CN106437723A - Grouting method for controlling stratum settlement when shield tunneling machine passes through risk source - Google Patents
Grouting method for controlling stratum settlement when shield tunneling machine passes through risk source Download PDFInfo
- Publication number
- CN106437723A CN106437723A CN201610635655.5A CN201610635655A CN106437723A CN 106437723 A CN106437723 A CN 106437723A CN 201610635655 A CN201610635655 A CN 201610635655A CN 106437723 A CN106437723 A CN 106437723A
- Authority
- CN
- China
- Prior art keywords
- grouting
- shield
- tunneling machine
- grout
- shield tunneling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 230000005641 tunneling Effects 0.000 title abstract 8
- 239000002689 soil Substances 0.000 claims abstract description 18
- 238000010276 construction Methods 0.000 claims abstract description 14
- 239000000463 material Substances 0.000 claims abstract description 10
- 239000011440 grout Substances 0.000 claims abstract description 9
- 238000007569 slipcasting Methods 0.000 claims description 16
- 210000004911 serous fluid Anatomy 0.000 claims description 15
- 238000004062 sedimentation Methods 0.000 claims description 7
- 238000010008 shearing Methods 0.000 claims description 7
- 230000001360 synchronised effect Effects 0.000 claims description 7
- 238000002347 injection Methods 0.000 claims description 2
- 239000007924 injection Substances 0.000 claims description 2
- 239000002002 slurry Substances 0.000 claims 2
- 238000009833 condensation Methods 0.000 description 3
- 230000005494 condensation Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009533 lab test Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Soil Sciences (AREA)
- Lining And Supports For Tunnels (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610635655.5A CN106437723A (en) | 2016-08-08 | 2016-08-08 | Grouting method for controlling stratum settlement when shield tunneling machine passes through risk source |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610635655.5A CN106437723A (en) | 2016-08-08 | 2016-08-08 | Grouting method for controlling stratum settlement when shield tunneling machine passes through risk source |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106437723A true CN106437723A (en) | 2017-02-22 |
Family
ID=58185167
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610635655.5A Pending CN106437723A (en) | 2016-08-08 | 2016-08-08 | Grouting method for controlling stratum settlement when shield tunneling machine passes through risk source |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106437723A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107165642A (en) * | 2017-06-06 | 2017-09-15 | 中铁十九局集团轨道交通工程有限公司 | Accurately control the shield construction method of ground settlement |
CN108678758A (en) * | 2018-04-28 | 2018-10-19 | 青岛新华友建工集团股份有限公司 | Major diameter slurry shield passes through shanty town settlement Control construction over long distances under the conditions of non-reinforced |
CN110210145A (en) * | 2019-06-05 | 2019-09-06 | 中北大学 | Extruding-enlarging branch tray grouting behind shaft or drift lining bored concrete pile single pile settlement calculation method |
CN111594190A (en) * | 2020-05-19 | 2020-08-28 | 北京市政建设集团有限责任公司 | Method for controlling shield tunneling parameters when shield passes through different risk sources |
CN114135302A (en) * | 2021-12-09 | 2022-03-04 | 中交天和机械设备制造有限公司 | Grouting control method and device for shield tunneling machine |
CN114152511A (en) * | 2022-02-07 | 2022-03-08 | 中国矿业大学(北京) | Method for measuring and calculating compression modulus and grouting rate of shield grouting slurry-soil complex |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3808714A1 (en) * | 1988-03-16 | 1989-10-05 | Westhaus Karl Heinz Prof Dr In | Method of constructing a tunnel, in particular a traffic tunnel, and shield driving machine for carrying out the method |
CN1854462A (en) * | 2005-04-28 | 2006-11-01 | 上海市基础工程公司 | Shiedling construction without influence on top layer of earth |
CN102312673A (en) * | 2010-07-09 | 2012-01-11 | 上海市基础工程有限公司 | Construction method for allowing shield to pass through operated subway tunnel in short distance under complex working conditions |
CN103291312A (en) * | 2013-06-06 | 2013-09-11 | 中国水电顾问集团华东勘测设计研究院 | Shield tunneling machine capable of realizing three-dimensional grouting |
CN103899323A (en) * | 2014-05-06 | 2014-07-02 | 中铁二十五局集团轨道交通工程有限公司 | Construction method of shield passing through railway yard |
CN104863118A (en) * | 2015-04-17 | 2015-08-26 | 中国矿业大学(北京) | Stratum settlement control method based on shield excavation gap |
-
2016
- 2016-08-08 CN CN201610635655.5A patent/CN106437723A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3808714A1 (en) * | 1988-03-16 | 1989-10-05 | Westhaus Karl Heinz Prof Dr In | Method of constructing a tunnel, in particular a traffic tunnel, and shield driving machine for carrying out the method |
CN1854462A (en) * | 2005-04-28 | 2006-11-01 | 上海市基础工程公司 | Shiedling construction without influence on top layer of earth |
CN102312673A (en) * | 2010-07-09 | 2012-01-11 | 上海市基础工程有限公司 | Construction method for allowing shield to pass through operated subway tunnel in short distance under complex working conditions |
CN103291312A (en) * | 2013-06-06 | 2013-09-11 | 中国水电顾问集团华东勘测设计研究院 | Shield tunneling machine capable of realizing three-dimensional grouting |
CN103899323A (en) * | 2014-05-06 | 2014-07-02 | 中铁二十五局集团轨道交通工程有限公司 | Construction method of shield passing through railway yard |
CN104863118A (en) * | 2015-04-17 | 2015-08-26 | 中国矿业大学(北京) | Stratum settlement control method based on shield excavation gap |
Non-Patent Citations (1)
Title |
---|
钱新等: "盾构下穿建(构)筑物控制沉降注浆技术研究与应用", 《现代隧道技术》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107165642A (en) * | 2017-06-06 | 2017-09-15 | 中铁十九局集团轨道交通工程有限公司 | Accurately control the shield construction method of ground settlement |
CN108678758A (en) * | 2018-04-28 | 2018-10-19 | 青岛新华友建工集团股份有限公司 | Major diameter slurry shield passes through shanty town settlement Control construction over long distances under the conditions of non-reinforced |
CN110210145A (en) * | 2019-06-05 | 2019-09-06 | 中北大学 | Extruding-enlarging branch tray grouting behind shaft or drift lining bored concrete pile single pile settlement calculation method |
CN111594190A (en) * | 2020-05-19 | 2020-08-28 | 北京市政建设集团有限责任公司 | Method for controlling shield tunneling parameters when shield passes through different risk sources |
CN114135302A (en) * | 2021-12-09 | 2022-03-04 | 中交天和机械设备制造有限公司 | Grouting control method and device for shield tunneling machine |
CN114135302B (en) * | 2021-12-09 | 2024-03-22 | 中交天和机械设备制造有限公司 | Grouting control method and device for shield tunneling machine |
CN114152511A (en) * | 2022-02-07 | 2022-03-08 | 中国矿业大学(北京) | Method for measuring and calculating compression modulus and grouting rate of shield grouting slurry-soil complex |
CN114152511B (en) * | 2022-02-07 | 2022-04-29 | 中国矿业大学(北京) | Method for measuring and calculating compression modulus and grouting rate of shield grouting slurry-soil complex |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106437723A (en) | Grouting method for controlling stratum settlement when shield tunneling machine passes through risk source | |
CN105041325B (en) | Construction method of high-tension water-rich extra-large-section weak breccia tunnel | |
CN104265307B (en) | Non-uniform-hardness stratum earth pressure balance shield tunnel underpassing railway existing line construction method | |
CN103334770B (en) | One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method | |
CN103899323B (en) | A kind of construction method of shield crossing rail yard | |
CN105804761B (en) | Construction method suitable for liquefied sand stratum shield near-distance passing through building | |
CN207377565U (en) | Constructing metro tunnel structure containing complicated geological and without shield launching place | |
CN110924967B (en) | Fine control construction method for shield proximity sensitive building in water-rich sandy gravel stratum | |
CN107842374B (en) | The novel inert slurry of shield and combination grouting process for upper soft lower hard water rich strata | |
CN107762533A (en) | A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel | |
CN102352757B (en) | Method for controlling upward floating of pipe piece during shield machine air pushing through mining tunnel | |
CN105736004A (en) | Balanced shield mud air-pressure cabin opening pressure maintaining and wall protecting construction method for shield tunneling | |
CN103306684A (en) | Process for grouting on back of shield segment | |
CN103089275A (en) | Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections | |
CN203961994U (en) | Under balancing earth-pressure shielding machine, wear the concealed tunneling structure of having runed shield tunnel | |
CN106761782A (en) | A kind of tunneling construction method for wearing operation tunnel under shield in rich water powder land floor | |
CN108775244A (en) | A kind of Mining Method receives shield machine and shield sky pushes away construction method | |
CN106050185B (en) | A kind of coal mining bottom plate meets the control method that tomography produces water inrush channel | |
CN109681236A (en) | Big cross section water-rich sand layer shield driving synchronous grouting method | |
CN108386202A (en) | City underground running tunnel list shield TBM constructions | |
CN109403997A (en) | Earth pressure balanced shield, EPBS warehouse entry construction method | |
CN108412509A (en) | The anti-card machine method of double-shielded TBM | |
CN109763828A (en) | Push-bench tunneling construction method | |
CN103306713A (en) | Networked reinforcement method for cross-layer drilling of outburst coal seam | |
CN110005422B (en) | Shield grouting wrapping method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Jiang Hua Inventor after: Zhang Jinxun Inventor after: Jiang Yusheng Inventor after: Wu Fumei Inventor after: Ding Yanjie Inventor before: Jiang Hua Inventor before: Zhang Jinxun Inventor before: Jiang Yusheng Inventor before: Wu Fumei Inventor before: Ding Yanjie |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170310 Address after: 100083 Beijing City, Haidian District Institute of Rutosids No. 11 Applicant after: China University of Mining & Technology, Beijing Applicant after: Beijing City Building Group Co., Ltd. Applicant after: BEIJING URBAN CONSTRUCTION DESIGN & DEVELOPMENT GROUP CO., LIMITED Applicant after: Beijing Urban Rail Transit Construction Engineering Co., Ltd. Address before: 100083 Beijing City, Haidian District Institute of Rutosids No. 11 Applicant before: China University of Mining & Technology, Beijing Applicant before: Beijing City Building Group Co., Ltd. Applicant before: BEIJING URBAN CONSTRUCTION DESIGN & DEVELOPMENT GROUP CO., LIMITED |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180302 Address after: 100083 Beijing City, Haidian District Institute of Rutosids No. 11 Applicant after: China University of Mining & Technology, Beijing Applicant after: Beijing City Building Group Co., Ltd. Address before: 100083 Beijing City, Haidian District Institute of Rutosids No. 11 Applicant before: China University of Mining & Technology, Beijing Applicant before: Beijing City Building Group Co., Ltd. Applicant before: BEIJING URBAN CONSTRUCTION DESIGN & DEVELOPMENT GROUP CO., LIMITED Applicant before: Beijing Urban Rail Transit Construction Engineering Co., Ltd. |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170222 |