CN108119153A - Shield grouting transport system with segmentation reducing driving structure - Google Patents

Shield grouting transport system with segmentation reducing driving structure Download PDF

Info

Publication number
CN108119153A
CN108119153A CN201711495173.5A CN201711495173A CN108119153A CN 108119153 A CN108119153 A CN 108119153A CN 201711495173 A CN201711495173 A CN 201711495173A CN 108119153 A CN108119153 A CN 108119153A
Authority
CN
China
Prior art keywords
pressurizing chamber
pipe
mixing
advanced
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711495173.5A
Other languages
Chinese (zh)
Inventor
易辉
周思峰
殷华斌
李琼
郭伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201711495173.5A priority Critical patent/CN108119153A/en
Publication of CN108119153A publication Critical patent/CN108119153A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses the shield grouting transport systems with segmentation reducing driving structure, the mixing of slip casting liquid pipe, auxiliary additive pipe is realized by mixing cavity volume first, then cavity volume is mixed to input the slurries of mixing into secondary mixing pressurizing chamber, slurries are carried out primary pressure processing by secondary mixing pressurizing chamber, slurries after pressurization are mixed into advanced in pressurizing chamber, secondary mixing pressurizing chamber and advanced mixing pressurizing chamber are the holding cavity structure of spiral gradient, realize being sufficiently mixed and pressurizeing for slurries with this configuration;Check valve ensures the stabilization of each pipeline, and the pipeline after slip casting is finally exported through slip casting delivery pipe.Whole system can be stablized, uniformly.

Description

Shield grouting transport system with segmentation reducing driving structure
Technical field
The invention discloses a kind of structure that slip casting is carried out to the shield machine soil body more particularly to segmentation reducing driving structure Shield grouting transport system, belong to shield machine construction technical field.
Background technology
In shield tunneling process, grouting behind shaft or drift lining mainly solves the problems, such as following:
(1) stratum deformation is controlled.Since the digging diameter of cutter head of shield machine is more than section of jurisdiction outer diameter, pipe sheet assembling finishes abjection After shield tail, an annular gap, abbreviation gap of the shield tail are formed between the soil body.If gap of the shield tail cannot be filled in time, gesture Stratum deformation must be caused, adjacent earth's surface building, structure sedimentation or tunnel is made to generate offset in itself.Grouting at the tail of the shield machine it is most heavy Syllabus is exactly timely filling gap of the shield tail, prevents from causing stratum that larger deformation occurs because of the presence of gap of the shield tail.
(2) impermeability in tunnel is improved.After grouting at the tail of the shield machine solidification, generally there is anti-permeability performance, it can be as the first of tunnel Road water-proof wire, so as to improve the anti-permeability performance in tunnel.
(3) slurries for possessing certain early strength fill gap of the shield tail in time, it can be ensured that the early strength of pipe-plate lining And stability at later stage.Shield tunnel is the structure of a kind of pipe-plate lining and the coefficient stable structure of country rock, and section of jurisdiction is carried on the back It uniformly, densely injects, fill the precondition for being to ensure that soil pressure stepless action in face gap.
Therefore, when pipe-plate lining carries out assembled, ensure slurries uniformly, to be densely attached with the soil body be very Important.
The content of the invention
It is an object of the invention to be directed to during shield machine excavates effectively to connect pipe-plate lining, therefore devise a set of Injection slurry and additive carry out effectively mixing compression system, and guarantee slurries are uniform, dense packing effect.
The uniform mixing slurry mixed by adding a mixing chamber realization, injection slurry and additive of injection slurry and additive It when liquid is output, is realized by a spiral gradient cavity volume, the final pressurization for realizing slurries.
To achieve the above object, the technical solution adopted by the present invention is the shield grouting conveying with segmentation reducing driving structure System, the system include slip casting liquid pipe 1, auxiliary additive pipe 2, mixing cavity volume 3, secondary mixing pressurizing chamber 4, advanced mixing pressurization Chamber 5, slip casting delivery pipe 6, force (forcing) pump 7 and check valve 8.
Slip casting liquid pipe 1, auxiliary additive pipe 2 are connected with mixing cavity volume 3, and the delivery outlet of mixing cavity volume 3 passes through first segment Pipeline is connected with secondary mixing pressurizing chamber 4, and secondary mixing pressurizing chamber 4 is connected by the second segment pipe with advanced mixing pressurizing chamber 5, Advanced mixing pressurizing chamber 5 is connected by the 3rd segment pipe with slip casting delivery pipe 6.
The diameter of first segment pipe, the diameter of the second segment pipe, the diameter of the 3rd segment pipe taper into, in systems shape Into segmentation reducing pressurizing structure.
Check valve 8 is equipped in first segment pipe, the second segment pipe, the 3rd segment pipe.
Advanced mixing pressurizing chamber 5 is connected with force (forcing) pump 7.
It is the structure of spiral gradient in secondary mixing pressurizing chamber 4, advanced mixing pressurizing chamber 5, by entrance to outlet Volume taper into, volume gradual change is utilized to realize primary and advanced two-step supercharging.
Compared with prior art, the present invention has the advantages that.
The present invention realizes the mixing of slip casting liquid pipe, auxiliary additive pipe by mixing cavity volume first, and then mixing cavity volume will The slurries of mixing are inputted to secondary and mixed in pressurizing chamber, and slurries are carried out primary pressure processing by secondary mixing pressurizing chamber, after pressurization Slurries into it is advanced mixing pressurizing chamber in, secondary mixing pressurizing chamber and it is advanced mixing pressurizing chamber be spiral gradient cavity volume knot Structure realizes being sufficiently mixed and pressurizeing for slurries with this configuration;Check valve ensures the stabilization of each pipeline, and the pipeline after slip casting is most It is exported eventually through slip casting delivery pipe.Whole system can be stablized, uniformly, densely be attached slurries and section of jurisdiction, economic performance It is good cost-effective.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structure diagram of mixing pressurizing chamber.
In figure:1st, slip casting liquid pipe, 2, auxiliary additive pipe, 3, mixing cavity volume, 4, secondary mixing pressurizing chamber, 5, advanced mixing Pressurizing chamber, 6, slip casting delivery pipe, 7, force (forcing) pump, 8 check valves.
Specific embodiment
As shown in Figs. 1-2, with segmentation reducing driving structure shield grouting transport system, the system include slip casting liquid pipe 1, Auxiliary additive pipe 2, mixing cavity volume 3, secondary mixing pressurizing chamber 4, advanced mixing pressurizing chamber 5, slip casting delivery pipe 6,7 and of force (forcing) pump Check valve 8.
Slip casting liquid pipe 1, auxiliary additive pipe 2 are connected with mixing cavity volume 3, and the delivery outlet of mixing cavity volume 3 passes through first segment Pipeline is connected with secondary mixing pressurizing chamber 4, and secondary mixing pressurizing chamber 4 is connected by the second segment pipe with advanced mixing pressurizing chamber 5, Advanced mixing pressurizing chamber 5 is connected by the 3rd segment pipe with slip casting delivery pipe 6.
The diameter of first segment pipe, the diameter of the second segment pipe, the diameter of the 3rd segment pipe taper into, in systems shape Into segmentation reducing pressurizing structure.
Check valve 8 is equipped in first segment pipe, the second segment pipe, the 3rd segment pipe.
Advanced mixing pressurizing chamber 5 is connected with force (forcing) pump 7.
It is the structure of spiral gradient in secondary mixing pressurizing chamber 4, advanced mixing pressurizing chamber 5, by entrance to outlet Volume taper into, volume gradual change is utilized to realize primary and advanced two-step supercharging.
The present invention realizes the mixing of slip casting liquid pipe, auxiliary additive pipe by mixing cavity volume first, and then mixing cavity volume will The slurries of mixing are inputted to secondary and mixed in pressurizing chamber, and slurries are carried out primary pressure processing by secondary mixing pressurizing chamber, after pressurization Slurries into it is advanced mixing pressurizing chamber in, secondary mixing pressurizing chamber and it is advanced mixing pressurizing chamber be spiral gradient cavity volume knot Structure realizes being sufficiently mixed and pressurizeing for slurries with this configuration;Check valve ensures the stabilization of each pipeline, and the pipeline after slip casting is most It is exported eventually through slip casting delivery pipe.Whole system can be stablized, uniformly, densely be attached slurries and section of jurisdiction, economic performance It is good cost-effective.
The principle that tradition is driven pipeline by booster pump is different from, structure according to the present invention utilizes spiral gradient With capacity cavity configuration, pressurize to mixed serum, meanwhile, the pipeline reducing diameter structure of three-level gradual change is also constituted to system sheet The driving structure of body supercharging;Compared with prior art, the system combines hydraulic principle and engine driven supercharging principle, is applied In shield grouting system, realize shield grouting process stabilization, rationally, uniformly.

Claims (5)

1. the shield grouting transport system with segmentation reducing driving structure, it is characterised in that:The system include slip casting liquid pipe (1), Auxiliary additive pipe (2), mixing cavity volume (3), secondary mixing pressurizing chamber (4), advanced mixing pressurizing chamber (5), slip casting delivery pipe (6), force (forcing) pump (7) and check valve (8);
Slip casting liquid pipe (1), auxiliary additive pipe (2) be connecteds with mixing cavity volume (3), mix the delivery outlet of cavity volume (3) by the One segment pipe is connected with secondary mixing pressurizing chamber (4), and secondary mixing pressurizing chamber (4) mixes pressurization by the second segment pipe with advanced Chamber (5) connects, and advanced mixing pressurizing chamber (5) is connected by the 3rd segment pipe with slip casting delivery pipe (6).
2. the shield grouting transport system of band segmentation reducing driving structure according to claim 1, it is characterised in that:First The diameter of segment pipe, the diameter of the second segment pipe, the diameter of the 3rd segment pipe taper into, and form segmentation reducing in systems and increase Laminated structure.
3. the shield grouting transport system of band segmentation reducing driving structure according to claim 1, it is characterised in that:First Check valve (8) is equipped in segment pipe, the second segment pipe, the 3rd segment pipe.
4. the shield grouting transport system of band segmentation reducing driving structure according to claim 1, it is characterised in that:It is advanced Mixing pressurizing chamber (5) is connected with force (forcing) pump (7).
5. the shield grouting transport system of band segmentation reducing driving structure according to claim 1, it is characterised in that:It is secondary Be the structure of spiral gradient in mixing pressurizing chamber (4), advanced mixing pressurizing chamber (5), by volume of the entrance to exporting by Gradual change is small, and primary and advanced two-step supercharging is realized using volume gradual change.
CN201711495173.5A 2017-12-31 2017-12-31 Shield grouting transport system with segmentation reducing driving structure Pending CN108119153A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711495173.5A CN108119153A (en) 2017-12-31 2017-12-31 Shield grouting transport system with segmentation reducing driving structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711495173.5A CN108119153A (en) 2017-12-31 2017-12-31 Shield grouting transport system with segmentation reducing driving structure

Publications (1)

Publication Number Publication Date
CN108119153A true CN108119153A (en) 2018-06-05

Family

ID=62232719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711495173.5A Pending CN108119153A (en) 2017-12-31 2017-12-31 Shield grouting transport system with segmentation reducing driving structure

Country Status (1)

Country Link
CN (1) CN108119153A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1563672A (en) * 2004-04-02 2005-01-12 上海第二市政工程有限公司 PMS sludge prepn. method and its application in construction of sludge balance shield and pipe-jacking
CN203162546U (en) * 2013-03-27 2013-08-28 国家电网公司 Slurry conveying system for electric power tunnel
CN204372402U (en) * 2014-12-29 2015-06-03 宾泰克(天津)泵业有限公司 The reducing connection set of water pump and fire main
CN205477628U (en) * 2015-10-28 2016-08-17 广州建恒机电设备安装有限公司 Biliquid thick liquid device is annotated in step in shield driving
CN106640139A (en) * 2017-01-04 2017-05-10 武汉大学 Auto-dissolving grouting reinforcement equipment
CN206233908U (en) * 2016-10-21 2017-06-09 吉林大学 A kind of new bionical polar region hot water bores nozzle
CN107435559A (en) * 2017-08-15 2017-12-05 山东华联矿业股份有限公司 Filling pipeline diameter changing device and change routing method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1563672A (en) * 2004-04-02 2005-01-12 上海第二市政工程有限公司 PMS sludge prepn. method and its application in construction of sludge balance shield and pipe-jacking
CN203162546U (en) * 2013-03-27 2013-08-28 国家电网公司 Slurry conveying system for electric power tunnel
CN204372402U (en) * 2014-12-29 2015-06-03 宾泰克(天津)泵业有限公司 The reducing connection set of water pump and fire main
CN205477628U (en) * 2015-10-28 2016-08-17 广州建恒机电设备安装有限公司 Biliquid thick liquid device is annotated in step in shield driving
CN206233908U (en) * 2016-10-21 2017-06-09 吉林大学 A kind of new bionical polar region hot water bores nozzle
CN106640139A (en) * 2017-01-04 2017-05-10 武汉大学 Auto-dissolving grouting reinforcement equipment
CN107435559A (en) * 2017-08-15 2017-12-05 山东华联矿业股份有限公司 Filling pipeline diameter changing device and change routing method

Similar Documents

Publication Publication Date Title
CN105332719A (en) Cement-polyurethane composite grouting process capable of blocking water fast
CN202001023U (en) Improved shield machine grouting pipeline system
CN106761782A (en) A kind of tunneling construction method for wearing operation tunnel under shield in rich water powder land floor
CN102733821A (en) Secondary double-liquid slurry re-grouting method capable of effectively controlling surface deformation
CN107939420A (en) The construction method filled after two backing of bored tunnel assembled
CN103291354B (en) Floor rock roadway layer-crossing pressure relief drilling filling and reinforcing method
CN103790592A (en) End soil mass reinforcement system and method
CN103510964A (en) Method for performing backfill grouting on pea gravel by adoption of shield type TBM in construction process
CN102635327A (en) Grouting method and system of cracked coal rock mass
CN206246125U (en) A kind of modified earth pressure balanced shield, EPBS hinge seal device
CN105386435A (en) Double-liquid grouting system used for cement and water glass solution and construction process of double-liquid grouting system
CN202023532U (en) Hole packer for reinforcing for grouting in coal mine
CN106437723A (en) Grouting method for controlling stratum settlement when shield tunneling machine passes through risk source
CN108868827A (en) Km deep-well high-ground stress combination of steel rope injection hole sealing device and method for sealing
CN103993902A (en) Gas extraction drilled hole two-step grouting hole sealing method
CN110630293A (en) Double-liquid and method for grouting wall
CN210714722U (en) Synchronous double-liquid-slurry grouting system
CN113217037B (en) Backfill system and backfill method for single shield TBM or behind shield segment wall
CN108119153A (en) Shield grouting transport system with segmentation reducing driving structure
CN107268567A (en) The fluid injection of vacuum bellows is pressurized joint grouting and reinforcing super soft ground processing method
CN111140252A (en) Circulating layering slip casting device
CN107060818A (en) A kind of combined type TBM synchronous grouting materials and grouting method
CN206815315U (en) The fluid injection supercharging capsule of fluid injection supercharging joint grouting and reinforcing super soft ground
CN106837378B (en) Exempt from wall for grouting segmentation cleaning bottom of hole retrusive controlling grouting equipment
CN206071599U (en) A kind of bull slurries injection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100124 Guanzhuang Zhou Jiajing, Chaoyang District, Beijing

Applicant after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd.

Applicant after: BRIDGE & TUNNEL ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

Address before: 100124 Guanzhuang Zhou Jiajing, Chaoyang District, Beijing

Applicant before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

Applicant before: BRIDGE & TUNNEL ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20180605