CN103979403A - Wire cable terminal lifting fixture as well as wire cable lifting method - Google Patents

Wire cable terminal lifting fixture as well as wire cable lifting method Download PDF

Info

Publication number
CN103979403A
CN103979403A CN201410207633.XA CN201410207633A CN103979403A CN 103979403 A CN103979403 A CN 103979403A CN 201410207633 A CN201410207633 A CN 201410207633A CN 103979403 A CN103979403 A CN 103979403A
Authority
CN
China
Prior art keywords
cable
lifting
wire cable
hook
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410207633.XA
Other languages
Chinese (zh)
Other versions
CN103979403B (en
Inventor
吴志祥
吴晓光
刘赞良
任锋
刘立君
陈振雨
路铁宁
张来锁
寇马军
孙秋刚
冯正阳
刘哨飞
张卿
张建飞
李涛
宋海涛
刘晨
张汝松
孙铁超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority to CN201410207633.XA priority Critical patent/CN103979403B/en
Publication of CN103979403A publication Critical patent/CN103979403A/en
Application granted granted Critical
Publication of CN103979403B publication Critical patent/CN103979403B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention belongs to the technical field of electric wire cable terminal lifting fixtures, and discloses a wire cable terminal lifting fixture as well as a wire cable lifting method. The wire cable terminal lifting fixture has the main technical characteristics that the wire cable terminal lifting fixture comprises a lifting hook and two branch sleeves, wherein the lower end of the sleeve is connected by a pin shaft and the two branch sleeves can be encircled to form the sleeve of which the upper end is provided with a bar-shaped notch; lifting plates which are integrally connected with the branch sleeves are arranged on the branch sleeves respectively; the upper ends of the lifting plates are provided with lifting rod holes; the insert end parts in the lifting rod holes are provided with lifting rods with lock nuts; the lifting hook comprises a carrying rod with a lifting hole in the upper end and a lifting hook body with the circular arc lower end; the lifting hook body is provided with at least two connecting holes which are ranked along the central line of the lifting hook body; the lifting rods are inserted into the connecting holes. In lifting, the two branch sleeves wrap the wire cable; the lower end of the lifting hook body passes through the bar-shaped notch, and presses the surface of the wire cable tightly, so that the sleeves cannot move along the direction of the wire cable; the insulation layer of the wire cable cannot be damaged, and the wire cable cannot fall off; the fixing before lifting and the detachment after lifting are convenient; the labor intensity is reduced greatly; the labor efficiency is improved greatly.

Description

线缆终端头提升卡具及线缆提升方法Lifting jig for cable terminal head and cable lifting method

技术领域 technical field

本发明属于电力线缆终端头提升卡具技术领域,具体地讲涉及线缆终端头提升卡具及线缆提升方法。 The invention belongs to the technical field of electric cable terminal lifting jigs, and in particular relates to a cable terminal lifting jig and a cable lifting method.

背景技术 Background technique

在线缆架设时,首先将线缆沿线塔伸开,然后用吊装设备将线缆吊装在线塔上固定。目前线缆吊装时主要用钢丝绳等绳索捆绑在线缆上,用吊装设备的挂钩挂在钢丝绳上。该方法存在以下缺陷:其一,用钢丝绳捆绑时不能将线缆位置牢牢固定,在吊装过程中,线缆在钢丝绳套内滑动,造成线缆与线塔的固定位置不好掌握,需要进一步拉动线缆,增加了劳动强度,降低了铺设效率;其二,在钢丝绳套滑道过程中,容易对绝缘层造成伤害;其三,在吊装线缆端部时,钢丝绳套容易松开、滑脱,造成吊装起来的线缆掉落,不但对线缆造成损伤,而且还容易造成人员伤亡的安全事故,其四,钢丝绳捆绑和解开的劳动强度大,工作效率低。 When the cable is erected, the cable is first stretched along the line tower, and then the cable is hoisted and fixed on the line tower with a hoisting device. Mainly bind on the cable with ropes such as steel wire rope when cable hoisting at present, hang on the steel wire rope with the hook of hoisting equipment. This method has the following defects: one, the position of the cable cannot be firmly fixed when it is bound with a steel wire rope. Pulling the cable increases the labor intensity and reduces the laying efficiency; second, it is easy to cause damage to the insulation layer during the slideway of the wire rope sleeve; third, when the end of the cable is hoisted, the wire rope sleeve is easy to loosen and slip off , cause the cable that is hoisted to fall, not only damage to cable, but also easily cause the safety accident of casualty, its 4th, the labor intensity of wire rope binding and untie is big, and work efficiency is low.

发明内容 Contents of the invention

本发明解决的第一个技术问题就是提供一种使用方便、安全性好、线缆不容易滑动、不会对线缆造成损伤、工作效率高、劳动强度小的线缆终端头提升卡具。 The first technical problem to be solved by the present invention is to provide a cable terminal lifting jig that is easy to use, has good safety, does not easily slide the cable, does not cause damage to the cable, has high work efficiency and low labor intensity.

为解决上述技术问题,本发明提出的技术方案为:包括吊钩和下端通过销轴连接的、可围成上端带有条形缺口的套管的两个分套管,在所述分套管上方分别设置有与分套管连为一体的吊板,在所述吊板上端设置有吊杆孔,在所述吊杆孔内插入端部带有锁紧螺母的吊杆,所述吊钩包括上端带有吊孔的提杆和下端圆弧状的吊钩体,在所述吊钩体上设置有至少两个沿吊钩体的中线排列的连接孔,所述吊杆插入所述的连接孔内。 In order to solve the above-mentioned technical problems, the technical solution proposed by the present invention is: two sub-sleeves comprising a hook and a lower end connected by a pin shaft, which can enclose a casing with a bar-shaped notch at the upper end, and the sub-sleeves Suspension plates connected with sub-casings are respectively arranged on the upper side. Suspension rod holes are arranged on the upper ends of the suspension plates, and suspension rods with lock nuts at the ends are inserted into the suspension rod holes. The suspension hooks It includes a lifting rod with a lifting hole at the upper end and an arc-shaped hook body at the lower end. At least two connecting holes arranged along the center line of the hook body are arranged on the hook body, and the hanging rod is inserted into the in the connecting hole.

其附加技术特征为: Its additional technical features are:

所述连接孔为3个; There are 3 connecting holes;

在所述吊杆端部设置有调位拨杆; An adjustment lever is arranged at the end of the boom;

在所述套管两端设置有向其径向外侧的弧状弯曲。 Both ends of the sleeve are provided with arc-shaped bends radially outward.

本发明解决的第二个技术问题就是提供一种使用上述线缆终端头提升卡具进行线缆提升方法。 The second technical problem to be solved by the present invention is to provide a cable lifting method using the above-mentioned cable terminal head lifting jig.

为解决上述技术问题,本发明提出的技术方案为: In order to solve the problems of the technologies described above, the technical solution proposed by the present invention is:

该方法包括下列步骤:  The method includes the following steps:

第一步:将锁紧螺母打开,将吊杆从吊杆孔中取出; Step 1: Open the lock nut and take out the boom from the boom hole;

第二步:将两个分套管沿销轴掰开; Step 2: Separate the two sub-sleeves along the pin shaft;

第三步:将两个分套管包在线缆上,将吊杆插入一侧吊杆孔,根据线缆直径的需要,先目测选择连接孔,并将吊杆插入该连接孔和另一侧的吊杆孔,将吊钩提起,使得吊钩体的下端穿过条形缺口紧紧压在线缆表面,如果吊钩体的下端不能紧紧压在线缆表面,更换其它连接孔,直至吊钩体的下端穿过条形缺口紧紧压在线缆表面,并将锁紧螺母拧上; Step 3: Wrap the two sub-sleeves on the cable, insert the suspender into the hole on one side of the suspender, select the connection hole visually according to the diameter of the cable, and insert the suspender into the connection hole and the other Lift the hook so that the lower end of the hook body passes through the strip-shaped gap and presses tightly on the surface of the cable. If the lower end of the hook body cannot be pressed tightly on the surface of the cable, replace other connecting holes. Press the surface of the cable tightly until the lower end of the hook body passes through the bar-shaped gap, and screw on the lock nut;

第四步:将起重设备的挂钩挂在吊孔上,将线缆起吊; Step 4: Hang the hook of the lifting equipment on the lifting hole, and lift the cable;

第五步:当线缆到达指定位置时将线缆固定好; Step 5: Fix the cable when it reaches the designated position;

第六步:打开锁紧螺母,并将两个分套管打开,从线缆上将两个分套管取下。 Step 6: Open the lock nut, open the two sub-sleeves, and remove the two sub-sleeves from the cable.

其附加技术特征为: Its additional technical features are:

在所述第五步中,当线缆角度不合适时,通过转动调位拨杆,来调节线缆角度,当线缆角度合适时,再将线缆固定。 In the fifth step, when the angle of the cable is inappropriate, the angle of the cable is adjusted by turning the adjustment lever, and when the angle of the cable is appropriate, the cable is fixed.

 本发明提供的线缆终端头提升卡具及线缆提升方法,同现有技术相比较具有以下优点:其一,由于包括吊钩和下端通过销轴连接的、可围成上端带有条形缺口的套管的两个分套管,在所述分套管上方分别设置有与分套管连为一体的吊板,在所述吊板上端设置有吊杆孔,在所述吊杆孔内插入端部带有锁紧螺母的吊杆,所述吊钩包括上端带有吊孔的提杆和下端圆弧状的吊钩体,在所述吊钩体上设置有至少两个沿吊钩体的中线排列的连接孔,所述吊杆插入所述的连接孔内,吊装时,将两个分套管包在线缆上,将吊杆插入一侧吊杆孔,根据线缆直径的需要,先目测选择连接孔,并将吊杆插入该连接孔和另一侧的吊杆孔,将吊钩提起,使得吊钩体的下端穿过条形缺口紧紧压在线缆表面,如果吊钩体的下端不能紧紧压在线缆表面,更换其它连接孔,直至吊钩体的下端穿过条形缺口紧紧压在线缆表面,并将锁紧螺母拧上,在吊装过程中,吊钩体的下端穿过条形缺口紧紧压在线缆表面,使得套管不会沿线缆方向移动;不会造成线缆的绝缘层损坏,也不会造成线缆脱落,安全性能大大提高,而且在吊装时,根据不同直径的线缆,更换不同的连接孔即可,应用范围大大提高;吊装前固定和吊装后的拆卸比较方便,劳动强度大大降低,劳动效率大大提高;其二,由于所述连接孔为3个,既能保证吊钩体的强度,又能适应相近型号线缆的要求;其三,在所述吊杆端部设置有调位拨杆,当线缆到达线塔上时,可能线缆的角度与所要求的固定角度不同,通过拨动调位拨杆,很方便地就能将线缆调整到需要的固定角度;其四,由于在所述套管两端设置有向其径向外侧的弧状弯曲,避免了在吊装过程中套管两端对线路绝缘层造成损伤。 Compared with the prior art, the cable terminal head lifting jig and cable lifting method provided by the present invention have the following advantages: First, since the hook and the lower end are connected by pin shafts, the upper end can be surrounded by a bar-shaped The two sub-casings of the notched casing are respectively provided with hanging plates connected with the sub-casings above the sub-casings, and a boom hole is arranged at the top of the hanging plate, and a boom hole is installed in the boom hole. A suspension rod with a lock nut is inserted at the end, and the suspension hook includes a lifting rod with a suspension hole at the upper end and an arc-shaped suspension hook body at the lower end. The connecting hole arranged on the center line of the hook body, the boom is inserted into the connecting hole, when hoisting, wrap the two sub-sleeves on the cable, insert the boom into the hole on one side of the boom, according to the diameter of the cable If necessary, select the connection hole by visual inspection, insert the boom into the connection hole and the boom hole on the other side, lift the hook so that the lower end of the hook body passes through the bar-shaped gap and presses tightly on the surface of the cable. If the lower end of the hook body cannot be tightly pressed on the surface of the cable, replace other connecting holes until the lower end of the hook body passes through the bar-shaped gap and is tightly pressed on the surface of the cable, and screw on the lock nut. In the middle, the lower end of the hook body passes through the strip-shaped gap and is tightly pressed on the surface of the cable, so that the sleeve will not move along the direction of the cable; it will not cause damage to the insulation layer of the cable, nor will it cause the cable to fall off, which is safe The performance is greatly improved, and when hoisting, according to the cables of different diameters, different connecting holes can be replaced, and the application range is greatly improved; the fixing before hoisting and the disassembly after hoisting are more convenient, the labor intensity is greatly reduced, and the labor efficiency is greatly improved; Its two, because there are 3 connecting holes, it can not only ensure the strength of the hook body, but also meet the requirements of cables of similar models; When the cable reaches the line tower, the angle of the cable may be different from the required fixed angle. By turning the adjustment lever, the cable can be easily adjusted to the required fixed angle; Both ends of the bushing are provided with arc-shaped bends radially outward, which avoids damage to the line insulation layer caused by the two ends of the bushing during hoisting.

附图说明 Description of drawings

图1为本发明线缆终端头提升卡具的结构示意图; Fig. 1 is a schematic structural view of the cable terminal head lifting jig of the present invention;

图2为吊钩的结构示意图; Fig. 2 is the structural representation of suspension hook;

图3为套管展开后的结构示意图; Fig. 3 is the schematic diagram of the structure after the casing is deployed;

图4为线缆终端头提升卡具使用时的结构示意图。 Fig. 4 is a schematic diagram of the structure of the cable terminal head lifting jig in use.

具体实施方式 Detailed ways

下面结合附图和具体实施例对本发明所提出的线缆终端头提升卡具及线缆提升方法做进一步说明。 The cable terminal head lifting jig and cable lifting method proposed by the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

如图1、图2和图3所示,为本发明提供的线缆终端头提升卡具的结构示意图,该线缆终端头提升卡具包括吊钩5和下端通过销轴2连接的两个分套管3、4,分套管3、4围成上端带有条形缺口1的套管6,在分套管3、4上方分别设置有与分套管3、4连为一体的吊板7、8,在吊板7、8上端设置有吊杆孔9,在吊杆孔9内插入端部带有锁紧螺母10的吊杆11,吊钩5包括上端带有吊孔51的提杆52和下端圆弧状的吊钩体53,在吊钩体53上设置有至少两个沿吊钩体53的中线排列的连接孔54,吊杆11插入连接孔54内。如图4所示,吊装时,将两个分套管3、4包在线缆12上,将吊杆11插入一侧的吊杆孔9,根据线缆12直径大小的需要,先目测选择连接孔54,并将吊杆11插入该连接孔54和另一侧的吊杆孔9,将吊杆11提起,使得吊钩体53的下端穿过条形缺口1紧紧压在线缆表面。如果吊钩体53的下端不能紧紧压在线缆12表面,更换其它连接孔54,直至吊钩体53的下端穿过条形缺口1紧紧压在线缆12表面,在吊装过程中,吊钩体53的下端穿过条形缺口1紧紧压在线缆12表面,使得套管6不会沿线缆方向移动;不会造成线缆的绝缘层损坏,也不会造成线缆脱落,而且在吊装时,根据不同直径的线缆,更换不同的连接孔即可,应用范围大大提高;吊装前固定和吊装后的拆卸比较方便,劳动强度大大降低,劳动效率大大提高。 As shown in Fig. 1, Fig. 2 and Fig. 3, it is a schematic diagram of the structure of the cable terminal head lifting jig provided by the present invention. The cable terminal head lifting jig includes a suspension hook 5 and two The sub-casings 3 and 4, the sub-casings 3 and 4 enclose the casing 6 with a strip-shaped notch 1 at the upper end, and above the sub-casings 3 and 4 are respectively provided with the hanging tubes connected with the sub-casings 3 and 4. Plates 7 and 8 are provided with a boom hole 9 at the upper end of the suspension board 7 and 8, and a boom 11 with a lock nut 10 at the end is inserted into the boom hole 9, and the hook 5 includes a hook with a hanging hole 51 at the upper end. The lifting rod 52 and the hook body 53 in the shape of an arc at the lower end are provided with at least two connecting holes 54 arranged along the midline of the hook body 53 on the hook body 53 , and the boom 11 is inserted into the connecting holes 54 . As shown in Figure 4, when hoisting, wrap the two sub-sleeves 3 and 4 on the cable 12, insert the boom 11 into the boom hole 9 on one side, and select it visually according to the diameter of the cable 12. Connecting hole 54, and insert the boom 11 into the connecting hole 54 and the boom hole 9 on the other side, lift the boom 11, so that the lower end of the hook body 53 passes through the strip-shaped gap 1 and is tightly pressed against the surface of the cable . If the lower end of the hook body 53 cannot be pressed tightly on the surface of the cable 12, replace other connecting holes 54 until the lower end of the hook body 53 passes through the strip-shaped gap 1 and is pressed tightly on the surface of the cable 12. During the hoisting process, The lower end of the hook body 53 passes through the strip-shaped gap 1 and presses tightly on the surface of the cable 12, so that the sleeve 6 will not move along the direction of the cable; it will not cause damage to the insulation layer of the cable, nor will it cause the cable to fall off , and during hoisting, according to different diameter cables, just replace different connecting holes, which greatly improves the application range; it is more convenient to fix before hoisting and disassemble after hoisting, the labor intensity is greatly reduced, and the labor efficiency is greatly improved.

连接孔54为3个,既能保证吊钩体53的强度,又能适应相近型号线缆的要求。 There are three connecting holes 54, which can not only ensure the strength of the hook body 53, but also meet the requirements of cables of similar types.

在吊杆11端部设置有调位拨杆13,当线缆到达线塔上时,可能线缆的角度与所要求的固定角度不同,通过拨动调位拨杆13,很方便地就能将线缆调整到需要的固定角度。 The end of the suspender 11 is provided with a position adjustment lever 13. When the cable reaches the line tower, the angle of the cable may be different from the required fixed angle. By turning the position adjustment lever 13, the Adjust the cable to the desired fixed angle.

在套管6的两端设置有向其径向外侧的弧状弯曲14,避免了在吊装过程中套管两端对线路绝缘层造成损伤。 Both ends of the bushing 6 are provided with arc-shaped bends 14 radially outward to avoid damage to the line insulation layer at both ends of the bushing during hoisting.

使用线缆终端头提升卡具提升线缆的方法,该方法包括下列步骤:  The method of lifting the cable by using the cable terminal head lifting fixture, the method includes the following steps:

第一步:将锁紧螺母10打开,将吊杆11从吊杆孔9中取出; The first step: open the lock nut 10, and take out the boom 11 from the boom hole 9;

第二步:将两个分套管3、4沿销轴2掰开; The second step: separate the two sub-sleeves 3 and 4 along the pin shaft 2;

第三步:将两个分套管3、4包在线缆12上,将吊杆11插入一侧吊杆孔9,根据线缆直径的需要,先目测选择连接孔54,并将吊杆11插入该连接孔54和另一侧的吊杆孔9,将吊钩5提起,使得吊钩体53的下端穿过条形缺口1紧紧压在线缆12表面,如果吊钩体53的下端不能紧紧压在线缆12表面,更换其它连接孔54,直至吊钩体53的下端穿过条形缺口1紧紧压在线缆12表面,并将锁紧螺母10拧上; Step 3: Wrap the two sub-sleeves 3 and 4 on the cable 12, insert the boom 11 into the hole 9 on one side of the boom, and select the connection hole 54 visually according to the diameter of the cable, and insert the boom 11 is inserted into the connection hole 54 and the suspension rod hole 9 on the other side, and the suspension hook 5 is lifted so that the lower end of the suspension hook body 53 passes through the strip-shaped gap 1 and is pressed tightly on the surface of the cable 12. If the suspension hook body 53 The lower end cannot be tightly pressed on the surface of the cable 12, and other connecting holes 54 are replaced until the lower end of the hook body 53 passes through the strip-shaped gap 1 and is pressed tightly on the surface of the cable 12, and the lock nut 10 is screwed on;

第四步:将起重设备的挂钩挂在吊孔51上,将线缆起吊; Step 4: Hang the hook of the lifting device on the lifting hole 51, and lift the cable;

第五步:当线缆到达指定位置时将线缆固定好; Step 5: Fix the cable when it reaches the designated position;

第六步:打开锁紧螺母,并将两个分套管打开,从线缆上将两个分套管取下。 Step 6: Open the lock nut, open the two sub-sleeves, and remove the two sub-sleeves from the cable.

在第五步中,当线缆角度不合适时,通过转动调位拨杆13,来调节线缆角度,当线缆角度合适时,再将线缆固定。 In the fifth step, when the angle of the cable is inappropriate, the angle of the cable is adjusted by turning the adjustment lever 13 , and then the cable is fixed when the angle of the cable is appropriate.

本发明的保护范围不仅仅局限于上述实施例,只要结构与本发明线缆终端头提升卡具结构相同,就落在本发明保护的范围。 The scope of protection of the present invention is not limited to the above-mentioned embodiments, as long as the structure is the same as that of the clamp for lifting the cable terminal head of the present invention, it falls within the scope of protection of the present invention.

Claims (6)

1. cable terminations head promotes jig, it is characterized in that: comprise that suspension hook is connected by bearing pin with lower end, can surround upper end with two minutes sleeve pipes of the sleeve pipe of bar v notch v, at described minute, above sleeve pipe, be respectively arranged with the boatswain chair being connected as a single entity with minute sleeve pipe, in described boatswain chair upper end, be provided with boom hole, in described boom hole, insert end with the suspension rod of jam nut
Described suspension hook comprises that upper end is with the circular-arc hook of shadoof and lower end of lifting hole(eyelet), is provided with the connecting bore that at least two center lines along hook are arranged on described hook, and described suspension rod inserts in described connecting bore.
2. cable terminations head according to claim 1 promotes jig, it is characterized in that: described connecting bore is 3.
3. cable terminations head according to claim 1 promotes jig, it is characterized in that: in described suspension rod end, be provided with positioning driving lever.
4. cable terminations head according to claim 1 promotes jig, it is characterized in that: at described sleeve pipe two ends, be provided with the bowing to its radial outside.
5. right to use requires the cable terminations head described in 1,2,3 or 4 to promote the method that jig promotes cable, it is characterized in that: the method comprises the following steps:
The first step: jam nut is opened, suspension rod is taken out from boom hole;
Second step: two minutes sleeve pipes are broken into two with one's hands along bearing pin;
The 3rd step: two minutes sleeve pipes are wrapped on cable, suspension rod is inserted to a side boom hole, according to the needs of cable diameter, connecting bore is selected in first range estimation, and suspension rod is inserted to the boom hole of this connecting bore and opposite side, suspension hook is mentioned, make the lower end of hook tightly be pressed in cable surface through bar v notch v, if the lower end of hook can not tightly be pressed in cable surface, change other connecting bore, until the lower end of hook is tightly pressed in cable surface through bar v notch v, and jam nut is screwed on;
The 4th step: the hook of weight-lifting equipment is hung on lifting hole(eyelet), cable is lifted by crane;
The 5th step: when cable arrives assigned address, cable is fixed;
The 6th step: open jam nut, and two minutes sleeve pipes are opened, from cable, two minutes sleeve pipes are taken off.
6. use line ball cable terminals according to claim 5 promote the method that jig promotes cable, it is characterized in that: in described the 5th step, when cable angle is improper, by the rotation driving lever of transposing, regulate cable angle, when cable angle is suitable, then cable is fixed.
CN201410207633.XA 2014-05-16 2014-05-16 How to Lift the Cable Using the Lifting Clamp of the Cable Terminal Head Active CN103979403B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410207633.XA CN103979403B (en) 2014-05-16 2014-05-16 How to Lift the Cable Using the Lifting Clamp of the Cable Terminal Head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410207633.XA CN103979403B (en) 2014-05-16 2014-05-16 How to Lift the Cable Using the Lifting Clamp of the Cable Terminal Head

Publications (2)

Publication Number Publication Date
CN103979403A true CN103979403A (en) 2014-08-13
CN103979403B CN103979403B (en) 2015-12-09

Family

ID=51271618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410207633.XA Active CN103979403B (en) 2014-05-16 2014-05-16 How to Lift the Cable Using the Lifting Clamp of the Cable Terminal Head

Country Status (1)

Country Link
CN (1) CN103979403B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108075387A (en) * 2016-11-16 2018-05-25 刘伟华 Special lifting aid for power tower
CN108069352A (en) * 2016-11-16 2018-05-25 刘伟华 Electric inspection process portable dam
CN108075393A (en) * 2016-11-16 2018-05-25 刘伟华 Replacing insulator string auxiliary tool
CN108069358A (en) * 2016-11-16 2018-05-25 刘伟华 Semi-automatic power equipment descending lifeline
CN108075390A (en) * 2016-11-16 2018-05-25 刘伟华 Multipurpose electric power transports checking maintenance instrument
CN109896417A (en) * 2019-03-14 2019-06-18 国网黑龙江省电力有限公司检修公司 Lifting type pipe bus tool special for hoisting and hanging method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6198326U (en) * 1984-12-05 1986-06-24
DE3539392A1 (en) * 1985-10-25 1987-05-14 Preformed Line Products Co CLAMPING DEVICE, IN PARTICULAR FOR FASTENING A POWER CABLE TO AN INSULATOR
JP2002310128A (en) * 2001-04-12 2002-10-23 Burest Kogyo Kenkyusho Co Ltd Wire support metal fitting for hanging bolt
CN2650367Y (en) * 2003-09-11 2004-10-20 杭州高盛电力设备有限公司 Suspension cable clamp for four-core bundling cable
CN201598100U (en) * 2009-07-23 2010-10-06 大连港集团有限公司 Anti-curl device for steel plate clamp suspension system
CN202030441U (en) * 2011-04-25 2011-11-09 青岛港(集团)有限公司 Anti-drop cast pipe hook
CN203339618U (en) * 2013-07-11 2013-12-11 红旗集团电力金具有限公司 Suspended wire clamp
CN203806962U (en) * 2014-05-16 2014-09-03 国网河北省电力公司衡水供电分公司 Cable terminal head lifting fixture

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6198326U (en) * 1984-12-05 1986-06-24
DE3539392A1 (en) * 1985-10-25 1987-05-14 Preformed Line Products Co CLAMPING DEVICE, IN PARTICULAR FOR FASTENING A POWER CABLE TO AN INSULATOR
JP2002310128A (en) * 2001-04-12 2002-10-23 Burest Kogyo Kenkyusho Co Ltd Wire support metal fitting for hanging bolt
CN2650367Y (en) * 2003-09-11 2004-10-20 杭州高盛电力设备有限公司 Suspension cable clamp for four-core bundling cable
CN201598100U (en) * 2009-07-23 2010-10-06 大连港集团有限公司 Anti-curl device for steel plate clamp suspension system
CN202030441U (en) * 2011-04-25 2011-11-09 青岛港(集团)有限公司 Anti-drop cast pipe hook
CN203339618U (en) * 2013-07-11 2013-12-11 红旗集团电力金具有限公司 Suspended wire clamp
CN203806962U (en) * 2014-05-16 2014-09-03 国网河北省电力公司衡水供电分公司 Cable terminal head lifting fixture

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108075387A (en) * 2016-11-16 2018-05-25 刘伟华 Special lifting aid for power tower
CN108069352A (en) * 2016-11-16 2018-05-25 刘伟华 Electric inspection process portable dam
CN108075393A (en) * 2016-11-16 2018-05-25 刘伟华 Replacing insulator string auxiliary tool
CN108069358A (en) * 2016-11-16 2018-05-25 刘伟华 Semi-automatic power equipment descending lifeline
CN108075390A (en) * 2016-11-16 2018-05-25 刘伟华 Multipurpose electric power transports checking maintenance instrument
CN108075387B (en) * 2016-11-16 2020-06-23 国网山东省电力公司潍坊供电公司 Lifting aids for power towers
CN108075393B (en) * 2016-11-16 2020-06-23 国网山东省电力公司潍坊供电公司 Auxiliary tool for replacement of insulator strings
CN108075390B (en) * 2016-11-16 2020-08-28 国网山东省电力公司潍坊供电公司 Multipurpose electric power operation and maintenance tool
CN109896417A (en) * 2019-03-14 2019-06-18 国网黑龙江省电力有限公司检修公司 Lifting type pipe bus tool special for hoisting and hanging method
CN109896417B (en) * 2019-03-14 2023-06-27 国网黑龙江省电力有限公司检修公司 Special lifting type tubular busbar lifting tool and lifting method

Also Published As

Publication number Publication date
CN103979403B (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN103979403B (en) How to Lift the Cable Using the Lifting Clamp of the Cable Terminal Head
CN104167687B (en) Tool for live-line replacement of suspension insulator and using working method thereof
EP3196998B1 (en) Process for live replacement of tension hard-tube bus-bar jumper insulator of +/- 800kv ultra-high-voltage dc transmission line
CN204508585U (en) A kind of suspender of cover parts
CN203806962U (en) Cable terminal head lifting fixture
CN204424800U (en) The lifting device of replacing insulator string on transmission line
CN205693247U (en) Multi-functional transmission rope hanger
CN102661057A (en) Power angle tower pull leg main material changing method and special main material clamp
CN205346627U (en) Simple and easy quick fixed wire pole plays gallows
CN203312700U (en) Tension tower wire end LF-type yoke plate fixing clamp
CN202488034U (en) Angle iron tower transmission line lifting device
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN103606849B (en) Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof
CN203607750U (en) Suspension ring device for loosening-tightening line pulley
CN103280738B (en) Aerial earth wire lowering or hoisting gear
CN206014242U (en) A kind of aid for lifting insulator
CN202978098U (en) Overhead ground wire lifter
CN205657407U (en) Overhead earth wire prevents falling string device
CN204675626U (en) Insulator fast-assembling suspender
CN203682865U (en) Tyre lifting-transporting clamp
CN204424798U (en) 800 kilovolts of DC power transmission line six-multiple conductor line lifters
CN204424803U (en) A kind of type low-voltage cable installs fixing wrapping head
CN107381324A (en) A kind of ultralong overweight wire insulation substring hangs auxiliary lifting appliance
CN203352055U (en) Electric pole grounding downlead lifting apparatus
CN207158591U (en) A kind of ultralong overweight wire insulation substring hangs auxiliary lifting appliance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant