CN108104114A - Churning compacted compound pile construction method again - Google Patents

Churning compacted compound pile construction method again Download PDF

Info

Publication number
CN108104114A
CN108104114A CN201810050018.0A CN201810050018A CN108104114A CN 108104114 A CN108104114 A CN 108104114A CN 201810050018 A CN201810050018 A CN 201810050018A CN 108104114 A CN108104114 A CN 108104114A
Authority
CN
China
Prior art keywords
churning
drilling tool
stake
drilling
compacted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810050018.0A
Other languages
Chinese (zh)
Inventor
樊军让
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810050018.0A priority Critical patent/CN108104114A/en
Publication of CN108104114A publication Critical patent/CN108104114A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

A kind of churning compacted compound pile construction method again is provided, drilling tool normally creeps into form straight-through cylindricality stake holes according to design requirement, the dryness filler less than ground level is inserted in stake holes, dryness filler mixes with slurries and drilling tool is subject to be bonded after squeezing with retaining wall after secondary pressurized drilling while churning slurries, drilling tool is just turning linked to while screw thread is promoted and is carrying out filling concrete, implanted reinforced bar cage in concrete in the backward stake holes of full stake, form composite pile, so that reduction stake is long in the case that identical structure size leads directly to the bearing capacity enhancing of cylindricality stake or same bearer power, so as to reduce cost, improve economic well-being of workers and staff.The bearing capacity of raising.

Description

Churning compacted compound pile construction method again
Technical field
The invention belongs to building foundation technical fields, and in particular to a kind of churning compacted compound pile construction method again.
Background technology
With the scale development of construction industry, modern architecture requirement is efficiently quick, in based process technical aspect, also needs More reliable and quick construction technology and method.And existing piling construction is generally using the squeezed screw thread construction method that spins, this side Method is also the ripe stake method of current application, but what this stake method formed is straight-through cylindricality stake, and it is small to be combined power with stratum, accordingly Bearing capacity is also small, in conclusion how on the basis of straight-through cylindricality stake, the combination power on raising and stratum, so as to improve pile body Bearing capacity, for this problem, it is necessary to be improved.
The content of the invention
Present invention solves the technical problem that:A kind of churning compacted compound pile construction method again is provided, by straight-through cylindricality stake Inside insert dryness filler, and carry out secondary pressurized drilling it is compacted after so that identical structure size lead directly to cylindricality stake bearing capacity increase It is long to reduce stake in the case of strong or same bearer power, so as to reduce cost, improves economic well-being of workers and staff.The bearing capacity of raising.
The technical solution adopted by the present invention:Churning compacted compound pile construction method again, comprises the following steps:
1) suitable bearing formation is selected, according to the design diameter of stake holes and projected depth h, selects suitable large torque spiral shell Rotary drill adds the churning mechanism of pressure-adjustable into stake machine on the drilling tool equipped with compacted function and drilling tool on Auger drilling stake machine;
2) Auger drilling stake machine is in place, is normally crept into stake holes depth on the bearing formation chosen using Auger drilling stake machine It spends to stop drilling after h1;
3) drilling tool carries brill, and drilling tool is when carrying brill according to soil layer situation, churning mechanism high-pressure rotary-spray cutting thread or low pressure slurry Liquid retaining wall, after drilling tool carries brill, the upper plane that the dryness filler being stirred and dryness filler are inserted into stake holes is less than Horizon Face h2;
4) drilling tool is secondary enters stake holes and starts pressing mechanism, and after reaching certain pressure, drilling tool is pressed directly into certain depth, Then secondary compaction drilling is axially downwardly carried out along stake holes, drilling tool churning slurries while compacted drilling make dry in stake holes Property filler and retaining wall bond, and the compacted drilling of drilling tool makes to be partially submerged into rock-soil layer while dryness filler is compacted, drilling tool to Under compacted drilling to after composite log depth h1, drilling tool continues to stop after being drilled down into projected depth h through composite log;
5) by normal perfusion stake technique, drilling tool is just turning linked to screw thread promotion, filling concrete is carried out at the same time, when concrete is filled After stake holes, implanted reinforced bar cage in the concrete into stake holes forms composite pile.
Above-mentioned steps 1) in, high-pressure injection pump and mating pulping device, institute are further included on the large torque stake machine High-pressure injection pump is stated to be equipped with to show the pressure gauge of mixed serum pressure and can protect by the high-pressure injection pump of frequency control Demonstrate,prove the uniformity of slurries mixing.
Above-mentioned steps 2) in, the depth of the h1 is at least 0.5h
Above-mentioned steps 3) in, the dryness filler is building waste or is cement, the mixture that sand adds stone in water and riverbed, Sand adds that stone grain size is 5~8cm in stone and stone content is 30-60% in the riverbed,
Above-mentioned steps 3) in, the pressure limit of slurries is 10-15MPa when churning mechanism high-pressure rotary-spray cuts thread, The pressure limit of slurries during the churning mechanism churning low pressure slurries retaining wall is 2-5MPa, and the upper plane of the dryness filler is low In ground level h2 and h2≤1m.
Above-mentioned steps 5) in, the composite pile and the semidiameter t for filling concrete after stake holes are 100mm-120mm..
The present invention compared with prior art the advantages of:
1st, the technical program inserts dryness filler in conventional straight-through cylindricality stake holes, passes through the compacted drilling of secondary pressurized Meanwhile dryness filler is mixed with churning slurries, the dryness filler be conducive in stake holes is bonded with retaining wall, and the compacted drilling of drilling tool makes Dryness filler is partially submerged into while compacted in rock-soil layer, is conducive to improve the bearing capacity of stake;
2nd, the composite pile that the technical program is formed substantially increases the bearing capacity of straight-through cylindricality stake, in same bearer power In the case of, reduce the length and construction cost of stake;
Description of the drawings
Fig. 1 is normal piling structure schematic diagram in the present invention;
Fig. 2 is to insert the structure diagram after dryness filler in stake holes of the present invention;
Fig. 3 is structure diagram when inventing compacted;
Fig. 4 is the compacted structure diagram through after composite log of the present invention;
Fig. 5 is the structure diagram that drilling tool of the present invention is just turning linked to concrete perfusion while screw thread is promoted;
Fig. 6 is the structure diagram of composite pile of the present invention.
Specific embodiment
A kind of embodiment of the 1-6 descriptions present invention below in conjunction with the accompanying drawings.
Churning compacted compound pile construction method again, comprises the following steps:
1) suitable bearing formation is selected, according to the design diameter of stake holes 2 and projected depth h, selects suitable large torque Auger drilling stake machine adds the rotary jetting apparatus of pressure-adjustable on Auger drilling stake machine on the drilling tool 1 equipped with compacted function and drilling tool 1 Structure, specifically, further including high-pressure injection pump and mating pulping device, the high-pressure injection pump on the large torque stake machine It is equipped with to show the pressure gauge of mixed serum pressure and can ensure what slurries mixed by the high-pressure injection pump of frequency control Uniformity;
2) Auger drilling stake machine is in place, is normally crept into stake holes 2 on the bearing formation chosen using Auger drilling stake machine Depth stops drilling after being h1, specifically, the depth of the h1 is at least 0.5h;
3) drilling tool 1 carries brill, and drilling tool 1 is when carrying brill according to soil layer situation, churning mechanism high-pressure rotary-spray cutting thread or low pressure Slurries retaining wall, after drilling tool 1 carries brill, the upper plane that the dryness filler 3 being stirred and dryness filler 3 are inserted into stake holes 2 is low In ground level h2, specifically, the dryness filler is building waste or is cement, the mixture that sand adds stone in water and riverbed, institute It states sand in riverbed and adds in stone that stone grain size is 5~8cm and stone content is 30-60%, sand adds Shi Zhongjia in every cubic metre of riverbed Marked as 32.5 cement 50-80kg mixing after formed dryness filler and 3 and dryness filler 3 moisture content below 20%;Tool Body, the pressure limit of slurries is 10-15MPa during churning mechanism high-pressure rotary-spray cutting thread, churning mechanism churning The pressure limit of slurries during low pressure slurries retaining wall is 2-5MPa, and the upper plane of the dryness filler 3 is less than ground level h2 and h2 ≤1m;
4) drilling tool 1 two times into stake holes 2 and starts pressing mechanism, and after reaching certain pressure, drilling tool 1 is pressed directly into a depthkeeping Degree, then axially downwardly carries out secondary compaction drilling, churning slurries while compacted drilling of drilling tool 1 make stake holes 2 along stake holes 2 Interior dryness filler 3 is bonded with retaining wall, and the compacted drilling of drilling tool 1 makes to be partially submerged into rock-soil layer while dryness filler 3 is compacted In, drilling tool 1 is compacted downwards to creep into composite log depth h1, and drilling tool 1 continues to be drilled down into projected depth h through composite log Stop;
5) by normal perfusion stake technique, drilling tool 1 is just turning linked to screw thread promotion, is carried out at the same time concrete 4 and is perfused, when concrete 4 After filling stake holes 2, implanted reinforced bar cage in the concrete 4 into stake holes 2 forms composite pile 5, specifically, the composite pile 5 is with filling The semidiameter t of concrete 4 is 100mm-120mm after full stake holes 2.
High-pressure injection pump in the technical program is frequency control, and the pressure of internal mix rear slurry is shown by pressure gauge Show, targetedly control operating pressure, pulping equipment continuous firing is only short when needing slip casting to ensure that slurries are uniformly mixed Period rests, and the composite pile 5 of formation and fills the semidiameter t of concrete 4 after stake holes 2 for 100mm-120mm, this construction method is main It is used in loess formation, sandy gravel stratum;During using this construction method, the softer stratum of soil layer is run into, when carrying out above-mentioned steps 4, due to Soil layer is softer, and drilling tool 1 can also complete compound pile driving construction in compacted drilling, without churning slurries are carried out.
Above-described embodiment, simply presently preferred embodiments of the present invention, is not used for limiting the scope of the present invention, therefore all with this The equivalence changes that content described in invention claim is done should all be included within scope of the invention as claimed.

Claims (6)

1. churning compacted compound pile construction method again, it is characterised in that comprise the following steps:
1) suitable bearing formation is selected, according to the design diameter of stake holes (2) and projected depth h, selects suitable large torque spiral shell Rotary drill adds the rotary jetting apparatus of pressure-adjustable into stake machine on the drilling tool (1) equipped with compacted function and drilling tool (1) on Auger drilling stake machine Structure;
2) Auger drilling stake machine is in place, is normally crept into stake holes (2) deeply on the bearing formation chosen using Auger drilling stake machine It spends to stop drilling after h1;
3) drilling tool (1) carries brill, and drilling tool (1) is when carrying brill according to soil layer situation, churning mechanism high-pressure rotary-spray cutting thread or low pressure Slurries retaining wall, after drilling tool (1) carries brill, to inserting the dryness filler (3) being stirred and dryness filler (3) in stake holes (2) Upper plane is less than ground level h2;
4) drilling tool (1) is secondary enters stake holes (2) and starts pressing mechanism, and after reaching certain pressure, drilling tool (1) is pressed directly into centainly Depth, then axially downwardly carries out secondary compaction drilling along stake holes (2), and drilling tool (1) churning slurries while compacted drilling make Dryness filler (3) in stake holes (2) is bonded with retaining wall, and portion while the compacted drilling of drilling tool (1) makes dryness filler (3) compacted Divide in embedded rock-soil layer, drilling tool (1) is compacted downwards to creep into composite log depth h1, and drilling tool (1) is downward through composite log continuation Stop after creeping into projected depth h;
5) by normal perfusion stake technique, drilling tool (1) is just turning linked to screw thread promotion, is carried out at the same time concrete (4) perfusion, works as concrete (4) after filling stake holes (2), implanted reinforced bar cage in the concrete (4) into stake holes (2) forms composite pile (5).
2. churning according to claim 1 compacted compound pile construction method again, it is characterised in that:Above-mentioned steps 1) in, it is described High-pressure injection pump and mating pulping device are further included on large torque stake machine, the high-pressure injection pump is equipped with to show The pressure gauge of mixed serum pressure and the uniformity that slurries mix can be ensured by the high-pressure injection pump of frequency control.
3. churning according to claim 1 compacted compound pile construction method again, it is characterised in that:Above-mentioned steps 2) in, it is described The depth of h1 is at least 0.5h.
4. churning according to claim 1 compacted compound pile construction method again, it is characterised in that:Above-mentioned steps 3) in, it is described Dryness filler (3) is building waste or is cement, the mixture that sand adds stone in water and riverbed, and sand adds stone in stone in the riverbed Grain size is 5~8cm and stone content is 30-60%.
5. churning according to claim 1 compacted compound pile construction method again, it is characterised in that:Above-mentioned steps 3) in, it is described The pressure limit of slurries is 10-15MPa during churning mechanism high-pressure rotary-spray cutting thread, the churning mechanism churning low pressure slurries shield The pressure limit of slurries during wall is 2-5MPa, and the upper plane of the dryness filler (3) is less than ground level h2 and h2≤1m.
6. churning according to claim 1 compacted compound pile construction method again, it is characterised in that:Above-mentioned steps 5) in, it is described Composite pile (5) and fill stake holes (2) afterwards concrete (4) semidiameter t be 100mm-120mm.
CN201810050018.0A 2018-01-18 2018-01-18 Churning compacted compound pile construction method again Pending CN108104114A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810050018.0A CN108104114A (en) 2018-01-18 2018-01-18 Churning compacted compound pile construction method again

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810050018.0A CN108104114A (en) 2018-01-18 2018-01-18 Churning compacted compound pile construction method again

Publications (1)

Publication Number Publication Date
CN108104114A true CN108104114A (en) 2018-06-01

Family

ID=62220169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810050018.0A Pending CN108104114A (en) 2018-01-18 2018-01-18 Churning compacted compound pile construction method again

Country Status (1)

Country Link
CN (1) CN108104114A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112921958A (en) * 2021-01-29 2021-06-08 徐州八方建筑工程有限公司 High-pressure jet grouting hole-leading static pressure pile construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55108524A (en) * 1979-01-08 1980-08-20 Tousen Concrete Kogyo Kk Method for tip treatment of pile
JPH04336115A (en) * 1991-05-10 1992-11-24 Takenaka Komuten Co Ltd Executing method for cast-in-place concrete pile
CN101603311A (en) * 2009-07-02 2009-12-16 北京建材地质工程公司 The adopting heavy hammer-tamping compaction soil preformed hole jet grouting pile construction method
CN103422496A (en) * 2012-05-22 2013-12-04 王庆伟 Rotary jet grouting expanding spiral soil-squeezing combined cast-in-place pile and pile forming method thereof
CN104947660A (en) * 2015-07-03 2015-09-30 陕西桩鑫建设工程有限公司 Reverse screw spike pile and construction method thereof
CN105484230A (en) * 2016-01-18 2016-04-13 邓亚光 Pile and soil concreted and integrated composite pile and construction method thereof
CN206396745U (en) * 2017-01-17 2017-08-11 陕西隆极机械设备有限公司 Long spire stake machine with the Counterboring apparatus that spins

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55108524A (en) * 1979-01-08 1980-08-20 Tousen Concrete Kogyo Kk Method for tip treatment of pile
JPH04336115A (en) * 1991-05-10 1992-11-24 Takenaka Komuten Co Ltd Executing method for cast-in-place concrete pile
CN101603311A (en) * 2009-07-02 2009-12-16 北京建材地质工程公司 The adopting heavy hammer-tamping compaction soil preformed hole jet grouting pile construction method
CN103422496A (en) * 2012-05-22 2013-12-04 王庆伟 Rotary jet grouting expanding spiral soil-squeezing combined cast-in-place pile and pile forming method thereof
CN104947660A (en) * 2015-07-03 2015-09-30 陕西桩鑫建设工程有限公司 Reverse screw spike pile and construction method thereof
CN105484230A (en) * 2016-01-18 2016-04-13 邓亚光 Pile and soil concreted and integrated composite pile and construction method thereof
CN206396745U (en) * 2017-01-17 2017-08-11 陕西隆极机械设备有限公司 Long spire stake machine with the Counterboring apparatus that spins

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112921958A (en) * 2021-01-29 2021-06-08 徐州八方建筑工程有限公司 High-pressure jet grouting hole-leading static pressure pile construction method

Similar Documents

Publication Publication Date Title
CN105887837B (en) A kind of construction method of field ground stirring concrete earth pile
CN105113498A (en) Method for constructing high-strength core composite piles
CN101487254A (en) Construction method of vibrating immersed tube gravel slip-casting pile
CN102182468B (en) Method and device for solidifying water-filling cracking surrounding rocks of tunnel by adopting high-pressure air water-dispelling grouting
CN106869120A (en) One kind carbonization mixing pile ventilative pipe pile composite foundation and its construction method
CN102011399A (en) PHC pile-based multiple high jet pedestal pile construction method
CN104762957B (en) A kind of spiral pore-forming rams the construction method that expands CFG stake
CN111519618A (en) Post-grouting device for prestressed pipe pile and construction method thereof
CN107806096B (en) Expanding compound pile construction method compacted again is cut in whirl spraying
CN107964946A (en) The construction method of stiff composite pile based on pump drainage water precipitation
CN208201874U (en) A kind of open-cell cloth bag grouting structure
CN107916663B (en) Construction method for soft soil foundation
CN108104114A (en) Churning compacted compound pile construction method again
CN112081158B (en) Construction method for forming reinforced composite pile foundation by advanced grouting of high-rise building
CN204728318U (en) Long auger cement paste dado formula implants the construction equipment of pile tube
CN110344402A (en) The construction method of curing agent processing stake holes sky pile cutoff mud
CN106192987A (en) A kind of construction method that stake periphery is crushed geology reinforcing
CN109881696A (en) A kind of HPPG back cover construction method
CN116024963A (en) Low-slurry-returning high-pressure rotary spraying composite grouting method and equipment
CN105221150B (en) A kind of method of horizontal jet grouting stake reinforced stone door punching coal
CN108221948A (en) A kind of method for processing foundation
CN211395636U (en) Slip casting ventilation combined treatment system
CN100363562C (en) Preventing plate with spreading and deep layer rotating spraying mixture head with diffusion preventing plate and guniting mouth
CN102979095A (en) Method for constructing triaxial cement-soil mixing piles in ultra-hard soil layer
JP2001081770A (en) Pile foundation work

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180601