CN108149695A - For the short support construction of steel and construction method of station accessory structure foundation pit Force transmission parts - Google Patents

For the short support construction of steel and construction method of station accessory structure foundation pit Force transmission parts Download PDF

Info

Publication number
CN108149695A
CN108149695A CN201810125733.6A CN201810125733A CN108149695A CN 108149695 A CN108149695 A CN 108149695A CN 201810125733 A CN201810125733 A CN 201810125733A CN 108149695 A CN108149695 A CN 108149695A
Authority
CN
China
Prior art keywords
steel
short support
support construction
station
accessory structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810125733.6A
Other languages
Chinese (zh)
Inventor
张兴其
浦玉炳
张乾坤
谷永涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Municipal Engineering Design And Research Institute Co Ltd
Original Assignee
Hefei Municipal Engineering Design And Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Municipal Engineering Design And Research Institute Co Ltd filed Critical Hefei Municipal Engineering Design And Research Institute Co Ltd
Priority to CN201810125733.6A priority Critical patent/CN108149695A/en
Publication of CN108149695A publication Critical patent/CN108149695A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses the short support construction of the steel for station accessory structure foundation pit Force transmission parts and construction methods, include the short support construction of steel for the short support construction of steel of station accessory structure foundation pit Force transmission parts, the short support tectonic level setting of the steel, the short support construction of the steel is arranged in post-cast strip, the steel it is short support construction both ends respectively with station agent structure and station accessory structure, the short support construction of the steel sets the lower edge of the top plate of accessory structure and bottom plate AT STATION, the top plate and bottom plate lower edge is provided with reinforcing bar, and the short support construction of steel carries out spot welding with reinforcing bar and fixes.The configuration of the present invention is simple, in the construction process, it can be ensured that attached foundation pit is stable, avoids the accessory structure sidesway poured in advance.

Description

For the short support construction of steel and construction method of station accessory structure foundation pit Force transmission parts
Technical field
The present invention relates to the underground structure technical field of rail traffic, more particularly, to station accessory structure foundation pit power transmissions The short support construction of steel and construction method of component.
Background technology
Subway station accessory structure (Ru Fengting, entrance etc.) construction carries out after generally binding at main body station, attached knot Structure construction is set up often by the building enclosure of agent structure foundation pit supports the construction for carrying out excavation of foundation pit and accessory structure, and Accessory structure and the connecting portion of agent structure set post-cast strip, but need in post empiricism first to cut the main body of connecting portion Fender post, the support needs between accessory structure fender post and main body fender post are removed before being poured in post-cast strip, accessory structure base The outer lateral earth pressure in hole is acted on accessory structure, and because post-cast strip is not constructed also, accessory structure is not yet connected as a single entity with agent structure, There are the risks of sidesway for accessory structure fender post.Currently used method is to be applied below accessory structure bottom plate and bottom plate entirety Power is transferred on the fender post below bottom plate by the armoured concrete slab poured, then cuts top fender post;And in structure roof First of support of side needs to directly act on agent structure beam.This method complex procedures, and agent structure beam is set Meter also needs to consider the lateral force of accessory structure foundation pit, and very big inconvenience is all brought to design and construction.
It is currently used to apply and the armoured concrete slab of bottom plate one-piece casting or pushing up below accessory structure bottom plate First of support of setting is directly acted on agent structure beam above plate, and construction is more complicated, is unfavorable for execute-in-place.
Invention content
In view of the drawbacks described above of the prior art, technical purpose of the invention is to provide the use that a kind of attached foundation pit is stablized In the short support construction of the steel of station accessory structure foundation pit Force transmission parts and construction method.
In order to achieve the above objectives, present invention employs following technical proposals:One kind of the present invention is used for station accessory structure The short support construction of steel of foundation pit Force transmission parts, the short support tectonic level setting of steel, the short support construction of steel are arranged in post-cast strip, Contact surface of the short support construction both ends of steel respectively with station agent structure and station accessory structure is held out against, the attached knot in station Structure is made of top plate and bottom plate, and the short support construction of steel sets the lower edge of the top plate of accessory structure and bottom plate AT STATION, the top Plate and bottom plate lower edge are provided with reinforcing bar, and the short support construction of steel carries out spot welding with reinforcing bar and fixes.
Further, the short support of the steel is configured to I-steel or steel pipe.
Further, pick up the car the 1/2-1/ of station accessory structure top plate and bottom plate for the position of the supporting point of the short support construction of the steel At 3.
Further, the post-cast strip is reserved with waterstop, the short support construction of steel AT STATION accessory structure b top plates and The waterstop that post-cast strip is reserved is avoided in the thickness range of bottom plate.
The present invention also provides a kind of steel for station accessory structure foundation pit Force transmission parts it is short support construction construction method, Include the following steps:
(1) between attached fender post and main body fender post, first of support and second support are set up, with digging with support It opens, digs to foundation pit bottom surface;
(2) the attached bottom plate of construction in foundation pit after more than 75% reach design strength, sets up the short support construction of steel, and remove Second supports;
(3) it constructs attached side wall and attached top plate, after more than 75% reach design strength, sets up the short support construction of steel, and Remove first of support;
(4) main body fender post, Construction Later Casting Zone are cut.
Beneficial effects of the present invention:
Stable structure of the present invention is reliable, simple in structure, and making is easy for construction, at low cost, for the power transmission of deep basal pit post-cast strip In, agent structure entirety stress is good, ensure that main body fender post is cut and during supporting removal, attached foundation pit is stablized, and avoids The accessory structure sidesway poured in advance.
Description of the drawings
Fig. 1 is the short support construction arrangement schematic diagram of the steel of the present invention;
Fig. 2 is schematic diagram at the I of the present invention;
Fig. 3 is A-A schematic diagrames of the present invention;
In figure, the short support construction of 1 steel, 2 post-cast strips, 3 reinforcing bars, 4 first of support, the support of 5 seconds, 6 attached fender posts, 7 Main body fender post, 8 attached top plates, 9 attached bottom plates, 10 attached side walls, a agent structures, b accessory structures.
Specific embodiment
The technique effect of the design of the present invention, concrete structure and generation is described further below with reference to attached drawing, with It is fully understood from the purpose of the present invention, feature and effect.
Embodiment 1
As shown in Figure 1 to Figure 3, the short support construction of a kind of steel for station accessory structure foundation pit Force transmission parts of the invention, Including the short support construction 1 of steel, the short support construction 1 of the steel is horizontally disposed, and the short support construction 1 of the steel is arranged in post-cast strip 2, institute Contact surface of short 1 both ends of support construction of steel stated respectively with station agent structure a and station accessory structure b is held out against, the station Accessory structure b is made of top plate and bottom plate, the steel short 1 setting of support the construction top plate of accessory structure b and bottom plate AT STATION Lower edge, the top plate and bottom plate lower edge are provided with reinforcing bar 3, and the short support construction 1 of steel carries out spot welding with reinforcing bar 3 and fixes.
The short support construction 1 of the steel is I-steel.
The position pick-up station accessory structure b top plates of supporting point of the short support construction 1 of the steel and 1/2 to 1/3 place of bottom plate, The post-cast strip 2 is reserved with waterstop, and the steel is short to support the thickness range of accessory structure b top plates and bottom plate AT STATION of construction 1 Inside avoid the reserved waterstop in post-cast strip 2.
In other embodiments, the short support construction 1 of the steel is steel pipe.The position of the supporting point of the short support construction 1 of the steel Put 1/2 to 1/3 place of pick up the car station accessory structure b top plates and bottom plate.
In other embodiments, the position pick-up station accessory structure b top plates of the supporting point of the short support construction 1 of the steel and bottom 1/2 to 1/3 place of plate.
The present invention the short support simple structure of steel, it is only necessary to top, bottom plate 1/2 to 1/3 at set, avoid structure reinforcing bars And waterstop, while be fixed by structure reinforcing bars, it is easy for construction, it is easily installed.
Embodiment 2:
The construction method of the short support construction of a kind of steel for station accessory structure foundation pit Force transmission parts of the present invention, including such as Lower step:
(1) between attached fender post 6 and main body fender post 7, set up first support 4 and second support 5, with dig with It struts, digs to foundation pit bottom surface;
(2) the attached bottom plate 9 of construction in foundation pit after more than 75% reach design strength, sets up the short support construction 1 of steel, and tear open Except second support 5;
(3) it constructs attached side wall 10 and attached top plate 8, after more than 75% reach design strength, sets up the short support construction of steel 1, and remove first of support 4;
(4) main body fender post 7, Construction Later Casting Zone 2 are cut.
The present invention method bottom, top plate 1/2 to 1/3 at set, avoid structure reinforcing bars and waterstop setting steel it is short Support, while first and second support can be directly removed, facilitate the construction of subsequent handling.
The preferred embodiment of the present invention described in detail above.It should be appreciated that those of ordinary skill in the art without Creative work is needed according to the present invention can to conceive and makes many modifications and variations.Therefore, all technologies in the art Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea Technical solution, all should be in the protection domain being defined in the patent claims.

Claims (5)

1. a kind of short support construction of steel for station accessory structure foundation pit Force transmission parts, including the short support construction (1) of steel, feature exists In:The short support construction (1) of the steel is horizontally disposed, and the short support construction (1) of the steel is arranged in post-cast strip (2), the steel Contact surface of short support construction (1) both ends respectively with station agent structure (a) and station accessory structure (b) is held out against, the station Accessory structure (b) is made of top plate and bottom plate, the steel it is short support construction (1) setting AT STATION the top plate of accessory structure (b) and The lower edge of bottom plate, the top plate and bottom plate lower edge are provided with reinforcing bar (3), and the short support construction (1) of steel carries out a solid welding with reinforcing bar (3) It is fixed.
2. the short support construction of the steel according to claim 1 for station accessory structure foundation pit Force transmission parts, it is characterised in that: The short support construction (1) of the steel is I-steel or steel pipe.
3. the short support construction of the steel according to claim 1 for station accessory structure foundation pit Force transmission parts, it is characterised in that: Position pick-up station accessory structure (b) top plate of the supporting point of the short support construction (1) of the steel and 1/2 to 1/3 place of bottom plate.
4. the short support construction of the steel according to claim 1 for station accessory structure foundation pit Force transmission parts, it is characterised in that: The post-cast strip (2) is reserved with waterstop, and the short support of the steel constructs (1) plate of accessory structure (b) top plate and bottom plate AT STATION The reserved waterstop in post-cast strip (2) is avoided in thick range.
5. the construction method of the short support construction of a kind of steel for station accessory structure foundation pit Force transmission parts, it is characterised in that including such as Lower step:
(1) between attached fender post (6) and main body fender post (7), first of support (4) and second support (5) are set up, with It digs with strutting, digs to foundation pit bottom surface;
(2) the attached bottom plate (9) of construction in foundation pit after reach design strength 75%, sets up the short support construction (1) of steel, and remove Second supports (5);
(3) it constructs attached side wall (10) and attached top plate (8), after reach design strength 75%, sets up the short support of steel and construct (1), and remove first support (4);
(4) main body fender post (7), Construction Later Casting Zone (2) are cut.
CN201810125733.6A 2018-02-08 2018-02-08 For the short support construction of steel and construction method of station accessory structure foundation pit Force transmission parts Pending CN108149695A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810125733.6A CN108149695A (en) 2018-02-08 2018-02-08 For the short support construction of steel and construction method of station accessory structure foundation pit Force transmission parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810125733.6A CN108149695A (en) 2018-02-08 2018-02-08 For the short support construction of steel and construction method of station accessory structure foundation pit Force transmission parts

Publications (1)

Publication Number Publication Date
CN108149695A true CN108149695A (en) 2018-06-12

Family

ID=62457105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810125733.6A Pending CN108149695A (en) 2018-02-08 2018-02-08 For the short support construction of steel and construction method of station accessory structure foundation pit Force transmission parts

Country Status (1)

Country Link
CN (1) CN108149695A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951701A (en) * 2018-07-26 2018-12-07 上海市机械施工集团有限公司 Wind pavilion and subway main body connection construction technique
CN109706967A (en) * 2019-02-19 2019-05-03 上海隧道工程有限公司 The construction method of external hanging type wind pavilion
CN110306590A (en) * 2019-06-11 2019-10-08 中铁一局集团有限公司 The construction method of the Metro Station Structure of main body after a kind of elder generation is attached

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204098042U (en) * 2014-03-21 2015-01-14 中天建设集团有限公司天津分公司 A kind of foundation ditch late poured band support structure
CN205242436U (en) * 2015-08-18 2016-05-18 上海建工七建集团有限公司 Supplementary soleplate traded interim bearing structure who props during system was gone along with sb. to guard him to underground complex
CN205421352U (en) * 2016-01-21 2016-08-03 昆明理工大学 Adopt reverse construction method post -cast strip reinforced structure of dowel steel
CN106320739A (en) * 2016-08-29 2017-01-11 中铁第四勘察设计院集团有限公司 Chiseling method of underground continuous wall between auxiliary part and main body of subway station
CN207846435U (en) * 2018-02-08 2018-09-11 合肥市市政设计研究总院有限公司 The short support construction of steel for station accessory structure foundation pit Force transmission parts

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204098042U (en) * 2014-03-21 2015-01-14 中天建设集团有限公司天津分公司 A kind of foundation ditch late poured band support structure
CN205242436U (en) * 2015-08-18 2016-05-18 上海建工七建集团有限公司 Supplementary soleplate traded interim bearing structure who props during system was gone along with sb. to guard him to underground complex
CN205421352U (en) * 2016-01-21 2016-08-03 昆明理工大学 Adopt reverse construction method post -cast strip reinforced structure of dowel steel
CN106320739A (en) * 2016-08-29 2017-01-11 中铁第四勘察设计院集团有限公司 Chiseling method of underground continuous wall between auxiliary part and main body of subway station
CN207846435U (en) * 2018-02-08 2018-09-11 合肥市市政设计研究总院有限公司 The short support construction of steel for station accessory structure foundation pit Force transmission parts

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951701A (en) * 2018-07-26 2018-12-07 上海市机械施工集团有限公司 Wind pavilion and subway main body connection construction technique
CN109706967A (en) * 2019-02-19 2019-05-03 上海隧道工程有限公司 The construction method of external hanging type wind pavilion
CN110306590A (en) * 2019-06-11 2019-10-08 中铁一局集团有限公司 The construction method of the Metro Station Structure of main body after a kind of elder generation is attached

Similar Documents

Publication Publication Date Title
CN108149695A (en) For the short support construction of steel and construction method of station accessory structure foundation pit Force transmission parts
CN102322269B (en) Super early receiving supporting structure of shield machine and super early receiving method
CN104652443B (en) Construction method of the interim horizontal support of deep basal pit as permanent structure beam
CN205024690U (en) Additional strengthening is propped in tearing open of supporting in deep basal pit
CN108487252A (en) A kind of deep foundation pit open cutting is suitable to make construction method
CN109457708A (en) The construction method of temporary support in a kind of deep foundation ditch concrete structure construction procedure
CN108301332A (en) The detachable steel trestle construction method of beret slice
CN110777809A (en) Deep foundation pit combined support adjacent to existing building and construction method thereof
CN111720126A (en) Construction method for entering tunnel through ingate of underground excavation tunnel
CN207846435U (en) The short support construction of steel for station accessory structure foundation pit Force transmission parts
CN209585054U (en) One kind is quickly met an urgent need diagonal brace for salvage of foundation pits
CN209179021U (en) A kind of foundation pit campshed support system
CN208815392U (en) A kind of trestle with rescue run channel
CN208734343U (en) A kind of station tunnel excavation structure with interim middle spacer post support
CN208870051U (en) A kind of support system of ultra-deep shaft foundation pit
CN216341267U (en) Underground mine trackless equipment maintenance trench
CN209277169U (en) Two bors d's oeuveres bracing members node apparatus
CN205804365U (en) A kind of cap excavation method top board node structure
CN109555129A (en) One kind is quickly met an urgent need diagonal brace and construction method for salvage of foundation pits
CN109356259A (en) A kind of novel combined side slope torrent slot structure and construction method
CN205224014U (en) Precast underground continuous wall of pre -buried steel sheet
CN210031831U (en) Sewage pipeline foundation pit supporting structure
CN208633118U (en) A kind of supporting construction that Subway Tunnel service channel pump house excavates
CN206873489U (en) A kind of subway station roof shield hole retaining wall structure
KR20140015974A (en) Arch wall shoring structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 230041 16, 17 and 18 floors of Nanguo office building, Yingshang Road West and Yijing Road South, Hefei City, Anhui Province

Applicant after: HEFEI MUNICIPAL DESIGN AND RESEARCH INSTITUTE Co.,Ltd.

Address before: 230041 16, 17 and 18 floors of Nanguo office building, Yingshui Road West and Yijing Road South, Hefei City, Anhui Province

Applicant before: HEFEI MUNICIPAL DESIGN AND RESEARCH INSTITUTE Co.,Ltd.

CB02 Change of applicant information
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180612

WD01 Invention patent application deemed withdrawn after publication