CN108086610A - Steel column decorative structure and its construction method - Google Patents
Steel column decorative structure and its construction method Download PDFInfo
- Publication number
- CN108086610A CN108086610A CN201711470985.4A CN201711470985A CN108086610A CN 108086610 A CN108086610 A CN 108086610A CN 201711470985 A CN201711470985 A CN 201711470985A CN 108086610 A CN108086610 A CN 108086610A
- Authority
- CN
- China
- Prior art keywords
- layer
- steel column
- gypsum
- decorative structure
- gypsum putty
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 84
- 239000010959 steel Substances 0.000 title claims abstract description 84
- 238000010276 construction Methods 0.000 title claims abstract description 42
- 239000010410 layer Substances 0.000 claims abstract description 226
- 239000010440 gypsum Substances 0.000 claims abstract description 88
- 229910052602 gypsum Inorganic materials 0.000 claims abstract description 88
- 239000003795 chemical substances by application Substances 0.000 claims abstract description 57
- 239000011247 coating layer Substances 0.000 claims abstract description 38
- 239000007800 oxidant agent Substances 0.000 claims abstract description 30
- 230000001590 oxidative effect Effects 0.000 claims abstract description 30
- 230000001680 brushing effect Effects 0.000 claims abstract description 29
- 239000004744 fabric Substances 0.000 claims abstract description 19
- 239000003973 paint Substances 0.000 claims abstract description 7
- 230000015572 biosynthetic process Effects 0.000 claims description 10
- 238000007667 floating Methods 0.000 claims description 9
- 244000137852 Petrea volubilis Species 0.000 claims description 7
- 238000001035 drying Methods 0.000 claims description 6
- 238000005498 polishing Methods 0.000 claims description 4
- 238000005034 decoration Methods 0.000 abstract description 19
- 238000005516 engineering process Methods 0.000 abstract description 5
- 238000005253 cladding Methods 0.000 abstract description 4
- 239000011248 coating agent Substances 0.000 description 7
- 238000000576 coating method Methods 0.000 description 7
- 238000005336 cracking Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 4
- 230000002265 prevention Effects 0.000 description 3
- 239000003513 alkali Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000839 emulsion Substances 0.000 description 2
- 239000011152 fibreglass Substances 0.000 description 2
- 238000004079 fireproofing Methods 0.000 description 2
- 239000003365 glass fiber Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000010422 painting Methods 0.000 description 2
- 238000007790 scraping Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 229920001800 Shellac Polymers 0.000 description 1
- 210000000481 breast Anatomy 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 230000009970 fire resistant effect Effects 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000009499 grossing Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 229920002521 macromolecule Polymers 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 210000003739 neck Anatomy 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000011253 protective coating Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000007761 roller coating Methods 0.000 description 1
- ZLGIYFNHBLSMPS-ATJNOEHPSA-N shellac Chemical compound OCCCCCC(O)C(O)CCCCCCCC(O)=O.C1C23[C@H](C(O)=O)CCC2[C@](C)(CO)[C@@H]1C(C(O)=O)=C[C@@H]3O ZLGIYFNHBLSMPS-ATJNOEHPSA-N 0.000 description 1
- 229940113147 shellac Drugs 0.000 description 1
- 235000013874 shellac Nutrition 0.000 description 1
- 239000004208 shellac Substances 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 239000002966 varnish Substances 0.000 description 1
- 238000009941 weaving Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/92—Protection against other undesired influences or dangers
- E04B1/94—Protection against other undesired influences or dangers against fire
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
- E04F13/04—Bases for plaster
- E04F13/047—Plaster carrying meshes
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Building Environments (AREA)
Abstract
The present invention relates to a kind of steel column decorative structure and its construction methods.The steel column decorative structure comprises the following steps:The brushing interfacial agents on fireproof coating layer form the first interface agent layer;After the first interface agent layer is formed 10 20 minutes, grid cloth is laid on the first interface agent layer, forms the first scrim layer;The brushing interfacial agents on the first scrim layer form second contact surface oxidant layer;Grid cloth is laid in second contact surface oxidant layer, forms the second scrim layer;The brushing gypsum putty on the second scrim layer forms gypsum putty layer;The brushing paint layer on gypsum putty layer completes the construction of steel column decorative structure.Using the construction technology of brushing, for conventional cladding decoration, decoration occupied area can be saved, expands plane real area, saves construction technology, and it is fast and simple.The steel column decorative structure obtained using above-mentioned construction method reduces the shared area of decoration, effectively increases the utilization rate of the area of plane.
Description
Technical field
The present invention relates to the realm of building construction, more particularly to steel column decorative structure and its construction method.
Background technology
Steel building is due to having many advantages, such as that dead weight is small, overall stiffness is good, deformability is strong, easy construction, and material
It is more environmentally protective with respect to for armored concrete, therefore, it is widely used in the necks such as large-sized workshop venue, high-rise building
Domain.
However, steel construction poor corrosion resistance, and heat-resisting not fire resisting.Therefore, steel structure surface needs sprayed fire proofing coating,
Fire resistant coating generally uses thicker fireproof coating.But steel structure surface has rough situation after sprayed fire proofing coating.
For the incrustation of steel construction, in order to avoid carrying out decoration construction on this rough surface, it can also reach
Certain decorative effect.Can generally cladding decoration be carried out to steel construction, that is, keel partition wall is added outside steel construction, and every
A variety of decoration plane materials are made on wall.Above-mentioned way so that the decorative effect of steel construction is more changeable, but increases decorative layer
More usable floor area can be lost afterwards.
The content of the invention
Based on this, it is necessary to for increase decorative layer after can lose more usable floor area the problem of, providing one kind can drop
The steel column decorative structure and its construction method of low decoration occupied area.
A kind of construction method of steel column decorative structure is equipped with fireproof coating layer on the steel column, comprises the following steps:
The brushing interfacial agents on the fireproof coating layer form the first interface agent layer;
After first interface agent layer is formed 10-20 minutes, grid cloth, shape are laid on first interface agent layer
Into the first scrim layer;
The interfacial agents are brushed on first scrim layer, form second contact surface oxidant layer;
The grid cloth is laid in the second contact surface oxidant layer, forms the second scrim layer;
The brushing gypsum putty on second scrim layer forms gypsum putty layer;
The brushing paint layer in the putty layer completes the construction of the steel column decorative structure.
In one embodiment, before the step of fireproof coating layer brushing interfacial agents, the first interface agent layer of formation,
It further includes:
Floating processing is carried out to the surface of the fireproof coating layer.
In one embodiment, the step of brushing gypsum putty on second scrim layer, formation gypsum putty layer
Include:
Gypsum putty described in first pass is laterally completely scraped on second scrim layer, forms the first gypsum putty layer, so
The gypsum putty is vertically completely scraped on the first gypsum putty layer afterwards, forms the second gypsum putty layer.
In one embodiment, further included after the step of the first gypsum putty layer of the formation:
It is polished after the first gypsum putty layer drying with 40# sand paper, floating putty and mottling is polished into polishing.
In one embodiment, further included after the step of the second gypsum putty layer of the formation:
It is polished and is cleaned up with 400# sand paper after the second gypsum putty layer drying.
In one embodiment, the thickness of the first gypsum putty layer and the second gypsum putty layer is no more than
2mm。
The steel column decorative structure that above-mentioned construction method obtains, the steel column are equipped with fireproof coating layer, the steel column facing
It is greasy that structure includes the first interface agent layer, the first scrim layer, second contact surface oxidant layer, the second scrim layer, the gypsum that stack gradually
Sublayer and dope layer, first interface agent layer are coated on the fireproof coating layer, first scrim layer and described first
Interface agent layer is connected with the second contact surface oxidant layer, and described second protects scrim layer and the second contact surface oxidant layer and the gypsum
Putty layer connects.
In one embodiment, the gypsum putty layer includes the first gypsum putty layer and the second gypsum putty layer, described
Second gypsum putty layer covers the first gypsum putty layer.
In one embodiment, the thickness of first interface agent layer is 3-5mm.
In one embodiment, square staff is equipped at the column angle of the steel column.
Above-mentioned steel column decorative structure brushes the first interface agent layer, the first scrim layer, second successively outside fireproof coating layer
Interface agent layer, the second scrim layer and gypsum putty layer, then the brushing paint layer on gypsum putty layer again complete the dress of steel column
Decorations.The production method of above-mentioned steel column decorative structure can save decoration occupied area, expand plane real area.Compared to routine
For steel column cladding, the construction period is greatly saved, and it is easily operated.In addition, set first in steel column decorative structure
Scrim layer and the second scrim layer effectively reduce the cracking degree of fireproof coating layer.It is obtained using above-mentioned construction method
Steel column decorative structure reduces the shared area of decoration, effectively increases the utilization rate of the area of plane.
Description of the drawings
Fig. 1 is the construction method flow chart of the steel column decorative structure of an embodiment;
Fig. 2 is the structure diagram of the steel column decorative structure of an embodiment.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained all other without making creative work
Embodiment belongs to the scope of protection of the invention.
As depicted in figs. 1 and 2, fireproof coating layer 20 is equipped on the steel column 2 of an embodiment, steel column decorative structure 1 is applied
Work method comprises the following steps:
Step S100, the brushing interfacial agents on fireproof coating layer 20 form the first interface agent layer 10.In the fire prevention of steel column 2
The surface of dope layer 20 batch applies interfacial agents, can play the role of structural traps, while is also the closure to fireproof coating layer 20
And protection.Wherein, the production method of interfacial agents is:Mass ratio is used as 1:The water and interfacial agents dry powder blend of 2-4 simultaneously stir, and obtain
To liquid interfacial agents.The mode of blade coating and roller coating may be employed in the painting way of interfacial agents.In the present embodiment, the first boundary
The thickness of face oxidant layer 10 is 3-5mm.
In the present embodiment, before the step of brushing interfacial agents on fireproof coating layer 20, the first interface agent layer 10 of formation,
It further includes:Floating processing is carried out to the surface of fireproof coating layer 20.The surface of fireproof coating layer 20 is handled, utilizes putty
It is batch embedding, 20 rough surface of protective coating layer is subjected to floating processing, reaches the level requirements of decoration.
In addition, it in the present embodiment, carries out further including to fire prevention after smoothing out processing on the surface to fireproof coating layer 20
The step of surface of dope layer 20 is cleared up removes the floating ash, greasy dirt, rubbish on 20 surface of fireproof coating layer etc., ensures fire prevention
The surface cleaning of dope layer 20, and moistening of sprinkling water provide basis for subsequent construction.
After the 10-20 minutes of the first interface agent layer 10 are formed, net is laid on the first interface agent layer 10 by step S110
Ge Bu forms the first scrim layer 11.Wherein, grid cloth is fiberglass gridding cloth, fiberglass gridding cloth be with middle alkali or
Alkali-free glass fiber tie up weaving yarns, through alkaline-resisting macromolecule emulsion coat glass fiber reticular cloth, have good alkali resistance, flexibility and
Through broadwise high resistance pulling force.Grid cloth is completely hung on steel column 2 together, the lap of splice of grid cloth prevents possibility not less than 100mm
Differential expansion between the decorative structure of generation and fireproof coating layer 20 avoids the face checking of steel column decorative structure 1.
Step S120, the brushing interfacial agents on the first scrim layer 11 form second contact surface oxidant layer 12.It is enterprising in steel column 2
Row second of interfacial agents batch apply, i.e. the brushing interfacial agents on the first scrim layer 11 strengthen the envelope to 20 structure of fireproof coating layer
It is stifled, ensure the fire protecting performance of steel column decorative structure 1.In the present embodiment, batch painting mode of second contact surface oxidant layer 12 and the first boundary
Face oxidant layer 10 is identical, and the thickness of second contact surface oxidant layer 12 is 3-5mm.
Step S130 is laid with grid cloth in second contact surface oxidant layer 12, forms the second scrim layer 13.On steel structure column
Completely hang grid cloth second, the risk for avoiding fireproof coating layer 20 cracking.In the present embodiment, the second scrim layer 13 with
First scrim layer 11 is identical, and the lap of splice of the second scrim layer 13 is not less than 100mm.
Step S140, the brushing gypsum putty on the second scrim layer 13 form gypsum putty layer 14.In the present embodiment
In, the brushing gypsum putty on the second scrim layer 13, the step of obtaining steel column decorative structure 1, includes:In the second scrim layer
First pass gypsum putty is laterally completely hung on 13, the first gypsum putty layer is formed, is then vertically completely scraped on the first gypsum putty layer
Gypsum putty forms the second gypsum putty layer.Two layers of batch gypsum putty on the second scrim layer 13, wherein, first pass glue
Skin scraper plate is laterally completely scraped, and connector must not stay raft, when often scraping a plate and finally receiving, pays attention to receiving neat and tidy.In the present embodiment
In, it is further included after the step of forming the first gypsum putty layer:It is polished after the drying of the first gypsum putty layer with 40# sand paper,
Floating putty and mottling are polished into polishing.Then, then by metope clean up.In the present embodiment, the thickness of the first putty layer is not
More than 2mm.
Second time gypsum putty is vertically completely scraped with rubber scraper plate, and connector must not stay raft, when often scraping a plate and finally receiving, is paid attention to
That receives is neat and tidy.In the present embodiment, further included after the step of forming the second gypsum putty layer:It is greasy in the second gypsum
It is polished and is cleaned up with 400# sand paper after sublayer drying.When with sand paper the second gypsum putty layer of polishing, leakage mill is careful not to
It is or putty is worn out.In the present embodiment, the thickness of the second gypsum putty layer is no more than 2mm.
Step S150, the brushing paint layer 15 on gypsum putty layer 14 complete the construction of steel column decorative structure 1.According to not
Same decoration demand, in the external coating dope layer 15 of gypsum putty layer 14.For example, dope layer 15 can be the breast of different colours
Shellac varnish.In the present embodiment, dope layer 15 is fireproof emulsion paint, can increase the fire protecting performance of steel column 2, when improving fire endurance
Between.
In the present embodiment, the brushing gypsum putty on the second scrim layer 13, formed gypsum putty layer 14 the step of it
Before further include:Square staff is set at the column angle of steel column 2.Square staff is added, the protection to steel column decorative structure 1 can be strengthened.
The construction method of above-mentioned steel column decorative structure 1 forms the first boundary by way of using and brushing on the surface of steel column 2
Face oxidant layer 10, the first scrim layer 11, second contact surface oxidant layer 12, the second scrim layer 13, gypsum putty layer 14 and dope layer 15,
Decoration occupied area can be effectively saved, expands plane real area.Using the construction technology of brushing, filled compared to conventional cladding
For decorations, construction technology is saved, and it is fast and simple.In addition, 11 He of the first scrim layer is set in steel column decorative structure 1
Second scrim layer 13 effectively reduces the cracking degree of fireproof coating layer 20, adds the fire protecting performance of steel column 2, improve
Fire resistance period.In addition, the construction method of above-mentioned steel column decorative structure 1 is simple for process, engineering cost is advantageously reduced.
The steel column decorative structure 1 obtained using above-mentioned construction method is introduced below.
As shown in Fig. 2, the steel column decorative structure 1 of an embodiment, steel column 2 is equipped with fireproof coating layer 20, steel column facing knot
Structure 1 include stack gradually the first interface agent layer 10, the first scrim layer 11, second contact surface oxidant layer 12, the second scrim layer 13,
Gypsum putty layer 14 and dope layer 15, the first interface agent layer 10 are coated on fireproof coating layer 20, the first scrim layer 11 and first
Interface agent layer 10 and second contact surface oxidant layer 12 connect, and the second scrim layer 13 connects with second contact surface oxidant layer 12 and gypsum putty layer 14
It connects.
Above-mentioned steel column decorative structure 1 sequentially formed on the surface of steel column 2 first interface agent layer 10, the first scrim layer 11,
Second contact surface oxidant layer 12, the second scrim layer 13 and gypsum putty layer 14 reduce the shared area of decoration, effectively increase flat
The utilization rate of face area.Meanwhile twice scrim layer is set in steel column decorative structure 1, i.e. the first scrim layer 11 and second
Scrim layer 13 can effectively reduce the cracking degree of fireproof coating layer 20, the fire protecting performance of enhancing steel column decorative structure 1.
As shown in Fig. 2, steel column 2 includes fireproof coating layer 20, the first interface agent layer 10, the first grid cloth successively from inside to outside
Layer 11, second contact surface oxidant layer 12, the second scrim layer 13, gypsum putty layer 14 and dope layer 15.To fireproof coating layer 20
Surface carries out floating processing, after the level requirements for reaching decoration, carries out subsequent construction.Wherein it is possible to utilize the embedding side of putty batch
Method handles 20 rough surface of fireproof coating layer.
After fireproof coating layer 20, which is completed to smooth out, to be handled and cleaned, at the external coating interface of fireproof coating layer 20
Agent forms the first interface agent layer 10.In the present embodiment, the thickness of the first interface agent layer 10 is 3-5mm.
After the brushing of interfacial agents is completed, grid cloth is completely hung on the structure of steel column 2 together, forms the first scrim layer
11, the first scrim layer 11 connects the first interface agent layer 10 and second contact surface oxidant layer 12, good by the first scrim layer 11
Flexibility, can prevent the differential expansion between steel column decorative structure 1 and fireproof coating layer 20.In the present embodiment,
The lap of splice of grid cloth is not less than 100mm in one scrim layer 11.
When constructed the first scrim layer 11 after to steel column 2 carry out second of interfacial agents brushing, formed second contact surface agent
Layer 12.Second contact surface oxidant layer 12 is identical with the first interface agent layer 10, can play the role of closure, realizes to fireproof coating layer
20 closure and protection ensures the fire protecting performance of steel column decorative structure 1.In the present embodiment, the thickness of second contact surface oxidant layer 12
For 3-5mm.
Then, grid cloth second is completely hung in 2 structure of steel column, forms the second scrim layer 13, the second scrim layer 13
Second contact surface oxidant layer 12 and gypsum putty layer 14 are connected, strengthens the closure to original structure, and avoids the risk of cracking.In this implementation
In example, the lap of splice of grid cloth is not less than 100mm in the second scrim layer 13.
Then, batch gypsum putty on the second scrim layer 13, forms gypsum putty layer 14.In the present embodiment, gypsum
Putty layer 14 includes the first gypsum putty layer and the second gypsum putty layer, and the second gypsum putty layer covers the first gypsum putty layer.
Applied in two coats gypsum putty layer 14 can provide basis for subsequent decoration construction.In originally implementing, the first gypsum putty layer
It is no more than 2mm with the thickness of the second gypsum putty layer.
In the present embodiment, square staff is equipped at the column angle of steel column 2.Square staff can form straight flange on the crest line at column angle
The part of rupture or cracking, protection and reinforcement gypsum putty 14 layers of most fragile of layer is resisted, ensures the complete of steel column decorative structure 1
Property.
Finally, the brushing paint layer 15 on gypsum putty layer 14 completes the construction of steel column decorative structure 1.It is filled using brushing
The method of decorations sequentially forms the first interface agent layer 10, the first scrim layer 11, the second boundary on the fireproof coating layer 20 of steel column 2
Face oxidant layer 12, the second scrim layer 13, gypsum putty layer 14 and dope layer 15.Construction cost is reduced, shortens the construction period,
And constructing operation is easy.Meanwhile the fire protecting performance of steel construction is strengthened, space occupancy rate is reduced, effectively increases plane
Usable floor area.In addition, above-mentioned steel column decorative structure 1 reduces the use of construction material, the environment protecting of interior decoration is improved.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and description is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that come for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (10)
1. a kind of construction method of steel column decorative structure, fireproof coating layer is equipped on the steel column, which is characterized in that including with
Lower step:
The brushing interfacial agents on the fireproof coating layer form the first interface agent layer;
After first interface agent layer 10-20 minute is formed, grid cloth is laid on first interface agent layer, formation the
One scrim layer;
The interfacial agents are brushed on first scrim layer, form second contact surface oxidant layer;
The grid cloth is laid in the second contact surface oxidant layer, forms the second scrim layer;
The brushing gypsum putty on second scrim layer forms gypsum putty layer;
The brushing paint layer in the putty layer completes the construction of the steel column decorative structure.
2. the construction method of steel column decorative structure according to claim 1, which is characterized in that applied in the fireproof coating layer
Before the step of brush interfacial agents, the first interface agent layer of formation, further include:
Floating processing is carried out to the surface of the fireproof coating layer.
3. the construction method of steel column decorative structure according to claim 1, which is characterized in that in second scrim layer
The step of upper brushing gypsum putty, formation gypsum putty layer, includes:
Gypsum putty described in first pass is laterally completely scraped on second scrim layer, forms the first gypsum putty layer, Ran Hou
It is vertical on the first gypsum putty layer completely to scrape the gypsum putty, form the second gypsum putty layer.
4. the construction method of steel column decorative structure according to claim 3, which is characterized in that in the first gypsum of the formation
It is further included after the step of putty layer:
It is polished after the first gypsum putty layer drying with 40# sand paper, floating putty and mottling is polished into polishing.
5. the construction method of steel column decorative structure according to claim 4, which is characterized in that in the second gypsum of the formation
It is further included after the step of putty layer:
It is polished and is cleaned up with 400# sand paper after the second gypsum putty layer drying.
6. the construction method of steel column decorative structure according to claim 5, which is characterized in that the first gypsum putty layer
It is no more than 2mm with the thickness of the second gypsum putty layer.
7. a kind of steel column decorative structure, the steel column is equipped with fireproof coating layer, which is characterized in that the steel column decorative structure bag
Include the first interface agent layer stacked gradually, the first scrim layer, second contact surface oxidant layer, the second scrim layer, gypsum putty layer and
Dope layer, first interface agent layer are coated on the fireproof coating layer, first scrim layer and first interfacial agents
Layer is connected with the second contact surface oxidant layer, and described second protects scrim layer and the second contact surface oxidant layer and the gypsum putty layer
Connection.
8. steel column decorative structure according to claim 7, which is characterized in that it is greasy that the gypsum putty layer includes the first gypsum
Sublayer and the second gypsum putty layer, the second gypsum putty layer cover the first gypsum putty layer.
9. steel column decorative structure according to claim 7, which is characterized in that the thickness of first interface agent layer is 3-
5mm。
10. steel column decorative structure according to claim 7, which is characterized in that square staff is equipped at the column angle of the steel column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711470985.4A CN108086610A (en) | 2017-12-29 | 2017-12-29 | Steel column decorative structure and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711470985.4A CN108086610A (en) | 2017-12-29 | 2017-12-29 | Steel column decorative structure and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108086610A true CN108086610A (en) | 2018-05-29 |
Family
ID=62180575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711470985.4A Pending CN108086610A (en) | 2017-12-29 | 2017-12-29 | Steel column decorative structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108086610A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109518900A (en) * | 2018-12-20 | 2019-03-26 | 苏州金螳螂建筑装饰股份有限公司 | A kind of naked top decorating structure of steel building and bullet apply construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001065140A (en) * | 1999-08-31 | 2001-03-13 | Mitsui Home Co Ltd | Corrugated metal lath and exterior finish structure using the same |
CN203654639U (en) * | 2013-12-23 | 2014-06-18 | 台州市中凯实业有限公司 | Durable fluorocarbon coating structure |
CN203834842U (en) * | 2014-03-28 | 2014-09-17 | 河南杭萧钢构有限公司 | Decoration node for steel column, after sprayed with fire retardant coating, of steel-structure building |
CN205134813U (en) * | 2015-11-20 | 2016-04-06 | 江西科阳工程材料技术有限公司 | Building wall veneer system |
CN105598020A (en) * | 2015-12-20 | 2016-05-25 | 安徽伟宏钢结构集团股份有限公司 | Fireproof paint construction process of indoor thin type steel structure |
CN207846913U (en) * | 2017-12-29 | 2018-09-11 | 上海建工一建集团有限公司 | Steel column decorative structure |
-
2017
- 2017-12-29 CN CN201711470985.4A patent/CN108086610A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001065140A (en) * | 1999-08-31 | 2001-03-13 | Mitsui Home Co Ltd | Corrugated metal lath and exterior finish structure using the same |
CN203654639U (en) * | 2013-12-23 | 2014-06-18 | 台州市中凯实业有限公司 | Durable fluorocarbon coating structure |
CN203834842U (en) * | 2014-03-28 | 2014-09-17 | 河南杭萧钢构有限公司 | Decoration node for steel column, after sprayed with fire retardant coating, of steel-structure building |
CN205134813U (en) * | 2015-11-20 | 2016-04-06 | 江西科阳工程材料技术有限公司 | Building wall veneer system |
CN105598020A (en) * | 2015-12-20 | 2016-05-25 | 安徽伟宏钢结构集团股份有限公司 | Fireproof paint construction process of indoor thin type steel structure |
CN207846913U (en) * | 2017-12-29 | 2018-09-11 | 上海建工一建集团有限公司 | Steel column decorative structure |
Non-Patent Citations (1)
Title |
---|
白少华: "《钢构件防火涂料表面一次成型仿古建筑油漆施工工法》" * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109518900A (en) * | 2018-12-20 | 2019-03-26 | 苏州金螳螂建筑装饰股份有限公司 | A kind of naked top decorating structure of steel building and bullet apply construction method |
CN109518900B (en) * | 2018-12-20 | 2023-12-01 | 苏州金螳螂建筑装饰股份有限公司 | Bare top decoration structure of steel structure building and elastic coating construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110130506B (en) | On-site coiled material waterproof layer and construction method thereof | |
CN102477797B (en) | A kind of construction method preventing infilled wall crack | |
CN101832015B (en) | Construction process for outer wall metal fluorocarbon coating | |
CN102518271B (en) | Coating construction method of faux stones | |
CN103572845B (en) | A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof | |
CN101935196A (en) | Putty for building external wall | |
CN102400525B (en) | Thin-layer plastering method for autoclaved aerated concrete block wall bodies | |
CN109797920A (en) | A kind of interior covering with paint construction method | |
CN106284998A (en) | Plastering on inner walls completely spreads fiberglass gridding cloth construction method | |
CN106592899A (en) | Construction method of inner wall | |
CN108265845A (en) | A kind of steel column surface thicker fire lagging structure and its construction method | |
CN110644626A (en) | Green and environment-friendly building construction method | |
CN210828119U (en) | Built-in reinforced polymer cement waterproof coating structure | |
CN111677280A (en) | Construction method of exterior wall coating | |
CN105298045B (en) | A kind of interior wall diatom ooze coating and its painting method | |
CN107489251A (en) | A kind of insulation and fire-proof paint exterior wall and its construction method | |
CN103195218B (en) | Wall ceramic sand mortar external plastering construction method | |
CN104386950A (en) | Exterior wall brick-imitating elastic texture coating and application process thereof | |
CN207846913U (en) | Steel column decorative structure | |
CN103964771A (en) | Waterproof surface mortar for thermal insulation system outside building outer wall and application method thereof | |
CN108086610A (en) | Steel column decorative structure and its construction method | |
CN107523116A (en) | Magnetic force putty paste and the method whitewashed a wall using magnetic force putty paste | |
CN103306384A (en) | Construction method of smearing waterproof sealant before final setting of concrete | |
CN101761242B (en) | Lossless and reversible repairing method of damaged hard basic layer | |
CN116378335A (en) | Construction method for painting house building wall surface |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180529 |
|
RJ01 | Rejection of invention patent application after publication |