CN108120897A - 一种基于三相电流不平衡度计算模型的配网单相接地选线方法 - Google Patents
一种基于三相电流不平衡度计算模型的配网单相接地选线方法 Download PDFInfo
- Publication number
- CN108120897A CN108120897A CN201711335410.1A CN201711335410A CN108120897A CN 108120897 A CN108120897 A CN 108120897A CN 201711335410 A CN201711335410 A CN 201711335410A CN 108120897 A CN108120897 A CN 108120897A
- Authority
- CN
- China
- Prior art keywords
- mrow
- current
- msub
- mover
- phase
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/088—Aspects of digital computing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S10/52—Outage or fault management, e.g. fault detection or location
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Mathematical Physics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Locating Faults (AREA)
Abstract
本发明公开一种基于三相电流不平衡度计算模型的配网单相接地选线方法,属于电力选线领域。本发明通过在主站数据处理中心通过对SCADA系统的遥测数据进行实时采集,将整个配电网的数据进行管理分析,利用数据挖掘(如流计算)技术,实时监测10kV母线上各出线的三相(A、B、C)电流、电压变化,态掌握配电网的运行参数与状态,通过三相稳态电流不平衡度计算模型,给出故障线路排序和分析结果,从而对小电流单相接地故障进行实时诊断分析,能够快速定位配电网中小电流接地故障的线路与位置,并最终通过报表和图形化等方式及时展示分析的结果。本发明能够快速定位配电网中小电流接地故障的线路与位置,并通过报表和图形化等方式及时展示分析的结果。
Description
技术领域
本发明涉及一种基于三相电流不平衡度计算模型的配网单相接地选线方法,属于电力选线领域。
背景技术
地区10Kv配电网均采用中性点不接地运行方式,又称小电流接地系统。小电流接地系统的单相接地故障是常见的故障形式,占据配电网故障的50%以上。发生单相接地时,故障相电压降低为零或接近为零,非故障相电压升高为线电压或接近线电压,虽然系统仍可带接地点运行1~2小时,供电可靠性比大电流接地系统高,但是必须尽快找出故障点并隔离,以免事故扩大和设备损坏。但一直以来,由于故障电流较小、电弧不稳定等原因,小电流接地系统故障检测比较困难,接地线路的选择及具体接地点的定位一直没有得到很好的解决,严重阻碍了供电可靠性和自动化水平的提高。单相接地故障定位要解决的主要问题包括三部分:(1)当母线上有很多出线时,首先需要进行故障选线;(2)选出故障线后,因为一条配电线上可能有很多分支线,需要确定故障点所在的分支或者故障区段;(3)在故障分支或者故障区段中确定故障点位置。在传统的故障定位过程中,配电网一般采用逐条线路拉闸停电的方法来确定故障线路,在选出故障线路后,再派工作人员到现场沿线查找故障区段和故障点,然后切除故障,这种方法由于人工的介入,所需的停电时间比较长,不能适应人们对配电网自动化水平的新要求。因此,有很必要设计一个能够快速进行故障选线的方法。本专利提出了一种基于三相电流不平衡度计算模型的配网单相接地选线方法,能够快速精确的进行故障线路选线问题。
发明内容
1、要解决的问题
为了解决现有技术中针对配网单相接地故障快速精准选线问题,本发明提出了一种基于三相电流不平衡度计算模型的配网单相接地选线方法,基于配网基础数据集成和拓扑分析技术,利用三相电流不平衡度计算模型来解决上述问题。
2、技术方案
为解决上述问题,本发明采用如下的技术方案。
一种基于三相电流不平衡度计算模型的配网单相接地选线方法,该方法包括下列顺序的步骤:该方法基于三相稳态电流不平衡度计算模型做为故障选线的基础,通过对配网的电源、变压器、线路、负荷、量测等进行全模型构建,并通过大数据的结构化数据实时流式同步技术,对量测数据(电流、电压、功率)进行实时采集,实时监测10kV母线上各出线的三相(A、B、C)电流、电压变化,态掌握配电网的运行参数与状态,通过三相稳态电流不平衡度计算模型,给出故障线路排序和分析结果,从而对小电流单相接地故障进行实时诊断分析,能够快速定位配电网中小电流接地故障的线路与位置,并最终通过报表和图形化等方式及时展示分析的结果;
(1、)从SCADA系统获得当前电网拓扑CIM文件,取得电网设备的状态信息和关联关系;
(2、)从SCADA系统获得当前各开关状态(0或1),各设备的对应量测点数据(电流I,有功P,无功Q,电压V)
(3、)建立三相电流不平衡度计算模型进行分析
当中性点不接地系统发生单相接地时(图2)中A相接地,S打开表示中性点不接地系统),如果忽略负荷电流和电容电流在线路阻抗上的电压降,全系统A相对地电压均为零,A相对地电容电流也为零,同时B相和C相的对地电压和电容电流也都升高倍,这时的电流分布如图2示;
非故障线路I始端所反应的零序电流为
即非故障线路零序电流为其本身的电流,电容性无功功率的方向为母线流向线路;
对于故障线路J,B相和C相与非故障线路一样,流过本身对地电流和而不同之处是在接地点要流回全系统B相和C相对地电流之和,其值为
此电流要从A相流回去,因此从A相流出的电流为
因此,故障线路J始端所反应的零序电流为
即故障线路零序电流,数值等于全系统非故障元件对地电容电流之总和(不包括故障线路本身),电容性无功功率方向为由线路流向母线,方向与非故障线路相反;
(4、)遍历CIM模型中的所有关键设备节点,如果其隶属于可信集合U的概率大于隶属于不可信集合V的概率,则设定CIM模型中的该节点有效,否则,设定该节点无效,从而通过对CIM模型的设备关联性分析,找出具体故障线路设备位置和实测数据;
(5、)给出线路排序和分析结果,从而对小电流单相接地故障进行实时诊断分析,并最终通过报表和图形化等方式及时展示分析的结果。
优选地,依据IEC61850标准和面向对象的方法,对配网的电源、变压器、线路、负荷、量测等进行全模型构建,并通过大数据的结构化数据实时流式同步技术,对量测数据(电流、电压、功率)进行实时采集。
优选地,当故障线路三相零序电流,数值等于全系统非故障元件对地电容电流之总和,且三相零序电流不平衡度比超50%时,判断故障相位。
优选地,建立关键设备节点的可信集合,构建隶属度函数,从而得到可信度向量关系,包括母线类型、开关类型、变压器类型和导线类型四类电气设备。
优选地,基于配网CIM模型、实测量测数据(电流、电压、功率)和遥信状态数据(设备状态数据)进行网络拓扑分析。
3、有益效果
相比于现有技术,本发明的有益效果为:
本发明基于配网基础数据集成和拓扑分析技术,提出了一种基于三相电流不平衡度计算模型的配网单相接地选线方法,能够快速精确的进行故障线路选线问题。本发明的技术方案通过主站数据处理中心通过对SCADA系统的遥测数据进行实时采集,将整个配电网的数据进行管理和分析,利用数据挖掘(如流计算)技术,实时监测10kV母线上各出线的三相(A、B、C)电流、电压变化,态掌握配电网的运行参数与状态,通过三相稳态电流不平衡度计算模型,给出故障线路排序和分析结果,从而对小电流单相接地故障进行实时诊断分析,能够快速定位配电网中小电流接地故障的线路与位置,并最终通过报表和图形化等方式及时展示分析的结果。
附图说明
图1为本发明的步骤流程图;
图2为中性点非直接接地系统中,用三相系统表示的单相接地时的电流分布图;
图3中性点非直接接地系统中,用零序等效网络表示的单相接地时的电流分布图。
具体实施方式
下面结合附图对本发明进行详细描述。
当中性点不接地系统由于绝缘损坏而发生单相接地故障时,单相故障接地点和线路的对地电容构成回路,系统中和线路上分别产生了零序电压和零序电流。考虑到系统不同运行状态下的区别,主要三种不同的单相接地故障类型:金属性接地故障、经小电阻接地故障、带负荷接地。
当中性点不接地配电网发生单相接地故障时,有以下情况:
(1)中性点对地电压与接地相的相电压大小相等、方向相反,并等于电网中出现的零序电压。由于线路上的零序电流较小,故全网零序电压近似相等。
(2)非故障线路上的零序电流为其本身的容性电流,零序电流超前零序电压90°。
(3)故障线路上的始端至接地点流过的是所有非故障线路上零序电流与故障线路接地点之前的零序电流之和,且滞后零序电压90°;故障线路接地点之后流过的是其本身的零序电流,且超前零序电压90°。
(4)故障线路从始端开始,距故障点越近,零序电流越大;故障点之后线路上零序电流大小与线路长度有关。
(5)接地过渡电阻的大小只影响零序电压的大小,进而影响零序电流的大小,且随着接地过渡电阻的增大,零序电压零序电流均减小。但其并不影响系统中各线路上零序电压与零序电流的相位关系,上述结论(1)依然成立。
(6)线路负载情况下,中性点不接地系统如果正常运行,则负荷电流不能产生零序电流;若系统发生单相接地故障,由于各线路上的线电压没有改变,所以负荷不发生变化,故负荷电流依然不产生零序电流,线路的对地电容电流仍然是零序电流的唯一来源,上述结论(1)依然成立。
根据前面对中性点不接地配电网发生单相接地故障的分析可知:以网络的正方向作为零序电流的正方向,则故障路径上的零序电流滞后零序电压90°,非故障路径上的零序电流超前零序电压90°。以上即为零序电流相量比较法的比较判据。
结合图1,本发明解决其技术问题所采用的技术方案是:
(1)配网全模型构建与数据采集
(1.1)对配网的电源、变压器、线路、负荷、量测等进行模型构建
(1.2)对量测数据(电流、电压、功率)进行实时采集
(1.3)从SCADA系统获得当前电网拓扑CIM文件,取得电网设备的状态信息和关联关系;
(2)建立三相电流不平衡度计算模型
当中性点不接地系统发生单相接地时(图2)中A相接地,S打开表示中性点不接地系统),如果忽略负荷电流和电容电流在线路阻抗上的电压降,全系统A相对地电压均为零,A相对地电容电流也为零,同时B相和C相的对地电压和电容电流也都升高倍。这时的电流分布如图2示。
非故障线路I始端所反应的零序电流为
即非故障线路零序电流为其本身的电流,电容性无功功率的方向为母线流向线路。
对于故障线路J,B相和C相与非故障线路一样,流过本身对地电流和而不同之处是在接地点要流回全系统B相和C相对地电流之和,其值为
此电流要从A相流回去,因此从A相流出的电流为
因此,故障线路J始端所反应的零序电流为
即故障线路零序电流,数值等于全系统非故障元件对地电容电流之总和(不包括故障线路本身),电容性无功功率方向为由线路流向母线,方向与非故障线路相反,如图2、图3所示。
(3)根据CIM模型进行拓扑分析
(3.1)遍历CIM模型中的所有关键设备节点xi,如果其隶属于可信集合U的概率大于隶属于不可信集合V的概率,则设定CIM模型中的该节点xi有效。否则,设定该节点无效。
(3.2)输出所有的标记为有效的设备节点,通过接口保存至SCADA系统中,并设定分析标志位为1。
(3.3)从EMS系统获得新的数据,即t+1时刻的各开关状态(0或1),各设备的对应量测点数据(电流I,有功P,无功Q,电压V)。
(4)计算结果展示
实现配网网架结构的可视化展示,生动地显示电网运行信息,以电网互动计算为核心,提供实时动态、虚拟场景的高级可视化电网运行展示方式,实现地区电网可视化、智能化决策。
下面,结合具体例子,具体介绍本发明的方案:
基于模糊推理的CIM模型拓扑实时规约与修正方法,包括以下步骤:
第一步:从SCADA系统获得当前电网拓扑CIM描述文件
第二步:从SCADA系统获得当前各开关状态(0或1),各设备的对应量测点数据(有功P,无功Q,电压V)
第三步:建立三相电流不平衡度计算模型进行分析
当中性点不接地系统发生单相接地时(图2)中A相接地,S打开表示中性点不接地系统),如果忽略负荷电流和电容电流在线路阻抗上的电压降,全系统A相对地电压均为零,A相对地电容电流也为零,同时B相和C相的对地电压和电容电流也都升高倍。这时的电流分布如图2示。
非故障线路I始端所反应的零序电流为
即非故障线路零序电流为其本身的电流,电容性无功功率的方向为母线流向线路。
对于故障线路J,B相和C相与非故障线路一样,流过本身对地电流和而不同之处是在接地点要流回全系统B相和C相对地电流之和,其值为
此电流要从A相流回去,因此从A相流出的电流为
因此,故障线路J始端所反应的零序电流为
即故障线路零序电流,数值等于全系统非故障元件对地电容电流之总和(不包括故障线路本身),电容性无功功率方向为由线路流向母线,方向与非故障线路相反。
第四步:遍历CIM模型中的所有关键设备节点xi,如果其隶属于可信集合U的概率大于隶属于不可信集合V的概率,则设定CIM模型中的该节点xi有效。否则,设定该节点无效。从而通过对CIM模型的设备关联性分析,找出具体故障线路设备位置和实测数据;
第五步:给出线路排序和分析结果,从而对小电流单相接地故障进行实时诊断分析,并最终通过报表和图形化等方式及时展示分析的结果。下面结合具体实施例对本发明进一步进行描述。
Claims (5)
1.一种基于三相电流不平衡度计算模型的配网单相接地选线方法,该方法包括下列顺序的步骤:该方法基于三相稳态电流不平衡度计算模型做为故障选线的基础,通过对配网的电源、变压器、线路、负荷、量测等进行全模型构建,并通过大数据的结构化数据实时流式同步技术,对量测数据(电流、电压、功率)进行实时采集,实时监测10kV母线上各出线的三相(A、B、C)电流、电压变化,态掌握配电网的运行参数与状态,通过三相稳态电流不平衡度计算模型,给出故障线路排序和分析结果,从而对小电流单相接地故障进行实时诊断分析,能够快速定位配电网中小电流接地故障的线路与位置,并最终通过报表和图形化等方式及时展示分析的结果;
(1、)从SCADA系统获得当前电网拓扑CIM文件,取得电网设备的状态信息和关联关系;
(2、)从SCADA系统获得当前各开关状态(0或1),各设备的对应量测点数据(电流I,有功P,无功Q,电压V)
(3、)建立三相电流不平衡度计算模型进行分析
当中性点不接地系统发生单相接地时中A相接地,S打开表示中性点不接地系统),如果忽略负荷电流和电容电流在线路阻抗上的电压降,全系统A相对地电压均为零,A相对地电容电流也为零,同时B相和C相的对地电压和电容电流也都升高倍;
非故障线路I始端所反应的零序电流为
<mrow>
<mn>3</mn>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mn>0</mn>
<mi>I</mi>
</mrow>
</msub>
<mo>=</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>B</mi>
<mi>I</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>C</mi>
<mi>I</mi>
</mrow>
</msub>
<mo>-</mo>
<mo>-</mo>
<mo>-</mo>
<mrow>
<mo>(</mo>
<mn>2</mn>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
</mrow>
即非故障线路零序电流为其本身的电流,电容性无功功率的方向为母线流向线路;
对于故障线路J,B相和C相与非故障线路一样,流过本身对地电流和而不同之处是在接地点要流回全系统B相和C相对地电流之和,其值为
<mrow>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mi>d</mi>
</msub>
<mo>=</mo>
<mrow>
<mo>(</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>B</mi>
<mi>I</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>C</mi>
<mi>I</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
<mo>+</mo>
<mrow>
<mo>(</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>B</mi>
<mi>J</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>C</mi>
<mi>J</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
<mo>+</mo>
<mrow>
<mo>(</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>B</mi>
<mi>F</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>C</mi>
<mi>F</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
<mo>-</mo>
<mo>-</mo>
<mo>-</mo>
<mrow>
<mo>(</mo>
<mn>2</mn>
<mo>-</mo>
<mn>2</mn>
<mo>)</mo>
</mrow>
</mrow>
此电流要从A相流回去,因此从A相流出的电流为
因此,故障线路J始端所反应的零序电流为
<mrow>
<mn>3</mn>
<msup>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mn>0</mn>
<mi>J</mi>
</mrow>
</msub>
<mo>&prime;</mo>
</msup>
<mo>=</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>A</mi>
<mi>J</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>B</mi>
<mi>J</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>C</mi>
<mi>J</mi>
</mrow>
</msub>
<mo>=</mo>
<mo>-</mo>
<mrow>
<mo>(</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>B</mi>
<mi>I</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>C</mi>
<mi>I</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>B</mi>
<mi>F</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mover>
<mi>I</mi>
<mo>&CenterDot;</mo>
</mover>
<mrow>
<mi>C</mi>
<mi>F</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
<mo>-</mo>
<mo>-</mo>
<mo>-</mo>
<mrow>
<mo>(</mo>
<mn>2</mn>
<mo>-</mo>
<mn>3</mn>
<mo>)</mo>
</mrow>
</mrow>
即故障线路零序电流,数值等于全系统非故障元件对地电容电流之总和(不包括故障线路本身),电容性无功功率方向为由线路流向母线,方向与非故障线路相反;
(4、)遍历CIM模型中的所有关键设备节点,如果其隶属于可信集合U的概率大于隶属于不可信集合V的概率,则设定CIM模型中的该节点有效,否则,设定该节点无效,从而通过对CIM模型的设备关联性分析,找出具体故障线路设备位置和实测数据;
(5、)给出线路排序和分析结果,从而对小电流单相接地故障进行实时诊断分析,并最终通过报表和图形化等方式及时展示分析的结果。
2.根据权利要求1所述的基于三相电流不平衡度计算模型的配网单相接地选线方法,其特征在于:依据IEC61850标准和面向对象的方法,对配网的电源、变压器、线路、负荷、量测等进行全模型构建,并通过大数据的结构化数据实时流式同步技术,对量测数据(电流、电压、功率)进行实时采集。
3.根据权利要求1所述的基于三相电流不平衡度计算模型的配网单相接地选线方法,其特征在于:当故障线路三相零序电流,数值等于全系统非故障元件对地电容电流之总和,且三相零序电流不平衡度比超50%时,判断故障相位。
4.根据权利要求1所述的基于三相电流不平衡度计算模型的配网单相接地选线方法,其特征在于:建立关键设备节点的可信集合,构建隶属度函数,从而得到可信度向量关系,包括母线类型、开关类型、变压器类型和导线类型四类电气设备。
5.根据权利要求3所述的基于三相电流不平衡度计算模型的配网单相接地选线方法,其特征在于:基于配网CIM模型、实测量测数据(电流、电压、功率)和遥信状态数据(设备状态数据)进行网络拓扑分析。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711335410.1A CN108120897A (zh) | 2017-12-14 | 2017-12-14 | 一种基于三相电流不平衡度计算模型的配网单相接地选线方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711335410.1A CN108120897A (zh) | 2017-12-14 | 2017-12-14 | 一种基于三相电流不平衡度计算模型的配网单相接地选线方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108120897A true CN108120897A (zh) | 2018-06-05 |
Family
ID=62229893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711335410.1A Pending CN108120897A (zh) | 2017-12-14 | 2017-12-14 | 一种基于三相电流不平衡度计算模型的配网单相接地选线方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108120897A (zh) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110133446A (zh) * | 2019-06-12 | 2019-08-16 | 中国石化集团胜利石油管理局有限公司电力分公司 | 拓扑图形化的小电流接地故障选线方法与装置 |
CN110261720A (zh) * | 2019-08-06 | 2019-09-20 | 云南电网有限责任公司电力科学研究院 | 配电网接地故障的单相接地判别方法及装置 |
CN110568300A (zh) * | 2019-06-24 | 2019-12-13 | 昆明理工大学 | 一种基于多源信息的配电网单相接地故障辨识方法 |
CN110707670A (zh) * | 2019-10-24 | 2020-01-17 | 南方电网科学研究院有限责任公司 | 一种变电站小电阻接地装置及其控制方法 |
CN110716154A (zh) * | 2019-10-23 | 2020-01-21 | 国网四川省电力公司南充供电公司 | 一种小电流接地故障智能切除系统 |
CN110763943A (zh) * | 2019-11-20 | 2020-02-07 | 中国南方电网有限责任公司 | 电流电能质量数据的获取方法、装置和计算机设备 |
CN110879332A (zh) * | 2019-12-05 | 2020-03-13 | 南京南瑞继保电气有限公司 | 一种适用于小电流接地系统的单相接地故障选相方法 |
CN111624408A (zh) * | 2020-05-27 | 2020-09-04 | 南京信息工程大学 | 基于共生多元泛函计算的电力线路对地电容实时测量方法 |
CN112363025A (zh) * | 2020-12-14 | 2021-02-12 | 广东电网有限责任公司 | 一种配电网单相接地故障诊断方法及系统 |
CN113742508A (zh) * | 2021-07-30 | 2021-12-03 | 国网河南省电力公司信息通信公司 | 一种电力设备在线监测海量信息的图形数据挖掘方法 |
CN113791304A (zh) * | 2021-08-23 | 2021-12-14 | 珠海许继芝电网自动化有限公司 | 故障类型及故障区段识别方法 |
CN113917276A (zh) * | 2021-07-19 | 2022-01-11 | 国网浙江省电力有限公司电力科学研究院 | 中压侧小电流系统单相接地短路故障定位方法及系统 |
CN114089107A (zh) * | 2021-11-16 | 2022-02-25 | 国网福建省电力有限公司南平供电公司 | 用于单相接地故障处置的变电站中心点接地的电容器选线方法 |
CN114188958A (zh) * | 2021-11-18 | 2022-03-15 | 南京大全电气研究院有限公司 | 一种电网三相不平衡研判方法、系统及配变终端 |
CN114545149A (zh) * | 2022-01-21 | 2022-05-27 | 国网浙江省电力有限公司嘉兴供电公司 | 一种小电流接地系统10kV线路单相接地故障定位方法 |
CN114675212A (zh) * | 2022-03-25 | 2022-06-28 | 江苏方天电力技术有限公司 | 一种配电变压器中性点连接异常研判方法 |
CN117991046A (zh) * | 2024-03-20 | 2024-05-07 | 国网江苏省电力有限公司南通市海门区供电分公司 | 一种高精度暂态录波故障在线监测系统及方法 |
CN118641891A (zh) * | 2024-08-15 | 2024-09-13 | 青岛鼎信通讯股份有限公司 | 一种配电网单相接地故障的识别方法、装置、设备及介质 |
-
2017
- 2017-12-14 CN CN201711335410.1A patent/CN108120897A/zh active Pending
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110133446B (zh) * | 2019-06-12 | 2021-04-13 | 中国石化集团胜利石油管理局有限公司电力分公司 | 拓扑图形化的小电流接地故障选线方法与装置 |
CN110133446A (zh) * | 2019-06-12 | 2019-08-16 | 中国石化集团胜利石油管理局有限公司电力分公司 | 拓扑图形化的小电流接地故障选线方法与装置 |
CN110568300A (zh) * | 2019-06-24 | 2019-12-13 | 昆明理工大学 | 一种基于多源信息的配电网单相接地故障辨识方法 |
CN110568300B (zh) * | 2019-06-24 | 2021-07-13 | 昆明理工大学 | 一种基于多源信息的配电网单相接地故障辨识方法 |
CN110261720A (zh) * | 2019-08-06 | 2019-09-20 | 云南电网有限责任公司电力科学研究院 | 配电网接地故障的单相接地判别方法及装置 |
CN110261720B (zh) * | 2019-08-06 | 2021-01-29 | 云南电网有限责任公司电力科学研究院 | 配电网接地故障的单相接地判别方法及装置 |
CN110716154A (zh) * | 2019-10-23 | 2020-01-21 | 国网四川省电力公司南充供电公司 | 一种小电流接地故障智能切除系统 |
CN110707670A (zh) * | 2019-10-24 | 2020-01-17 | 南方电网科学研究院有限责任公司 | 一种变电站小电阻接地装置及其控制方法 |
CN110763943A (zh) * | 2019-11-20 | 2020-02-07 | 中国南方电网有限责任公司 | 电流电能质量数据的获取方法、装置和计算机设备 |
CN110763943B (zh) * | 2019-11-20 | 2022-09-23 | 中国南方电网有限责任公司 | 电流电能质量数据的获取方法、装置和计算机设备 |
CN110879332A (zh) * | 2019-12-05 | 2020-03-13 | 南京南瑞继保电气有限公司 | 一种适用于小电流接地系统的单相接地故障选相方法 |
CN110879332B (zh) * | 2019-12-05 | 2022-03-29 | 南京南瑞继保电气有限公司 | 一种适用于小电流接地系统的单相接地故障选相方法 |
CN111624408A (zh) * | 2020-05-27 | 2020-09-04 | 南京信息工程大学 | 基于共生多元泛函计算的电力线路对地电容实时测量方法 |
CN112363025A (zh) * | 2020-12-14 | 2021-02-12 | 广东电网有限责任公司 | 一种配电网单相接地故障诊断方法及系统 |
CN113917276A (zh) * | 2021-07-19 | 2022-01-11 | 国网浙江省电力有限公司电力科学研究院 | 中压侧小电流系统单相接地短路故障定位方法及系统 |
CN113917276B (zh) * | 2021-07-19 | 2023-12-26 | 国网浙江省电力有限公司电力科学研究院 | 中压侧小电流系统单相接地短路故障定位方法及系统 |
CN113742508A (zh) * | 2021-07-30 | 2021-12-03 | 国网河南省电力公司信息通信公司 | 一种电力设备在线监测海量信息的图形数据挖掘方法 |
CN113742508B (zh) * | 2021-07-30 | 2023-09-08 | 国网河南省电力公司信息通信公司 | 一种电力设备在线监测海量信息的图形数据挖掘方法 |
CN113791304B (zh) * | 2021-08-23 | 2024-04-09 | 珠海许继芝电网自动化有限公司 | 故障类型及故障区段识别方法 |
CN113791304A (zh) * | 2021-08-23 | 2021-12-14 | 珠海许继芝电网自动化有限公司 | 故障类型及故障区段识别方法 |
CN114089107B (zh) * | 2021-11-16 | 2023-12-22 | 国网福建省电力有限公司南平供电公司 | 用于单相接地故障处置的变电站中心点接地的电容器选线方法 |
CN114089107A (zh) * | 2021-11-16 | 2022-02-25 | 国网福建省电力有限公司南平供电公司 | 用于单相接地故障处置的变电站中心点接地的电容器选线方法 |
CN114188958A (zh) * | 2021-11-18 | 2022-03-15 | 南京大全电气研究院有限公司 | 一种电网三相不平衡研判方法、系统及配变终端 |
CN114545149A (zh) * | 2022-01-21 | 2022-05-27 | 国网浙江省电力有限公司嘉兴供电公司 | 一种小电流接地系统10kV线路单相接地故障定位方法 |
CN114675212A (zh) * | 2022-03-25 | 2022-06-28 | 江苏方天电力技术有限公司 | 一种配电变压器中性点连接异常研判方法 |
CN114675212B (zh) * | 2022-03-25 | 2024-06-04 | 江苏方天电力技术有限公司 | 一种配电变压器中性点连接异常研判方法 |
CN117991046A (zh) * | 2024-03-20 | 2024-05-07 | 国网江苏省电力有限公司南通市海门区供电分公司 | 一种高精度暂态录波故障在线监测系统及方法 |
CN118641891A (zh) * | 2024-08-15 | 2024-09-13 | 青岛鼎信通讯股份有限公司 | 一种配电网单相接地故障的识别方法、装置、设备及介质 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108120897A (zh) | 一种基于三相电流不平衡度计算模型的配网单相接地选线方法 | |
CN103308823B (zh) | 一种配电网单相断线不接地故障定位方法 | |
CN104297632B (zh) | 有限pmu下基于最小二乘法估计的电网故障在线检测方法 | |
CN102064537B (zh) | 基于电子互感器的单相接地故障判断处理方法 | |
CN110118913A (zh) | 一种消弧线圈分散补偿配电网接地故障选线方法 | |
CN101435845B (zh) | 小接地电流系统双回线单相接地故障测距方法 | |
CN106646130B (zh) | 一种基于电流极性比较的主动配电网故障定位方法及系统 | |
CN104375056B (zh) | 基于电压及电流初始行波的变电站电缆出线故障监测方法 | |
CN105785232A (zh) | 小电流接地系统单相接地故障综合选线方法 | |
CN108957243A (zh) | 一种应用于配电网的单相接地故障定位方法及系统 | |
CN108594077A (zh) | 一种基于监测点观测交叉区域的电压暂降故障源定位方法 | |
CN103364684B (zh) | 一种基于小波分析的故障选线方法 | |
CN111781461B (zh) | 一种小电流接地电力系统的接地故障选线定段方法 | |
CN103852693B (zh) | 一种小电流接地选线系统的判断方法 | |
CN109917175A (zh) | 一种针对高抗退出时的过电压快速预测方法 | |
CN104316836A (zh) | 基于相对保护熵与名义过渡电阻的电网故障在线检测方法 | |
CN104253421A (zh) | 一种基于站域信息共享的同杆双回线路继电保护优化配置方法 | |
CN108181550A (zh) | 一种交流微电网故障类型判断和选相方法 | |
CN106026053A (zh) | 基于低励磁阻抗变压器单相接地故障定位隔离系统和方法 | |
CN109031044A (zh) | 一种调度端变电站小电流单相接地自动选线方法 | |
CN106443334B (zh) | 一种基于零序电流差分极性比较的配电网故障选线方法 | |
CN102969695A (zh) | 中性点经小电阻接地方式时的接地预告方法 | |
CN104020394A (zh) | 基于网络技术的供电系统小电流选线方法 | |
CN206147037U (zh) | 一种基于中性点灵活接地方式的故障选线装置 | |
CN104931859A (zh) | 基于分布式录波的故障监测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180605 |
|
WD01 | Invention patent application deemed withdrawn after publication |