CN108075393A - Replacing insulator string auxiliary tool - Google Patents

Replacing insulator string auxiliary tool Download PDF

Info

Publication number
CN108075393A
CN108075393A CN201611009168.4A CN201611009168A CN108075393A CN 108075393 A CN108075393 A CN 108075393A CN 201611009168 A CN201611009168 A CN 201611009168A CN 108075393 A CN108075393 A CN 108075393A
Authority
CN
China
Prior art keywords
pipe
hoisting rope
pedestal
locking device
locking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611009168.4A
Other languages
Chinese (zh)
Other versions
CN108075393B (en
Inventor
赵洪远
于学超
王磊
赵兴亮
孙晓磊
李振东
王福升
于冬
龚建刚
顾泽林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611009168.4A priority Critical patent/CN108075393B/en
Publication of CN108075393A publication Critical patent/CN108075393A/en
Application granted granted Critical
Publication of CN108075393B publication Critical patent/CN108075393B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a kind of replacing insulator string auxiliary tools, including pedestal, pedestal is equipped with the locking device being locked at pedestal in power tower lower beam, laterally thicker pipe is vertically installed on pedestal, hoisting rope is wound on pipe, the pulley that transmission cooperation is wound with hoisting rope epimere is further included, and pulley upper end is also installed with locking device pulley being locked in power tower upper beam, outer locking device and internal locking device are also equipped on pedestal.This patent quality is slim and graceful, it is easy to carry, power tower or power transmission tower lower part can be quickly installed to, one people can be easily accomplished the work for transferring heavy insulator chain on the ground, lowering velocity is stable, controllable, the hoisting rope of lower section insulator chain can be locked when being in an emergency, ensure that insulator chain will not fall ground and cause the accident, personnel, device security are all high.

Description

Replacing insulator string auxiliary tool
Technical field
The present invention relates to replacing insulator string auxiliary tools.
Background technology
Insulator chain is common electrical device in power supply circuit, it is mainly by two or more insulation in structure Subcomponent is combined, to the component of flexible suspension conducting wire.For hanging conducting wire and conducting wire being made to insulate with shaft tower and the earth. Therefore, every place for having power transmission line and power transmission tower must connect power transmission line and power transmission tower with insulator chain, and application is non- Often extensively, number of applications is also very huge.
It in order to ensure the reliably working of insulator chain, not only needs to inspect periodically, it is also necessary to periodically carry out insulator chain Maintenance, it is also necessary to which the sub-pieces to go wrong are replaced.Since insulator chain usually contains 20-30 piece insulating trips, because This weight is very big.Due to no dedicated replacement instrument, at least need several talents that can complete replacement operation when replacing, and It is on the power transmission tower of high-altitude, operation difficulty is very huge.Particularly when insulator chain is transferred to ground from high-altitude, once because Cause rubber sleeve or hand pine, insulator chain that will directly drop on ground for fatigue, not only easily smash ground adjunct, insulator String also can be by the breakage that can not be repaired.More seriously, high-altitude application personnel are if there is fatigue the problems such as, will more endanger Danger.
The content of the invention
A kind of rational in infrastructure the technical problem to be solved by the present invention is to provide against the above deficiency, quality is slim and graceful, carrying side Just, power tower or power transmission tower lower part can be quickly installed to, a people can be easily accomplished on the ground transfers heavy insulator chain Work, lowering velocity is stable, controllable, can lock the hoisting rope of lower section insulator chain when being in an emergency, and ensures Insulator chain will not fall ground and cause the accident, all high replacing insulator string auxiliary tool of personnel, device security.
In order to solve the above technical problems, this replacing insulator string being structurally characterized in that with auxiliary tool:Including pedestal, pedestal The locking device being locked at pedestal in power tower lower beam is equipped with, laterally thicker pipe is vertically installed on pedestal, Hoisting rope is wound on pipe, further includes the pulley that transmission cooperation is wound with hoisting rope epimere, pulley upper end is also installed with cunning Wheel is locked at the locking device in power tower upper beam, and external lock mandrel is laterally vertically installed on pedestal, is turned on external lock mandrel It is dynamic to be set with lock sleeve, the outer locking device that hoisting rope can be pressed on to pipe periphery is installed, the bottom in pipe on lock sleeve The internal lock mandrel of coaxial arrangement is also laterally vertically installed on seat, is rotatablely equipped with turntable on internal lock mandrel, on turntable and pipe Equipped with the internal locking device being locked at hoisting rope on pipe.
This replacing insulator string with auxiliary tool be by circular pipe type rub twin-lock locking structure to realize rational in infrastructure, quality Merrily and lightheartedly, it is easy to carry, power tower or power transmission tower lower part can be quickly installed to, it is heavy that a people can be easily accomplished decentralization on the ground Insulator chain work, lowering velocity is stable, controllable, can be by the hoisting rope of lower section insulator chain when being in an emergency It is locked, ensure that insulator chain will not fall ground and cause the accident, personnel, device security are all high.
Circular pipe type friction twin-lock locking structure mainly includes pedestal, pipe, external lock mandrel, lock sleeve, outer locking device, internal lock Mandrel, turntable and internal locking device.Wherein, pedestal is a slab construction, is the main framework of this patent, is other component Carrier is installed, installation site and space are provided for other component.Pedestal one side is equipped with locking device, and pedestal is fast by locking device Speed is installed on power tower or the crossbeam of power transmission tower lower part namely realizes the Fast Installation of this patent.This patent is being installed and used When, general pedestal plate face is vertically arranged.The pipe is the set of a circular tube shaped, axial horizontally disposed, and and pedestal Vertically it is solid-located.The main function of pipe is to lift the load that the hoisting rope of insulator chain provides a winding and force Body.In actual production, pipe end can also be coaxially affixed there are one oviduct, and the thinner one end of oviduct is docked with pipe, The thicker one end of oviduct is set away from pipe.Set oviduct main purpose, be in order to the hoisting rope of pipe end into Row /V prevents hoisting rope from being slipped from pipe end.When actually manufacturing, the outer end of outer locking cover also it is corresponding be installed with it is a piece of with The corresponding taper arcs of oviduct, effect are and fit in oviduct, by hoisting rope /V in arc-shaped passage, tool The effect of secure reliable operation.Under reality during anti-insulator chain, floor installation is mounted on electric power in power tower lower part, pulley Tower top, hoisting rope differentially-wound is between pulley and pipe.Hoisting rope epimere connecting insulator string, hoisting rope lower end is by operating personnel It holds.The effect of pipe second is that by the frictional force between hoisting rope come offset insulator chain decline when gravity.Obviously, The number of turns that hoisting rope is wrapped on pipe is more, and the frictional force that hoisting rope receives pipe is bigger, can overcome the weight of insulator chain Power is bigger, therefore the number of turns of winding hoisting rope can be determined according to insulator chain actual weight.According to force analysis, absolutely The frictional force that the gravity of edge substring is equal between pipe and hoisting rope adds the traction force of operating personnel.Obviously, operating personnel are led to Cross the size of the traction force of control drawing hoisting rope, it is possible to control under the speed namely control insulator chain that hoisting rope slides Put the speed of speed.Specifically, when operating personnel apply smaller traction force, the gravity of insulator chain is more than pipe and hangs The traction force that frictional force and operating personnel between dress rope apply, insulator chain start slowly to transfer.Operating personnel is allowed to continue to subtract During small traction force, insulator chain lowering velocity will be getting faster.When operating personnel apply larger traction force, insulator chain Gravity is less than the frictional force between pipe and hoisting rope and the traction force of operating personnel's application, and insulator chain starts slowly to slow down straight To stopping.When there is fortuitous event such as humidity or the rainy frictional force caused between pipe and hoisting rope reduces, operating personnel Apply with all strength when can not reduce insulator chain lowering velocity, by the lock sleeve that is sleeved on external lock mandrel and can be sleeved on Turntable on internal lock mandrel triggers outer locking device respectively and internal locking device action carrys out the urgent decline for suspending insulator chain.When When outer locking device and internal locking device are triggered, the two will relatively be locked together hoisting rope with pipe, so lift Rope can not just be rotated relative to pipe, also can not just be realized the decentralization of insulator chain, be play a part of promptly to protect.Therefore, this patent When in use, only need a ground staff that can easily manipulate heavy insulator chain and stablize decentralization, operation is very simple.I.e. Make when there are special circumstances, can also safeguard protection be realized by outer locking device and internal locking device, fundamentally improved The use reliability and security of this patent, the effective guarantee person and equipment safety.
In actual production, pipe end can also be coaxially affixed there are one oviduct, the thinner one end of oviduct and pipe Docking, the thicker one end of oviduct are set away from pipe.The main purpose of oviduct is set, is for the lifting to pipe end Rope carries out /V, prevents hoisting rope from being slipped from pipe end.When actually manufacturing, also correspondence is installed with one for the outer end of outer locking cover Piece and the corresponding taper arcs of oviduct, effect be with fit in oviduct, by hoisting rope /V in arc-shaped passage It is interior, there is safeguard work reliably effect.
As an improvement, the outer locking device includes the outer locking cover for being installed in lock sleeve one side, outer locking cover is buckled for half Cover on the arc plate on the outside of pipe, between outer locking cover inner wall and circular tube external wall be equipped with hoisting rope by curved channel, locking Set opposite side is installed with draw ring by lever, and draw ring is connected with pedal ring by drawstring.
This outer locking device mainly includes the structures such as outer locking cover, passage, lever, draw ring, drawstring and foot pedal.Wherein, Outer locking cover and lever are separately fixed at the both sides of lock sleeve, such as left side and right side.In this way, outer locking cover and lever just pass through lock Fixed and external lock mandrel constitutes hinged installation relation with pedestal, and when activation lever end is moved, lever will be in lock sleeve It is rotated under support around external lock mandrel, so as to achieve the purpose that outer locking cover is driven to swing.In this patent, outer locking cover is located at circle Below pipe and deviation right side, the purpose so designed are that the hoisting rope epimere being wrapped in for convenience on pipe is upwardly extended with sliding Wheel connection also allows for hoisting rope hypomere to the left or lower section extends, drastically increases simple operation, very convenient.At this In patent, outer locking cover is half to buckle the arc plate covered on the outside of pipe.In its natural state, outer locking cover and when pipe, coaxially set It puts, an arc-shaped gap, i.e., arc-shaped passage is formed between outer locking cover inner wall and circular tube external wall.The passage is lifting The space that rope passes through, in nature, which is far wider than the winding thickness of hoisting rope, in order to the smooth slip of hoisting rope. In this patent, lever end is installed with draw ring, and draw ring is extended downwardly by drawstring and is connected with pedal ring, therefore lever, drawing Ring, drawstring and pedal ring composition are driven matching relationship successively.In actual use, floor installation generally can be made into pedal ring ratio Ground is slightly higher and the position that stroke can drive outer locking cover to be pressed on hoisting rope on pipe is stepped under it.In work, step on foot-operated During ring, pedal ring will can agitate outer locking by drawstring and the draw ring pull lever bottom, lever by lock sleeve and external lock mandrel It is put on cover, arc-shaped passage can narrow at this time, and outer locking cover inner wall can rub with hoisting rope.When pedal ring is floored, Passage between outer locking cover and pipe is most narrow, hoisting rope fixation is locked on pipe namely is realized the locking of hoisting rope With the secure localization of decentralization insulator chain, job security has greatly been ensured.For convenience of narration, this state is known as to lock shape State.
As an improvement, being evenly equipped with the locking slot with pipe coaxial arrangement on outer locking cover inner wall, rubber is installed in locking slot Adhesive tape.
The uniformly distributed locking slot on outer locking cover inner wall, and rubber strip is installed in locking slot, main purpose is to increase To the frictional force of hoisting rope during locking state, and hoisting rope is applied using rubber strip natural resiliency and is protected.In this patent, lock Tight slot and rubber strip are all the strips with pipe coaxial arrangement, so set all liftings mainly ensured in the range of button cover Rope can all be subject to the friction of rubber strip and protection namely the reliability for increasing locking.
As a kind of preferred embodiment, the internal locking device is located at including uniform ring inside and outside the perforation pipe on pipe Several locking slideways, lock in slideway and be fitted with latch, latch inner end is hinged on turntable periphery by annulate shaft, on pipe Inside and outside linkage slideway is additionally provided with, linkage stick is fitted in the slideway that links, linkage stick inner end is hinged on by universal driving shaft to be turned Disk periphery, linkage stick outer end is hinged on by drive shaft on outer locking cover inner wall, when outer locking cover is away from pipe outside latch Along locking slideway is submerged, latch outer edge stretches out locking slideway when outer locking cover is close to pipe.
This internal locking device is mainly including locking slideway, latch, annulate shaft, linkage slideway, linkage stick, linkage hinge shaft, drive The structures such as moving axis.Wherein, locking slideway uniform ring is located on pipe, and is penetrated through outside in pipe and set.Slideway is locked in length Bar shaped is set, and is arranged on along pipe is axially extending on pipe.The latch is to slide inserting relation, latch with locking slideway And the strip tablet being extended along locking slideway.Latch inner end is hinged on by annulate shaft on turntable periphery, therefore is locked Tight plate can be swung around annulate shaft with respect to turntable.In nature, latch outer edge is submerged in locking slideway namely not revealed Go out to lock slideway.And in nature, latch be tilt insertion locking slideway namely latch direction of insertion with Radially there are angles for pipe.In this patent, latch both can be hinged on turntable periphery by the annulate shaft of a root long, Turntable periphery can be hinged on by two or more annulate shafts.A linkage slideway, linkage slideway perforation circle are additionally provided on pipe Outside is set in pipe, and is set towards outer locking cover inner wall middle part.It is slided in linkage slideway and is fitted with a linkage stick, link stick It extends to the inner end in pipe to be hinged on turntable periphery by universal driving shaft, the outer end that linkage stick is extended to outside pipe passes through driving Axis is corresponding hinged in the middle part of outer locking cover inner wall.Because above-mentioned drive shaft, universal driving shaft, annulate shaft, turntable are all with outer locking Axis is coaxially disposed, therefore outer locking cover just constitutes transmission matching relationship by the stick that links with turntable, latch.When this patent by Nature to locking state switch when namely when stepping on pedal ring, outer locking cover is close to pipe, arc-shaped channel narrows, Start the hoisting rope that rubs, slow down insulator chain lowering velocity.Meanwhile outer locking cover is turned by the stick driving disc low-angle that links It is dynamic, and then turntable driving latch synchronizing moving.And the rotation direction of driving plate driving disc just makes latch to extending The direction for locking slideway is slided, and the outer edge of such latch will skid off locking slideway namely be formed in pipe periphery several Convex ribs.So not only play the role of increasing pipe and hoisting rope frictional force, and with the lifting that will be wrapped on pipe The effect of the fixed clamping of rope, but also the cross section of arc-shaped passage has been further reduced, hoisting rope is made to be more difficult to pass through.Furthermore Latch outer edge and rubber strip are all along the axially extending setting of pipe, and therefore, the cooperation of the two can make arc-shaped passage In the waveform that height rises and falls, coupling mechanism force of this patent to hoisting rope is greatly strengthened, the decentralization of insulator chain is positioned more Reliably.The mode of above-mentioned decentralization insulator chain is " positive routine decentralization ".Therefore, this patent is when running into special circumstances, such as suddenly Under play light rain pipe and hoisting rope frictional force caused to reduce either ground handling operator's fatigue and need to rest or ground behaviour Making personnel's operation error causes hoisting rope to be slipped from hand, and ground handling operator need to only step on pedal ring with foot at this time, i.e., The quick positioning of insulator chain can be achieved, it is easy to operate, safe and reliable.Certainly, ground handling operator can also decontrol and hang completely Dress rope hypomere, " the pause and transition in rhythm or melody formula for only stepping on flowing mode by foot-operated central spacer to control the slip of hoisting rope namely realize insulator chain Decentralization ".Ground handling operator can also be by way of controlling and stepping on angle under pedal ring, fill outer locking device and internal locking It puts and reaches critical locking state, hoisting rope is not locked completely at this time, is simply slided relatively slow namely is realized insulator chain " critical formula is slowly transferred ".
As an improvement, the latch outer edge is wedge shaped.
Latch outer edge is set into wedgewise, primarily to the frictional force of increase latch outer edge and hoisting rope, Improve locking effect.
As an improvement, the hoisting rope hypomere is set with the thick circular cone rubber sleeve in the thin lower end in upper end, circular cone rubber sleeve lower section Hoisting rope on be to have sling.
Conical rubber set and the rope-tying buckle on hoisting rope are set in hoisting rope hypomere, can not only facilitate ground operator Member holds, primarily to ensure in pole in special circumstances, that is, the situation of outer locking device and internal locking device all failures Lower use.When outer locking device and internal locking device all failures, the insulator chain transferred rapidly can drive hoisting rope quickly to move Dynamic, the circular cone rubber sleeve of last hoisting rope latter end can be brought into the arc-shaped passage between outer locking decoration and pipe.Due to circle Cone rubber set is conical namely upper end is more carefully easily accessible passage, and lower end is more slightly easily detected by passage.Between so Can constantly slow down the lowering velocity of insulator chain every the conical rubber set of setting, the decentralization power of straight only insulator chain be not enough to by Be caught in passage conical rubber set take passage out of until namely realize the secure localization of insulator chain.
As a kind of realization method, pedestal is equipped with conical bore and circular cone hole, is fitted in conical bore and circular cone hole Circular cone bolt, circular cone bolt can be slided along circular cone hole, and the locking device is installed in circular cone bolt end, and the crossbeam is angle Steel, the locking device include being installed in the horizontal-extending upper flat plate of circular cone stud base, and upper flat plate rear end is vertical fixed oriented The stringer board of lower extension, stringer board lower part are installed with the lower tablet set with parallel interval above and below upper flat plate, and lower tablet is equipped with screw hole, Be bolted with the positioning bolt level board of angle steel being clamped between upper flat plate and lower tablet in inner cavity in screw hole.
In this patent, pedestal is equipped with several butt holes being connected with locking device, mainly includes conical bore and circular cone Hole, wherein circular cone hole are the bar holes of conical bore dimensionally extending transversely.Either conical bore or circular cone hole, Vertical section is all the wide bellmouth in the narrow one end in one end.Circular cone bolt, circular cone bolt one end are fitted in conical bore and circular cone hole The circular cone sprue for inserting cooperation completely with conical bore is installed with, the other end is corresponding with locking device to be solid-located.Circular cone bolt Bolt is similar to, although there is bolt in title, there is no be threadedly coupled cooperation.The circular cone sprue of circular cone bolt is inserted into circular cone Behind hole and circular cone hole, conical bore or circular cone hole will be submerged completely, and end face is concordant with pedestal, therefore will not be hung on the move Fill the adverse effect that is burdened with of restricting.Circular cone bolt can only rotate in conical bore, so as to fulfill freely adjusting for locking device setting angle It is whole.Circular cone bolt can not only rotate in circular cone hole, can also be free to slide along circular cone hole length direction, therefore not But the setting angle of locking device can be adjusted, the installation site of locking device can also be adjusted, adaptability is very strong, contributes to this Patent realizes Fast Installation.
As the crossbeam of power tower it is most common hardware fitting structure using angle steel, it is very universal on Electrical tower. For this angle steel crossbeams, this patent devises targetedly locking device.This locking device mainly includes parallel up and down Every setting upper flat plate with lower tablet, the positioning that is fixedly connected with the stringer board of upper flat plate and lower tablet and is screwed onto on lower tablet Bolt.Traditional angle steel has two vertical fixed platen surfaces, and for convenience of describing, horizontally disposed tablet is known as level board, Another vertically disposed tablet is known as vertical panel, an avris of level board is corresponding with the upper avris of vertical panel to be fixed in one It rises.In this patent, upper flat plate and lower tablet are spaced up and down, therefore form a clip slot or cavity between the two. The width of the clip slot is wider than the level board of angle steel, in order to smoothly insert the level board of angle steel into clip slot.It chats for convenience It states, one end that angle steel level board is inserted into clip slot is known as inner end, namely affixed one end is known as with vertical panel by the other end Outer end.Lower tablet is equipped with screw hole, and screw hole is axially vertically disposed, and positioning bolt is bolted in screw hole.When angle steel level board inner end When inserting in clip slot, the level board of angle steel can be fixed to clamp in clip slot by way of the screwed in place bolt into clip slot It is interior, so as to fulfill the fixation of angle steel level board and upper flat plate and lower tablet namely the Fast Installation of realization this patent.
In conclusion using the replacing insulator string auxiliary tool of this structure, rational in infrastructure, quality is slim and graceful, carries It is convenient, power tower or power transmission tower lower part can be quickly installed to, a people can be easily accomplished on the ground transfers heavy insulator The work of string, lowering velocity is stable, controllable, can lock the hoisting rope of lower section insulator chain when being in an emergency, and protects Card insulator chain will not fall ground and cause the accident, and personnel, device security are all high.
Description of the drawings
The present invention is described in further detail with reference to attached drawing:
Fig. 1 is the overall structure diagram of this patent;
Fig. 2 is the structure diagram of internal locking device nature;
Fig. 3 is the structure diagram of internal locking device locking state;
Fig. 4 is the structure diagram that two sleeve locking apparatus lock fit system one;
Fig. 5 is the structure diagram that two sleeve locking apparatus lock fit system two;
Fig. 6 is the structure diagram of locking device.
Specific embodiment
As shown in the figure, replacing insulator string auxiliary tool includes pedestal 1, pedestal is equipped with is locked at electric power by pedestal Locking device 2 in tower lower beam 10 is laterally vertically installed with thicker pipe 3 on pedestal, hoisting rope is wound on pipe 4, the pulley 5 that transmission cooperation is wound with hoisting rope epimere is further included, pulley upper end, which is also installed with, is locked at pulley on power tower Locking device on portion's crossbeam, is laterally vertically installed with external lock mandrel 6 on pedestal, on external lock mandrel turning set equipped with lock sleeve 7, Hoisting rope can be pressed in the outer locking device 8 of pipe periphery by being equipped on lock sleeve, also laterally vertical on the pedestal in pipe The internal lock mandrel 9 of coaxial arrangement is installed with, turntable 11 is rotatablely equipped on internal lock mandrel, turntable and pipe are equipped with hoisting rope The internal locking device 12 being locked on pipe.This replacing insulator string mainly includes pedestal, pipe, outer locking with auxiliary tool Axis, lock sleeve, outer locking device, internal lock mandrel, turntable and internal locking device.Wherein, pedestal is a slab construction, is that this is special The main framework of profit is the installation carrier of other component, installation site and space is provided for other component.Pedestal one side is equipped with lock Tight device, pedestal are quickly installed on power tower or the crossbeam of power transmission tower lower part namely are realized this patent by locking device Fast Installation.When installing and using, general pedestal plate face is vertically arranged this patent.The pipe is a circular tube shaped Set, it is axial horizontally disposed, and vertical with pedestal be solid-located.The main function of pipe is to lift the lifting of insulator chain Rope provides the carrier of a winding and force.Below reality during insulator chain, floor installation is in power tower lower part, pulley installation On power tower top, hoisting rope differentially-wound is between pulley and pipe.Hoisting rope epimere connecting insulator string, hoisting rope lower end is by grasping Make personnel's holding.The effect of pipe second is that by the frictional force between hoisting rope come offset insulator chain decline when weight Power.Obviously, the number of turns that hoisting rope is wrapped on pipe is more, and the frictional force that hoisting rope receives pipe is bigger, can overcome insulation The gravity of substring is bigger, therefore the number of turns of winding hoisting rope can be determined according to insulator chain actual weight.According to stress point Analysis understands that the gravity of insulator chain is equal to traction force of the frictional force between pipe and hoisting rope plus operating personnel.Obviously, grasp Make size of the personnel by the traction force of control drawing hoisting rope, it is possible to control the speed namely control exhausted that hoisting rope slides The speed of edge substring lowering velocity.Specifically, when operating personnel apply smaller traction force, the gravity of insulator chain is more than The traction force that frictional force and operating personnel between pipe and hoisting rope apply, insulator chain start slowly to transfer.Allow operator When member continues to reduce traction force, insulator chain lowering velocity will be getting faster.When operating personnel apply larger traction force, absolutely The gravity of edge substring is less than the frictional force between pipe and hoisting rope and the traction force of operating personnel's application, and insulator chain starts slowly It is slow to slow down until stopping.When there is fortuitous event such as humidity or the rainy frictional force caused between pipe and hoisting rope reduces, Operating personnel apply with all strength when can not reduce insulator chain lowering velocity, can be by the lock sleeve that is sleeved on external lock mandrel It triggers outer locking device respectively with the turntable being sleeved on internal lock mandrel and internal locking device action promptly suspends insulator chain Decline.When outer locking device and internal locking device are triggered, the two will relatively be locked together hoisting rope with pipe, So hoisting rope can not just be rotated relative to pipe, also can not just realize the decentralization of insulator chain, play a part of promptly to protect.Cause This, this patent when in use, only needs a ground staff that can easily manipulate heavy insulator chain and stablizes decentralization, operation is non- It is often simple.Even if when there are special circumstances, can also safeguard protection be realized by outer locking device and internal locking device, from root Improve the use reliability and security of this patent in sheet, the effective guarantee person and equipment safety.
In actual production, pipe end can also be coaxially affixed there are one oviduct, the thinner one end of oviduct and pipe Docking, the thicker one end of oviduct are set away from pipe.The main purpose of oviduct is set, is for the lifting to pipe end Rope carries out /V, prevents hoisting rope from being slipped from pipe end.When actually manufacturing, also correspondence is installed with one for the outer end of outer locking cover Piece and the corresponding taper arcs of oviduct, effect be with fit in oviduct, by hoisting rope /V in arc-shaped passage It is interior, there is safeguard work reliably effect.
In this patent, the outer locking device includes the outer locking cover 13 for being installed in lock sleeve one side, and outer locking cover is Half button covers on the arc plate on the outside of pipe, be equipped between outer locking cover inner wall and circular tube external wall hoisting rope by curved channel 14, lock sleeve opposite side is installed with draw ring 16 by lever 15, and draw ring is connected with pedal ring 18 by drawstring 17.This outer locking fills Putting mainly includes the structures such as outer locking cover, passage, lever, draw ring, drawstring and foot pedal.Wherein, outer locking cover and lever difference The both sides of lock sleeve are fixed on, such as left side and right side.In this way, outer locking cover and lever just pass through lock sleeve and external lock mandrel and bottom Seat constitutes hinged installation relation, and when activation lever end is moved, lever will turn under the support of lock sleeve around external lock mandrel It is dynamic, so as to achieve the purpose that outer locking cover is driven to swing.In this patent, outer locking cover is located at below pipe and on the right side of deviation, The purpose so designed is that the hoisting rope epimere being wrapped in for convenience on pipe is upwardly extended and is connected with pulley, also allows for lifting Rope hypomere is to the left or lower section extends, and drastically increases simple operation, very convenient.In this patent, outer locking cover is Half button covers on the arc plate on the outside of pipe.In its natural state, outer locking cover and when pipe, are coaxially disposed, outer locking cover inner wall An arc-shaped gap, i.e., arc-shaped passage are formed between circular tube external wall.The passage be hoisting rope by space, from During right state, which is far wider than the winding thickness of hoisting rope, in order to the smooth slip of hoisting rope.In this patent, lever end End is installed with draw ring, and draw ring is extended downwardly by drawstring and is connected with pedal ring, therefore lever, draw ring, drawstring and pedal ring structure Into being driven matching relationship successively.In actual use, generally floor installation can be made pedal ring more slightly higher than ground and is being stepped under it Stroke can drive the position that hoisting rope is pressed on pipe by outer locking cover.In work, when stepping on pedal ring, pedal ring will pass through Drawstring and the draw ring pull lever bottom, lever can be agitated by lock sleeve and external lock mandrel and put on outer locking cover, arc-shaped at this time Passage can narrow, and outer locking cover inner wall can rub with hoisting rope.When pedal ring is floored, between outer locking cover and pipe Passage it is most narrow, by hoisting rope fixation be locked on pipe namely realize hoisting rope locking and transfer insulator chain peace Full positioning, has greatly ensured job security.For convenience of narration, this state is known as locking state.
In this patent, the locking slot 19 with pipe coaxial arrangement is evenly equipped on outer locking cover inner wall, is installed in locking slot There is rubber strip 20.The uniformly distributed locking slot on outer locking cover inner wall, and rubber strip is installed in locking slot, main purpose is to increase To the frictional force of hoisting rope during big locking state, and hoisting rope is applied using rubber strip natural resiliency and is protected.In this patent, Locking slot and rubber strip are all the strips with pipe coaxial arrangement, so set mainly ensure button cover in the range of all hang Dress rope can all be subject to the friction of rubber strip and protection namely the reliability for increasing locking.
In the present embodiment, the internal locking device includes several locks inside and outside the perforation pipe that uniform ring is located on pipe Tight slideway 21 locks and latch 22 is fitted in slideway, and latch inner end is hinged on turntable periphery by annulate shaft 23, is gone back on pipe Equipped with inside and outside linkage slideway 24, linkage stick 25 is fitted in the slideway that links, linkage stick inner end is hinged by universal driving shaft 26 In turntable periphery, linkage stick outer end is hinged on outer locking cover inner wall by drive shaft 27, is locked when outer locking cover is away from pipe Plate outer edge submerges locking slideway, and latch outer edge stretches out locking slideway when outer locking cover is close to pipe.This internal locking device It is main to include the structures such as locking slideway, latch, annulate shaft, linkage slideway, linkage stick, linkage hinge shaft, drive shaft.Wherein, lock Slideway uniform ring is located on pipe, and is penetrated through outside in pipe and set.The elongated setting of slideway is locked, is axially prolonged along pipe It stretches and is arranged on pipe.The latch is to slide inserting relation with locking slideway, and latch is also to be set along locking slideway extension The strip tablet put.Latch inner end is hinged on by annulate shaft on turntable periphery, therefore latch can be opposite turn around annulate shaft Disk is swung.In nature, latch outer edge submerges in locking slideway namely does not expose locking slideway.And certainly During right state, latch is that tilt insertion locking slideway namely direction of insertion and the pipe of latch be radially that there are angles 's.In this patent, latch both can be hinged on turntable periphery by the annulate shaft of a root long, can also be by two or more Annulate shaft is hinged on turntable periphery.A linkage slideway is additionally provided on pipe, outside is set in linkage slideway perforation pipe, and direction It is set in the middle part of outer locking cover inner wall.It is slided in linkage slideway and is fitted with a linkage stick, linkage stick extends to the inner end in pipe It is hinged on by universal driving shaft on turntable periphery, linkage stick extends to the outer end outside pipe and passes through in drive shaft and outer locking cover inner wall Portion corresponds to hinged.Because above-mentioned drive shaft, universal driving shaft, annulate shaft, turntable are all coaxially disposed with external lock mandrel, therefore external lock Tight cover just constitutes transmission matching relationship by the stick that links with turntable, latch.When this patent is from nature to locking state During switching namely when stepping on pedal ring, outer locking cover is close to pipe, arc-shaped channel narrows, starts the hoisting rope that rubs, slows down Insulator chain lowering velocity.Meanwhile outer locking cover is by the stick driving disc Small-angle Rotation that links, and then turntable driving latch Synchronizing moving.And the rotation direction of driving plate driving disc just makes latch be slided to the direction for extending locking slideway, this The outer edge of sample latch will skid off locking slideway namely form several convex ribs in pipe periphery.So not only play increasing Big pipe and the effect of hoisting rope frictional force, and play an important role of that the hoisting rope that will be wrapped on pipe fixes clamping, and The cross section of arc-shaped passage has also been further reduced, hoisting rope is made to be more difficult to pass through.Furthermore latch outer edge and rubber strip are all It is along the axially extending setting of pipe, therefore, the cooperation of the two can make the waveform that arc-shaped passage rises and falls in height, significantly Coupling mechanism force of this patent to hoisting rope is enhanced, it is relatively reliable to the decentralization positioning of insulator chain.Above-mentioned decentralization insulator chain Mode is " positive routine decentralization ".Therefore, for this patent when running into special circumstances, such as unexpected lower light rain causes pipe and hoisting rope Frictional force reduces that either ground handling operator's fatigue needs to rest or ground handling operator's operation error causes hoisting rope It is slipped from hand, ground handling operator only need to step on pedal ring with foot at this time, you can realize the quick positioning of insulator chain, It is easy to operate, safe and reliable.Certainly, ground handling operator can also decontrol hoisting rope hypomere completely, only by riding central spacer " decentralization of pause and transition in rhythm or melody formula " for stepping on flowing mode to control the slip of hoisting rope namely realize insulator chain.Ground handling operator can also By way of controlling and stepping on angle under pedal ring, outer locking device and internal locking device to be made to reach critical locking state, at this time Hoisting rope is not locked completely, is simply slided " critical formula is slowly transferred " relatively slow namely that realize insulator chain.
In this patent, the latch outer edge is wedge shaped.Latch outer edge is set into wedgewise, primarily to Increase the frictional force of latch outer edge and hoisting rope, improve locking effect.
In the present embodiment, the hoisting rope hypomere is set with the thick circular cone rubber sleeve 28 in the thin lower end in upper end, circular cone rubber It is to have sling 29 to cover on the hoisting rope of lower section.Conical rubber set and the rope-tying buckle on hoisting rope are set in hoisting rope hypomere, no But ground handling operator can be facilitated to hold, primarily to ensure in pole in special circumstances, that is, outer locking device and interior It is used in the case of locking device all failures.When outer locking device and internal locking device all failures, the insulator transferred rapidly String can drive hoisting rope quickly to move, and the circular cone rubber sleeve of last hoisting rope latter end can be brought between outer locking decoration and pipe Arc-shaped passage.Since conical rubber set is conical namely upper end is more carefully easily accessible passage, and lower end relatively it is thick not Easily by passage.The lowering velocity of insulator chain can constantly be slowed down by being spaced such that the conical rubber set of setting, straight only to insulate Until the decentralization power of substring is not enough to take the conical rubber set for being caught in passage out of passage namely realize the peace of insulator chain Full positioning.
In this patent, pedestal is equipped with conical bore and circular cone hole, and circular cone spiral shell is fitted in conical bore and circular cone hole Bolt, circular cone bolt can be slided along circular cone hole, and the locking device is installed in circular cone bolt end.
In this patent, pedestal is equipped with several butt holes being connected with locking device, mainly includes conical bore and circular cone Hole, wherein circular cone hole are the bar holes of conical bore dimensionally extending transversely.Either conical bore or circular cone hole, Vertical section is all the wide bellmouth in the narrow one end in one end.Circular cone bolt, circular cone bolt one end are fitted in conical bore and circular cone hole The circular cone sprue for inserting cooperation completely with conical bore is installed with, the other end is corresponding with locking device to be solid-located.Circular cone bolt Bolt is similar to, although there is bolt in title, there is no be threadedly coupled cooperation.The circular cone sprue of circular cone bolt is inserted into circular cone Behind hole and circular cone hole, conical bore or circular cone hole will be submerged completely, and end face is concordant with pedestal, therefore will not be hung on the move Fill the adverse effect that is burdened with of restricting.Circular cone bolt can only rotate in conical bore, so as to fulfill freely adjusting for locking device setting angle It is whole.Circular cone bolt can not only rotate in circular cone hole, can also be free to slide along circular cone hole length direction, therefore not But the setting angle of locking device can be adjusted, the installation site of locking device can also be adjusted, adaptability is very strong, contributes to this Patent realizes Fast Installation.
In the present embodiment, the crossbeam 10 is angle steel 30, and the locking device includes being installed in circular cone stud base's water The upper flat plate 31 of flat extension, 31 rear end of upper flat plate are vertically installed with the stringer board 32 extended downwardly, 32 lower part of stringer board be installed with it is upper The tablet lower tablet 33 that parallel interval is set about 31, lower tablet 33 are equipped with screw hole 34, are bolted in screw hole 34 by angle steel 30 Level board 35 be clamped in positioning bolt 36 between upper flat plate 31 and lower tablet 32 in inner cavity.
As the crossbeam of power tower it is most common hardware fitting structure using angle steel, it is very universal on Electrical tower. For this angle steel crossbeams, this patent devises targetedly locking device.This locking device mainly includes parallel up and down Every setting upper flat plate with lower tablet, the positioning that is fixedly connected with the stringer board of upper flat plate and lower tablet and is screwed onto on lower tablet Bolt.Traditional angle steel has two vertical fixed platen surfaces, and for convenience of describing, horizontally disposed tablet is known as level board, Another vertically disposed tablet is known as vertical panel, an avris of level board is corresponding with the upper avris of vertical panel to be fixed in one It rises.In this patent, upper flat plate and lower tablet are spaced up and down, therefore form a clip slot or cavity between the two. The width of the clip slot is wider than the level board of angle steel, in order to smoothly insert the level board of angle steel into clip slot.It chats for convenience It states, one end that angle steel level board is inserted into clip slot is known as inner end, namely affixed one end is known as with vertical panel by the other end Outer end.Lower tablet is equipped with screw hole, and screw hole is axially vertically disposed, and positioning bolt is bolted in screw hole.When angle steel level board inner end When inserting in clip slot, the level board of angle steel can be fixed to clamp in clip slot by way of the screwed in place bolt into clip slot It is interior, so as to fulfill the fixation of angle steel level board and upper flat plate and lower tablet namely the Fast Installation of realization this patent.

Claims (7)

1. a kind of replacing insulator string auxiliary tool, it is characterized in that:Including pedestal(1), pedestal(1)It is equipped with pedestal(1) It is locked at power tower lower beam(10)On locking device(2), laterally thicker pipe is vertically installed on pedestal(3), circle Hoisting rope is wound on pipe(4), further include the pulley that transmission cooperation is wound with hoisting rope epimere(5), pulley(5)Upper end is also fixed Have and pulley is locked at power tower upper beam(10)On locking device(2), pedestal(1)Upper transverse direction is vertically installed with outer locking Axis(6), turning set is equipped with lock sleeve on external lock mandrel(7), hoisting rope can be pressed on pipe periphery by being equipped on lock sleeve Outer locking device(8), the pedestal in pipe(1)The upper internal lock mandrel for being also laterally vertically installed with coaxial arrangement(9), internal lock mandrel On be rotatablely equipped with turntable(11), turntable(11)Be equipped with internal locking device hoisting rope being locked on pipe with pipe (12).
2. replacing insulator string auxiliary tool as described in claim 1, it is characterized in that:The outer locking device(8)Including It is installed in the outer locking cover of lock sleeve one side(13), outer locking cover is partly to buckle the arc plate covered on the outside of pipe, in outer locking cover Between wall and circular tube external wall be equipped with hoisting rope by curved channel(14), lock sleeve opposite side passes through lever(15)It is installed with drawing Ring(16), draw ring(16)Pass through drawstring(17)It is connected with pedal ring(18).
3. replacing insulator string auxiliary tool as claimed in claim 2, it is characterized in that:Be evenly equipped on outer locking cover inner wall with The locking slot of pipe coaxial arrangement(19), rubber strip is installed in locking slot(20).
4. the replacing insulator string auxiliary tool as described in the arbitrary claims of claim 1-3, it is characterized in that:The internal lock Tight device(12)Several locking slideways being located at including uniform ring inside and outside the perforation pipe on pipe(21), the interior inserting of locking slideway There is latch(22), latch inner end passes through annulate shaft(23)Turntable periphery is hinged on, inside and outside linkage is additionally provided on pipe Slideway(24), link slideway in be fitted with linkage stick(25), linkage stick inner end passes through universal driving shaft(26)Turntable periphery is hinged on, is joined Dynamic stick outer end passes through drive shaft(27)It is hinged on outer locking cover inner wall, latch outer edge submerges when outer locking cover is away from pipe Slideway is locked, latch outer edge stretches out locking slideway when outer locking cover is close to pipe.
5. replacing insulator string auxiliary tool as claimed in claim 4, it is characterized in that:The latch outer edge is in wedge Shape.
6. replacing insulator string auxiliary tool as claimed in claim 5, it is characterized in that:The hoisting rope hypomere is set with Hold the circular cone rubber sleeve that thin lower end is thick(28), it is to have sling on the hoisting rope below circular cone rubber sleeve(29).
7. replacing insulator string auxiliary tool as claimed in claim 6, it is characterized in that:Pedestal(1)Be equipped with conical bore and Circular cone bolt is fitted in circular cone hole, conical bore and circular cone hole, circular cone bolt can be slided along circular cone hole, the locking dress It puts and is installed in circular cone bolt end, the crossbeam(10)For angle steel(30), the locking device is including being installed in circular cone bolt bottom The horizontal-extending upper flat plate in portion(31), upper flat plate(31)Rear end is vertically installed with the stringer board extended downwardly(32), stringer board(32)Under Portion is installed with and upper flat plate(31)The lower tablet that upper and lower parallel interval is set(33), lower tablet(33)It is equipped with screw hole(34), spiral shell Hole(34)It is inside bolted with angle steel(30)Level board(35)It is clamped in upper flat plate(31)With lower tablet(32)Between in inner cavity Positioning bolt(36).
CN201611009168.4A 2016-11-16 2016-11-16 Auxiliary tool for replacing insulator string Expired - Fee Related CN108075393B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611009168.4A CN108075393B (en) 2016-11-16 2016-11-16 Auxiliary tool for replacing insulator string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611009168.4A CN108075393B (en) 2016-11-16 2016-11-16 Auxiliary tool for replacing insulator string

Publications (2)

Publication Number Publication Date
CN108075393A true CN108075393A (en) 2018-05-25
CN108075393B CN108075393B (en) 2020-06-23

Family

ID=62162959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611009168.4A Expired - Fee Related CN108075393B (en) 2016-11-16 2016-11-16 Auxiliary tool for replacing insulator string

Country Status (1)

Country Link
CN (1) CN108075393B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0686418A (en) * 1992-09-02 1994-03-25 Sanwa Tekki Corp Insulator lifting device
KR20030032299A (en) * 2001-10-17 2003-04-26 박갑수 A descender device for the refuge relief
CN102133457A (en) * 2011-04-01 2011-07-27 张一扬 Controllable safe slowly descending device
CN203248465U (en) * 2013-04-19 2013-10-23 李国耀 Automatic locking rotary disc buckle connector
CN103979403A (en) * 2014-05-16 2014-08-13 国网河北省电力公司衡水供电分公司 Wire cable terminal lifting fixture as well as wire cable lifting method
CN205104835U (en) * 2015-10-30 2016-03-23 国家电网公司 A auxiliary device for power line erects

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0686418A (en) * 1992-09-02 1994-03-25 Sanwa Tekki Corp Insulator lifting device
KR20030032299A (en) * 2001-10-17 2003-04-26 박갑수 A descender device for the refuge relief
CN102133457A (en) * 2011-04-01 2011-07-27 张一扬 Controllable safe slowly descending device
CN203248465U (en) * 2013-04-19 2013-10-23 李国耀 Automatic locking rotary disc buckle connector
CN103979403A (en) * 2014-05-16 2014-08-13 国网河北省电力公司衡水供电分公司 Wire cable terminal lifting fixture as well as wire cable lifting method
CN205104835U (en) * 2015-10-30 2016-03-23 国家电网公司 A auxiliary device for power line erects

Also Published As

Publication number Publication date
CN108075393B (en) 2020-06-23

Similar Documents

Publication Publication Date Title
US4449596A (en) Drilling of wells with top drive unit
JP2008045363A (en) Suspension device
CN108069352A (en) Electric inspection process portable dam
CN106744431A (en) Oil exploitation well head quick locking steel wire rope multiple protector
CN115285821B (en) System and method for quickly separating new and old steel wire ropes from each other and replacing ropes of multi-rope friction type elevator
CN108075393A (en) Replacing insulator string auxiliary tool
CN108069353A (en) The special resistance thick stick of electric system field work
CN108069358A (en) Semi-automatic power equipment descending lifeline
CN210103238U (en) Device for elevator subsection well construction
CN108075387A (en) Power tower Special lifting assistor
CN108075390A (en) Multipurpose electric power transports checking maintenance instrument
CN102530717B (en) Lifting appliance
CN113612160B (en) Winch operation tool for bypass cable lapping and operation method thereof
CN208522433U (en) A kind of underground work cable stringer
JPH06233425A (en) Method and apparatus for temporary connection of wire
CN106672836B (en) Rope fixing device
CN107762234A (en) A kind of anti-climbing signal tower
CN110639135A (en) Twisted rope type descent control device
CN205397765U (en) Elevator device of overcoming difficulties fast
CN220467391U (en) Steel wire rope winch lower-mounted offshore platform crane
CN112943141B (en) Pipe rod shearing device for underground operation construction
CN217061613U (en) Insulation protection device for power transmission and distribution
CN117552709A (en) Auxiliary device for power distribution fault maintenance
US1755728A (en) Combination make-up cathead and friction hoist
CN209940405U (en) Mine detection probe lifter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190415

Address after: 261021 No. 425 Dongfeng West Street, Weicheng District, Weifang City, Shandong Province

Applicant after: STATE GRID SHANDONG ELECTRIC POWER COMPANY WEIFANG POWER SUPPLY Co.

Applicant after: State Grid Corporation of China

Address before: 261041 No. 8221 Dongfeng East Street, Weifang City, Shandong Province

Applicant before: Liu Weihua

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200623