CN108086438A - A kind of construction method of the new greenery patches structure based on sponge city - Google Patents

A kind of construction method of the new greenery patches structure based on sponge city Download PDF

Info

Publication number
CN108086438A
CN108086438A CN201711344894.6A CN201711344894A CN108086438A CN 108086438 A CN108086438 A CN 108086438A CN 201711344894 A CN201711344894 A CN 201711344894A CN 108086438 A CN108086438 A CN 108086438A
Authority
CN
China
Prior art keywords
greenery patches
water
cistern
sludge
rainwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711344894.6A
Other languages
Chinese (zh)
Inventor
陈洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Energy Saving Technology Co Ltd
Original Assignee
Wuhu Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Energy Saving Technology Co Ltd filed Critical Wuhu Energy Saving Technology Co Ltd
Priority to CN201711344894.6A priority Critical patent/CN108086438A/en
Publication of CN108086438A publication Critical patent/CN108086438A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/002Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The invention discloses a kind of construction method of the new greenery patches structure based on sponge city, including:(1)Arrange plantation layer;(2)Cistern is built;(3)Ground water storage is in place;(4)Filter well is buried;(5)Tile work;(6)Control room is set;(7)Detector is set;(8)Greenery patches is planted and daily management.Construction is simple of the present invention, difficulty is low, and construction is orderly, and construction quality is easily controllable, the construction equipment being related to is few, construction cost is low, and osmotic effect is good, using water-permeable brick and pervious concrete making, make to ooze under rainwater is rapid, super part of oozing enters greenery patches region, and the plant in greenery patches plays rainwater interception function, increases residence time of the rainwater in the region of greenery patches.

Description

A kind of construction method of the new greenery patches structure based on sponge city
Technical field
The present invention relates to a kind of greenery patches construction methods, and in particular to a kind of new greenery patches structure based on sponge city is applied Work method.
Background technology
With the propulsion of Urbanization Construction, increasing for hardened ground changes original water regime, causes rainfall runoff Increase, the frequent ponding in road surface, the frequent large area ponding in urban, while rain flood peak value becomes larger, soil moisture content is reduced, underground Water level decreasing phenomenon aggravation etc..In addition, China's Urban Water Shortage Problem of Cities getting worse, northern area resource-type water shortage, southern area Water quality type water shortage.In such a case, government puts forward to build the target in " sponge city ", is given in each side such as policy, finances To support.
Sponge city, as its name suggests, city is such as sponge, in duration of raining, can quickly absorb, accumulate, permeating, Purifying rainwater reduces rainwater and forms runoff, recharge of groundwater;Simultaneously when not raining, by a series for the treatment of measures and mating The water of accumulation is used pipe network facilities, so as to which rainwater resource be allowed preferably to be dissolved into the supply and drain water system in city.It makes Rational sponge urban water system, can both be effectively protected the original ecosystem in city, and can also slowly recover original The destroyed ecosystem, simultaneously for the Development control area of entire urbanization influence drop to it is lower.
Traditional sponge urban construction pattern, is hard surface everywhere.Whenever heavy rain, " the ash such as pipe duct, pumping plant is relied primarily on Color " facility carrys out draining, and with " quick to exclude " and " end concentration " control for main planning and design concept, rainwater mainly passes through draining Facility is drained, and can not penetrate into underground, is often resulted in and is met rain flooded, drought and waterlogging racing does not meet the requirement of sponge urban construction.
The content of the invention
Goal of the invention:The present invention proposes a kind of new greenery patches knot based on sponge city for deficiency of the prior art The construction method of structure.
Technical solution:The construction method of a kind of new greenery patches structure based on sponge city of the present invention, including such as Lower step:
(1)Arrange plantation layer:It according to the shape in greenery patches and needs to set, the plantation layer in rectangle greenery patches is designed to intermediate low both sides The shape gradually increased sets flat ditch in intermediate lowest part, and the foundation pit of cistern is dug in the lowest part of flat ditch;And circular plot Greenery patches is then designed to the shape continuously decreased between surrounding senior middle school, and the foundation pit of cistern is dug in intermediate lowest part;
(2)Cistern is built:Cistern is embedded in underground, and the volume of cistern is set according to the area in greenery patches, per 3-5 ㎡ greenery patchess The cistern volume of 1m3 is set, construction cistern is piled up with concrete prefabricated or masonry, columns base is arranged to conical bottom, The dirt inlet of sludge pump is set in the lowest part of conical bottom, drainpipe, cistern top are laterally set in cistern upper portion side wall Rectangle sewer is set up, it is inspection shaft that cat ladder is set to connect columns base, sewer the upper surface of on the side wall of sewer Mouthful, the catch pit port is equipped with the grid of comb mouth or reinforcement welding;
(3)Ground water storage is in place:Water tank and suction pump are separately fixed on the ground in the range of the 3m of foundation pit periphery, suction pump Water outlet connect water tank with PB pipes, and protection support is carried out to PB pipes and is fixed, the water inlet end of suction pump is connected with pvc pipe to be stored The water outlet in pond;
(4)Filter well is buried:Filter well is laid with according to the position of drainpipe, the gap between adjacent filter well is backfilled with original soil, It tamps smooth, is then laid with collector pipe, by the well lid of collector pipe one end connection filter well;
(5)Tile work:Osmos tube is wrapped up with permeable geotextiles in advance, then by the osmos tube and the nozzle pair of collector pipe after package It connects, reinforces, osmos tube nozzle is made to be flushed with ground, is laid out according to osmos tube, seepage ditch region, seepage ditch width are marked with gray line More than infiltration 50~80mm of pipe diameter, loaded filter is then laid between adjacent seepage ditch region, loaded filter is from the bottom to top successively The gravel layer of metalling, 100~150cm thickness and the sandy soil layer of 200~250mm thickness for 100~150mm thickness, division tile work area Domain and greenery patches region, greenery patches area distribution use water-permeable brick and pervious concrete making in the both sides in tile work region, tile work region, After laying, smooth and water seasoning is tamped;
(6)Control room is set:The control room of sealing is set or in ground arrangement above control room in another side wall of sewer, Spray pump, sludge pump and PLC central controller are set in control room;The water inlet of the spray pump is arranged on cistern In bottom sidewall, the outlet pipe of spray pump is embedded in plantation layer, and connects out multiple spray tubes on outlet pipe as needed, In spray tube upper end, spray head is set;The dirt inlet of the water inlet pipe connection columns base of the sludge pump, the row of sludge pump Dirty mouth is arranged on ground more than plantation layer;
(7)Detector is set:In the bottom sidewall of cistern, sludge search switch, sludge search switch connection are set PLC central controller;In plantation layer, hygrosensor, hygrosensor connection PLC central controller are set;
(8)Greenery patches is planted and daily management:Flowers and plants seed is sowed on plantation layer or is planted into flowers and plants, aloft plants drought-enduring plant Object plants waterlogging plant in lower, opens spray pump and pours or poured using natural rain, rainwater penetrates into ground by plantation layer Under, when rainwater is excessive, rainwater can be flowed into the inspection shaft of the lowest part in greenery patches, and enters the cistern being located in the ground, cistern Man Hou, rainwater are discharged into river along drainpipe;In more days fine days of summer, hygrosensor detects that plantation layer humidity reaches and sets During fixed lower limit, signal is passed into PLC central controller, PLC central controller starts spray pump and supplies water to spray tube, by Spray head carries out spray pouring to flowers and plants, will when the moisture that hygrosensor is detected in plantation layer reaches the upper limit of setting Signal passes to PLC central controller, and PLC central controller closes spray pump;By prolonged sludge settling, visited in sludge When slowdown monitoring switch detects that precipitating sludge reaches the upper limit in conical bottom, signal is passed into PLC central controller, the control of PLC centers Device starts in the thick grass that sludge pump is arranged sludge earthward;In greenery patches flowers and plants grow, water-soluble fertilizer is added in also in cistern Material or pesticide.
Further, step(4)In before be laid with filter well, first fix Jing Chi, mounting groove be directed at according to fixed lobe Water filter well plate is packed into well pond by mode, and cement mortar is then injected into mounting groove, while clears up the slurries for overflowing mounting groove, then Well lid is shelved on Jing Chi.
Further, step(4)Described in filter well include Jing Chi, water filter well plate and well lid, the well lid is arranged on described On Jing Chi, the water filter well plate is arranged in the well pond, and permeable hole, the water filter well plate are evenly distributed on the water filter well plate On be symmetrically distributed with fixed lobe, mounting groove, the mounting groove and the fixed lobe phase are symmetrically distributed in the well pond Match somebody with somebody, the side of the Jing Chi is equipped with discharge outlet, and the well lid is equipped with water inlet.
Further, step(5)The method of middle water seasoning is to cover full wafer tile work region with stack of rice straw, and waters and support Shield, curing time are 1~2 day, ensure stack of rice straw moistening during maintenance, and idler is forbidden to trample thereon.
Advantageous effect:Construction is simple of the present invention, difficulty is low, and construction is orderly, and construction quality is easily controllable, and the construction being related to is set Standby few, construction cost is low, and osmotic effect is good, using water-permeable brick and pervious concrete making, makes to ooze under rainwater is rapid, super to ooze part Into greenery patches region, the plant in greenery patches plays rainwater interception function, increases residence time of the rainwater in the region of greenery patches, Root system of plant can play catharsis to suspended matter, impurity in rainfall runoff etc., and rainwater infiltrates on the spot, directly penetrates into anti-filter Layer, after rainwater enters loaded filter, rainwater migrates in loaded filter, and rainwater can only downwards be permeated by hole, and flow velocity is slow, stops Stay the time long, metalling, gravel layer and sandy soil layer have adsorption capacity, and the organic granular in rainwater is adsorbed, by raw in hole Long anaerobe degradation, purified rainwater are stored in thin solum, can be increased the water content of thin solum, be adjusted gas It waits, containment urban heat land effect, while can also reduce the pollution of runoff and flood threatens, the rainwater for reaching seepage ditch is then suitable The hole for tree pond cover board enters in osmos tube, then is conveyed rainwater downwards by osmos tube, is sent into filter well, oozes through collector pipe Well by rainwater storage in underground, prevents take up ground space, water filter well plate plays retardance rainwater as the container for collecting rainwater Effect, rainwater can only downwards continue to permeate by permeable hole, and remaining fixed particle is stopped in water filter well plate surface in rainwater, It can not fall, separate impurity.When amount of rainfall is more than that filter well collects the upper limit, extra rainwater is defeated downwards by drainpipe It send, the extra rainwater being finally collected into fully enters unified storage, the rain that will be collected by suction pump in cistern in cistern Water is pumped into water tank and stores, and the rainwater of storage can replace Tap Water from Some Cities and underground water, be filled applied to greening Irrigate, road cleaning, supplement water landscape, toilet flushing etc., can also be used as the make-up water source of park landscape water body, greatly improve The resource utilization efficiency of rainwater, turns waste into wealth, and space-time discontinuous, unstable rainwater resource is converted into and is supplied with lasting The problem of systems stabilisation of outlet capacity becomes the water resource for urban green space comprehensive utilization, alleviates water resources shortage, it is right Building the ecological agriculture, ecocity, environmental protection all has very great meaning.
Specific embodiment
With reference to specific embodiment, the invention will be further described:
Embodiment 1
A kind of construction method of the new greenery patches structure based on sponge city, includes the following steps:
(1)Arrange plantation layer:It according to the shape in greenery patches and needs to set, the plantation layer in rectangle greenery patches is designed to intermediate low both sides The shape gradually increased sets flat ditch in intermediate lowest part, and the foundation pit of cistern is dug in the lowest part of flat ditch;And circular plot Greenery patches is then designed to the shape continuously decreased between surrounding senior middle school, and the foundation pit of cistern is dug in intermediate lowest part;
(2)Cistern is built:Cistern is embedded in underground, and the volume of cistern is set according to the area in greenery patches, per 3-5 ㎡ greenery patchess The cistern volume of 1m3 is set, construction cistern is piled up with concrete prefabricated or masonry, columns base is arranged to conical bottom, The dirt inlet of sludge pump is set in the lowest part of conical bottom, drainpipe, cistern top are laterally set in cistern upper portion side wall Rectangle sewer is set up, it is inspection shaft that cat ladder is set to connect columns base, sewer the upper surface of on the side wall of sewer Mouthful, the catch pit port is equipped with the grid of comb mouth or reinforcement welding;
(3)Ground water storage is in place:Water tank and suction pump are separately fixed on the ground in the range of the 3m of foundation pit periphery, suction pump Water outlet connect water tank with PB pipes, and protection support is carried out to PB pipes and is fixed, the water inlet end of suction pump is connected with pvc pipe to be stored The water outlet in pond;
(4)Filter well is buried:Filter well is laid with according to the position of drainpipe, the gap between adjacent filter well is backfilled with original soil, It tamps smooth, is then laid with collector pipe, by the well lid of collector pipe one end connection filter well;
(5)Tile work:Osmos tube is wrapped up with permeable geotextiles in advance, then by the osmos tube and the nozzle pair of collector pipe after package It connects, reinforces, osmos tube nozzle is made to be flushed with ground, is laid out according to osmos tube, seepage ditch region, seepage ditch width are marked with gray line More than infiltration 50~80mm of pipe diameter, loaded filter is then laid between adjacent seepage ditch region, loaded filter is from the bottom to top successively The gravel layer of metalling, 100~150cm thickness and the sandy soil layer of 200~250mm thickness for 100~150mm thickness, division tile work area Domain and greenery patches region, greenery patches area distribution use water-permeable brick and pervious concrete making in the both sides in tile work region, tile work region, After laying, smooth and water seasoning is tamped;
(6)Control room is set:The control room of sealing is set or in ground arrangement above control room in another side wall of sewer, Spray pump, sludge pump and PLC central controller are set in control room;The water inlet of the spray pump is arranged on cistern In bottom sidewall, the outlet pipe of spray pump is embedded in plantation layer, and connects out multiple spray tubes on outlet pipe as needed, In spray tube upper end, spray head is set;The dirt inlet of the water inlet pipe connection columns base of the sludge pump, the row of sludge pump Dirty mouth is arranged on ground more than plantation layer;
(7)Detector is set:In the bottom sidewall of cistern, sludge search switch, sludge search switch connection are set PLC central controller;In plantation layer, hygrosensor, hygrosensor connection PLC central controller are set;
(8)Greenery patches is planted and daily management:Flowers and plants seed is sowed on plantation layer or is planted into flowers and plants, aloft plants drought-enduring plant Object plants waterlogging plant in lower, opens spray pump and pours or poured using natural rain, rainwater penetrates into ground by plantation layer Under, when rainwater is excessive, rainwater can be flowed into the inspection shaft of the lowest part in greenery patches, and enters the cistern being located in the ground, cistern Man Hou, rainwater are discharged into river along drainpipe;In more days fine days of summer, hygrosensor detects that plantation layer humidity reaches and sets During fixed lower limit, signal is passed into PLC central controller, PLC central controller starts spray pump and supplies water to spray tube, by Spray head carries out spray pouring to flowers and plants, will when the moisture that hygrosensor is detected in plantation layer reaches the upper limit of setting Signal passes to PLC central controller, and PLC central controller closes spray pump;By prolonged sludge settling, visited in sludge When slowdown monitoring switch detects that precipitating sludge reaches the upper limit in conical bottom, signal is passed into PLC central controller, the control of PLC centers Device starts in the thick grass that sludge pump is arranged sludge earthward;In greenery patches flowers and plants grow, water-soluble fertilizer is added in also in cistern Material or pesticide.
Further, step(4)In before be laid with filter well, first fix Jing Chi, mounting groove be directed at according to fixed lobe Water filter well plate is packed into well pond by mode, and cement mortar is then injected into mounting groove, while clears up the slurries for overflowing mounting groove, then Well lid is shelved on Jing Chi.
Further, step(4)Described in filter well include Jing Chi, water filter well plate and well lid, the well lid is arranged on described On Jing Chi, the water filter well plate is arranged in the well pond, and permeable hole, the water filter well plate are evenly distributed on the water filter well plate On be symmetrically distributed with fixed lobe, mounting groove, the mounting groove and the fixed lobe phase are symmetrically distributed in the well pond Match somebody with somebody, the side of the Jing Chi is equipped with discharge outlet, and the well lid is equipped with water inlet.
Further, step(5)The method of middle water seasoning is to cover full wafer tile work region with stack of rice straw, and waters and support Shield, curing time are 1~2 day, ensure stack of rice straw moistening during maintenance, and idler is forbidden to trample thereon.
The above described is only a preferred embodiment of the present invention, not make limitation in any form to the present invention, though So the present invention is disclosed above with preferred embodiment, however is not limited to the present invention, any to be familiar with this professional technology people Member, without departing from the scope of the present invention, when the technology contents using the disclosure above make a little change or modification For the equivalent embodiment of equivalent variations, as long as being the content without departing from technical solution of the present invention, technical spirit according to the invention To any simple modification, equivalent change and modification that above example is made, in the range of still falling within technical solution of the present invention.

Claims (4)

1. a kind of construction method of the new greenery patches structure based on sponge city, it is characterised in that:Include the following steps:
(1)Arrange plantation layer:It according to the shape in greenery patches and needs to set, the plantation layer in rectangle greenery patches is designed to intermediate low both sides The shape gradually increased sets flat ditch in intermediate lowest part, and the foundation pit of cistern is dug in the lowest part of flat ditch;And circular plot Greenery patches is then designed to the shape continuously decreased between surrounding senior middle school, and the foundation pit of cistern is dug in intermediate lowest part;
(2)Cistern is built:Cistern is embedded in underground, and the volume of cistern is set according to the area in greenery patches, per 3-5 ㎡ greenery patchess The cistern volume of 1m3 is set, construction cistern is piled up with concrete prefabricated or masonry, columns base is arranged to conical bottom, The dirt inlet of sludge pump is set in the lowest part of conical bottom, drainpipe, cistern top are laterally set in cistern upper portion side wall Rectangle sewer is set up, it is inspection shaft that cat ladder is set to connect columns base, sewer the upper surface of on the side wall of sewer Mouthful, the catch pit port is equipped with the grid of comb mouth or reinforcement welding;
(3)Ground water storage is in place:Water tank and suction pump are separately fixed on the ground in the range of the 3m of foundation pit periphery, suction pump Water outlet connect water tank with PB pipes, and protection support is carried out to PB pipes and is fixed, the water inlet end of suction pump is connected with pvc pipe to be stored The water outlet in pond;
(4)Filter well is buried:Filter well is laid with according to the position of drainpipe, the gap between adjacent filter well is backfilled with original soil, It tamps smooth, is then laid with collector pipe, by the well lid of collector pipe one end connection filter well;
(5)Tile work:Osmos tube is wrapped up with permeable geotextiles in advance, then by the osmos tube and the nozzle pair of collector pipe after package It connects, reinforces, osmos tube nozzle is made to be flushed with ground, is laid out according to osmos tube, seepage ditch region, seepage ditch width are marked with gray line More than infiltration 50~80mm of pipe diameter, loaded filter is then laid between adjacent seepage ditch region, loaded filter is from the bottom to top successively The gravel layer of metalling, 100~150cm thickness and the sandy soil layer of 200~250mm thickness for 100~150mm thickness, division tile work area Domain and greenery patches region, greenery patches area distribution use water-permeable brick and pervious concrete making in the both sides in tile work region, tile work region, After laying, smooth and water seasoning is tamped;
(6)Control room is set:The control room of sealing is set or in ground arrangement above control room in another side wall of sewer, Spray pump, sludge pump and PLC central controller are set in control room;The water inlet of the spray pump is arranged on cistern In bottom sidewall, the outlet pipe of spray pump is embedded in plantation layer, and connects out multiple spray tubes on outlet pipe as needed, In spray tube upper end, spray head is set;The dirt inlet of the water inlet pipe connection columns base of the sludge pump, the row of sludge pump Dirty mouth is arranged on ground more than plantation layer;
(7)Detector is set:In the bottom sidewall of cistern, sludge search switch, sludge search switch connection are set PLC central controller;In plantation layer, hygrosensor, hygrosensor connection PLC central controller are set;
(8)Greenery patches is planted and daily management:Flowers and plants seed is sowed on plantation layer or is planted into flowers and plants, aloft plants drought-enduring plant Object plants waterlogging plant in lower, opens spray pump and pours or poured using natural rain, rainwater penetrates into ground by plantation layer Under, when rainwater is excessive, rainwater can be flowed into the inspection shaft of the lowest part in greenery patches, and enters the cistern being located in the ground, cistern Man Hou, rainwater are discharged into river along drainpipe;In more days fine days of summer, hygrosensor detects that plantation layer humidity reaches and sets During fixed lower limit, signal is passed into PLC central controller, PLC central controller starts spray pump and supplies water to spray tube, by Spray head carries out spray pouring to flowers and plants, will when the moisture that hygrosensor is detected in plantation layer reaches the upper limit of setting Signal passes to PLC central controller, and PLC central controller closes spray pump;By prolonged sludge settling, visited in sludge When slowdown monitoring switch detects that precipitating sludge reaches the upper limit in conical bottom, signal is passed into PLC central controller, the control of PLC centers Device starts in the thick grass that sludge pump is arranged sludge earthward;In greenery patches flowers and plants grow, water-soluble fertilizer is added in also in cistern Material or pesticide.
2. a kind of construction method of new greenery patches structure based on sponge city according to claim 1, it is characterised in that: Step(4)In before filter well is laid with, first fix Jing Chi, according to fixed lobe be aligned mounting groove mode water filter well plate is packed into In well pond, cement mortar is then injected into mounting groove, while clears up the slurries for overflowing mounting groove, then well lid is shelved on Jing Chi On.
3. a kind of construction method of new greenery patches structure based on sponge city according to claim 1, it is characterised in that: Step(4)Described in filter well include Jing Chi, water filter well plate and well lid, the well lid be arranged on the Jing Chi on, the water filter well Plate is arranged in the well pond, and permeable hole is evenly distributed on the water filter well plate, fixation is symmetrically distributed on the water filter well plate Protrusion is symmetrically distributed with mounting groove in the well pond, and the mounting groove matches with the fixed lobe, the side of the Jing Chi Equipped with discharge outlet, the well lid is equipped with water inlet.
4. a kind of construction method of new greenery patches structure based on sponge city according to claim 1, it is characterised in that: Step(5)The method of middle water seasoning is to cover full wafer tile work region, and water seasoning with stack of rice straw, and curing time is 1~2 My god, ensure stack of rice straw moistening during maintenance, and idler is forbidden to trample thereon.
CN201711344894.6A 2017-12-15 2017-12-15 A kind of construction method of the new greenery patches structure based on sponge city Pending CN108086438A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711344894.6A CN108086438A (en) 2017-12-15 2017-12-15 A kind of construction method of the new greenery patches structure based on sponge city

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711344894.6A CN108086438A (en) 2017-12-15 2017-12-15 A kind of construction method of the new greenery patches structure based on sponge city

Publications (1)

Publication Number Publication Date
CN108086438A true CN108086438A (en) 2018-05-29

Family

ID=62176312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711344894.6A Pending CN108086438A (en) 2017-12-15 2017-12-15 A kind of construction method of the new greenery patches structure based on sponge city

Country Status (1)

Country Link
CN (1) CN108086438A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183532A (en) * 2018-09-21 2019-01-11 于佳惠 A kind of north city rainwater purification depending on road is regulated and stored ecological utilization system
CN112012322A (en) * 2020-08-03 2020-12-01 深圳市润辰建设发展有限公司 Rainwater processing system is used in sponge city

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088305A (en) * 2016-08-04 2016-11-09 苏州筑园景观规划设计股份有限公司 Greenery patches and construction method thereof with underground conservation pool
CN106759825A (en) * 2016-12-14 2017-05-31 浙江建设职业技术学院 A kind of construction method of sponge urban green space water storage system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088305A (en) * 2016-08-04 2016-11-09 苏州筑园景观规划设计股份有限公司 Greenery patches and construction method thereof with underground conservation pool
CN106759825A (en) * 2016-12-14 2017-05-31 浙江建设职业技术学院 A kind of construction method of sponge urban green space water storage system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183532A (en) * 2018-09-21 2019-01-11 于佳惠 A kind of north city rainwater purification depending on road is regulated and stored ecological utilization system
CN109183532B (en) * 2018-09-21 2021-03-12 于佳惠 Depend on ecological utilization system of regulation of northern city rainwater of road
CN112012322A (en) * 2020-08-03 2020-12-01 深圳市润辰建设发展有限公司 Rainwater processing system is used in sponge city

Similar Documents

Publication Publication Date Title
CN110249844B (en) Street tree pool with water storage and drainage device
CN106759825B (en) Construction method of sponge urban green land water storage system
CN106978839B (en) A kind of sponge urban rainwater collection purification utilization integrated system
CN208235696U (en) Rainwater garden system based on sponge ecosystem water purification
CN105625549B (en) A kind of multifunction system for oozing worry available for sponge urban rainwater, harvesting and purifying
CN204959952U (en) Recessed formula greenery patches rainwater regulation dispatch pond and distributed rainwater regulation dispatch pond system
CN105089142A (en) Low elevation greenbelt rainwater regulation scheduling pool and distributed rainwater regulation scheduling pool system
CN207567889U (en) Residential quarters Rainwater collection system
CN110016886B (en) Riverway near natural ecological embankment
CN205502122U (en) A rainwater collection clean system for urban afforestation
CN107989153A (en) A kind of novel construction method for building sponge city
CN108330769A (en) A kind of plumbing utilization system
CN205712403U (en) A kind of sponge urban rainwater that can be used for oozes worry, the multifunction system harvesting and purifying
CN206667420U (en) Sponge city high-effective penetrating type greenery patches constructs
CN206452786U (en) A kind of slope greening ground self-priming structure
CN106717413B (en) Sponge urban greening irrigation system and construction method thereof
CN106499002B (en) Lawn greenery patches rainwater cyclic utilization system
CN207553247U (en) Recessed greenery patches rainwater utilization and collection system
CN112982072B (en) Green belt water storage and drainage curbstone system and water storage and drainage method
CN208105449U (en) A kind of ecostagnation pond
CN213571388U (en) Landscape design is with people's road structure
CN108086438A (en) A kind of construction method of the new greenery patches structure based on sponge city
CN108086459A (en) A kind of construction method of sponge urban green space water storage system
CN208501715U (en) A kind of Rain Garden
CN109487900A (en) A kind of the shock resistance drain filtering system of domestic and construction method of concave herbaceous field

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180529