CN108104335A - A kind of cladding system of the assembled flexible of curtain wall - Google Patents

A kind of cladding system of the assembled flexible of curtain wall Download PDF

Info

Publication number
CN108104335A
CN108104335A CN201711142990.2A CN201711142990A CN108104335A CN 108104335 A CN108104335 A CN 108104335A CN 201711142990 A CN201711142990 A CN 201711142990A CN 108104335 A CN108104335 A CN 108104335A
Authority
CN
China
Prior art keywords
cable body
curtain wall
rope
intermediate plate
clamp piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711142990.2A
Other languages
Chinese (zh)
Other versions
CN108104335B (en
Inventor
唐柏鉴
刘浩
蒋娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou University of Science and Technology
Original Assignee
Suzhou University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou University of Science and Technology filed Critical Suzhou University of Science and Technology
Priority to CN201711142990.2A priority Critical patent/CN108104335B/en
Publication of CN108104335A publication Critical patent/CN108104335A/en
Application granted granted Critical
Publication of CN108104335B publication Critical patent/CN108104335B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The present invention is a kind of cladding system of the assembled flexible of curtain wall, the system is by rope anchor system, cable body adjuster, cable body drag hook connects system composition with rope curtain, rope anchor system includes cable body, wall connecting end rope head and cable body adjuster connecting pin rope head, cable body adjuster includes outer cylinder, and it is connected to two inner cylinders of the outer cylinder upper and lower ends mouth inner surface, cable body drag hook is made of the first outer intermediate plate and the first inner clamp piece, the lateral surface of first inner clamp piece is additionally provided with the wall construction portion of company with wall connecting, rope curtain connects system by the second outer intermediate plate, second inner clamp piece and wedge-shaped inserted sheet form, the lateral surface of second outer intermediate plate is equipped with the curtain wall construction portion of company being connected with curtain wall.Present invention ground completion rope anchor system and the connection of cable body adjuster at the scene first, is then mounted in agent structure, then completes the installation of cable body drag hook, finally install rope curtain connection system, realize the fabricated construction of curtain wall and excellent seismic wind resistance.

Description

A kind of cladding system of the assembled flexible of curtain wall
Technical field
The invention belongs to building enclosure systems technology fields, and in particular to a kind of cladding system of the assembled flexible of curtain wall.
Background technology
One building generally requires to set curtain wall to reach the requirement of beautiful, safety and quakeproof and windproof.Building curtain wall Using starting from the end of the 19th century, initial stage is applied to local building on a small scale.At the beginning of 21 century, China has become world architecture curtain Wall produces and uses the first big country, and all kinds of curtain wall yield reach 200,000,000 square metres, and the half for accounting for world's total amount is more.It builds in China Curtain wall industry realize from scratch, rule all the land from foreign capitals dominate to domestic enterprise, from imitate be introduced into autonomous innovation across More formula develops.
Dry-hanging method is to set stress point on the body construction, and curtain wall panel is fixed on building by metal hanger and adhesives On object, since late 1980s, dry-hanging method obtains quick application.
Stress point of traditional dry-hanging method on major structure of construction is by burying rigid backbone in agent structure outer surface System and formed, curtain wall panel and the rigid backbone system joint connection in site.The rigid backbone technology of curtain wall is at least big scarce there are three It falls into:(1)Skeletons clumsy, horizontal direction, vertical member are numerous, and connecting node is numerous and diverse, therefore skeleton system material consumption itself is huge; Meanwhile bulky skeleton system adds the load-bearing burden of agent structure, therefore also increase the material utilization amount of agent structure. (2)Complicated skeleton system, field operation amount is big, and there are many site welding operations, against building assembled, industrialized Development trend.(3)It is soft to strive for the three-dimensional of curtain wall and agent structure although people come up with various connecting structure Property connection, but since skeleton is rigid, actual effect is difficult to ensure that.
The content of the invention
It is an object of the invention to overcome the technological deficiency of above-mentioned curtain wall rigid backbone system, load-bearing skeleton is using flexible Drag-line, curtain wall are connected with drag-line using unidirectional self-lock mode, entire skeleton system whole assembled in situ, and a kind of curtain wall provided The cladding system of assembled flexible.
To realize above-mentioned technical purpose and the technique effect, the invention is realized by the following technical scheme:
A kind of cladding system of the assembled flexible of curtain wall, the system is by rope anchor system, cable body adjuster, cable body drag hook and Suo Mulian Welding system forms, wherein:
The rope anchor system includes cable body, wall connecting end rope head and cable body adjuster connecting pin rope head, the cable body and passes through rope Body adjuster connecting pin rope head links together with cable body adjuster, and the wall connecting end rope head is connected to the main body knot of wall On structure;
The cable body adjuster includes outer cylinder and is connected to two of the outer cylinder upper and lower ends mouth inner surface Inner cylinder, the outer cylinder side offer two groups of symmetrical holes, for stretching into the hole by foreign object, realize outer cylinder and The rotation of inner cylinder;
The cable body drag hook includes the both ends of the first outer intermediate plate and the first inner clamp piece, the first outer intermediate plate and the first inner clamp piece It is respectively connected together by connector, cable body, first inner clip is equipped between the first outer intermediate plate and the first inner clamp piece The lateral surface of piece is equipped with the wall construction portion of company with wall connecting.
The rope curtain connection system includes the second outer intermediate plate, the second inner clamp piece and wedge-shaped inserted sheet, the second outer intermediate plate It is respectively connected together by connector with the both ends of the second inner clamp piece, is equipped between the second outer intermediate plate and the second inner clamp piece Cable body sets wedge-shaped inserted sheet between the described second outer intermediate plate and cable body and sets wedge between the second inner clamp piece and cable body Shape inserted sheet, the lateral surface of the second outer intermediate plate are equipped with the curtain wall construction portion of company being connected with curtain wall.
Further, the wall connecting end rope head is casting type anchor head, and the casting type anchor head is with pre-plugged in master Together in body structure and the first anchor slab that is vertical with agent structure and vertically placing is bolted, the cable body adjuster Connecting pin rope head is clip type anchor head, and the cable body penetrates in the inner cylinder of cable body adjuster and passes through clip type anchor head progress Anchoring.
Further, between two adjacent cable bodies, is connected to by corresponding wall connecting end rope head The both sides of one anchor slab share bolt.
Further, the outer circle tube inner surface is equipped with inner surface screw thread, and upper and lower two inner cylinder outer surfaces are set There is the outer surface thread with outer circle tube inner surface thread fitting, outer cylinder passes through inner surface screw thread and outer surface thread with inner cylinder It is screwed on together, the hole that the outer cylinder side opens up is rectangular, stretches into the hole by long stick, realizes outer cylinder and inner circle The rotation of cylinder.
Further, the even wall construction portion be with the perpendicular affixed plate in the first inner clamp piece side, offer spiral shell on plate Keyhole hole, the plate pass through by bolt hole with pre-plugged on wall and with wall body vertical and the second horizontal positioned anchor slab It is bolted together.
Further, the both ends of first inner clamp piece and the first outer intermediate plate are respectively connected together by the first bolt.
Further, the even curtain wall construction portion is integrated knot with contour and founding above and below the lateral surface of the second outer intermediate plate Structure, the centre in the even curtain wall construction portion are equipped with elliptical hole, and the major diameter of the elliptical hole is not less than the first anchor slab thickness It three times, for the overhanging skeleton of curtain wall panel to be inserted directly into the elliptical hole, and is fixed using respective nut.
Further, the both ends of second inner clamp piece and the second outer intermediate plate are respectively connected together by the second bolt.
Further, the cable body is steel wire rope or steel strand wires.
The beneficial effects of the invention are as follows:
(1)Curtain wall frame greatlys save material, based on structure be effectively reduced loading burden.Conventional curtain wall skeleton is firm for rigidity Frame, generally all using the steel or aluminium skeleton vertically and horizontally interconnected, material utilization amount is huge, and connecting node is various, because Also the structure with regard to based on causes larger load-bearing burden for this;The present invention uses load-bearing skeleton of the flexible cable for curtain wall, drag-line Tensile strength is high, and materials are few;Importantly, the present invention greatly reduces connecting node quantity, limited curtain wall is only existed The connecting node of the connecting node of plate and drag-line, drag-line and wall, number of nodes are reduced, and material utilization amount subtracts greatly;Further, bone Frame system materials itself reduce, and the loading that skeleton system is transmitted to agent structure naturally also just reduces, therefore can also reduce main body knot The materials of structure.
(2)Scene is all fabricated construction, and curtain wall installation speed is substantially improved.All components, the connecting structure of the present invention It all completes in factory, after transporting scene to, it is very easy to be light and handy to install required external tool for whole fabricated constructions;Into One step, the present invention is provided with adjuster for curtain wall supporting member cable body, and adjuster can both adjust the Initial cable force of drag-line, also Can contain the installation error at scene, and the installation of conventional rigid skeleton, if because installation error cause skeleton partially long or It is partially short, then site welding, cutting etc. science and engineering is needed to make;Simultaneously as connecting node quantity is significantly reduced, therefore the present invention For green construction, noise pollution, air pollution, water pollution of traditional construction etc. have been abandoned completely, and has substantially increased curtain wall Installation speed.
(3)The three-dimensional for being truly realized curtain wall and agent structure is flexibly connected, and improves antidetonation wind resistance temperature resistance of curtain wall etc. Comprehensive performance.Curtain wall differs greatly with both agent structure material properties, therefore cannot be deformed simultaneously both under external action, Otherwise curtain wall can damage even broken.Technical staff comes up with the flexibility that various connecting structure try hard to realize curtain wall and agent structure Connection, deforms, but actual effect is difficult to ensure that avoid curtain wall together with agent structure.The supporting member of curtain wall of the present invention is soft Property drag-line, therefore horizontal both direction(I.e. perpendicular to the both direction of cable body)It all naturally realizes flexible connection, so exists Under horizontal earthquake, wind, temperature action, curtain wall and agent structure will not together with deform.Further, the present invention is also in curtain wall and drawing Unidirectional self-lock function is devised in the connection of rope, i.e., employs wedge-shaped inserted sheet vertically downwards, under curtain wall dead weight, curtain wall and drag-line Connection can be more and more tighter, and in effect vertically upward(Such as upward vertical seismic action)Under, curtain wall can be slight with drag-line The changing of the relative positions, but both unlikely disengaging(With the presence of nut).
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the right side view of Fig. 1 of the present invention;
Fig. 3 is rope anchor system structure diagram of the present invention;
Fig. 4 is the side view of Fig. 3 of the present invention;
Fig. 5 is cable body controller structure schematic diagram of the present invention;
Fig. 6 is the outer cylinder sectional view of cable body adjuster of the present invention;
Fig. 7 is cable body drag hook top view of the present invention;
Fig. 8 is cable body drag hook front view of the present invention;
Fig. 9 connects system top view for rope curtain of the present invention;
Figure 10 is the A-A sectional views of Fig. 9 of the present invention;
Figure 11 is the B-B sectional views of Fig. 9 of the present invention.
Figure label explanation:1st, rope anchor system;2nd, cable body adjuster;3rd, cable body drag hook;4th, rope curtain connection system;5th, main body Structure;11st, cable body;12nd, wall connecting end rope head;13rd, cable body adjuster connecting pin rope head;14th, the first anchor slab;21st, outer cylinder; 22nd, inner cylinder;31st, the first outer intermediate plate;32nd, the first inner clamp piece;33rd, wall construction portion is connected;34th, the first bolt;41st, the second outer clip Piece;42nd, the second inner clamp piece;43rd, wedge-shaped inserted sheet;44th, curtain wall construction portion is connected;45th, the second bolt.
Specific embodiment
It is below with reference to the accompanying drawings and in conjunction with the embodiments, next that the present invention will be described in detail.
As depicted in figs. 1 and 2, a kind of cladding system of the assembled flexible of curtain wall, the system is by rope anchor system 1, cable body tune Section device 2, cable body drag hook 3 connect system 4 with rope curtain and form, wherein:
As shown in Figure 3 and Figure 4, the rope anchor system 1 includes cable body 11, wall connecting end rope first 12 and cable body adjuster connecting pin Rope first 13, the cable body 11 are linked together by cable body adjuster connecting pin rope first 13 with cable body adjuster 2, and the wall connects End rope first 12 is connect to be connected in the agent structure 5 of wall;
As shown in Figure 5 and Figure 6, the cable body adjuster 2 includes outer cylinder 21 and is connected in the outer cylinder 21 Two inner cylinders 22 of lower two-port inner surface, 21 side of outer cylinder offers two groups of symmetrical holes, for by outer Object stretches into the hole, realizes the rotation of outer cylinder 21 and inner cylinder 22, during site operation, it is only necessary to be stretched by the long stick of 30-40cm Enter the hole, the rotation of outer cylinder 21 and inner cylinder 22 can be realized by rotating long stick, so as to adjust the length of cable body 11 and internal force;
As shown in Figure 7 and Figure 8, the cable body drag hook 3 includes the first outer 31 and first inner clamp piece 32 of intermediate plate, first outer clip The both ends of 31 and first inner clamp piece 32 of piece are respectively connected together by connector, and the first inner clamp piece 32 is located at wall one side, the One outer intermediate plate 31 and 32 obvolvent of the first inner clamp piece are into a circle, which is slightly larger than the diameter of cable body 11, outside first Cable body 11 is equipped between 31 and first inner clamp piece 32 of intermediate plate, the lateral surface of first inner clamp piece 32 is equipped with and wall connecting Even wall construction portion 33.
As shown in Figures 9 to 11, rope curtain connection system 4 includes the second outer intermediate plate 41, the second inner clamp piece 42 and wedge Shape inserted sheet 43, the both ends of second outer 41 and second inner clamp piece 42 of intermediate plate are respectively connected together by connector, outside second Intermediate plate 41 is located at curtain wall one side, and into a circle, which is slightly larger than for the second outer intermediate plate 41 and 42 obvolvent of the second inner clamp piece The diameter of cable body 11 is equipped with cable body 11, in the described second outer intermediate plate 41 between the second outer 41 and second inner clamp piece 42 of intermediate plate Wedge-shaped inserted sheet 43 between cable body 11 is set and wedge-shaped inserted sheet 43 is set between the second inner clamp piece 42 and cable body 11, is used for To 11 unidirectional self-lock of cable body, the lateral surface of the second outer intermediate plate 41 is equipped with the curtain wall construction portion of company 44 being connected with curtain wall.
With continued reference to Fig. 3 and Fig. 4, wall connecting end rope first 12 is casting type anchor head, the casting type anchor head with it is pre- It is first embedded in agent structure 5 and together with the first anchor slab 14 that is vertical with agent structure 5 and vertically placing is bolted, The cable body adjuster connecting pin rope first 13 is clip type anchor head, and the cable body 11 is penetrated in the inner cylinder 22 of cable body adjuster 2 And pass through the clip type anchor head and be anchored.
Between two adjacent cable bodies 11, the first anchor slab is connected to by corresponding wall connecting end rope first 12 14 both sides share bolt.
21 inner surface of outer cylinder be equipped with inner surface screw thread, upper and lower two 22 outer surfaces of inner cylinder be provided with outside The outer surface thread of 21 inner surface thread fitting of cylinder, outer cylinder 21 pass through inner surface screw thread and outer surface thread with inner cylinder 22 It is screwed on together, the hole that 21 side of outer cylinder opens up is rectangular, stretches into the hole by long stick, realizes 21 He of outer cylinder The rotation of inner cylinder 22.
With continued reference to Fig. 7 and Fig. 8, the even wall construction portion 33 be with the perpendicular affixed plate in 32 side of the first inner clamp piece, Bolt hole is offered on plate, the plate by bolt hole and pre-plugged on wall and with wall body vertical and horizontal positioned Second anchor slab is bolted together, and the both ends of the 32 and first outer intermediate plate 31 of the first inner clamp piece pass through the first bolt 34 It is respectively connected together.
With continued reference to Fig. 9 to Figure 11, the both ends of the 42 and second outer intermediate plate 41 of the second inner clamp piece pass through the second bolt 45 Be respectively connected together, above and below the even lateral surface of curtain wall construction portion 44 and the second outer intermediate plate 41 contour and founding be integrated knot Structure, the centre in the even curtain wall construction portion 44 are equipped with elliptical hole, and the major diameter of the elliptical hole is thick not less than the first anchor slab 14 During in-site installation curtain wall, the overhanging skeleton for the circular cylindrical shape being just connected in factory with curtain wall is inserted directly into for three times of degree The elliptical hole, then overhanging skeleton lower end fixed using nut, realize the plug and play of curtain wall.
The cable body 11 is steel wire rope or steel strand wires, remaining material is all steel.
The principle of the invention
For the present invention after the completion of major structure of construction construction, rope anchor system 1 and cable body adjuster 2 are completed in ground first at the scene Connection, then the connector of rope anchor system 1 and cable body adjuster 2 is installed in agent structure 5, the 3rd step is completed cable body and drawn The installation of hook 3, final step installation rope curtain connection system 4.After so, curtain wall can be inserted directly into rope curtain connection system 4, realize the fabricated construction of curtain wall and excellent seismic wind resistance.
Furthermore, it is necessary to explanation, unless stated otherwise or is pointed out, the otherwise term in specification " first ", " the The descriptions such as two " are used only for distinguishing various components, element, step in specification etc., without being intended to indicate that various components, member Logical relation or ordinal relation between element, step etc..
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should all be included in the protection scope of the present invention.

Claims (9)

1. a kind of cladding system of the assembled flexible of curtain wall, which is characterized in that the system is by rope anchor system(1), cable body adjuster (2), cable body drag hook(3)System is connected with rope curtain(4)Composition, wherein:
The rope anchor system(1)Including cable body(11), wall connecting end rope head(12)With cable body adjuster connecting pin rope head(13), The cable body(11)Pass through cable body adjuster connecting pin rope head(13)With cable body adjuster(2)It links together, the wall connects Connect end rope head(12)It is connected to the agent structure of wall(5)On;
The cable body adjuster(2)Including outer cylinder(21)And it is connected to the outer cylinder(21)Upper and lower ends mouth Two inner cylinders of inner surface(22), the outer cylinder(21)Side offers two groups of symmetrical holes, for being stretched by foreign object Enter the hole, realize outer cylinder(21)And inner cylinder(22)Rotation;
The cable body drag hook(3)Including the first outer intermediate plate(31)With the first inner clamp piece(32), the first outer intermediate plate(31)With First inner clamp piece(32)Both ends be respectively connected together by connector, in the first outer intermediate plate(31)With the first inner clamp piece(32) Between be equipped with cable body(11), first inner clamp piece(32)Lateral surface be equipped with wall construction portion of company with wall connecting(33);
The rope curtain connection system(4)Including the second outer intermediate plate(41), the second inner clamp piece(42)With wedge-shaped inserted sheet(43), it is described Second outer intermediate plate(41)With the second inner clamp piece(42)Both ends be respectively connected together by connector, in the second outer intermediate plate(41) With the second inner clamp piece(42)Between be equipped with cable body(11), in the described second outer intermediate plate(41)With cable body(11)Between set wedge shape Inserted sheet(43)And in the second inner clamp piece(42)With cable body(11)Between wedge-shaped inserted sheet is set(43), the second outer intermediate plate (41)Lateral surface be equipped with the curtain wall construction portion of company that is connected with curtain wall(44).
2. the cladding system of the assembled flexible of curtain wall according to claim 1, which is characterized in that wall connecting end rope Head(12)For casting type anchor head, the casting type anchor head is with pre-plugged in agent structure(5)Upper and and agent structure(5)Vertically And the first anchor slab vertically placed(14)It is bolted together, the cable body adjuster connecting pin rope head(13)For intermediate plate Formula anchor head, the cable body(11)Penetrate cable body adjuster(2)Inner cylinder(22)In and pass through the clip type anchor head and be anchored.
3. the cladding system of the assembled flexible of curtain wall according to claim 2, which is characterized in that two adjacent ropes Body(11)Between, pass through corresponding wall connecting end rope head(12)It is connected to the first anchor slab(14)Both sides, share bolt.
4. the cladding system of the assembled flexible of curtain wall according to claim 1, which is characterized in that the outer cylinder(21)It is interior Surface is equipped with inner surface screw thread, upper and lower two inner cylinders(22)Outer surface is provided with and outer cylinder(21)Inner surface screw thread is matched somebody with somebody The outer surface thread of conjunction, outer cylinder(21)With inner cylinder(22)Together with being screwed on by inner surface screw thread with outer surface thread, institute State outer cylinder(21)The hole that side opens up is rectangular, stretches into the hole by long stick, realizes outer cylinder(21)And inner cylinder (22)Rotation.
5. the cladding system of the assembled flexible of curtain wall according to claim 1, which is characterized in that the even wall construction portion (33)For with the first inner clamp piece(32)The perpendicular affixed plate in side offers bolt hole on plate, which passes through bolt hole Together with being bolted with pre-plugged on wall and with wall body vertical and the second horizontal positioned anchor slab.
6. the cladding system of the assembled flexible of curtain wall according to claim 1 or 5, which is characterized in that first inner clip Piece(32)With the first outer intermediate plate(31)Both ends pass through the first bolt(34)It is respectively connected together.
7. the cladding system of the assembled flexible of curtain wall according to claim 1, which is characterized in that the even curtain wall construction portion (44)With the second outer intermediate plate(41)Lateral surface above and below contour and founding be structure as a whole, the even curtain wall construction portion(44)In Between be equipped with elliptical hole, the major diameter of the elliptical hole is not less than the first anchor slab(14)Three times of thickness, for by curtain wall panel Overhanging skeleton is inserted directly into the elliptical hole, and is fixed using respective nut.
8. the cladding system of the assembled flexible of the curtain wall according to claim 1 or 7, which is characterized in that second inner clip Piece(42)With the second outer intermediate plate(41)Both ends pass through the second bolt(45)It is respectively connected together.
9. the cladding system of the assembled flexible of the curtain wall according to any one in claim 1-5 and 7, which is characterized in that The cable body(11)For steel wire rope or steel strand wires.
CN201711142990.2A 2017-11-17 2017-11-17 Assembled flexible dry hanging system of curtain wall Active CN108104335B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711142990.2A CN108104335B (en) 2017-11-17 2017-11-17 Assembled flexible dry hanging system of curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711142990.2A CN108104335B (en) 2017-11-17 2017-11-17 Assembled flexible dry hanging system of curtain wall

Publications (2)

Publication Number Publication Date
CN108104335A true CN108104335A (en) 2018-06-01
CN108104335B CN108104335B (en) 2023-10-20

Family

ID=62206864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711142990.2A Active CN108104335B (en) 2017-11-17 2017-11-17 Assembled flexible dry hanging system of curtain wall

Country Status (1)

Country Link
CN (1) CN108104335B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339299A (en) * 2018-11-12 2019-02-15 深圳市建艺装饰集团股份有限公司 Curtain wall installs system and its construction method
CN111663647A (en) * 2020-05-29 2020-09-15 北京市建筑设计研究院有限公司 Stay cable regulator
CN112227570A (en) * 2020-09-22 2021-01-15 北京江河幕墙系统工程有限公司 Precise tensioning process for ultra-long vertical cable of cable net curtain wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101265750A (en) * 2008-04-22 2008-09-17 东南大学 Backstay cable lever stretching device
WO2011050652A1 (en) * 2009-10-28 2011-05-05 福建鹏坤实业有限公司 Dry suspension assembly for curtain wall panels
CN103074851A (en) * 2012-12-21 2013-05-01 柳州欧维姆机械股份有限公司 Composite strand tapered anchoring steel strand finished product cable and manufacture method thereof
JP2015071879A (en) * 2013-10-02 2015-04-16 清水建設株式会社 Curtain wall-mounting method, and curtain wall-lifting box for use in the same
CN106013534A (en) * 2016-05-26 2016-10-12 江河创建集团股份有限公司 Combined large-span curtain wall system
CN106836577A (en) * 2015-06-26 2017-06-13 金国鑫 A kind of method of building stone curtain wall dried hanging
CN207646957U (en) * 2017-11-17 2018-07-24 苏州科技大学 A kind of cladding system of the assembled flexible of curtain wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101265750A (en) * 2008-04-22 2008-09-17 东南大学 Backstay cable lever stretching device
WO2011050652A1 (en) * 2009-10-28 2011-05-05 福建鹏坤实业有限公司 Dry suspension assembly for curtain wall panels
CN103074851A (en) * 2012-12-21 2013-05-01 柳州欧维姆机械股份有限公司 Composite strand tapered anchoring steel strand finished product cable and manufacture method thereof
JP2015071879A (en) * 2013-10-02 2015-04-16 清水建設株式会社 Curtain wall-mounting method, and curtain wall-lifting box for use in the same
CN106836577A (en) * 2015-06-26 2017-06-13 金国鑫 A kind of method of building stone curtain wall dried hanging
CN106013534A (en) * 2016-05-26 2016-10-12 江河创建集团股份有限公司 Combined large-span curtain wall system
CN207646957U (en) * 2017-11-17 2018-07-24 苏州科技大学 A kind of cladding system of the assembled flexible of curtain wall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339299A (en) * 2018-11-12 2019-02-15 深圳市建艺装饰集团股份有限公司 Curtain wall installs system and its construction method
CN109339299B (en) * 2018-11-12 2023-12-26 深圳市建艺装饰集团股份有限公司 Curtain wall installation system and construction method thereof
CN111663647A (en) * 2020-05-29 2020-09-15 北京市建筑设计研究院有限公司 Stay cable regulator
CN112227570A (en) * 2020-09-22 2021-01-15 北京江河幕墙系统工程有限公司 Precise tensioning process for ultra-long vertical cable of cable net curtain wall
CN112227570B (en) * 2020-09-22 2021-10-08 北京江河幕墙系统工程有限公司 Precise tensioning process for ultra-long vertical cable of cable net curtain wall

Also Published As

Publication number Publication date
CN108104335B (en) 2023-10-20

Similar Documents

Publication Publication Date Title
CN108104335A (en) A kind of cladding system of the assembled flexible of curtain wall
CN107288218A (en) A kind of assembled steel tendon concrete frame structure bean column node and preparation method thereof
CN106193408B (en) Cable-stayed unbonded prestressed concrete flat slab
CN203080400U (en) Extra-large span suspension bridge with uniparted hyperboloid space cable net main cables
CN114197715A (en) Prefabricated wallboard of assembled, floor and connection structure thereof
CN100354485C (en) Fixing device and building method for outer decorative stone curtain wall of steel pipe truss tower
CN207646957U (en) A kind of cladding system of the assembled flexible of curtain wall
CN206023079U (en) A kind of joint type extra large cable traction anchoring integrated device of pre-assembled formula
CN106159811B (en) A kind of joint type extra large cable traction anchoring integrated device of pre-assembled formula
CN209369118U (en) A kind of connection system of steel frame and prefabricated panel
CN108729541A (en) Connect beam type Building block construction method
CN210460055U (en) Reinforced structure is built in room
CN208308249U (en) A kind of fixed device of air hose promotion
CN114687511A (en) Novel assembled internal heat-insulation light wallboard adopting layered alternate lap joint
CN212078409U (en) Suspended ceiling component
CN210140398U (en) Multifunctional suspension equipment for mechanical engineering
CN109113354B (en) Whole-course cableway type windproof real-time pulled cable wind system and construction method thereof
CN207829303U (en) The fusiformis anchor head of major diameter high tensile reinforcement for reinforced concrete beam column node
CN106284822A (en) A kind of big hollow rate wallboard and production technology thereof
CN207469557U (en) A kind of big opening type super-span suspended-dome structure
WO2019218679A1 (en) Cfrp suspension strip intersecting cable support structure
CN206800625U (en) Novel light energy-saving environmental-protection hollow pre-fabricated panels frame structure
CN214169634U (en) Arc-shaped component assembly type building
CN215888614U (en) Pre-buried coupling assembling construction structures of safe construction facility
CN116623984A (en) Steel wire rope reinforcing structure for improving stability of brick masonry

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant