CN107060818A - A kind of combined type TBM synchronous grouting materials and grouting method - Google Patents

A kind of combined type TBM synchronous grouting materials and grouting method Download PDF

Info

Publication number
CN107060818A
CN107060818A CN201710018199.4A CN201710018199A CN107060818A CN 107060818 A CN107060818 A CN 107060818A CN 201710018199 A CN201710018199 A CN 201710018199A CN 107060818 A CN107060818 A CN 107060818A
Authority
CN
China
Prior art keywords
combined type
type tbm
synchronous grouting
accelerator
slurries
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710018199.4A
Other languages
Chinese (zh)
Inventor
汪平
黄小良
李进
王曙光
汪岳健
冉鹏
吉伟
李慧英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Traffic Building (Group) Co., Ltd.
Chongqing Construction Engineering Group Co Ltd
Original Assignee
CHONGQING TRAFFIC BUILDING (GROUP) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING TRAFFIC BUILDING (GROUP) Co Ltd filed Critical CHONGQING TRAFFIC BUILDING (GROUP) Co Ltd
Priority to CN201710018199.4A priority Critical patent/CN107060818A/en
Publication of CN107060818A publication Critical patent/CN107060818A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/46Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement
    • C09K8/467Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement containing additives for specific purposes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering

Abstract

The invention discloses a kind of combined type TBM synchronous grouting materials and grouting method, its drip irrigation device is:The injecting paste material is made up of following components by weight percent raw material:Cement 7 15.3%, sand 35 47%, flyash 10 16%, swelled ground 2.9 3%, accelerator 0.7 4%, water surplus.A kind of combined type TBM synchronous grouting materials of the present invention, significantly shorten setting time, overcome the not enough problem of slip casting, improve operating efficiency, it is ensured that construction quality.

Description

A kind of combined type TBM synchronous grouting materials and grouting method
【Technical field】
The present invention relates to combined type TBM synchronization jobs, and in particular to a kind of combined type TBM synchronous grouting materials and slip casting side Method.
【Background technology】
Shield machine type is single circle combined type TBM, and maximum digging diameter is 6885mm, due to transit tunnel country rock self-stability Well, excavation face need not strengthen support, be tunneled using its open mode, and lining segment is using leading to that high-precision punching block makes ,, will between section of jurisdiction and shield tail housing between section of jurisdiction and stratum after shield machine is tunneled with the wedge-shaped reinforced concrete segment of lining cutting In the presence of certain annular space, for control stratum deformation, sedimentation is reduced, and is conducive to improving tunnel impermeability and pipe-plate lining Early stage stability, it is necessary in time after the wall of section of jurisdiction radial clearance slurries, as synchronous grouting are filled by the way of slip casting.
In the construction of urban ring road Tunnel Engineering, because traffic above-ground is busy, underground utilities are intensive, and major control along the line is built (structure), which builds thing, two river spring city houses selling offices and skyscraper etc..Interval engineering geology mainly belongs to tectonic denudation hills slope landforms, Present situation hypsography is smaller, and physical features is gentle, and stratum is mainly made up of artificial plain fill, silty clay, land pebble and Sandy Silt, Loading whole of the slurries of synchronous grouting between section of jurisdiction and country rock is less than 50%, and the solidification layer of consolidation slurry can not coagulate rapidly Knot, and effectively section of jurisdiction is lifted and lateral support, it is unfavorable for the stabilization of three-dimensional position after the shaping of section of jurisdiction, so as to cause pipe Piece loses the mass defects such as circle, sinking, faulting of slab ends.
【Brief description of the drawings】
Fig. 1 is the setting time relation schematic diagram of accelerator volume and simultaneous grouting slurry in the present invention.
【The content of the invention】
A kind of combined type TBM synchronous grouting materials of the present invention, significantly shorten setting time, overcome the not enough problem of slip casting, Improve operating efficiency, it is ensured that construction quality.
The invention also discloses a kind of combined type TBM synchronous grouting methods.
The present invention is achieved by the following technical solutions:
A kind of combined type TBM synchronous grouting materials, the injecting paste material is made up of following components by weight percent raw material:
It is preferred that, the injecting paste material is made up of following components by weight percent raw material:
It is preferred that, the injecting paste material is made up of following components by weight percent raw material:
It is preferred that, the accelerator is in styrene-acrylic emulsion, polyacrylate emulsion, hydroxymethyl cellulose, polypropylene fibre One or more mixtures with hydramine.The main component of hydramine is polyaluminium sulfate, organic with other of advantage of lower cost Composition is mixed, and is used as the main component raw material of accelerator.
It is preferred that, chopped glass fiber is contained in the accelerator, Length of Glass Fiber is less than 3mm.Using chopped glass fiber, glass preferably Fine length control can effectively improve solidification layer intensity within 3mm, with preferable shock resistance blocking property.
It is preferred that, smectite content is higher than 12% in the swelled ground.Clay is substituted using swelled ground, preferably montmorillonite contains Swelled ground of the amount more than 12% can expand rapidly, and support the soil layer at gap as raw material at annular space.
A kind of combined type TBM synchronous grouting methods,
1), filling system pipeline is cleaned;
2) injecting paste material in addition to accelerator, is uniformly added into, and continuously stirs mixing injecting paste material, primary slurries are obtained;
3), in tunneling process, when between section of jurisdiction and stratum, when producing annular space between section of jurisdiction and shield tail housing, pass through It is arranged near filling system and sets up liquid accelerating agent delivery pump, accelerator is mixed into primary slurries injects annular gap;
4), the annular gap of 4-6 bursts of injections of slurries point during slip casting;
5), to the dark slurries of discovery at TBM cutterheads, slip casting is stopped.
Compared with prior art, the invention has the advantages that:
1st, combined type TBM synchronous grouting materials of the invention, are greatly shortened the setting time of simultaneous grouting slurry, slurries Presetting period is most short to be reduced to 30 minutes or so, the quick slip casting during initial set, the not enough problem of grouting amount is overcome, in final set When significantly shorten setting time, cripetura activity time improves operating efficiency, it is to avoid wall-rock crack expands, and Mortar mix proportion is in original On the basis of having a match ratio, by improving cement consumption or adding accelerator, to reduce slurries fluidity, when accelerating slurries and condensing Between, it is ensured that it can comparatively fast be solidified after slurries injection, and add the antiblock that short glass fiber improves solidification layer;
2nd, a kind of combined type TBM synchronous grouting methods of the invention, by setting up liquid speed near synchronous grouting system Solidifying agent delivery pump, control simultaneous grouting slurry flow velocity matches with liquid accelerating agent flow velocity, makes accelerator and simultaneous grouting slurry It is well mixed, cause to alter slurry phenomenon to reduce the shake produced during TBM shield speedy drivages, point multiply note during initial set Slurry, overcomes the problem of grouting amount is not enough, and TBM its open modes are tunneled, and synchronous grouting pressure is injected in the mode of flowing automatically, and slip casting speed Degree matched with driving speed, in the absence of because grouting pressure is excessive and caused by slurries loss phenomenon, pre-hardening slurries are same within 30 minutes When also adapt to the underground water of larger flow and reduce slurries and wash away number of dropouts, improve and protect slurry amount.
【Embodiment】
A kind of combined type TBM synchronous grouting methods,
1), filling system pipeline is cleaned;
2) injecting paste material in addition to accelerator, is uniformly added into, and continuously stirs mixing injecting paste material, primary slurries are obtained;
3), in tunneling process, when between section of jurisdiction and stratum, when producing annular space between section of jurisdiction and shield tail housing, pass through It is arranged near filling system and sets up liquid accelerating agent delivery pump, accelerator is mixed into primary slurries injects annular gap;
4), the annular gap of 4-6 bursts of injections of slurries point during slip casting;
5), to the dark slurries of discovery at TBM cutterheads, slip casting is stopped.
With reference to specific embodiment, the technical program is further illustrated:
A kind of combined type TBM synchronous grouting materials, the injecting paste material is made up of following components by weight percent raw material
Table 1:Different accelerators and setting time obtained by cement proportion in each embodiment
Fig. 1 is referred to, the setting time of simultaneous grouting slurry can be further greatly shortened after adding liquid accelerating agent, is starched The liquid presetting period is most short to be reduced to 30 minutes or so, by setting up liquid accelerating agent delivery pump near synchronous grouting system, Control simultaneous grouting slurry flow velocity matches with liquid accelerating agent flow velocity, accelerator is well mixed with simultaneous grouting slurry, with Reduce the shake produced during TBM shield speedy drivages to cause to alter slurry phenomenon, 30 minutes pre-hardening slurries also adapt to larger simultaneously The underground water of flow and reduce slurries and wash away number of dropouts, improve and protect slurry amount.

Claims (7)

1. a kind of combined type TBM synchronous grouting materials, it is characterised in that:The injecting paste material is by following components by weight percent raw material group Into:
2. a kind of combined type TBM synchronous grouting materials according to claim 1, it is characterised in that:The injecting paste material by Following components by weight percent raw material composition:
3. a kind of combined type TBM synchronous grouting materials according to claim 1, it is characterised in that:The injecting paste material by Following components by weight percent raw material composition:
4. a kind of combined type TBM simultaneous grouting slurry materials according to claim 1, it is characterised in that:The accelerator For the one or more and the mixture of hydramine in styrene-acrylic emulsion, polyacrylate emulsion, hydroxymethyl cellulose, polypropylene fibre.
5. a kind of combined type TBM synchronous grouting materials according to claim 1, it is characterised in that:Contain in the accelerator There is chopped glass fiber, Length of Glass Fiber is less than 3mm.
6. a kind of combined type TBM synchronous grouting materials according to claim 1, it is characterised in that:Covered in the swelled ground De- stone content is higher than 12%.
7. a kind of combined type TBM synchronous grouting methods, it is characterised in that:
1), filling system pipeline is cleaned;
2) injecting paste material in addition to accelerator, is uniformly added into, and continuously stirs mixing injecting paste material, primary slurries are obtained;
3), in tunneling process, when between section of jurisdiction and stratum, when producing annular space between section of jurisdiction and shield tail housing, by setting Liquid accelerating agent delivery pump is set up near filling system, accelerator is mixed into primary slurries injects annular gap;
4), the annular gap of 4-6 bursts of injections of slurries point during slip casting;
5), to the dark slurries of discovery at TBM cutterheads, slip casting is stopped.
CN201710018199.4A 2017-01-10 2017-01-10 A kind of combined type TBM synchronous grouting materials and grouting method Pending CN107060818A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710018199.4A CN107060818A (en) 2017-01-10 2017-01-10 A kind of combined type TBM synchronous grouting materials and grouting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710018199.4A CN107060818A (en) 2017-01-10 2017-01-10 A kind of combined type TBM synchronous grouting materials and grouting method

Publications (1)

Publication Number Publication Date
CN107060818A true CN107060818A (en) 2017-08-18

Family

ID=59598859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710018199.4A Pending CN107060818A (en) 2017-01-10 2017-01-10 A kind of combined type TBM synchronous grouting materials and grouting method

Country Status (1)

Country Link
CN (1) CN107060818A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409769A (en) * 2019-08-13 2019-11-05 南通装配式建筑与智能结构研究院 A kind of fast gravity die high intensity heavy Machine-blasting mortar construction of long-distance sand transport
CN111792871A (en) * 2019-04-09 2020-10-20 北京中矿时代工程技术研究院有限公司 Composite additive for grouting material and grouting material
CN114249573A (en) * 2021-12-31 2022-03-29 贵州大学 Subway shield tunnel synchronous grouting material in water-rich karst area, and preparation method and application thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6363687B2 (en) * 1983-08-06 1988-12-08
CN1686914A (en) * 2005-04-18 2005-10-26 刘文涛 Subsequent backfilled pea gravel concrete for lining back of tunnels and backfilling method
CN101928122A (en) * 2009-12-31 2010-12-29 中国建筑股份有限公司 Synchronous grouting material used for tunnel and preparation method thereof
CN102777373A (en) * 2012-07-10 2012-11-14 镇江长城注浆设备有限公司 Double-liquid synchronous grouting pump
CN104671723A (en) * 2014-12-12 2015-06-03 安徽恒源煤电股份有限公司 Paste injecting material of expansive soil cement paste

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6363687B2 (en) * 1983-08-06 1988-12-08
CN1686914A (en) * 2005-04-18 2005-10-26 刘文涛 Subsequent backfilled pea gravel concrete for lining back of tunnels and backfilling method
CN101928122A (en) * 2009-12-31 2010-12-29 中国建筑股份有限公司 Synchronous grouting material used for tunnel and preparation method thereof
CN102777373A (en) * 2012-07-10 2012-11-14 镇江长城注浆设备有限公司 Double-liquid synchronous grouting pump
CN104671723A (en) * 2014-12-12 2015-06-03 安徽恒源煤电股份有限公司 Paste injecting material of expansive soil cement paste

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111792871A (en) * 2019-04-09 2020-10-20 北京中矿时代工程技术研究院有限公司 Composite additive for grouting material and grouting material
CN110409769A (en) * 2019-08-13 2019-11-05 南通装配式建筑与智能结构研究院 A kind of fast gravity die high intensity heavy Machine-blasting mortar construction of long-distance sand transport
CN114249573A (en) * 2021-12-31 2022-03-29 贵州大学 Subway shield tunnel synchronous grouting material in water-rich karst area, and preparation method and application thereof

Similar Documents

Publication Publication Date Title
CN105386433B (en) A kind of microorganism soil-fixing CFG pile composite foundations and construction method
CN204898658U (en) Be used for consolidating little biological glue knot sand pile of soft soil foundation
CN106761782A (en) A kind of tunneling construction method for wearing operation tunnel under shield in rich water powder land floor
CN101086164B (en) Highly effective quick-speed anti-seep plugging technology for cofferdam
CN105155541B (en) A kind of dual slurry closure construction method of catch pit
CN102660952B (en) Controllable clay paste slurry grouting technique
CN105386435B (en) It is a kind of to be used for the double-liquid grouting system and its construction technology of cement and water glass solution
CN103912003B (en) The method of water and hole is moved on a kind of simple and efficient shutoff stratum
CN103790592A (en) End soil mass reinforcement system and method
CN102733821A (en) Secondary double-liquid slurry re-grouting method capable of effectively controlling surface deformation
CN107129221A (en) A kind of slurries suitable for low strength stratum shield duct piece grouting behind shaft or drift lining
CN103696416B (en) A kind of method for processing foundation
CN107842374A (en) The new inert slurry of shield and combination grouting process for upper soft lower hard water rich strata
CN104533451A (en) Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock
CN107060818A (en) A kind of combined type TBM synchronous grouting materials and grouting method
CN109736815A (en) Grouting serous fluid and grouting process for subway tunnel tunneling water sealing consolidation
CN105484269A (en) Leakage prevention construction method of foundation pit support structure under blasting condition
CN105569071A (en) Cement-based material underwater grouting or mud-jack rock block foundation construction method
CN103396065A (en) Synchronous grouting grout for shield construction control and grouting method thereof
CN106522966A (en) Sandy cobble stratum earth pressure balance rectangular shield jacking-tunneling antifriction construction method
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN105971638A (en) Application of WSS construction method in shield tool changing reinforcement of water-rich sand layer
CN109440757A (en) A kind of foundation reinforcement method for karst region
CN102518450B (en) Method for grouting ordinary cement rather than ultra-fine cement when reinforcing stratum by adopting shallow excavation method
CN104108919A (en) Environment-friendly water-stop curtain

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180130

Address after: No. 4 Xiang Jin Road, Yubei District, Chongqing

Applicant after: Chongqing Construction Engineering Group Co., Ltd.

Applicant after: Chongqing Traffic Building (Group) Co., Ltd.

Address before: 401120, 4 Jin Xiang Road, Chongqing, Yubei District

Applicant before: Chongqing Traffic Building (Group) Co., Ltd.

TA01 Transfer of patent application right
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170818

WD01 Invention patent application deemed withdrawn after publication