CN108131144A - A kind of construction method for widening traffic tunnel and uninterrupted traffic - Google Patents

A kind of construction method for widening traffic tunnel and uninterrupted traffic Download PDF

Info

Publication number
CN108131144A
CN108131144A CN201711268427.XA CN201711268427A CN108131144A CN 108131144 A CN108131144 A CN 108131144A CN 201711268427 A CN201711268427 A CN 201711268427A CN 108131144 A CN108131144 A CN 108131144A
Authority
CN
China
Prior art keywords
traffic
tunnel
widening
shield
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711268427.XA
Other languages
Chinese (zh)
Inventor
王柏松
朱琳
李建伟
闫艳辉
李荣鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Equipment Group Co Ltd CREG
Original Assignee
China Railway Engineering Equipment Group Co Ltd CREG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Equipment Group Co Ltd CREG filed Critical China Railway Engineering Equipment Group Co Ltd CREG
Priority to CN201711268427.XA priority Critical patent/CN108131144A/en
Publication of CN108131144A publication Critical patent/CN108131144A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of construction methods for widening traffic tunnel and uninterrupted traffic, and existing traffic and the serious disturbance tunnel periphery soil body are interrupted when solving the problems, such as in the prior art to widen existing tunnel.The present invention includes the following steps:Traffic shield, precutting trough construction, section excavation, strengthening supporting, prefabricated pipe section assembly, setting tunnel inverted arch are laid with, more than working cycles is repeated and is widened until completing original tunnel.The present invention does not only interfere with existing traffic, but also the soil body around tunnel will not be caused to disturb, and construction safety when being widened to existing tunnel, has very big application value.

Description

A kind of construction method for widening traffic tunnel and uninterrupted traffic
Technical field
The present invention relates to technical field of tunnel construction, particularly relate to a kind of construction for widening traffic tunnel and uninterrupted traffic Method.
Background technology
At present, it is higher and higher to the through-current capacity requirement of road with the development of society, the magnitude of traffic flow is increasing, in order to The unimpeded of road is kept, it is very necessary that existing traffic tunnel is widened.Existing traffic tunnel is widened, it is necessary to consider such as What maintains current traffic, if suspends traffic or changes its course.But suspend traffic, it can be brought sternly to current traffic The adverse effect of weight, causes the congestion of existing traffic;Or change its course, it can occupied space resource increase land seizure amount.Meanwhile It must also consider how broadening mode copes with the soil body around the tunnel disturbed when building old tunnel, how to avoid to tunnel The soil body of road profile periphery is disturbed again.
Invention content
For the deficiency in above-mentioned background technology, the present invention proposes a kind of construction for widening traffic tunnel and uninterrupted traffic Method solves and existing traffic is interrupted when being widened in the prior art to existing tunnel and the serious disturbance tunnel periphery soil body is asked Topic.
The technical proposal of the invention is realized in this way:A kind of construction method for widening traffic tunnel and uninterrupted traffic, Include the following steps:
Step 1:Traffic shield is laid with, traffic shield is laid in existing tunnel, traffic shield is original traffic route and will The construction and excavation region segmentation widened comes, and traffic shield is circular for traffic aisle, periphery and the original of traffic shield It is construction reserved space between tunnel Internal periphery;
Step 2:Precutting trough is constructed, and is continuously cut along the predetermined tunnel cross-section periphery widened using pre-cut scouring machine, while Casting concrete in cutting groove forms the protective case of dome-shaped after the concrete setting in precutting trough;
Step 3, section excavation carry out widening the excavation driving in face, excavate pick under the shielding of the protective case described in step 2 Into excavation face of the position between protective case and former tunnel Internal periphery, what the process that driving is excavated in face of widening covered always in protective case It is carried out in length;
Step 4, strengthening supporting carry out widening after face excavates driving for step 3, along exposed protective case installation support steel arch-shelf, Gunite concrete carries out strengthening supporting in support steel arch-shelf, along the inside of protective case after setting support steel arch-shelf and gunite concrete Face forms smoother branch sheath;
Step 5, prefabricated pipe section are assembled, along the branch sheath medial surface assembly prefabricated pipe section described in step 4, after prefabricated pipe section assembly Section of jurisdiction Load -carring arch is formed on the inside of branch sheath;
Step 6 sets tunnel inverted arch, and inverted arch link block is set between the bottom of the section of jurisdiction Load -carring arch described in step 5, makes pipe Piece Load -carring arch and inverted arch form a complete section of jurisdiction carrying arcuation ring;
Step 7 repeats step 2 to the constructing operation of step 6, until complete whole tunnel widen and lining cutting, it is whole The dismounting traffic shield after the completion of widening lining cutting in tunnel.
Further, the traffic shield described in step 1 disposably spreads complete strips tunnel, and whole tunnel to be done is opened up All traffic shields are disposably removed after wide and lining cutting.
Further, the traffic shield described in step 1 is the prefabricated shield of pin-connected panel.
Further, the prefabricated shield of the pin-connected panel is the prefabricated component of steel machine-shaping or is what armored concrete made Prefabricated component.
Further, after step 2 is carried out, before step 3, glass fibre bolt anchorage is carried out to excavation face and is applied Work.
Further, after step 2 is carried out, before step 3, pre-grouting strengthening construction is carried out to excavation face.
Further, the inverted arch link block described in step 6 mutually splices with former tunnel inverted arch.
The present invention using protection shield isolate traffic aisle and construct reserved space, can in the case where not influencing existing traffic into It widens in row tunnel;Protection shield can not only effectively improve construction efficiency using prefabricated component assembly, but also can reduce construction pair The influence of existing traffic;Using pre-cut channel process, the section that needs to excavate is isolated using soil layer is cut, can be dropped to the maximum extent The disturbance that the low soil layer to around tunnel generates, ensure that the stability of soil layer around tunnel, while be poured in precutting trough mixed The protective case that solidifying soil is formed can effectively support the soil body of precutting trough periphery, carry out advance reinforcement safeguard procedures, avoid The soil property of the precutting trough periphery soil body is soft and ground is caused to cave in or swell and seriously affects construction speed;In precutting trough and former tunnel Glass fibre anchor pole between road Internal periphery is set, the soil body can be effectively prevent to loosen and large area is caused to cave in, ensure that construction It successfully carries out, the horizontal pre-grouting of carry out can further effectively prevent the soil body to loosen and large area is caused to collapse in excavation face It collapses, ensure that excavating tunneling construction successfully carries out;Using inverted arch connection prefabricated pipe section and the inverted arch in former tunnel, can not only save Saving construction material reduces construction cost, but also can be spliced based on former tunnel inverted arch, and then make construction more just It is prompt.
Description of the drawings
In order to illustrate the embodiments of the present invention more clearly, attached drawing makees letter needed in being described below to embodiment Singly introduce, it should be apparent that, the accompanying drawings in the following description is only some embodiments of the present invention, for the common skill in this field For art personnel, without creative efforts, other attached drawings are can also be obtained according to these attached drawings.
Fig. 1 is the Construction Principle schematic diagram by longitudinal profiled outline at tunnel center;
Fig. 2 is the sectional view in A-A faces in Fig. 1;
Fig. 3 is the sectional view in the B-B faces in Fig. 1;
In figure:1- originals tunnel Internal periphery, the new tunnel Internal peripheries of 2-, 3- traffic shields, 4- precutting troughs, 5- support steel arch-shelfs, 6- are mixed Solidifying soil, 7- sections of jurisdiction Load -carring arch, 7a prefabricated pipe sections, 7b- wedgings section of jurisdiction, 8- excavation faces, 9- glass fibre anchor poles, 10- originals tunnel is faced upward Arch, 11- inverted arch link blocks.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of not making the creative labor Embodiment shall fall within the protection scope of the present invention.
As shown in Figure 1 to Figure 3, embodiment 1, a kind of construction method for widening traffic tunnel and uninterrupted traffic, including with Lower step:
Step 1:Traffic shield 3 is laid with, prefabricated traffic shield 3 is laid in existing tunnel, traffic shield 3 is by reinforced concrete Soil makes, and traffic shield 3 is through entire tunnel and original traffic route and the construction and excavation region segmentation that will be widened It comes, traffic shield 3 is circular for traffic aisle, and the peripheral of traffic shield is left blank in advance between former tunnel Internal periphery for construction Between.
Step 2:Precutting trough is constructed, and is continuously cut along the predetermined tunnel cross-section periphery widened using pre-cut scouring machine, together When in precutting trough 4 casting concrete, the protective case of dome-shaped is formed after the concrete setting in precutting trough 4.Protective case is along tunnel wheel Exterior feature plays support and protective effect in dome-shaped.
Step 3, section excavation carry out widening the excavation driving in face, are opened under the shielding of the protective case described in step 2 Excavate into excavation face 8 of the position between precutting trough 4 and former tunnel edge 1, the process that excavation face 8 excavates driving protecting always It is carried out in the length of shell covering;The construction of precutting trough 4 is worked by the way of cutting, the soil body is not caused to disturb.
Step 4, strengthening supporting carry out widening after face excavates driving for step 3, branch are set along exposed protective case inner surface Steel arch-shelf 5 is supportted, and gunite concrete 6 carries out strengthening supporting in support steel arch-shelf 5, setting support steel arch-shelf 5 and injection are mixed Smoother branch sheath is formed along the medial surface of precutting trough 4 after solidifying soil 6.
Step 5, prefabricated pipe section is assembled, along the branch sheath medial surface assembly prefabricated pipe section 7a described in step 4, prefabricated pipe section Section of jurisdiction Load -carring arch 7 is formed after 7a assembly on the inside of branch sheath, the medial surface of section of jurisdiction Load -carring arch 7 forms new tunnel Internal periphery 2.
Step 6 sets tunnel inverted arch, and inverted arch link block is set between the bottom of the section of jurisdiction Load -carring arch 7 described in step 5 11, section of jurisdiction Load -carring arch 7 and inverted arch 11 is made to form a complete section of jurisdiction carrying arcuation ring;
Step 7 repeats step 2 to the constructing operation of step 6, and the depth that the precutting trough 4 in step 2 is cut every time is 3 meters, until complete whole tunnel widen and lining cutting, widening for whole tunnel remove traffic shield 3 after the completion of lining cutting, complete tunnel Widen work in road.
Embodiment 2, a kind of construction method for widening traffic tunnel and uninterrupted traffic, the traffic shield described in step 1 3 be the prefabricated component of steel machine-shaping, and protection shield can not only effectively improve construction efficiency using prefabricated component assembly, but also can be with Reduce influence of the construction to existing traffic.
The depth that precutting trough 4 in step 2 is cut every time is 4 meters, after step 2 is carried out, before step 3, is excavated Setting glass fibre anchor pole 9 is reinforced in face 8, and 8 soil body of excavation face can be effectively prevent to loosen and large area is caused to cave in, and is protected Construction has been demonstrate,proved successfully to carry out.Other steps of the present embodiment are same as Example 1.
Embodiment 3, a kind of construction method for widening traffic tunnel and uninterrupted traffic, the precutting trough 4 in step 2 are each The depth of cutting is 6 meters, and after step 2 is carried out, before step 3, pre-grouting reinforcing, Ke Yijin are carried out in excavation face 8 One step effectively prevent 8 soil body of excavation face to loosen and large area is caused to cave in, and ensure that construction successfully carries out.The present embodiment its His step is same as Example 2.
Embodiment 4, a kind of construction method for widening traffic tunnel and uninterrupted traffic, the assembled prefabricated pipe described in step 5 Wedging carries out prefabricated pipe section 7a, while the back of section of jurisdiction ring 7 is carried out using conventional method using wedging section of jurisdiction 7b during piece 7a Fill slip casting.It is used cooperatively using wedging section of jurisdiction 7b and prefabricated pipe section 7a, the fastening of prefabricated pipe section 7a assembly can be effectively ensured Performance is filled slip casting to the back of section of jurisdiction ring 7 using conventional method, can be further ensured that the reliability of support.This implementation Other steps of example are same as Example 1.
Embodiment 5, a kind of construction method for widening traffic tunnel and uninterrupted traffic, the inverted arch connection described in step 6 Block 11 splices with 10 phase of former tunnel inverted arch.Prefabricated pipe section 7a and former tunnel inverted arch 10 are connected using inverted arch link block 11, not only may be used Construction cost is reduced, but also can be spliced, and then make construction based on former tunnel inverted arch 10 to save construction material It is more convenient.Other steps of the present embodiment are same as Example 1.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.

Claims (7)

1. a kind of construction method for widening traffic tunnel and uninterrupted traffic, which is characterized in that include the following steps:
Step 1:Traffic shield is laid with, traffic shield is laid in existing tunnel, traffic shield is original traffic route and will The construction and excavation region segmentation widened comes, and traffic shield is circular for traffic aisle, periphery and the original of traffic shield It is construction reserved space between tunnel Internal periphery;
Step 2:Precutting trough is constructed, and is continuously cut along the predetermined tunnel cross-section periphery widened using pre-cut scouring machine, while Casting concrete in precutting trough forms the protective case of dome-shaped after the concrete setting in precutting trough;
Step 3, section excavation carry out widening the excavation driving in face, excavate pick under the shielding of the protective case described in step 2 Into excavation face of the position between protective case and former tunnel Internal periphery, what the process that driving is excavated in face of widening covered always in protective case It is carried out in length;
Step 4, strengthening supporting carry out widening after face excavates driving for step 3, along exposed protective case installation support steel arch-shelf, Gunite concrete carries out strengthening supporting in support steel arch-shelf, along the inside of protective case after setting support steel arch-shelf and gunite concrete Face forms smoother branch sheath;
Step 5, prefabricated pipe section are assembled, along the branch sheath medial surface assembly prefabricated pipe section described in step 4, after prefabricated pipe section assembly Section of jurisdiction Load -carring arch is formed on the inside of branch sheath;
Step 6 sets tunnel inverted arch, and inverted arch link block is set between the bottom of the section of jurisdiction Load -carring arch described in step 5, makes pipe Piece Load -carring arch and inverted arch form a complete section of jurisdiction carrying arcuation ring;
Step 7 repeats step 2 to the constructing operation of step 6, until complete whole tunnel widen and lining cutting, it is whole The dismounting traffic shield after the completion of widening lining cutting in tunnel.
2. the construction method according to claim 1 for widening traffic tunnel and uninterrupted traffic, it is characterised in that:Step 1 Described in traffic shield disposably spread complete strips tunnel, whole tunnel to be done widen with disposably removed after lining cutting it is all Traffic shield.
3. the construction method according to claim 1 for widening traffic tunnel and uninterrupted traffic, it is characterised in that:Step 1 Described in traffic shield be pin-connected panel prefabricated shield.
4. the construction method according to claim 3 for widening traffic tunnel and uninterrupted traffic, it is characterised in that:The spelling The prefabricated shield of dress formula is the prefabricated component of steel machine-shaping or is the prefabricated component that armored concrete makes.
5. the construction method according to claim 1 for widening traffic tunnel and uninterrupted traffic, it is characterised in that:Carry out After step 2, before step 3, glass fibre bolt anchorage construction is carried out to excavation face.
6. widening the construction method of traffic tunnel and uninterrupted traffic according to claim 1-5 any one of them, feature exists In:After step 2 is carried out, before step 3, pre-grouting strengthening construction is carried out to excavation face.
7. the construction method according to claim 6 for widening traffic tunnel and uninterrupted traffic, it is characterised in that:Step 6 Described in inverted arch link block mutually splice with former tunnel inverted arch.
CN201711268427.XA 2017-12-05 2017-12-05 A kind of construction method for widening traffic tunnel and uninterrupted traffic Pending CN108131144A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711268427.XA CN108131144A (en) 2017-12-05 2017-12-05 A kind of construction method for widening traffic tunnel and uninterrupted traffic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711268427.XA CN108131144A (en) 2017-12-05 2017-12-05 A kind of construction method for widening traffic tunnel and uninterrupted traffic

Publications (1)

Publication Number Publication Date
CN108131144A true CN108131144A (en) 2018-06-08

Family

ID=62389904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711268427.XA Pending CN108131144A (en) 2017-12-05 2017-12-05 A kind of construction method for widening traffic tunnel and uninterrupted traffic

Country Status (1)

Country Link
CN (1) CN108131144A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594993A (en) * 2019-01-23 2019-04-09 四川交通职业技术学院 A kind of tunnel enlarging construction method in the case of uninterrupted traffic
CN110675725A (en) * 2019-09-11 2020-01-10 山东大学 Lining construction device and method in segmental excavation model test of multi-arch tunnel
CN113279295A (en) * 2021-05-13 2021-08-20 中铁五局集团成都工程有限责任公司 Construction traffic fluffing method for narrow urban road station in famous-region tourist area

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852525A (en) * 2012-09-29 2013-01-02 中铁二局股份有限公司 Underground tunnel enlarging and excavating method from small section of single-line tunnel to large section of double-line tunnel
CN103114856A (en) * 2013-03-05 2013-05-22 福州市规划设计研究院 Construction method for in-situ broadening and remolding of existing double-arched tunnel
CN103470285A (en) * 2013-09-27 2013-12-25 福州大学 Construction device for in-situ maintenance or extension of highway tunnel
CN104329095A (en) * 2014-09-03 2015-02-04 福州市规划设计研究院 Construction method for widening existing tunnel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852525A (en) * 2012-09-29 2013-01-02 中铁二局股份有限公司 Underground tunnel enlarging and excavating method from small section of single-line tunnel to large section of double-line tunnel
CN103114856A (en) * 2013-03-05 2013-05-22 福州市规划设计研究院 Construction method for in-situ broadening and remolding of existing double-arched tunnel
CN103470285A (en) * 2013-09-27 2013-12-25 福州大学 Construction device for in-situ maintenance or extension of highway tunnel
CN104329095A (en) * 2014-09-03 2015-02-04 福州市规划设计研究院 Construction method for widening existing tunnel

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
P LUNARDI等: "A new construction method for widening highway and railway tunnels", 《CONGRESSO INTERNAZIONALE SU》 *
中国科学技术情报研究所: "出国参观考察报告 79 019 国际隧道掘进技术", <科学技术文献出版社> *
李佳翰等: "既有隧道扩挖及改建技术探讨", 《隧道建设》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594993A (en) * 2019-01-23 2019-04-09 四川交通职业技术学院 A kind of tunnel enlarging construction method in the case of uninterrupted traffic
CN110675725A (en) * 2019-09-11 2020-01-10 山东大学 Lining construction device and method in segmental excavation model test of multi-arch tunnel
CN113279295A (en) * 2021-05-13 2021-08-20 中铁五局集团成都工程有限责任公司 Construction traffic fluffing method for narrow urban road station in famous-region tourist area

Similar Documents

Publication Publication Date Title
KR100632858B1 (en) Construction method of three arch excavation tunnel
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN104612698B (en) A kind of shallow-depth-excavation tunnel top bar interval wall construction method
CN1837506B (en) Construction method for excavating box-shape structure over an operating tunnel
CN108005664A (en) A kind of hole pile construction method of platform structure
CN108131144A (en) A kind of construction method for widening traffic tunnel and uninterrupted traffic
KR101391218B1 (en) Construction methods of close-twin tunnel by blast shock-controlling and rebar reinforced shotcrete
CN101270579B (en) Foundation pit guard method for expansion construction from deep foundation pit to shallow foundation pit
CN103590836B (en) Method for processing tunnel collapse caused by shallow-buried excavation
CN108442943A (en) A kind of branch-cut bridge section tunnel and Double side heading method construction method
CN105862930B (en) A kind of protection structure to creating existing tunnel below underground engineering
CN106894830B (en) A kind of double curvature arch supporting construction and construction method for underground engineering
CN108035733A (en) A kind of perpendicular support partial excavation method of rock matter large section tunnel steelframe dike combination
KR100877452B1 (en) Construction method of middle wall of three arch excavation tunnel
CN107575237A (en) A kind of subsurface excavation method is combined the construction method of construction subway station with shield method
CN108412502A (en) A kind of deep tunnel passes through upper-soft lower-hard ground construction method
CN108661652B (en) Reinforcing device and method for shield starting and receiving ends in mine tunnel
JP2001032673A (en) Tunnel work execution method
CN110439572A (en) A kind of ductule zero brushes slope and appears construction technology
CN105840203A (en) Large section loess tunnel pre-cutting method construction method
CN107339114B (en) Mountain highway tunnel portal critical slope pre-balancing stable control structure and method
CN206144578U (en) Last soft hard ground layer tunnel supporting structure down
JP2816741B2 (en) How to build a large cavity
CN211256952U (en) Newly-built enclosure structure of existing basement extension
CN208982058U (en) Vertical shaft surrounding rock supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180608