CN207459565U - Can the safe and reliable insulation of fast construction get over coil holder - Google Patents
Can the safe and reliable insulation of fast construction get over coil holder Download PDFInfo
- Publication number
- CN207459565U CN207459565U CN201721640018.3U CN201721640018U CN207459565U CN 207459565 U CN207459565 U CN 207459565U CN 201721640018 U CN201721640018 U CN 201721640018U CN 207459565 U CN207459565 U CN 207459565U
- Authority
- CN
- China
- Prior art keywords
- base unit
- column
- terminal pad
- cross bar
- safe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 238000009413 insulation Methods 0.000 title claims abstract description 13
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 6
- 241000282326 Felis catus Species 0.000 claims description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012212 insulator Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000010977 unit operation Methods 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Abstract
This application involves it is a kind of can the safe and reliable insulation of fast construction get over coil holder, including the base unit being made of several columns and cross bar, if dried layer base unit forms base unit after being stacked, topmost operation unit is provided in base unit, separate seat is in several pedestals on ground between the base unit includes, column is plugged in each pedestal, the terminal pad with jack is provided on column, cross bar is arranged between terminal pad adjacent two-by-two;The column upper end sets sleeve, and base unit column corresponding with subfoundation unit in upper strata passes through sleeve grafting;Operation unit is plugged in the column top of top layer's base unit, the operation unit includes the insulating bar being plugged in column, insulating bar upper end is provided with the top contact with tablet, top cross bar is connected between top contact adjacent two-by-two.The application overall structure is simple, builds principle and is easily understood, and can be rapidly completed and build, and can stablize after finishing beneficial to ground, is readily transported after dismounting.
Description
Technical field
This application involves it is a kind of can the safe and reliable insulation of fast construction get over coil holder.
Background technology
When 110kV, 220 kV circuits put stringing, it is necessary to across charged 10kV circuits, 35kV circuits, it is often necessary to set up
More coil holder.Tradition is set up more coil holder gesture and set up using rod to be set up with scaffolding steel pipe, and there are following defects:When set up
Time is very long, and a more coil holder needs the time of one to two day to set up, and early-stage preparations are also required to two days;Second is that need skilled person
It can just complete to set up, this results in the more coil holder disunity set up, nonstandard, varies with each individual;Third, set up the more coil holder finished
It is easily deformed bending;Fourth, often result in personnel's electric shock accidents when removing.
The content of the invention
The purpose of the application be propose one kind can fast construction, remove, build, prevented in demolishing process get an electric shock can
Coil holder is got in the safe and reliable insulation of fast construction.
What the application was realized in:Can the safe and reliable insulation of fast construction get over coil holder include by several columns and cross bar
If dried layer base unit forms base unit after being stacked, topmost job ticket is provided in base unit for the base unit of composition
Member, separate seat is plugged with column in each pedestal, is set on column in several pedestals on ground between the base unit includes
There is the terminal pad with jack, cross bar is arranged between terminal pad adjacent two-by-two, and cross bar is provided at both ends with crossbar joint, in horizontal stroke
Vertical bolt slot is offered on knock-off joint and the terminal pad slot of transverse direction, crossbar joint pass through terminal pad slot and terminal pad
Grafting is positioned by the bolt for being inserted into bolt slot and being pierced by jack with terminal pad;The column upper end sets sleeve, upper strata
Base unit column corresponding with subfoundation unit passes through sleeve grafting;It is plugged in the column top of top layer's base unit
Operation unit, the operation unit include the insulating bar being plugged in column, insulating bar upper end are provided with the top with tablet
Portion's connector is connected with top cross bar between top contact adjacent two-by-two.
The top cross bar is provided at both ends with quarter butt connector, and the quarter butt connector is the connector with quarter butt, the quarter butt
It is overlapped on foregoing tablet, and passes through buckle and fixed with tablet.
The cat ladder of hook is provided between the cross bar of upper and lower two layers of base unit, hook is mounted with cross bar.
The terminal pad is socketed on column, is equally spaced on terminal pad disc equipped with several jacks.
The crossbar joint is U-shaped head, and the terminal pad slot with terminal pad grafting, U-shaped head both sides are formed in U-shaped mouth
Face offers bolt slot, and the bolt slot is straight slot.
Small big under the bolt, maximum width is not less than bolt slot length, and circular hole is offered at bolt lower part.
Due to implementing above-mentioned technical proposal, the application can be rapidly completed whole take by terminal pad and the connection structure of crossbeam
Build, and can successively increased heights, top layer are built using insulating bar as needed, it is effective exhausted so as to be provided for final structure
Edge guarantee.The application overall structure is simple, builds principle and is easily understood, and of short duration training can be quickly finished and built, the application
It can stablize after finishing beneficial to ground, be readily transported after dismounting.
Description of the drawings
The concrete structure of the application is provided by following drawings and examples:
Fig. 1 is the structure diagram of the application base unit;
Fig. 2 is the structure diagram of the application;
Fig. 3 is the structure diagram that column is connected with crossbeam.
Legend:1. column, 1-1. sleeves, 2. bolts, 3. terminal pads, 3-1. jacks, 4. pedestals, 5. cat ladders, 6. cross bars, 6-
1. crossbar joint, 6-2. terminal pad slots, 6-3. bolt slots, 7. top contacts, 8. buckles, 9. top cross bars, 9-1. quarter butts
Connector.
Specific embodiment
The application can determine specifically from the limitation of following embodiments according to the technical solution of the application with actual conditions
Embodiment.
As shown in Figures 1 to 3, can the safe and reliable insulation of fast construction get over coil holder include be made of several columns 1 and cross bar 6
Base unit, if dried layer base unit be stacked after form base unit, base unit topmost be provided with operation unit, institute
Separate seat is plugged with column 1 in each pedestal 4, is set on column 1 in several pedestals 4 on ground between stating base unit and including
There is the terminal pad 3 with jack 3-1, cross bar 6 is arranged between terminal pad 3 adjacent two-by-two, and cross bar 6 is provided at both ends with cross bar and connects
Head 6-1 offers vertical bolt slot 6-3 and terminal pad the slot 6-2, crossbar joint 6-1 of transverse direction on crossbar joint 6-1
By terminal pad slot 6-2 and 3 grafting of terminal pad, by being inserted into bolt slot 6-3 and being pierced by the bolt 2 of jack 3-1 with connecting
Disk 3 is connect to position;1 upper end of column sets sleeve 1-1, and base unit column 1 corresponding with subfoundation unit in upper strata passes through
Sleeve 1-1 grafting;Operation unit is plugged on 1 top of column of top layer's base unit, the operation unit includes being plugged in
Insulating bar in column 1 is provided with the top contact 7 with tablet in insulating bar upper end, between top contact 7 adjacent two-by-two
It is connected with top cross bar 9.
Further, it is with quarter butt that the top cross bar 9, which is provided at both ends with quarter butt connector 9-1, the quarter butt connector 9-1,
Connector, the quarter butt is overlapped on foregoing tablet, and is passed through buckle 8 and fixed with tablet.
The top cross bar 9, quarter butt connector 9-1 and top contact 7 are insulator.
The cat ladder 5 of hook can be provided between the cross bar 6 of upper and lower two layers of base unit, hook is mounted with cross bar 6.
As shown in figure 3, the terminal pad 3 is socketed on column 1, it is equally spaced on 3 disc of terminal pad equipped with several
Jack 3-1.
As shown in figure 3, the crossbar joint 6-1 is U-shaped head, is formed in U-shaped mouth and inserted with the terminal pad of 3 grafting of terminal pad
Slot 6-2, it is straight slot that U-shaped head two sides, which offer bolt slot 6-3, the bolt slot 6-3,.
Small big under the bolt 2, maximum width is not less than bolt slot 6-3 length, is offered at 2 lower part of bolt
Circular hole after bolt 2 is inserted into bolt slot 6-3 and is pierced by jack 3-1, block is penetrated in circular hole, prevents bolt 2 from departing from.
In use, first put pedestal 4, and the grafting column 1 in each pedestal 4, by terminal pad 3 by cross bar 6 one by one
Installing in place, forms one layer of base unit, successively builds base unit until forming base unit;Base unit, which is built, to be finished
Afterwards, there is the insulating bar of top contact 7 in the 1 interpolation tape splicing of column of the base unit of top layer, it is by top contact 7 that top is horizontal
Bar is installed in place one by one, completes to build.To further ensure that overall stability, bundle rope can be bound outside ring the application entirety, enhanced
Whole stability.
More than technical characteristic constitutes the most preferred embodiment of the application, is imitated with stronger adaptability and optimal implementation
Fruit can increase and decrease inessential technical characteristic according to actual needs, to meet the needs of different situations.
Claims (6)
1. it is a kind of can the safe and reliable insulation of fast construction get over coil holder, it is characterised in that:Including being made of several columns and cross bar
Base unit, if dried layer base unit be stacked after form base unit, base unit topmost be provided with operation unit, institute
Separate seat is plugged with column in each pedestal, band is provided on column in several pedestals on ground between stating base unit and including
There is the terminal pad of jack, cross bar is arranged between terminal pad adjacent two-by-two, and cross bar is provided at both ends with crossbar joint, is connect in cross bar
Vertical bolt slot is offered on head and the terminal pad slot of transverse direction, crossbar joint are inserted by terminal pad slot with terminal pad
It connects, is positioned by the bolt for being inserted into bolt slot and being pierced by jack with terminal pad;The column upper end sets sleeve, upper strata base
Plinth unit column corresponding with subfoundation unit passes through sleeve grafting;Work is plugged in the column top of top layer's base unit
Industry unit, the operation unit include the insulating bar being plugged in column, insulating bar upper end are provided with the top with tablet
Connector is connected with top cross bar between top contact adjacent two-by-two.
2. it is according to claim 1 can the safe and reliable insulation of fast construction get over coil holder, it is characterised in that:The top is horizontal
Bar is provided at both ends with quarter butt connector, and the quarter butt connector is the connector with quarter butt, and the quarter butt is overlapped on foregoing tablet, and
It is fixed by being buckled with tablet.
3. it is according to claim 1 can the safe and reliable insulation of fast construction get over coil holder, it is characterised in that:At upper and lower two layers
The cat ladder of hook is provided between the cross bar of base unit, hook is mounted with cross bar.
4. it is according to claim 1 can the safe and reliable insulation of fast construction get over coil holder, it is characterised in that:The terminal pad
It is socketed on column, is equally spaced on terminal pad disc equipped with several jacks.
5. according to claim 1 or 4 can the safe and reliable insulation of fast construction get over coil holder, it is characterised in that:The horizontal stroke
Knock-off joint is U-shaped head, the terminal pad slot with terminal pad grafting is formed in U-shaped mouth, U-shaped head two sides offer bolt and insert
Slot, the bolt slot are straight slot.
6. according to claim 1 or 4 can the safe and reliable insulation of fast construction get over coil holder, it is characterised in that:It is described to insert
Small big under pin, maximum width is not less than bolt slot length, and circular hole is offered at bolt lower part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721640018.3U CN207459565U (en) | 2017-11-30 | 2017-11-30 | Can the safe and reliable insulation of fast construction get over coil holder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721640018.3U CN207459565U (en) | 2017-11-30 | 2017-11-30 | Can the safe and reliable insulation of fast construction get over coil holder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207459565U true CN207459565U (en) | 2018-06-05 |
Family
ID=62275514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721640018.3U Active CN207459565U (en) | 2017-11-30 | 2017-11-30 | Can the safe and reliable insulation of fast construction get over coil holder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207459565U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108054673A (en) * | 2017-11-30 | 2018-05-18 | 国网新疆电力公司吐鲁番供电公司 | Can the safe and reliable insulation of fast construction get over coil holder |
-
2017
- 2017-11-30 CN CN201721640018.3U patent/CN207459565U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108054673A (en) * | 2017-11-30 | 2018-05-18 | 国网新疆电力公司吐鲁番供电公司 | Can the safe and reliable insulation of fast construction get over coil holder |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105298201B (en) | Transmission line cable termination solid draws lower device | |
CN207459565U (en) | Can the safe and reliable insulation of fast construction get over coil holder | |
CN101277002B (en) | Method for construction of charged assembling 10kV bi-gyrus distribution line concrete lever | |
CN108466863A (en) | A kind of solution bundle line-putting method of prestress wire | |
CN108054673A (en) | Can the safe and reliable insulation of fast construction get over coil holder | |
CN206971689U (en) | Support operating platform that is detachable and recycling | |
CN201763230U (en) | Grounding antiskid bamboo ladder | |
CN104963500A (en) | Building scaffolding stairs easy to detach and install and erection method thereof | |
KR101708994B1 (en) | Guide ring rope for transmission lines | |
CN107059641A (en) | Goods-shelf type pier shaft external scaffolding | |
CN102434088A (en) | Protective cage type steel crawling ladder and manufacturing method thereof | |
CN202949168U (en) | Line construction aerial working platform | |
CN205248754U (en) | Wall -hanging cable support frame | |
CN209837049U (en) | Prevent soil landing slope structure | |
CN101936126A (en) | Grounding anti-skidding bamboo ladder | |
CN206736745U (en) | Goods-shelf type pier shaft external scaffolding | |
CN105958408A (en) | Novel wedge type insulating strain clamp capable of preventing wire from falling off | |
CN207392712U (en) | A kind of construction hydraulic climbing scaffold | |
CN205429589U (en) | Pass through change platform pin configuration of multilayer circuit | |
CN205742030U (en) | A kind of flexible guardrail ribbing device | |
CN206503377U (en) | A kind of movable railing of steel trestle | |
CN106158296B (en) | A kind of dry-type high-voltage lead end fixed structure | |
CN205637330U (en) | Buckling restrained brace pole | |
CN205476414U (en) | Can improve scalable springboard of building construction safety nature | |
CN109742705A (en) | A kind of high-altitude fire-resisting cable auxiliary mounting jig |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |