 240 ~ 360mm;
Supporting arch 3 is by the Bolt net and jet of three layers of high-strength high pretightening force within the scope of relaxation zone and its within the scope of the 1m of outside The high-strength anchoring Load -carring arch of formation in country rock, supporting arch 3 include the country rock and first anchored by three batches of the first high strength anchor bars The country rock that grouted anchor bar 17 is reinforced, the slip casting of the Anchor Agent anchoring section and free segment and grouted anchor bar of three batches of the first high strength anchor bars Section is arranged in the country rock of supporting arch 3.
The bottom plate of arched tunnel 1 is led using several the second high strength anchor bars 25 and 26 grouting and reinforcing of the second grouted anchor bar Dynamic supporting forms the closed active support structure for 1 liang of tunnel side, top semi-circular arch and bottom plate.
First high strength anchor bar and the second high strength anchor bar 25 are all made of diameter 22mm or more, yield strength is greater than the height of 500MPa Strong left hand thread steel anchor rod and the attachment to match with its intensity;First high strength anchor bar and the second high strength anchor bar 25 are using high pre- Clamp force installation, prefastening torque require to reach 300 ~ 500N.m, pre-tighten force request and reach 50 ~ 100kN;The metal mesh is diamond shape iron Silk screen, the girder steel are reinforcing bar ladder beam, and the concrete spray coating is not less than 42.5 common silicic acid using strength grade Salt cement;The injecting paste material that first grouted anchor bar 17 and the second grouted anchor bar 26 use be strength grade for 42.5 it is common Portland cement, ratio of mud 1:2, while water-reducing agent is added to improve the permeability of slurries.
The arch that the shell arch combination strength bearing structure is formed using high-intensitive, high density anchor pole and grouting and reinforcing Shape bearing structure, spacing × array pitch of every layer of first high strength anchor bar is 900 in the bolt-mesh-spurting supporting of three layers of high-strength high pretightening force × 900mm, for three layers of bolt-mesh-spurting supporting all after the completion of construction, spacing × array pitch of the first high strength anchor bar is 300 × 300mm;The One high strength anchor bar uses anchorage length for the extensible bolting of 1000 ~ 1500mm, wherein relatively stable other than being anchored at relaxation zone enclose Length in rock is not less than 1000mm;First high strength anchor bar meet " three footpaths mate " anchor principle: bolt diameter, bore diameter and Resin anchoring agent diameter is respectively 22mm, 28mm and 23mm.
The slip casting of first grouted anchor bar 17 should lag third layer concrete spray coating for a period of time, the note of the first grouted anchor bar 17 Starch hole between array pitch arrangement should according to injecting paste material property, country rock physics classroom teaching and cranny development situation, grouting pressure with And the comprehensive determination of slurries spread condition of on-the-spot test.
A kind of construction method of tunnel shell arch combination strength bearing structure, includes the following steps,
(1) according to the productive geological conditions of 1 engineering of tunnel, 1 section of tunnel chooses the preferable stalk Semicircular arched of stability, and adopts With theory analysis and method for numerical simulation, the cross dimensions of arched tunnel 1 is rationally determined;
(2) crustal stress, mining induced stress and 1 surrounding rock structure of tunnel and its rock mechanics parameters are based on, using method for numerical simulation, Determine the form and size of 1 surrounding wall rock loosening ring of tunnel;
(3) based on 1 section configuration of tunnel and size, surrouding rock stress condition, wall rock loosening ring form and size, reasonable lane is determined 1 supporting intensity of road and supporting parameter carry out " shell arch combination strength carries " Surrounding Rock Control construction: right in time after tunnel 1 excavates 1 liang of tunnel side and top semi-circular arch, carry out three layers of high-strength height using " the first high strength anchor bar, metal mesh, girder steel, gunite concrete " The bolt-mesh-spurting supporting of pretightning force, the length of three batches of the first high strength anchor bars should be anchored to the stable region 1m or more other than relaxation zone;
(4) right using the second high strength anchor bar 25 and the second grouted anchor bar 26 after the completion of to 1 liang of tunnel side and top semi-circular arch construction 1 bottom plate of tunnel carries out active support, and carries out concrete hardening processing to bottom plate;
The Specific construction process of step (3) is,
Tunnel 1 carries out first layer combination supporting, sequence of construction after excavating in time are as follows: side and the top semi-circular arch paving the 1 liang of tunnel One layer of metal mesh 11 hangs first layer girder steel 14 --- install first first high strength anchor bar 7 and implement high pretightening force --- injection First layer concrete spray coating 4;
After first layer concrete spray coating 4 is completed and solidified, implement second layer combination supporting, sequence of construction are as follows: mixed in first layer 4 lateral wall upper berth second layer metal net 12 of solidifying soil spray-up hangs second layer girder steel 15 --- and installation the first high strength anchor bar of second batch 8 is simultaneously Implement high pretightening force --- the second concrete spray coating 5 of injection;
After second layer concrete spray coating 5 is completed and solidified, implement third layer combination supporting, sequence of construction are as follows: mixed in the second layer Solidifying soil 5 lateral wall of spray-up paving third layer metal mesh 13 hangs third layer girder steel 16 --- and the first high strength anchor bar of installation third batch 8 is simultaneously real Apply high pretightening force --- injection third layer concrete spray coating 6, the injection of third layer concrete spray coating 6 are completed and are completed after solidifying Third layer combination supporting;
After completing third layer combination supporting, certain time is lagged, when wall-rock crack is relatively developed, using the first grouted anchor bar 17 Grouting and reinforcing is carried out to the country rock in 1 liang of tunnel side and top semi-circular arch relaxation zone.
The present embodiment not makes any form of restriction shape of the invention, material, structure etc., all according to this hair Bright technical spirit any simple modification, equivalent change and modification to the above embodiments, belong to the technology of the present invention side The protection scope of case.

Claims (7)

1. a kind of tunnel shell arch combination strength bearing structure, including tunnel, the section on tunnel top are semicircular arch or skene arch, lane Country rock outside road is followed successively by the country rock outside the country rock within the scope of relaxation zone and relaxation zone within the scope of 1m, feature from inside to outside Be: the inner wall of the country rock within the scope of relaxation zone is provided with branch protective case, 1m model outside the country rock and relaxation zone within the scope of relaxation zone The supporting that is internally provided with of country rock in enclosing is encircleed;
The branch protective case is the tough coagulation with a certain toughness formed by the bolt-mesh-spurting supporting of three layers of high-strength high pretightening force Soil cursting, branch protective case include three layer concrete spray-ups and three batches of the first high strength anchor bars being embedded in inside three layer concrete spray-ups Nut fastening section, three-layer metal net compress metal mesh and connect the girder steel of the first high strength anchor bar and the outer end of the first grouted anchor bar Portion, nut fastening section, three-layer metal net and the girder steel of three batches of the first high strength anchor bars correspond to mating setting and pour respectively pre-buried Inside three layer concrete spray-ups, every layer concrete jetting thickness is 80 ~ 120mm, the overall thickness of tough concrete-shell is 240 ~ 360mm;
Supporting arch is by the Bolt net and jet of three layers of high-strength high pretightening force within the scope of relaxation zone and its within the scope of the 1m of outside The high-strength anchoring Load -carring arch of formation in country rock, supporting arch include the country rock and the first slip casting anchor anchored by the first high strength anchor bar The slip casting section setting of the country rock that bar is reinforced, the Anchor Agent anchoring section and free segment and grouted anchor bar of three batches of the first high strength anchor bars exists In the country rock of supporting arch.
2. a kind of tunnel shell arch combination strength bearing structure according to claim 1, it is characterised in that: the bottom of arched tunnel Plate carries out active support using several the second high strength anchor bars and the second grouted anchor bar grouting and reinforcing, formed for roadway's sides, The closed active support structure of top semi-circular arch and bottom plate.
3. a kind of tunnel shell arch combination strength bearing structure according to claim 2, it is characterised in that: the first high strength anchor bar With the second high strength anchor bar be all made of diameter 22mm or more, yield strength greater than 500MPa high-strength left hand thread steel anchor rod and with The attachment that its intensity matches;First high strength anchor bar and the second high strength anchor bar are installed using high pretightening force, and prefastening torque requires to reach To 300 ~ 500N.m, pre-tightens force request and reach 50 ~ 100kN;The metal mesh is diamond shape wire netting, and the girder steel is reinforcing bar ladder Beam, the concrete spray coating are not less than 42.5 ordinary portland cement using strength grade;First grouted anchor bar The injecting paste material used with the second grouted anchor bar be strength grade for 42.5 ordinary portland cement, ratio of mud 1:2 mixes simultaneously Aqua is added and subtracted to improve the permeability of slurries.
4. a kind of tunnel shell arch combination strength bearing structure according to claim 3, it is characterised in that: the shell arch group The arch bearing structure that strength bearing structure is formed using high-intensitive, high density anchor pole and grouting and reinforcing is closed, three layers high-strength Spacing × array pitch of every layer of first high strength anchor bar is 900 × 900mm, three layers of Bolt net and jet branch in the bolt-mesh-spurting supporting of high pretightening force For shield all after the completion of construction, spacing × array pitch of the first high strength anchor bar is 300 × 300mm;First high strength anchor bar is using anchoring length Degree is the extensible bolting of 1000 ~ 1500mm, wherein the length being anchored at other than relaxation zone in opposite stabilizing surrounding rock is not less than 1000mm;First high strength anchor bar meets " three footpaths mate " and anchors principle: bolt diameter, bore diameter and resin anchoring agent diameter point It Wei not 22mm, 28mm and 23mm.
5. a kind of tunnel shell arch combination strength bearing structure according to claim 4, it is characterised in that: the first grouted anchor bar Slip casting should lag third layer concrete spray coating for a period of time, the arrangement of array pitch should be according to note between the injected hole of the first grouted anchor bar Pulp material property, country rock physics classroom teaching and cranny development situation, grouting pressure and the slurries of on-the-spot test spread condition It is comprehensive to determine.
6. a kind of construction method of tunnel shell arch combination strength bearing structure as claimed in claim 5, it is characterised in that: including Following steps,
(1) according to the productive geological conditions of roadway engineering, drift section chooses the preferable stalk Semicircular arched of stability, and uses Theory analysis and method for numerical simulation rationally determine the cross dimensions of arched tunnel;
(2) crustal stress, mining induced stress and roadway surrounding rock structure and its rock mechanics parameters are based on, using method for numerical simulation, Determine the form and size of tunnel surrounding wall rock loosening ring;
(3) based on cross-section shape of roadway and size, surrouding rock stress condition, wall rock loosening ring form and size, reasonable lane is determined Road supporting intensity and supporting parameter carry out " shell arch combination strength carries " Surrounding Rock Control construction: to lane in time after tunnel excavates Road two is helped to encircle with top semi-circular, and it is pre- to carry out three layers of high-strength height using " the first high strength anchor bar, metal mesh, girder steel, gunite concrete " The bolt-mesh-spurting supporting of clamp force, the length of three batches of the first high strength anchor bars should be anchored to the stable region 1m or more other than relaxation zone;
(4) after the completion of to roadway's sides and top semi-circular arch construction, using the second high strength anchor bar and the second grouted anchor bar to tunnel Bottom plate carries out active support, and carries out concrete hardening processing to bottom plate.
7. a kind of construction method of tunnel shell arch combination strength bearing structure as claimed in claim 5, it is characterised in that: step (3) Specific construction process is,
Tunnel carries out first layer combination supporting, sequence of construction after excavating in time are as follows: in roadway's sides and top semi-circular arch paving first Layer metal mesh, extension first layer girder steel --- install first first high strength anchor bar and implement high pretightening force --- injection first layer are mixed Solidifying soil spray-up;
After first layer concrete spray coating is completed and solidified, implement second layer combination supporting, sequence of construction are as follows: in first layer coagulation Native spray-up lateral wall paving second layer metal net hangs second layer girder steel --- and installation the first high strength anchor bar of second batch simultaneously implements high preload Power --- injection second layer concrete spray coating;
After second layer concrete spray coating is completed and solidified, implement third layer combination supporting, sequence of construction are as follows: in second layer coagulation Native spray-up lateral wall paving third layer metal mesh hangs third layer girder steel --- and installation the first high strength anchor bar of third batch simultaneously implements high preload Power --- injection third layer concrete spray coating, third layer concrete ejection complete third layer combination branch after completing and solidifying Shield;
After completing third layer combination supporting, certain time is lagged, when wall-rock crack is relatively developed, using the first grouted anchor bar pair Country rock in roadway's sides and top semi-circular arch relaxation zone carries out grouting and reinforcing.
CN201910161192.7A 2019-03-04 2019-03-04 Roadway shell and arch combined strong bearing structure and construction method thereof Active CN109736850B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910161192.7A CN109736850B (en) 2019-03-04 2019-03-04 Roadway shell and arch combined strong bearing structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910161192.7A CN109736850B (en) 2019-03-04 2019-03-04 Roadway shell and arch combined strong bearing structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN109736850A true CN109736850A (en) 2019-05-10
CN109736850B CN109736850B (en) 2023-08-22

Family

ID=66369192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910161192.7A Active CN109736850B (en) 2019-03-04 2019-03-04 Roadway shell and arch combined strong bearing structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN109736850B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111911209A (en) * 2020-08-17 2020-11-10 河北工程大学 Accurate targeted anchor grouting control method suitable for deep soft rock roadway
CN112832802A (en) * 2021-03-04 2021-05-25 淮北市平远软岩支护工程技术有限公司 Large-bottom plate supporting structure and method for asymmetric pressure
CN113339031A (en) * 2021-07-22 2021-09-03 内蒙古上海庙矿业有限责任公司 Roadway support process system under extremely soft stratum condition and construction method
CN113638745A (en) * 2021-09-03 2021-11-12 淮北市平远软岩支护工程技术有限公司 Method and equipment for reinforcing homogeneous supporting ring body of high-impact-ground-pressure roadway

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967984A (en) * 2010-09-03 2011-02-09 安徽理工大学 Deep well tunnel cable anchor rigid-flexible coupling support and surrounding rock overall reinforced support method
CN103711507A (en) * 2013-12-05 2014-04-09 中国矿业大学 Method for controlling deformation of large broken rock zone roadway by using multi-steel stranded wire combined supporting device
CN105178981A (en) * 2015-09-30 2015-12-23 中国矿业大学 Total-section closed type deep-shallow coupling yielding, bolting-grouting and supporting method for incompact and fractured soft-rock roadway
CN107035387A (en) * 2016-12-12 2017-08-11 贵州理工学院 A kind of roadway surrounding rock control method under the influence of strong dynamic pressure
CN109268027A (en) * 2018-08-20 2019-01-25 河南理工大学 A kind of tunnel apex angle curved surface country rock intensive control method
CN109372556A (en) * 2018-09-30 2019-02-22 淮阴工学院 A kind of sandwich arch and construction method suitable for high stressed soft rock tunnel supporting roadway surrounding rock
US20210040849A1 (en) * 2017-06-28 2021-02-11 Shandong University Of Science And Technology Grouting anchor bolt and grouting anchor cable for supporting of large deformation and constant resistance and quantitative roadway supporting method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967984A (en) * 2010-09-03 2011-02-09 安徽理工大学 Deep well tunnel cable anchor rigid-flexible coupling support and surrounding rock overall reinforced support method
CN103711507A (en) * 2013-12-05 2014-04-09 中国矿业大学 Method for controlling deformation of large broken rock zone roadway by using multi-steel stranded wire combined supporting device
CN105178981A (en) * 2015-09-30 2015-12-23 中国矿业大学 Total-section closed type deep-shallow coupling yielding, bolting-grouting and supporting method for incompact and fractured soft-rock roadway
CN107035387A (en) * 2016-12-12 2017-08-11 贵州理工学院 A kind of roadway surrounding rock control method under the influence of strong dynamic pressure
US20210040849A1 (en) * 2017-06-28 2021-02-11 Shandong University Of Science And Technology Grouting anchor bolt and grouting anchor cable for supporting of large deformation and constant resistance and quantitative roadway supporting method
CN109268027A (en) * 2018-08-20 2019-01-25 河南理工大学 A kind of tunnel apex angle curved surface country rock intensive control method
CN109372556A (en) * 2018-09-30 2019-02-22 淮阴工学院 A kind of sandwich arch and construction method suitable for high stressed soft rock tunnel supporting roadway surrounding rock

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111911209A (en) * 2020-08-17 2020-11-10 河北工程大学 Accurate targeted anchor grouting control method suitable for deep soft rock roadway
CN111911209B (en) * 2020-08-17 2022-02-08 河北工程大学 Accurate targeted anchor grouting control method suitable for deep soft rock roadway
CN112832802A (en) * 2021-03-04 2021-05-25 淮北市平远软岩支护工程技术有限公司 Large-bottom plate supporting structure and method for asymmetric pressure
CN112832802B (en) * 2021-03-04 2022-03-01 淮北市平远软岩支护工程技术有限公司 Large-bottom plate supporting structure and method for asymmetric pressure
CN113339031A (en) * 2021-07-22 2021-09-03 内蒙古上海庙矿业有限责任公司 Roadway support process system under extremely soft stratum condition and construction method
CN113638745A (en) * 2021-09-03 2021-11-12 淮北市平远软岩支护工程技术有限公司 Method and equipment for reinforcing homogeneous supporting ring body of high-impact-ground-pressure roadway

Also Published As

Publication number Publication date
CN109736850B (en) 2023-08-22

Similar Documents

Publication Publication Date Title
CN107035387B (en) A kind of roadway surrounding rock control method under the influence of strong dynamic pressure
CN103195441B (en) A kind of supporting and reinforcing structure of coal mine tunnel and construction technology thereof
CN109736850A (en) A kind of tunnel shell arch combination strength bearing structure and its construction method
CN105178981B (en) The closed depth coupling of broken soft rock roadway full-fracture-surfacanchoring-rod, which allows, presses bolt-grouting support method
CN101967984B (en) Deep well tunnel cable anchor rigid-flexible coupling support and surrounding rock overall reinforced support method
CN105781571A (en) Construction method for soft rock deformation tunnel lining support dismantling-replacing arch
CN104533453A (en) Substep dynamic coupling support method for roadway fault fracture zone
CN102493821B (en) Support method for high stress roadway coal-rock mass
CN209704587U (en) A kind of tunnel shell arch combination strength bearing structure
CN104389628B (en) Landslide location tunnel reinforcement device and reinforced construction method
CN202360119U (en) Soft rock roadway supporting structure with multiple spray layers of seal coats
CN201746840U (en) Foundation pit support system equipped with a plurality of inclined rear anchors capable of recycling
CN212296427U (en) Double-lane arrangement working face outer lane narrow coal pillar stable supporting structure
CN104594926A (en) Rapid composite roof roadway support method for high-stress water guiding karst cave group
CN106593467A (en) Supporting method for underground soft rock roadway of coal mine
CN107060774A (en) A kind of anti-tunnel portal wall damage device and construction method
CN206752482U (en) Control the combination retaining structure of biased deformation
CN110242335A (en) The passive coupling supporting system of large deformation stope drift active workings master and construction method
CN108775252A (en) The supporting construction and method for protecting support in Deep Soft Rock tunnel
CN103711507A (en) Method for controlling deformation of large broken rock zone roadway by using multi-steel stranded wire combined supporting device
CN105040712A (en) High-pressure washing anchor planting and recharging comprehensive biological protection structure of soft and hard smashing interbedding type composite rock slope and construction method of structure
CN108316941A (en) A kind of breaking surrounding rock and soft-rock tunnel U-shaped steel cover canopy method for protecting support
CN103334779A (en) Method for constructing isotropic surrounding rock soft rock roadway support
CN207660614U (en) Roadway floor prestress anchorage cable group coordinates ruggedized construction with slip casting
CN206129285U (en) Deep soft rock roadway under high stress crossover point supporting construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant