CN108054673A - Can the safe and reliable insulation of fast construction get over coil holder - Google Patents

Can the safe and reliable insulation of fast construction get over coil holder Download PDF

Info

Publication number
CN108054673A
CN108054673A CN201711238900.XA CN201711238900A CN108054673A CN 108054673 A CN108054673 A CN 108054673A CN 201711238900 A CN201711238900 A CN 201711238900A CN 108054673 A CN108054673 A CN 108054673A
Authority
CN
China
Prior art keywords
base unit
column
terminal pad
cross bar
safe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711238900.XA
Other languages
Chinese (zh)
Inventor
杜华槐
黄勇
卢冠军
卢秋锦
刘立新
殷莉
李滨
王庆元
马益青
王毅冰
王添军
左红艳
库都来提·吐尔地
吴晓晖
潘超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TURPAN POWER SUPPLY COMPANY STATE GRID XINJIANG ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Original Assignee
TURPAN POWER SUPPLY COMPANY STATE GRID XINJIANG ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TURPAN POWER SUPPLY COMPANY STATE GRID XINJIANG ELECTRIC POWER Co Ltd, State Grid Corp of China SGCC filed Critical TURPAN POWER SUPPLY COMPANY STATE GRID XINJIANG ELECTRIC POWER Co Ltd
Priority to CN201711238900.XA priority Critical patent/CN108054673A/en
Publication of CN108054673A publication Critical patent/CN108054673A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Abstract

This application involves it is a kind of can the safe and reliable insulation of fast construction get over coil holder, including the base unit being made of several columns and cross bar, if dried layer base unit forms base unit after being stacked, topmost operation unit is provided in base unit, separate seat is in several pedestals on ground between the base unit includes, column is plugged in each pedestal, the terminal pad with jack is provided on column, cross bar is arranged between terminal pad adjacent two-by-two;The column upper end sets sleeve, and base unit column corresponding with subfoundation unit in upper strata passes through sleeve grafting;Operation unit is plugged in the column top of top layer's base unit, the operation unit includes the insulating bar being plugged in column, insulating bar upper end is provided with the top contact with tablet, top cross bar is connected between top contact adjacent two-by-two.The application overall structure is simple, builds principle and is easily understood, and can be rapidly completed and build, and can stablize after finishing beneficial to ground, is readily transported after dismounting.

Description

Can the safe and reliable insulation of fast construction get over coil holder
Technical field
This application involves it is a kind of can the safe and reliable insulation of fast construction get over coil holder.
Background technology
When 110kV, 220 kV circuits put stringing, it is necessary to across charged 10kV circuits, 35kV circuits, it is often necessary to set up More coil holder.Tradition is set up more coil holder gesture and set up using rod to be set up with scaffolding steel pipe, and there are following defects:When set up Time is very long, and a more coil holder needs the time of one to two day to set up, and early-stage preparations are also required to two days;Second is that need skilled person It can just complete to set up, this results in the more coil holder disunity set up, nonstandard, varies with each individual;Third, set up the more coil holder finished It is easily deformed bending;Fourth, often result in personnel's electric shock accidents when removing.
The content of the invention
The purpose of the application be propose one kind can fast construction, remove, build, prevented in demolishing process get an electric shock can Coil holder is got in the safe and reliable insulation of fast construction.
What the application was realized in:Can the safe and reliable insulation of fast construction get over coil holder include by several columns and cross bar If dried layer base unit forms base unit after being stacked, topmost job ticket is provided in base unit for the base unit of composition Member, separate seat is plugged with column in each pedestal, is set on column in several pedestals on ground between the base unit includes There is the terminal pad with jack, cross bar is arranged between terminal pad adjacent two-by-two, and cross bar is provided at both ends with crossbar joint, in horizontal stroke Vertical bolt slot is offered on knock-off joint and the terminal pad slot of transverse direction, crossbar joint pass through terminal pad slot and terminal pad Grafting is positioned by the bolt for being inserted into bolt slot and being pierced by jack with terminal pad;The column upper end sets sleeve, upper strata Base unit column corresponding with subfoundation unit passes through sleeve grafting;It is plugged in the column top of top layer's base unit Operation unit, the operation unit include the insulating bar being plugged in column, insulating bar upper end are provided with the top with tablet Portion's connector is connected with top cross bar between top contact adjacent two-by-two.
The top cross bar is provided at both ends with quarter butt connector, and the quarter butt connector is the connector with quarter butt, the quarter butt It is overlapped on foregoing tablet, and passes through buckle and fixed with tablet.
The cat ladder of hook is provided between the cross bar of upper and lower two layers of base unit, hook is mounted with cross bar.
The terminal pad is socketed on column, is equally spaced on terminal pad disc equipped with several jacks.
The crossbar joint is U-shaped head, and the terminal pad slot with terminal pad grafting, U-shaped head both sides are formed in U-shaped mouth Face offers bolt slot, and the bolt slot is straight slot.
Small big under the bolt, maximum width is not less than bolt slot length, and circular hole is offered at bolt lower part.
Due to implementing above-mentioned technical proposal, the application can be rapidly completed whole take by terminal pad and the connection structure of crossbeam Build, and can successively increased heights, top layer are built using insulating bar as needed, it is effective exhausted so as to be provided for final structure Edge guarantee.The application overall structure is simple, builds principle and is easily understood, and of short duration training can be quickly finished and built, the application It can stablize after finishing beneficial to ground, be readily transported after dismounting.
Description of the drawings
The concrete structure of the application is provided by following drawings and examples:
Fig. 1 is the structure diagram of the application base unit;
Fig. 2 is the structure diagram of the application;
Fig. 3 is the structure diagram that column is connected with crossbeam.
Legend:1. column, 1-1. sleeves, 2. bolts, 3. terminal pads, 3-1. jacks, 4. pedestals, 5. cat ladders, 6. cross bars, 6- 1. crossbar joint, 6-2. terminal pad slots, 6-3. bolt slots, 7. top contacts, 8. buckles, 9. top cross bars, 9-1. quarter butts Connector.
Specific embodiment
The application can determine specifically from the limitation of following embodiments according to the technical solution of the application with actual conditions Embodiment.
As shown in Figures 1 to 3, can the safe and reliable insulation of fast construction get over coil holder include be made of several columns 1 and cross bar 6 Base unit, if dried layer base unit be stacked after form base unit, base unit topmost be provided with operation unit, institute Separate seat is plugged with column 1 in each pedestal 4, is set on column 1 in several pedestals 4 on ground between stating base unit and including There is the terminal pad 3 with jack 3-1, cross bar 6 is arranged between terminal pad 3 adjacent two-by-two, and cross bar 6 is provided at both ends with cross bar and connects Head 6-1 offers vertical bolt slot 6-3 and terminal pad the slot 6-2, crossbar joint 6-1 of transverse direction on crossbar joint 6-1 By terminal pad slot 6-2 and 3 grafting of terminal pad, by being inserted into bolt slot 6-3 and being pierced by the bolt 2 of jack 3-1 with connecting Disk 3 is connect to position;1 upper end of column sets sleeve 1-1, and base unit column 1 corresponding with subfoundation unit in upper strata passes through Sleeve 1-1 grafting;Operation unit is plugged on 1 top of column of top layer's base unit, the operation unit includes being plugged in Insulating bar in column 1 is provided with the top contact 7 with tablet in insulating bar upper end, between top contact 7 adjacent two-by-two It is connected with top cross bar 9.
Further, it is with quarter butt that the top cross bar 9, which is provided at both ends with quarter butt connector 9-1, the quarter butt connector 9-1, Connector, the quarter butt is overlapped on foregoing tablet, and is passed through buckle 8 and fixed with tablet.
The top cross bar 9, quarter butt connector 9-1 and top contact 7 are insulator.
The cat ladder 5 of hook can be provided between the cross bar 6 of upper and lower two layers of base unit, hook is mounted with cross bar 6.
As shown in figure 3, the terminal pad 3 is socketed on column 1, it is equally spaced on 3 disc of terminal pad equipped with several Jack 3-1.
As shown in figure 3, the crossbar joint 6-1 is U-shaped head, is formed in U-shaped mouth and inserted with the terminal pad of 3 grafting of terminal pad Slot 6-2, it is straight slot that U-shaped head two sides, which offer bolt slot 6-3, the bolt slot 6-3,.
Small big under the bolt 2, maximum width is not less than bolt slot 6-3 length, is offered at 2 lower part of bolt Circular hole after bolt 2 is inserted into bolt slot 6-3 and is pierced by jack 3-1, block is penetrated in circular hole, prevents bolt 2 from departing from.
In use, first put pedestal 4, and the grafting column 1 in each pedestal 4, by terminal pad 3 by cross bar 6 one by one Installing in place, forms one layer of base unit, successively builds base unit until forming base unit;Base unit, which is built, to be finished Afterwards, there is the insulating bar of top contact 7 in the 1 interpolation tape splicing of column of the base unit of top layer, it is by top contact 7 that top is horizontal Bar is installed in place one by one, completes to build.To further ensure that overall stability, bundle rope can be bound outside ring the application entirety, enhanced Whole stability.
More than technical characteristic constitutes the most preferred embodiment of the application, is imitated with stronger adaptability and optimal implementation Fruit can increase and decrease inessential technical characteristic according to actual needs, to meet the needs of different situations.

Claims (6)

1. it is a kind of can the safe and reliable insulation of fast construction get over coil holder, it is characterised in that:Including being made of several columns and cross bar Base unit, if dried layer base unit be stacked after form base unit, base unit topmost be provided with operation unit, institute Separate seat is plugged with column in each pedestal, band is provided on column in several pedestals on ground between stating base unit and including There is the terminal pad of jack, cross bar is arranged between terminal pad adjacent two-by-two, and cross bar is provided at both ends with crossbar joint, is connect in cross bar Vertical bolt slot is offered on head and the terminal pad slot of transverse direction, crossbar joint are inserted by terminal pad slot with terminal pad It connects, is positioned by the bolt for being inserted into bolt slot and being pierced by jack with terminal pad;The column upper end sets sleeve, upper strata base Plinth unit column corresponding with subfoundation unit passes through sleeve grafting;Work is plugged in the column top of top layer's base unit Industry unit, the operation unit include the insulating bar being plugged in column, insulating bar upper end are provided with the top with tablet Connector is connected with top cross bar between top contact adjacent two-by-two.
2. it is according to claim 1 can the safe and reliable insulation of fast construction get over coil holder, it is characterised in that:The top is horizontal Bar is provided at both ends with quarter butt connector, and the quarter butt connector is the connector with quarter butt, and the quarter butt is overlapped on foregoing tablet, and It is fixed by being buckled with tablet.
3. it is according to claim 1 can the safe and reliable insulation of fast construction get over coil holder, it is characterised in that:At upper and lower two layers The cat ladder of hook is provided between the cross bar of base unit, hook is mounted with cross bar.
4. it is according to claim 1 can the safe and reliable insulation of fast construction get over coil holder, it is characterised in that:The terminal pad It is socketed on column, is equally spaced on terminal pad disc equipped with several jacks.
5. according to claim 1 or 4 can the safe and reliable insulation of fast construction get over coil holder, it is characterised in that:The horizontal stroke Knock-off joint is U-shaped head, the terminal pad slot with terminal pad grafting is formed in U-shaped mouth, U-shaped head two sides offer bolt and insert Slot, the bolt slot are straight slot.
6. according to claim 1 or 4 can the safe and reliable insulation of fast construction get over coil holder, it is characterised in that:It is described to insert Small big under pin, maximum width is not less than bolt slot length, and circular hole is offered at bolt lower part.
CN201711238900.XA 2017-11-30 2017-11-30 Can the safe and reliable insulation of fast construction get over coil holder Pending CN108054673A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711238900.XA CN108054673A (en) 2017-11-30 2017-11-30 Can the safe and reliable insulation of fast construction get over coil holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711238900.XA CN108054673A (en) 2017-11-30 2017-11-30 Can the safe and reliable insulation of fast construction get over coil holder

Publications (1)

Publication Number Publication Date
CN108054673A true CN108054673A (en) 2018-05-18

Family

ID=62120989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711238900.XA Pending CN108054673A (en) 2017-11-30 2017-11-30 Can the safe and reliable insulation of fast construction get over coil holder

Country Status (1)

Country Link
CN (1) CN108054673A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002012655A1 (en) * 2000-08-08 2002-02-14 Siemens Aktiengesellschaft Work platform for high-bay racking
CN102296801A (en) * 2011-06-24 2011-12-28 梁苏珊 Upright post support with adjustable disk buckle and upright post scaffold with adjustable disk buckle
CN203086058U (en) * 2013-02-05 2013-07-24 彭自力 Multidirectional combined-type crossing frame
CN205369863U (en) * 2016-03-04 2016-07-06 赵益廷 It uses disc scaffold to be fit for performance
CN205558226U (en) * 2016-02-19 2016-09-07 张赛娟 Quick detachable and assemble scaffold frame
CN106013750A (en) * 2016-07-07 2016-10-12 山东枣建建设集团有限公司 Disc buckle direct insertion type support frame capable of being rapidly assembled and disassembled and construction method thereof
CN205846579U (en) * 2016-07-13 2016-12-28 国网浙江义乌市供电公司 A kind of high-tension line insulation operation platform
CN206350402U (en) * 2016-11-29 2017-07-25 厦门晟馨纺织品有限公司 A kind of Pet tent supporting structure
CN206376589U (en) * 2017-01-10 2017-08-04 广州市安建脚手架有限公司 A kind of stage bracket structure
CN206397099U (en) * 2017-01-12 2017-08-11 重庆艺术工程职业学院 A kind of rack platform for concrete structure construction of encorbelmenting
CN107346873A (en) * 2017-09-15 2017-11-14 国网四川省电力公司眉山供电公司 A kind of New insulated crossing frame
CN207459565U (en) * 2017-11-30 2018-06-05 国网新疆电力公司吐鲁番供电公司 Can the safe and reliable insulation of fast construction get over coil holder

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002012655A1 (en) * 2000-08-08 2002-02-14 Siemens Aktiengesellschaft Work platform for high-bay racking
CN102296801A (en) * 2011-06-24 2011-12-28 梁苏珊 Upright post support with adjustable disk buckle and upright post scaffold with adjustable disk buckle
CN203086058U (en) * 2013-02-05 2013-07-24 彭自力 Multidirectional combined-type crossing frame
CN205558226U (en) * 2016-02-19 2016-09-07 张赛娟 Quick detachable and assemble scaffold frame
CN205369863U (en) * 2016-03-04 2016-07-06 赵益廷 It uses disc scaffold to be fit for performance
CN106013750A (en) * 2016-07-07 2016-10-12 山东枣建建设集团有限公司 Disc buckle direct insertion type support frame capable of being rapidly assembled and disassembled and construction method thereof
CN205846579U (en) * 2016-07-13 2016-12-28 国网浙江义乌市供电公司 A kind of high-tension line insulation operation platform
CN206350402U (en) * 2016-11-29 2017-07-25 厦门晟馨纺织品有限公司 A kind of Pet tent supporting structure
CN206376589U (en) * 2017-01-10 2017-08-04 广州市安建脚手架有限公司 A kind of stage bracket structure
CN206397099U (en) * 2017-01-12 2017-08-11 重庆艺术工程职业学院 A kind of rack platform for concrete structure construction of encorbelmenting
CN107346873A (en) * 2017-09-15 2017-11-14 国网四川省电力公司眉山供电公司 A kind of New insulated crossing frame
CN207459565U (en) * 2017-11-30 2018-06-05 国网新疆电力公司吐鲁番供电公司 Can the safe and reliable insulation of fast construction get over coil holder

Similar Documents

Publication Publication Date Title
CN105298201B (en) Transmission line cable termination solid draws lower device
CN207459565U (en) Can the safe and reliable insulation of fast construction get over coil holder
CN101277002B (en) Method for construction of charged assembling 10kV bi-gyrus distribution line concrete lever
CN108466863A (en) A kind of solution bundle line-putting method of prestress wire
CN108054673A (en) Can the safe and reliable insulation of fast construction get over coil holder
CN206971689U (en) Support operating platform that is detachable and recycling
CN201763230U (en) Grounding antiskid bamboo ladder
CN104963500A (en) Building scaffolding stairs easy to detach and install and erection method thereof
CN202282576U (en) Moso bamboo crossing frame
KR101708994B1 (en) Guide ring rope for transmission lines
CN105040966A (en) Simple building staircase and installing method of simple building staircase
CN107059641A (en) Goods-shelf type pier shaft external scaffolding
CN102434088A (en) Protective cage type steel crawling ladder and manufacturing method thereof
CN202949168U (en) Line construction aerial working platform
CN205248754U (en) Wall -hanging cable support frame
CN209837049U (en) Prevent soil landing slope structure
CN206736745U (en) Goods-shelf type pier shaft external scaffolding
CN105958408A (en) Novel wedge type insulating strain clamp capable of preventing wire from falling off
CN207392712U (en) A kind of construction hydraulic climbing scaffold
CN205429589U (en) Pass through change platform pin configuration of multilayer circuit
CN206503377U (en) A kind of movable railing of steel trestle
CN215563981U (en) Assembled folding stair for building that can install fast
CN205637330U (en) Buckling restrained brace pole
CN106158296B (en) A kind of dry-type high-voltage lead end fixed structure
CN205476414U (en) Can improve scalable springboard of building construction safety nature

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination