CN108051616A - GIS device loop resistance tests auxiliary tool and power construction implementation - Google Patents

GIS device loop resistance tests auxiliary tool and power construction implementation Download PDF

Info

Publication number
CN108051616A
CN108051616A CN201710995078.5A CN201710995078A CN108051616A CN 108051616 A CN108051616 A CN 108051616A CN 201710995078 A CN201710995078 A CN 201710995078A CN 108051616 A CN108051616 A CN 108051616A
Authority
CN
China
Prior art keywords
rod
plug
wire
cable
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710995078.5A
Other languages
Chinese (zh)
Inventor
王玲
周佳
李相峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Benxi Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Benxi Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Benxi Power Supply Co of State Grid Liaoning Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Benxi Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Priority to CN201710995078.5A priority Critical patent/CN108051616A/en
Publication of CN108051616A publication Critical patent/CN108051616A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/04Housings; Supporting members; Arrangements of terminals
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/08Measuring resistance by measuring both voltage and current

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

GIS device loop resistance tests auxiliary tool and power construction implementation, belongs to power transmission and transforming equipment operation and prevention technique field, in order to be applied to carry out GIS device loop resistance test job, to solve the problems, such as safety installation test clamp, including:Hook shaped cable clamp and insulating bar, it is connected between the insulating bar and hook shaped cable clamp by sawtooth occlusal pattern rotary joint, it is the Curved hook insulator for clamping connection lead to hook shaped cable clamp body, curved side has the conductive material with wire contacts in it, pressure-wire, current line as p-wire are electrically connected respectively with the conductive material, and are drawn by the afterbody of hook shaped cable clamp body.

Description

GIS设备回路电阻测试辅助工具及电力施工实施方法Auxiliary tool for GIS equipment loop resistance test and implementation method of electric power construction

技术领域technical field

本发明属于输变电设备运行与防灾技术领域,涉及一种GIS设备回路电阻测试辅助工具。The invention belongs to the technical field of power transmission and transformation equipment operation and disaster prevention, and relates to an auxiliary tool for testing loop resistance of GIS equipment.

背景技术Background technique

GIS设备由于其结构简单、维护方便等优点近年来在电网中广泛应用,由于 GIS设备生产厂家众多,形式结构多样,对于GIS接地开关的接地侧与外壳不是绝缘的设备,不能利用回路上的两组接地开关合到待测回路上进行测量,就需要从进出线套管注入电流进行测量。此时,需要试验人员登高爬上GIS设备两侧进出线套管,人工安装测试线夹进行测量。由于GIS设备结构紧凑,与周围临近间隔距离小,感应电大或距离过近无法满足作业的安全距离,在装、拆测试线时极易发生工作人员触电、高空坠落和高空落物伤人的安全事故等原因使部分GIS设备无法进行测量。Due to its simple structure and convenient maintenance, GIS equipment has been widely used in power grids in recent years. Due to the large number of GIS equipment manufacturers and various forms and structures, the grounding side of the GIS grounding switch is not insulated from the shell, and the two circuits on the circuit cannot be used. When the group grounding switch is connected to the circuit to be tested for measurement, it is necessary to inject current from the inlet and outlet bushings for measurement. At this time, it is necessary for the test personnel to climb up to the inlet and outlet bushings on both sides of the GIS equipment, and manually install the test wire clamp for measurement. Due to the compact structure of the GIS equipment, the distance between it and the surrounding area is small, the induction current is too large or the distance is too close to meet the safe distance of the operation, and it is very easy to cause electric shock, high-altitude fall and high-altitude falling objects to injure people when installing and dismantling the test line. Accidents and other reasons make some GIS equipment unable to measure.

发明内容Contents of the invention

本发明提供一种GIS设备回路电阻测试辅助工具,为了应用于开展GIS设备回路电阻测试工作,以解决安全安装测试线夹的问题。The invention provides an auxiliary tool for testing the loop resistance of GIS equipment, which is used for testing the loop resistance of GIS equipment and solves the problem of safely installing test line clips.

一种GIS设备回路电阻测试辅助工具,包括:勾型线夹及绝缘杆,所述的绝缘杆与勾型线夹之间通过锯齿咬合型旋转接头连接,勾型线夹本体是用于夹接引线的弯曲形勾状绝缘体,在其内弯侧具有与引线接触的导电材质,作为测试线的电压线、电流线分别与所述导电材质电连接,并由勾型线夹本体的尾部引出。An auxiliary tool for testing loop resistance of GIS equipment, comprising: a hook-shaped clamp and an insulating rod, the insulating rod and the hook-shaped clamp are connected by a sawtooth-type rotary joint, and the hook-shaped clamp body is used for clamping The curved hook-shaped insulator of the lead wire has a conductive material in contact with the lead wire on its inwardly bent side, and the voltage line and current line as the test line are respectively electrically connected to the conductive material and drawn out from the tail of the hook-shaped clamp body.

所述的锯齿咬合型旋转接头包括上杆、与上杆一体式连接的上盘体、下杆、与下杆一体式连接的下盘体,所述的上、下盘体具有贯穿以供穿心螺栓螺纹连接的螺纹孔,所述的上、下盘体相向设置且相向面具有锯齿面,两相向的锯齿面于穿心螺栓与所述螺纹孔螺纹连接以紧固限位时相互咬合,所述的上杆与勾型线夹固定连接,所述的下杆与绝缘杆固定连接。The zigzag type rotary joint includes an upper rod, an upper disc integrally connected with the upper rod, a lower rod, and a lower disc integrally connected with the lower rod. The upper and lower discs have penetrating holes for wearing The threaded hole of the threaded connection of the core bolt, the upper and lower plates are arranged opposite to each other and the opposite surfaces have serrated surfaces, and the two opposite serrated surfaces are engaged with each other when the threaded bolt is threaded with the threaded hole to tighten the limit, The upper rod is fixedly connected with the hook clamp, and the lower rod is fixedly connected with the insulating rod.

所述的螺纹孔由穿心螺栓螺纹连接,并在穿心螺栓端部具有紧固穿心螺栓的蝶形螺母。The threaded holes are threadedly connected by through-bolts, and wing nuts for fastening the through-bolts are provided at the ends of the through-bolts.

所述的绝缘杆为接扣式绝缘拉杆。The insulating rod is a buckle type insulating pull rod.

所述接扣式的结构,其包括两个分别位于不同安装段的绝缘杆端部的接扣,接扣扣接以固定两个不同的安装段的绝缘杆。The buckle-type structure includes two buckles respectively located at the ends of insulating rods of different installation sections, and the buckles are fastened to fix the insulating rods of two different installation sections.

有益效果:该测试工具能够提高测试效率,减轻测试人员劳动强度;满足各种电压等级GIS设备的测试要求;能够在安装时尽可能降低工作人员的登高和触电可能,保障测试人员人身安全,在一定程度上,杜绝高空坠落、人身感电事故发生。Beneficial effects: the test tool can improve test efficiency and reduce the labor intensity of testers; meet the test requirements of GIS equipment with various voltage levels; it can reduce the possibility of staff climbing and electric shock as much as possible during installation, and ensure the personal safety of testers. To a certain extent, prevent falling from high altitude and personal electric shock accidents.

附图说明Description of drawings

图1为电缆井盖的结构示意图;Fig. 1 is the structural representation of cable manhole cover;

图2为输电杆塔通用式保护帽模板的结构示意图;Fig. 2 is the structural schematic diagram of the general protection cap formwork of transmission tower;

图3为支撑平台的结构示意图;Fig. 3 is the structural representation of support platform;

图4为66kV-220kV对接卡簧式接地线线夹的结构示意图;Figure 4 is a schematic structural diagram of the 66kV-220kV docking spring type grounding wire clamp;

图5为GIS设备回路电阻测试辅助工具的结构示意图;Fig. 5 is a structural schematic diagram of a GIS equipment loop resistance test auxiliary tool;

图6为便携式变电站设备除雪机的结构示意图;Fig. 6 is the structural representation of portable substation equipment snow removal machine;

图7为组合式旋转式地锚装置的结构示意图;Fig. 7 is a structural schematic diagram of a combined rotary ground anchor device;

图8为直线塔架空地线提升器的结构示意图;Fig. 8 is a structural schematic diagram of a linear tower overhead ground wire lifter;

图9为电缆绕、放线装置的结构示意图;Fig. 9 is a structural schematic diagram of a cable winding and unwinding device;

图10为电缆绕、放线装置的第一内部图;Fig. 10 is the first internal view of the cable winding and pay-off device;

图11为电缆绕、放线装置的第二内部图;Fig. 11 is the second internal view of the cable winding and pay-off device;

图12为电力视频监控平台的总体构架图;Fig. 12 is the overall frame diagram of electric power video surveillance platform;

图13为电力视频监控平台的业务构架图;Figure 13 is a business architecture diagram of the power video monitoring platform;

图14为电力视频监控平台的逻辑构架图;Fig. 14 is a logical framework diagram of the power video surveillance platform;

图15为电力视频监控平台的部署架构图。Figure 15 is a deployment architecture diagram of the power video monitoring platform.

其中:in:

3-1.固定模板,3-2.拼接模板,3-3.第一平板,3-4.第二平板,3-5.固定板,3-6.平板;3-1. Fixed template, 3-2. Splicing template, 3-3. First plate, 3-4. Second plate, 3-5. Fixed plate, 3-6. Flat plate;

6-1.尖部,6-2.槽部,6-3.加持部,6-4.C型夹口槽,6-5.卡簧,6-6.转轴,6-7. 最高边缘点,6-8.铰接部,6-9.销钉;6-1. Tip, 6-2. Groove, 6-3. Holder, 6-4. C-shaped clamp groove, 6-5. Circlip, 6-6. Shaft, 6-7. Top edge point, 6-8. hinge, 6-9. pin;

7-1.钩型线夹,7-2.绝缘杆,7-3.导电材质,7-4.电压线,7-5.电流线,7-6.穿心螺栓,7-7.蝶形螺母,7-8.锯齿面;7-1. Hook clamp, 7-2. Insulation rod, 7-3. Conductive material, 7-4. Voltage wire, 7-5. Current wire, 7-6. Through-hole bolt, 7-7. Butterfly Shaped nut, 7-8. Serrated surface;

8-1.发动机,8-2.软轴,8-3.绝缘杆,8-4.旋转毛刷,8-5.手柄,8-6.防水伞裙;8-1. Engine, 8-2. Flexible shaft, 8-3. Insulation rod, 8-4. Rotating brush, 8-5. Handle, 8-6. Waterproof umbrella skirt;

9-1.地锚旋转杆,9-2.旋转片,9-3.水平杆,9-4.水平杆支杆,9-5.水平杆固定杆,9-6.悬挂点挂环,9-7.旋转杆旋转叉孔;9-1. Ground anchor rotating rod, 9-2. Rotating piece, 9-3. Horizontal rod, 9-4. Horizontal rod support rod, 9-5. Horizontal rod fixing rod, 9-6. Suspension point hanging ring, 9-7. The rotating fork hole of the rotating rod;

10-1.横扭头角铁组合,10-2.压板,10-3.可调丝杠,10-4.横桥水平加长铁, 10-5.横桥铁;10-1. Horizontal twist head angle iron combination, 10-2. Press plate, 10-3. Adjustable lead screw, 10-4. Horizontal extension iron for cross bridge, 10-5. Cross bridge iron;

11-1.插头线出口,11-2.开口,11-3.转轴,11-4.壳体,11-5.插排线,11-6.插头线,11-7.插接壳体。11-1. Plug wire outlet, 11-2. Opening, 11-3. Shaft, 11-4. Housing, 11-5. Plug cable, 11-6. Plug wire, 11-7. Plug housing .

具体实施方式Detailed ways

实施例:本实施例要解决的技术问题是:针对GIS设备结构情况,应用该的辅助工具后,测试人员可以在设备停电、带电的情况下均可测试,测试人员应用该工具,通过绝缘操作杆将测试线夹悬挂在测试回路的的进、出线套管上,利用回路电阻测试仪,完成GIS设备回路电阻测试工作。一是能够避免利用回路上的两组接地开关合到待测回路测试时,频繁的操作断路器、隔离开关、接地开关等设备所引起的误操作事故;二是测试人员可以在地面进行操作,省去登高作业过程,防止出现高空坠落的危险;三是测试人员可以在设备停电、带电的情况下完成测试工作,且在地面进行操作,增大了作业时的安全距离,防止发生人身感电事故,四是省去测试人员打开接地开关接地侧与GIS外壳软连接这一过程,节省测试时间,减轻测试人员劳动强度。Embodiment: The technical problem to be solved in this embodiment is: for the structure of GIS equipment, after applying the auxiliary tool, the tester can test the equipment when the equipment is powered off or charged. The rod hangs the test wire clip on the inlet and outlet bushings of the test loop, and the loop resistance tester is used to complete the loop resistance test of the GIS equipment. One is to avoid misoperation accidents caused by frequent operation of circuit breakers, isolating switches, grounding switches and other equipment when the two sets of grounding switches on the circuit are connected to the circuit to be tested; the other is that testers can operate on the ground, Eliminate the need for climbing operations to prevent the risk of falling from high altitudes; third, testers can complete the test work when the equipment is powered off or charged, and operate on the ground, which increases the safety distance during operation and prevents personal induction Accident, the fourth is to save the tester from opening the grounding switch ground side and the soft connection process of the GIS shell, saving the test time and reducing the labor intensity of the tester.

其技术解决方案:该工具采用勾型线夹加装绝缘杆杆和测试线来制作做测试工具。绝缘杆与勾型线夹之间通过锯齿咬合型旋转接头连接,满足不同测试方向的要求。勾型线夹本体为绝缘材质,与引线接触部分为导电材质,线夹尾部引出两根测试线,分别作为电压线、电流线。绝缘杆部分采用接扣式绝缘拉杆,满足不同电压等级、不同设备高度的测试需求。无需人工登高安装测试线,线夹与引线接触可靠,不受引线规格影响,并且线夹可与绝缘拉杆固定在被测试端,不受环境风力的影响,安装紧固可靠。Its technical solution: the tool uses a hook-shaped clamp to add insulating rods and test lines to make a test tool. The insulating rod and the hook-type clamp are connected by a sawtooth-type rotary joint to meet the requirements of different test directions. The body of the hook-type clamp is made of insulating material, and the part in contact with the lead wire is made of conductive material. Two test lines are drawn from the tail of the clamp, which are respectively used as voltage lines and current lines. The insulating rod part adopts the buckle-type insulating pull rod to meet the test requirements of different voltage levels and different equipment heights. There is no need to install the test line manually, the contact between the clamp and the lead wire is reliable, and it is not affected by the specification of the lead wire, and the clamp can be fixed on the tested end with the insulating pull rod, which is not affected by the wind force of the environment, and the installation is fast and reliable.

具体方案如下:The specific plan is as follows:

一种GIS设备回路电阻测试辅助工具,包括:勾型线夹及绝缘杆,所述的绝缘杆与勾型线夹之间通过锯齿咬合型旋转接头连接,勾型线夹本体是用于夹接引线的弯曲形勾状绝缘体,在其内弯侧具有与引线接触的导电材质,作为测试线的电压线、电流线分别与所述导电材质电连接,并由勾型线夹本体的尾部引出。An auxiliary tool for testing loop resistance of GIS equipment, comprising: a hook-shaped clamp and an insulating rod, the insulating rod and the hook-shaped clamp are connected by a sawtooth-type rotary joint, and the hook-shaped clamp body is used for clamping The curved hook-shaped insulator of the lead wire has a conductive material in contact with the lead wire on its inwardly bent side, and the voltage line and current line as the test line are respectively electrically connected to the conductive material and drawn out from the tail of the hook-shaped clamp body.

所述的锯齿咬合型旋转接头包括上杆、与上杆一体式连接的上盘体、下杆、与下杆一体式连接的下盘体,所述的上、下盘体具有贯穿以供穿心螺栓螺纹连接的螺纹孔,所述的上、下盘体相向设置且相向面具有锯齿面,两相向的锯齿面于穿心螺栓与所述螺纹孔螺纹连接以紧固限位时相互咬合以防止两个相向面相互传动改变紧固方向,所述的上杆与勾型线夹固定连接,所述的下杆与绝缘杆固定连接。The zigzag type rotary joint includes an upper rod, an upper disc integrally connected with the upper rod, a lower rod, and a lower disc integrally connected with the lower rod. The upper and lower discs have penetrating holes for wearing The threaded hole of the threaded connection of the core bolt, the upper and lower plates are arranged opposite to each other and the opposite surfaces have serrated surfaces, and the two opposite serrated surfaces are engaged with each other when the threaded bolt is threaded with the threaded hole for fastening and limiting. To prevent the two facing surfaces from being driven to change the fastening direction, the upper rod is fixedly connected to the hook clamp, and the lower rod is fixedly connected to the insulating rod.

所述的螺纹孔由穿心螺栓螺纹连接,并在穿心螺栓端部具有紧固穿心螺栓的蝶形螺母。所述的绝缘杆为接扣式绝缘拉杆。所述接扣式的结构,其包括两个分别位于不同安装段的绝缘杆端部的接扣,接扣扣接以固定两个不同的安装段的绝缘杆。The threaded holes are threadedly connected by through-bolts, and wing nuts for fastening the through-bolts are provided at the ends of the through-bolts. The insulating rod is a buckle type insulating pull rod. The buckle-type structure includes two buckles respectively located at the ends of insulating rods of different installation sections, and the buckles are fastened to fix the insulating rods of two different installation sections.

本实施例具有的效果:The effect that this embodiment has:

1、提高测试效率,减轻测试人员劳动强度;1. Improve test efficiency and reduce labor intensity of testers;

2、满足各种电压等级GIS设备的测试要求;2. Meet the test requirements of GIS equipment with various voltage levels;

3、保障测试人员人身安全,杜绝高空坠落、人身感电事故发生;3. Guarantee the personal safety of testers, and prevent falling from high altitudes and personal electric shock accidents;

4、防止GIS设备误分、误合及分合闸不到位的情况发生,保障GIS设备安全可靠运行。4. Prevent GIS equipment from mis-dividing, mis-closing, and opening-closing not in place, and ensure the safe and reliable operation of GIS equipment.

5、节约生产成本,为企业降本增效。5. Save production costs, reduce costs and increase efficiency for enterprises.

对该方案的其他说明:Additional notes on the program:

1、勾型线夹的选择,外壳选用塑料材质,使夹体与引线实现电气绝缘,且保证电压线与电流线的电气隔离;1. The choice of hook-type wire clamp, the shell is made of plastic material, so that the clamp body and the lead wire can be electrically insulated, and the electrical isolation between the voltage line and the current line can be ensured;

2、测试线线径选择20平方毫米,以满足测试电流不小于100A;2. The diameter of the test line is 20 square millimeters to meet the test current not less than 100A;

3、锯齿咬合面型旋转接头,能够使咬合接触面积大,测试线夹不发生晃动,且对不同测试方向进行调节;3. The serrated occlusal surface type rotary joint can make the occlusal contact area large, the test line clamp does not shake, and can adjust different test directions;

4、接扣式绝缘杆的选择,装拆方便,易于操作,满足不同电压等级、不同测试高度的需要。4. The choice of buckle-type insulation rod is convenient for assembly and disassembly, easy to operate, and meets the needs of different voltage levels and different test heights.

可行性分析及实施效果:Feasibility analysis and implementation effect:

该项目加工完成后,从材料的选择、机械试验、耐压试验均通过验证,证明实施可行。并先后在220kV桥北变、高官变、赫地变的GIS回路电阻测试中进行测试,测试数据合格,满足《输变电设备检修试验规程》的要求,测试效率大幅提升,单回路平均测试时间由原来的41分钟下降到22分钟,圆满实现了预期目标。After the processing of the project is completed, the material selection, mechanical test and pressure test have all passed the verification, proving that the implementation is feasible. And it has been tested in the GIS loop resistance test of 220kV Qiaobei Substation, Gaoguan Substation, and Hedi Substation successively. The test data is qualified and meets the requirements of the "Test Regulations for Maintenance of Power Transmission and Transformation Equipment". The test efficiency has been greatly improved, and the average test time of a single loop The original 41 minutes dropped to 22 minutes, and the expected goal was successfully achieved.

在另一个实施例中,其记载了一种电力施工实施方法,给出了一个全面性的电力施工过程中的实施方法,使用该实施方法,可以更为方便和高效的进行电力施工实施。In another embodiment, it records an implementation method of electric power construction, and provides a comprehensive implementation method in the process of electric power construction. Using this implementation method, the implementation of electric power construction can be performed more conveniently and efficiently.

该所述的电力实施实施方法的技术方案,为包括如下方法中的一种以上。The technical solution of the said electric power implementation method includes more than one of the following methods.

1.实施用于固定光缆的方法,包括如下步骤:1. implement the method for fixing optical cable, comprise the steps:

S1.选取中间带折页以折叠的铝合金材料的台面作为工作台,在工作台的四角固定可伸缩桌腿,所述的桌腿为弹簧折叠桌腿以支撑工作台,使桌腿与工作台能成九十度角折叠;S1. Select the table with folded aluminum alloy material in the middle as the workbench, and fix the retractable table legs at the four corners of the workbench. The table legs are folded by springs to support the workbench, so that the table legs are in line with the workbench. The table can be folded at a ninety-degree angle;

S2.选取光缆夹持器为接续时固定光缆之用,工作台左右侧各安装一只光缆夹持器,夹持器两面都是平的以固定工作台台面,有V型槽的一面用于固定光缆,开口方向朝向工作人员。S2. Select the fiber optic cable holder to fix the fiber optic cable during connection. One fiber optic cable holder is installed on the left and right sides of the workbench. Both sides of the holder are flat to fix the workbench. The side with V-shaped groove is used for Fix the fiber optic cable with the opening facing the staff.

信息通信分公司目前维护光缆线路达到3000公里,每年需要熔接光缆作业多达几百次,光缆熔接人员在熔接光缆操作时没有专用的光缆熔接操作台,使用简易折叠桌进行熔接作业。光缆熔接工作多位于山上,折叠桌使用起来非常笨重,且不方便。该方法是研制800cm×600cm×500cm铝合金材质的折叠桌,中间可以折叠,桌腿可任意伸缩以适应山区等地势不平施工场所,桌腿下安装防滑爪,研制光缆固定夹具安装在桌子两侧,桌面上设计固定光缆熔接机的槽位,保证使用时的设备稳定,折叠桌内设计能放置建议工具槽位,以便施工时能将简易工具放置在折叠桌内。通信光缆接续工作台,支架采用高强度高锰钢管焊制而成,具有轻便、坚固耐用、收放简单等特点,台面由防水高强度铝合金板采用吸塑新工艺吸塑贴面而成。使用尺寸为:长800mm,宽600mm,高500mm,完全可以满足任何型号尺寸的接头盒,终端盒,摆放任何一款熔接机及工具,夹持器采用轻质耐磨铝合金压铸而成,其结构具有固定台面牢固,拆卸安装方便,在台面上的位置随意性强等特点,夹持器适合目前所有直径7mm~28mm通用光缆施工,该光缆接续工作台具有轻便、适用任何地形等特点,工作台台面为防火材料,不怕烤烫,不怕硬物磕碰,割划,适合野外作业场景,在光缆接续中能极大的提高工作效率,缩短光缆接续的时间,很好的保障了野外光缆作业施工中的熔接质量。The information and communication branch currently maintains 3,000 kilometers of optical cable lines, and needs to weld optical cables hundreds of times a year. Optical cable welding personnel do not have a dedicated optical cable welding operation table when welding optical cables, and use simple folding tables for welding operations. Most of the cable splicing work is located on the mountain, and the folding table is very cumbersome and inconvenient to use. The method is to develop a folding table made of aluminum alloy of 800cm×600cm×500cm, which can be folded in the middle, and the legs of the table can be stretched arbitrarily to adapt to uneven terrain such as mountainous areas. , The slot for fixing the optical cable fusion splicer is designed on the desktop to ensure the stability of the equipment during use. The folding table is designed to place suggested tool slots, so that simple tools can be placed in the folding table during construction. Communication optical cable connection workbench, the bracket is made of high-strength high-manganese steel pipe welded, with the characteristics of lightness, durability, and easy storage and storage. The use size is: length 800mm, width 600mm, height 500mm, which can fully meet any type of splicing box, terminal box, and place any type of welding machine and tools. The holder is made of light-weight wear-resistant aluminum alloy die-casting. Its structure has the characteristics of firm fixed table top, convenient disassembly and installation, and strong random position on the table top. The clamper is suitable for the construction of all general-purpose optical cables with a diameter of 7mm to 28mm. The optical cable splicing workbench is light and suitable for any terrain. The workbench is made of fireproof material, which is not afraid of scalding, bumping and scratching by hard objects. It is suitable for field work scenarios. It can greatly improve work efficiency and shorten the time of cable connection during optical cable connection, which is a good guarantee for field optical cable operations. Welding quality during construction.

2.实施使电缆井盖防雨防盗的方法,包括如下步骤:2. Implement the method of making the cable manhole cover rainproof and anti-theft, including the following steps:

S1.在电缆井盖不设置孔洞以防止雨水、雪水灌入电缆井;S1. No holes are set in the cable well cover to prevent rainwater and snow water from pouring into the cable well;

S2.电缆井盖的井圈制作向上的凹槽形状,井盖下表面边缘制作成向下凸起,嵌入井圈凹槽;以防止雨水进入井内并用于防止井盖移位,防止井盖被盗;S2. The well ring of the cable manhole cover is made into an upward groove shape, and the edge of the lower surface of the manhole cover is made to protrude downward, embedded in the groove of the well ring; to prevent rainwater from entering the well and to prevent the well cover from shifting and preventing the well cover from being stolen;

S3.电缆井盖的上表面中心制作成直径500mm的圆平面,用于和强磁铁配合以开启井盖,并在圆平面边缘制作直径120mm的圆形凹槽用于嵌入信息标牌井号,且还制作30mm的圆形凹槽用于嵌入井内信息芯片用于扫描读取信息以实现对电缆井电缆通道的管理。S3. The center of the upper surface of the cable manhole cover is made into a circular plane with a diameter of 500mm, which is used to cooperate with a strong magnet to open the manhole cover, and a circular groove with a diameter of 120mm is made on the edge of the circular plane for embedding the information sign number, and also made The 30mm circular groove is used to embed the information chip in the well for scanning and reading information to realize the management of the cable channel in the cable well.

目前市区内配电线路电缆设备日益增多,电缆井众多,没有统一信息进行管理,电缆井内部积水较多,难以清理,井盖上面有孔洞导致雨水流入井内,铁质井盖经常发生损坏、丢失的现象,易发生人员坠井的危险。原有井盖存在以下几个问题:1、井盖上有两个孔洞,易进水。2、井盖上为“电力”字样标注产权,时间长模糊,信息不清楚。3、井盖锁具经常碾压易失灵。4、井圈、井盖牙槽设计简单,易移位或被盗。本发明研制一款新型的电缆井盖,井盖上没有孔洞,防止雨水、雪水灌入电缆井。井圈制作向上凹槽形状,井盖下表面边缘设计制作成向下凸起,嵌入井圈凹槽,防止雨水进入井内的同时防止井盖移位,防止井盖被盗。井盖上表面中心制作成为直径500mm的圆平面,用于和强磁铁配合开启井盖,平面边缘制作直径120mm的圆形凹槽用于嵌入信息标牌井号,制作30mm 的圆形凹槽用于嵌入井内信息芯片,用扫描读取信息。方便电缆井电缆通道的管理,所述电缆井盖可以有效防止雨水、雪水进入电缆井,有效减少电缆井内部积水,防止电力电缆长期在水中浸泡引发的故障停电。新型井盖可以有效防止井盖被压时偏移原位,没有专用工具无法打开井盖,起到防盗作用,有效防止人员、车辆坠井事故的发生。新型电缆井盖有固定的标识安装区域,嵌入式标牌耐磨损、指示清晰、信息齐全,和其他单位井盖有明显区分。嵌入可扫描芯片,大大增加了信息量,人员巡视路过时可以清楚掌握设备情况及巡视记载。为电缆线路运行维护起到帮助作用。该井盖结构简单,投资小,方便制作,方便安装,计划批量生产,在国网本溪供电公司配电专业推广应用,提高电缆设备运行管理水平,提高电缆设备安全性,提高供电可靠性,降低人员车辆坠井风险。At present, the distribution line and cable equipment in urban areas are increasing day by day, there are many cable wells, and there is no unified information for management. There is a lot of water in the cable wells, which is difficult to clean. There are holes on the manhole covers that cause rainwater to flow into the wells. Iron manhole covers are often damaged and lost. Phenomenon, prone to the danger of people falling into the well. The original manhole cover has the following problems: 1. There are two holes on the manhole cover, which is easy for water to enter. 2. The title of "electric power" is marked on the manhole cover, the time is long and vague, and the information is not clear. 3. Manhole cover locks are often crushed and easy to fail. 4. The alveolar design of the well ring and well cover is simple, easy to be displaced or stolen. The invention develops a novel cable well cover, which has no holes to prevent rainwater and snow water from pouring into the cable well. The well circle is made into an upward groove shape, and the edge of the lower surface of the well cover is designed to protrude downward, embedded in the well circle groove, to prevent rainwater from entering the well and prevent the well cover from shifting and the well cover from being stolen. The center of the upper surface of the well cover is made into a circular plane with a diameter of 500mm, which is used to cooperate with a strong magnet to open the well cover. A circular groove with a diameter of 120mm is made on the edge of the plane for embedding the information sign number, and a circular groove of 30mm is made for embedding in the well. Information chip, read information by scanning. It facilitates the management of the cable channel of the cable well. The cable well cover can effectively prevent rainwater and snow water from entering the cable well, effectively reduce water accumulation inside the cable well, and prevent power outages caused by long-term immersion of power cables in water. The new manhole cover can effectively prevent the manhole cover from shifting to its original position when it is pressed, and the manhole cover cannot be opened without special tools, which plays an anti-theft role and effectively prevents accidents of people and vehicles falling into the well. The new cable manhole cover has a fixed sign installation area, and the embedded sign is wear-resistant, with clear instructions and complete information, which is clearly distinguished from other unit manhole covers. Embedded with a scannable chip, the amount of information is greatly increased, and personnel can clearly grasp the equipment situation and inspection records when passing by. It is helpful for the operation and maintenance of cable lines. The well cover is simple in structure, small in investment, easy to manufacture and easy to install, and is planned to be mass-produced. It will be popularized and applied in the power distribution company of State Grid Benxi Power Supply Company to improve the operation and management level of cable equipment, improve the safety of cable equipment, improve the reliability of power supply, and reduce the number of personnel. Vehicle fall risk.

3.实施制备输电杆塔通用式保护帽模板的方法,用厚度为1mm的钢板焊制长度最小规格为400mm的固定模板,另外焊制多个长度为100mm的拼接模板,拼接模板的数量随杆塔基础立桩面大小相应增加,所述的固定模板由两个相互垂直的平板连接而成,并在各所述平板的背向安装垂直板面的固定板,所述的拼接模板为平板,并且部分拼接模板具有垂直板面的固定板;第一固定模板的第一固定板与第一拼接模板的固定板通过螺栓连接,该第一拼接模板与一个以上的没有固定板的接模板拼接,并且拼接的最后一个拼接模板带有固定板,其为第二拼接模板,第二拼接模板通过其固定板与第二固定模板的第一平板的固定板通过螺栓连接,第二固定模板的第二平板的固定板与第三拼接板的固定板通过螺栓连接,该第三拼接模板与一个以上的没有固定板的接模板拼接,并且拼接的最后一个拼接模板带有固定板,其为第四拼接模板,第四拼接模板通过其固定板与第三固定模板的第一平板的固定板通过螺栓连接,以此连接方式,直至一带有固定板的拼接模板,其通过固定板与第一固定模板的第二固定板螺栓连接,以将固定模板与拼接模板围接成为空心正方体形状的保护帽模板,并将所述保护帽的棱角处通过弧形棱角模板条改为弧形。3. Implement the method of preparing the general-purpose protective cap formwork for transmission towers. Use a steel plate with a thickness of 1mm to weld a fixed formwork with a minimum length of 400mm, and weld a plurality of spliced formworks with a length of 100mm. The number of spliced forms varies with the foundation of the tower. The size of the pile surface is correspondingly increased. The fixed formwork is formed by connecting two mutually perpendicular flat plates, and a fixed plate with a vertical surface is installed on the back of each of the flat plates. The spliced formwork is a flat plate, and some The splicing formwork has a fixed plate with a vertical plate surface; the first fixed plate of the first fixed formwork is connected with the fixed plate of the first spliced formwork by bolts, and the first spliced formwork is spliced with more than one spliced formwork without a fixed plate, and spliced The last splicing template has a fixing plate, which is a second splicing template, and the second splicing template is connected by bolts to the fixing plate of the first flat plate of the second fixed template through its fixing plate, and the second flat plate of the second fixed template The fixing plate and the fixing plate of the third splicing plate are connected by bolts, and the third splicing template is spliced with more than one splicing template without a fixing plate, and the last splicing template to be spliced has a fixing plate, which is the fourth splicing template, The fourth splicing formwork is connected by bolts with the fixing plate of the first plate of the third fixed formwork through its fixing plate, in this way, until a splicing formwork with a fixing plate, it passes through the fixing plate and the second fixed plate of the first fixing formwork. The fixing plate is connected by bolts, so that the fixing formwork and the splicing formwork are surrounded to form a hollow cube-shaped protective cap formwork, and the corners of the protective cap are changed into arcs by means of arc-shaped corner formwork strips.

上述方案是在电力线路杆塔施工后,根据混凝土保护帽立桩面的大小对模板进行安装后,进行浇筑混凝土使保护帽成形并养护,使之达到一定强度以承受自重的临时性结构,并能拆除重复使用的一种输电杆塔通用式保护帽模板。The above scheme is to install the formwork according to the size of the pile surface of the concrete protective cap after the construction of the power line pole tower, and then pour concrete to form the protective cap and maintain it so that it can reach a certain strength to bear its own weight. Temporary structure, and can A common protective cap formwork for transmission poles and towers is removed and reused.

目前,随着输电线路标准化的建设,塔脚保护帽也是其中重要的一项内容,保护帽必须要坚固、无裂纹、外形不仅要标准还要美观。保护帽的作用是:在电力线路杆塔施工组立后,为保护地脚螺栓的螺帽不被拆除及避免塔座积水需在塔脚处浇灌水泥沙浆,制成保护层。现在浇筑混凝土保护帽的模板多为木质材料,制做成形后一次使用,浪费材料,不可随保护帽大小进行调整,不可重复使用。其次,杆塔保护帽成形后很少有合格的,其中最重要的原因就是没有合格的模板。现在采用胶合板、木方做为模板,用钉子固定接合处,这样水泥沙浆膨胀后很容易将钉子拔出,造成保护帽变形,另外胶合板、木方为一次性使用,并且每个保护帽的大小不同,每次都要进行重新加工木质模板,这样就大大增加了施工成本,保护帽外观也达不到标准形状。为了保证施工后的混凝土保护帽美观、节省材料、减少施工成本。将可重复使用组装的钢性模板替代原来胶合板、木方为材料的一次性木质模板,该发明提供一种输电杆塔通用式保护帽模板,达到组装方便,重复使用的目的。上述方法用薄钢板焊制保护帽最小规格的固定模板,另外焊制多个的拼接模板,固定模板与拼接模板用螺栓连接,可随杆塔基础立桩面大小相应增加,将棱角处通过模板改为弧形,这样不仅不易破损而且美观,并达到组装方便、重复使用。具体操作是用厚度为1mm的钢板焊制长度最小规格为400mm 的固定模板,另外焊制多个100mm的拼接模板,可随杆塔基础立桩面大小相应增加,固定模板与拼接模板用螺栓连接。为了使保护帽坚固耐用,将保护帽的棱角处通过弧形棱角模板条改为弧形,这样不仅不易破损而且美观,并达到组装方便、重复使用、减少了施工成本的目的。其有益效果是,大小规格可调适合任何杆塔保护帽的浇筑,采用重复使用的钢材料替代了木质材料,大大减少了施工成本,避免了螺帽不被拆除及避免塔座积水,保证线路安全运行。At present, with the construction of standardized transmission lines, the protection cap of the tower foot is also an important part of it. The protection cap must be strong, free of cracks, and its appearance must not only be standard but also beautiful. The function of the protective cap is: after the construction and assembly of the power line pole tower, in order to protect the nuts of the anchor bolts from being removed and to avoid water accumulation at the tower base, cement mortar must be poured at the tower foot to form a protective layer. Most of the formworks for pouring concrete protection caps are wooden materials, which are used once after making and forming, which wastes materials, cannot be adjusted with the size of the protection caps, and cannot be reused. Secondly, there are few qualified ones after the tower protective cap is formed, and the most important reason is that there is no qualified formwork. Now plywood and wood are used as templates, and nails are used to fix the joints, so that the nails can be easily pulled out after the cement mortar expands, causing deformation of the protective cap. In addition, plywood and wood are disposable, and the size of each protective cap Different, the wooden formwork must be reprocessed every time, which greatly increases the construction cost, and the appearance of the protective cap cannot reach the standard shape. In order to ensure the appearance of the concrete protective cap after construction, save materials and reduce construction costs. The reusable and assembled steel formwork replaces the original disposable wooden formwork made of plywood and wood squares. The invention provides a general-purpose protective cap formwork for transmission poles and towers, which achieves the purpose of easy assembly and repeated use. The above method uses thin steel plates to weld the fixed formwork of the minimum specification for the protective cap, and welds a plurality of splicing formworks in addition. The fixed formwork and the splicing formwork are connected by bolts, which can be increased correspondingly with the size of the pile surface of the tower foundation. It is arc-shaped, which is not only not easy to break but also beautiful, and achieves convenient assembly and repeated use. The specific operation is to use a steel plate with a thickness of 1mm to weld a fixed formwork with a minimum length of 400mm, and to weld multiple 100mm spliced formworks, which can increase with the size of the pile surface of the tower foundation. The fixed formwork and spliced formwork are connected by bolts. In order to make the protective cap durable, the edges and corners of the protective cap are changed into arcs through arc-shaped corner formwork strips, which is not only not easy to break but also beautiful, and achieves the purpose of easy assembly, repeated use, and reduced construction costs. Its beneficial effect is that the size and specification can be adjusted and is suitable for pouring any tower protective cap, and the reused steel material is used instead of wooden material, which greatly reduces the construction cost, avoids the nut from being removed and avoids water accumulation in the tower base, and ensures the line safe operation.

4.实施电力项目施工中登杆塔防坠落的方法,在现有的安全带腰带上绑扎一根直径8mm的涤尼玛绳,绳上每间隔若干米安放一个铝合金快扣环,作业人员每登杆塔所述若干米就安装一个铝合金快扣环在主材上,如果作业人员失足,坠落高度控制在所述若干米以内,调整铝合金快扣环间隔距离,以控制坠落高度;铝合金快扣环与主材的连接方法为使用涤尼玛绳与主材用死结的方法连接,再将死结的一端用铝合金快扣环锁住,人员上下杆塔时铝合金快扣环统一扣在作业人员腰间;涤尼玛绳参数:铭牌标直径Φ8mm,瞬间接断力2400KG;铝合金快扣环参数:铭牌标瞬间破坏力8KN。4. To implement the method of preventing falling from climbing towers in the construction of electric power projects, tie a polyester Nima rope with a diameter of 8mm on the existing safety belt belt, and place an aluminum alloy quick buckle ring every several meters on the rope. Install an aluminum alloy quick buckle ring on the main material within a few meters of the climbing tower. If the operator stumbles, the falling height is controlled within the mentioned several meters, and the distance between the aluminum alloy quick buckle rings is adjusted to control the falling height; The connection method between the quick buckle and the main material is to use the polyester Nima rope to connect the main material with a dead knot, and then lock one end of the dead knot with an aluminum alloy quick buckle. The waist of the worker; the parameters of the polyester Nima rope: the diameter of the nameplate is Φ8mm, and the instantaneous breaking force is 2400KG; the parameters of the aluminum alloy quick buckle ring: the instantaneous destructive force of the nameplate is 8KN.

在电力线路施工和维护工作中,常常要进行高处作业。这其中以输电线路检修作业最为普遍,一直以来作业人员上、下杆塔都是徒手进行,没有任何安全防护措施。一担失手或踩滑就有可能发生人身伤亡事故。近年来一些单位为杜绝此类事件发生,在杆塔上安装全程滑道或围栏,效果明显但投资巨大。现辽宁省地区220kV及以下输电线路90%的铁塔都没有安全滑道装置,而致使2010年-2016 年期间因攀登铁塔无防护而导致人身死亡的严重事故高达7例。我们开发研制了一种投资少、效果好、经济实用的防坠装置。目前国内没有此项目研制及应用。上述方案主要目的在于提供一种登杆塔防坠落装置,以解决在输电线登杆塔作业过程中登杆塔无保护、多人登塔无保护的问题。为了实现上述目的,提供了一种登杆塔防坠落装置,它的技术原理为在现有的安全带腰带上绑扎一根Φ8MM涤尼玛绳,绳上每间隔5米按放一个铝合金快扣环。作业人员每登杆塔5米就安装一个铝合金快扣环在主材上,此时如果作业人员失足,坠落高度就可以控制在5 米以内。如果调整铝合金快扣环间隔距离,甚至可以控制坠落高度(1米)的作用。涤尼玛绳参数:铭牌标直径Φ8MM,瞬间接断力2400KG。铝合金快扣环参数:铭牌标瞬间破坏力8KN。铝合金快扣环与主材的连接方法:涤尼玛绳与主材用死结的方法连接,再将死结的一端用铝合金快扣环锁住。涤尼玛绳长度要适当,不可过短或过长。50米长直径Φ8MM涤尼玛绳重约2KG,10个铝合金快扣环重约0.5KG。人员上下杆塔时铝合金快扣环统一扣在作业人员腰间。有益效果主要包含以下五个方面:1、制作材料应选用耐热、防腐、抗锈蚀型材料。2、登杆塔防坠落装置的操作灵活、方便。3、登杆塔防坠落装置可以完全替代铁塔滑道。4、登杆塔防坠落装置可以控制在坠落高度1m内。5、使用寿命长。6、多人登杆塔作业时,只需要第一个登杆塔的人携带登杆塔防坠落安全绳索即可保证所有登杆塔作业人员的安全。该装置的形状、构造:输电线路登杆塔防坠落装置原件包括: 50米长直径Φ8MM涤尼玛绳1条,铝合金扣环10个,安全绳自锁器(登塔作业人员每人携带一条)。在2014年8月至2015年11月期间,发明人一共使用本装置进行作业26次,真正做到了上、下塔全程安全防护,为了推进登杆塔防坠落装置全面运用,经过现场实际检验,小组制定了《登杆塔防坠落装置技术导则》,并编制了《登杆塔防坠落装置应用与维护指导书》,对技术导则进行细化,对相关人员进行了充足的培训,确保该技术的可靠落实,使之更加适应作业人员攀登铁塔的需求。登杆塔防坠落装置替代了输电线路铁塔无速差保护装置的弊端,填补了国内在这一个领域的空白。In the construction and maintenance of power lines, it is often necessary to work at heights. Among them, the maintenance work of transmission lines is the most common. For a long time, operators have been doing it with bare hands, without any safety protection measures. Personal injury or death may occur if a load is missed or slipped. In recent years, in order to prevent such incidents, some units have installed full slides or fences on the towers, which have obvious effects but huge investment. At present, 90% of the iron towers of 220kV and below transmission lines in Liaoning Province do not have safety slide devices, and as a result, there were as many as 7 serious accidents caused by climbing iron towers without protection during 2010-2016. We have developed a kind of anti-falling device with less investment, good effect, economical and practical. At present, there is no development and application of this project in China. The main purpose of the above proposal is to provide a fall prevention device for climbing towers, so as to solve the problems of no protection for climbing towers and no protection for multiple people climbing towers during the operation of climbing towers on transmission lines. In order to achieve the above purpose, a climbing pole tower fall prevention device is provided. Its technical principle is to bind a Φ8MM polyester Nima rope on the existing safety belt belt, and place an aluminum alloy quick buckle on the rope every 5 meters. ring. The operator installs an aluminum alloy quick buckle ring on the main material every 5 meters of the tower. If the operator stumbles at this time, the falling height can be controlled within 5 meters. If you adjust the distance between the aluminum alloy quick buckle rings, you can even control the effect of the drop height (1 meter). Polyester Nima rope parameters: nameplate diameter Φ8MM, instant breaking force 2400KG. Parameters of aluminum alloy quick buckle ring: The instant destructive force of the nameplate is 8KN. The connection method of the aluminum alloy quick buckle ring and the main material: the polyester Nima rope is connected with the main material by a dead knot, and then the end of the dead knot is locked with an aluminum alloy quick buckle ring. The length of the polyester Nima rope should be appropriate, not too short or too long. The 50-meter-long diameter Φ8MM polyester Nima rope weighs about 2KG, and the weight of 10 aluminum alloy quick buckle rings is about 0.5KG. The aluminum alloy quick buckle ring is uniformly buckled on the waist of the operator when the personnel go up and down the pole tower. The beneficial effects mainly include the following five aspects: 1. Heat-resistant, anti-corrosion and anti-corrosion materials should be selected as the manufacturing material. 2. The operation of the climbing tower anti-falling device is flexible and convenient. 3. The anti-fall device of the climbing tower can completely replace the slideway of the iron tower. 4. The anti-fall device of the climbing tower can be controlled within 1m of the falling height. 5. Long service life. 6. When multiple people are working on the pole climbing tower, only the first person to climb the pole tower needs to carry the anti-falling safety rope of the pole climbing tower to ensure the safety of all climbing tower operators. The shape and structure of the device: The original components of the anti-fall device for the transmission line boarding tower include: 1 piece of 50-meter-long diameter Φ8MM polyester Nima rope, 10 aluminum alloy buckles, safety rope self-locking device (each person who climbs the tower carries one ). During the period from August 2014 to November 2015, the inventor used this device to carry out operations 26 times in total, and truly achieved the safety protection of the whole process of going up and down the tower. Formulated the "Technical Guidelines for Fall Prevention Devices for Climbing Towers" and compiled the "Guidelines for the Application and Maintenance of Fall Prevention Devices for Climbing Towers" to refine the technical guidelines and provide sufficient training for relevant personnel to ensure the safety of this technology Reliable implementation makes it more adaptable to the needs of operators climbing iron towers. The climbing tower anti-fall device replaces the disadvantages of the transmission line tower without speed difference protection device, and fills the gap in this field in China.

5.实施电力领域中巡线无人机控制的方法,在巡线无人机的机体上安装一个支撑平台,支撑平台上安装电子控制设备和起吊舵机,巡线无人机起飞后通过遥控器控制起吊舵机的开合;支撑平台的安装方法:5. Implement the method of controlling the line inspection UAV in the field of electric power. Install a support platform on the body of the line inspection UAV. Install electronic control equipment and lifting steering gear on the support platform. After the line inspection UAV takes off, it can be controlled by remote control. The device controls the opening and closing of the lifting steering gear; the installation method of the supporting platform:

S1.加工碳纤维板,根据巡线无人机脚架所在位置对碳纤维板进行设计加工;S1. Process the carbon fiber board, design and process the carbon fiber board according to the position of the tripod of the line patrol drone;

S2.将碳纤维板与巡线无人机本体安装好;S2. Install the carbon fiber board and the line patrol drone body;

S3.碳纤维板上表面安装电子设备;S3. Mount electronic equipment on the surface of the carbon fiber board;

S4.碳纤维板对地表面安装舵机;S4. The carbon fiber plate is installed on the surface of the steering gear;

S5.巡线无人机起飞后舵机横梁在闭合状态下以牵引重物;S5. After the line patrol UAV takes off, the beam of the steering gear is closed to pull heavy objects;

S6.地面人员通过遥控器控制舵机横梁水平运动以控制重物的松脱。S6. The ground personnel control the horizontal movement of the steering gear beam through the remote control to control the loosening of the heavy objects.

飞机起飞后,平台下方的舵机可以起吊重物,并且在遥控器的作用下自由开合。After the plane takes off, the steering gear under the platform can lift heavy objects and open and close freely under the action of the remote control.

6.实施制作66kV-220kV对接卡簧式接地线线夹的方法,所述线夹包括相对设置的两个线夹夹板,所述线夹夹板包括一体式依次连接的尖部、槽部及夹持部,所述槽部的内相对面是C型夹口槽,所述的各侧夹口槽内具有用于夹持线路的卡簧,两个卡簧相向设置,且卡簧通过转轴轴接于C型夹口最高边缘点附近,所述的夹持部具有突出的铰接部,并在内部开槽,相对的两个夹持部的铰接部通过销钉铰接,且销钉位于弹簧内部,弹簧被紧压在所述铰接部的所述开槽内,按照上述线夹的结构进行装配。6. Implement the method of making 66kV-220kV docking spring type grounding wire clamp, the clamp includes two clamp splints arranged oppositely, and the clamp splint includes an integrated tip, groove and clip connected in sequence The inner opposite surface of the groove is a C-shaped clamp groove, and there are clip springs for clamping the circuit in each side clip groove. The two clip springs are arranged opposite to each other, and the clip springs pass through the shaft It is connected near the highest edge point of the C-shaped jaw. The clamping part has a protruding hinge part and is slotted inside. The hinge parts of the two opposite clamping parts are hinged by pins, and the pins are located inside the spring. The spring It is tightly pressed in the slot of the hinge part, and assembled according to the structure of the above-mentioned wire clip.

上述方案用于解决传统便携式接单卡簧线夹地线触发力矩过大,无法保证线夹夹线成功率,进而导致的现有线夹装设成功率较低,及传统便携式接单卡簧线夹地线线夹开合力矩过大,很难单手操作,带来危险隐患的问题。在相同作业条件下,由于传统便携式接单卡簧线夹地线线夹卡簧后退距离较小,因而在触发过程中触发力较大。可以通过加长卡簧触发力臂和将传统的单卡簧改成双卡簧,进一步减小触发力,提高线夹夹线成功率。由于装设接地线时,作业人员需在杆塔横担部位,作业条件受到较大限制,传统便携式接单卡簧线夹地线线夹调整需双手进行,给作业人员带来较大不便。对接卡簧式接地线通过改变传统线夹结构,将卡簧转轴前移,使之便于单手操作,提高了操作便利性。进一步的方案是:所述的尖部是与槽部外壁平齐处向内逐渐增大切割距离形成。所述的尖部的最大宽度处与槽部外壁平齐处相距5mm。所述的夹持部具有防滑纹,所述的防滑纹是条形纹、矩形纹的组合。由上述方案,可以得到的有益效果,包括经济效益与安全效益,从经济效益上来说,本实施例采用新研制的对接卡簧式接地线后,改革了传统的工艺方法,简化了作业流程,保证了装设接地线的安全性。简化了作业程序,缩短了装设接地线时间,做到省时省力,从而缩短检修期。从停电节约时间上来算,挂接对接卡簧式接地线能在每次检修作业中能节省3~10min作业时间。以2015年为例,年计划停电检修66kV~220kV输电线102条·次,若采用对接卡簧式接地线将缩短负荷停供时间5~22小时,为企业创造了一定的经济效益。The above solution is used to solve the problem that the trigger torque of the ground wire of the traditional portable single-connected circlip clamp is too large, which cannot guarantee the success rate of the clamp clamp, which leads to the low success rate of the existing clamp installation, and the traditional portable single-connected circlip wire. The opening and closing torque of the ground wire clip is too large, it is difficult to operate with one hand, which brings about dangerous and hidden dangers. Under the same operating conditions, the trigger force is relatively large during the triggering process due to the small retreat distance of the traditional portable single-connecting circlip clamp ground wire clamp circlip. By lengthening the trigger arm of the circlip and changing the traditional single circlip into a double circlip, the trigger force can be further reduced and the success rate of clamping the wire can be improved. When installing the grounding wire, the operator needs to be at the crossarm of the tower, and the working conditions are greatly restricted. The adjustment of the traditional portable circlip clamp and the ground wire clamp requires both hands, which brings great inconvenience to the operator. The butt spring type grounding wire changes the structure of the traditional clamp and moves the spring shaft forward, making it easy to operate with one hand and improving the convenience of operation. A further solution is: the tip is formed by gradually increasing the cutting distance inwardly from the point flush with the outer wall of the groove. The distance between the point where the maximum width of the tip is flush with the outer wall of the groove is 5mm. The clamping portion has anti-slip lines, and the anti-slip lines are a combination of striped lines and rectangular lines. From the above scheme, the beneficial effects that can be obtained include economic benefits and safety benefits. In terms of economic benefits, this embodiment adopts the newly developed butt spring type grounding wire, reforms the traditional process, and simplifies the operation process. The safety of installing the grounding wire is guaranteed. It simplifies the operation procedure, shortens the time for installing the grounding wire, saves time and effort, and shortens the maintenance period. Calculated from the time saved in power outages, the hooking and docking of the spring-type grounding wire can save 3 to 10 minutes of working time in each maintenance operation. Taking 2015 as an example, there are 102 planned power outages for 66kV-220kV transmission lines per year. If the butt spring type grounding wire is used, the load outage time will be shortened by 5-22 hours, creating certain economic benefits for the enterprise.

从安全效益上说,对接卡簧式接地线可以单手完成开启线夹操作,打开线夹只需将线夹垂直向下捏开即可完成卡簧装设,装设接地线时触发率有较大提高,缩短人员在杆塔上作业时间。同时由于对接卡簧式接地线线夹在材选用上在保证接地线电气性能同时注重材料的轻型化,每组(3套)接地线减轻0.42kg,有效减轻人员登杆塔时的负重,减少了作业人员体力支出。对接卡簧式接地线的使用既有效缩短检修期,又节省了作业人员体力,有效的控制了现场的安全风险。本实施例中,对于该线夹制定对策表如下:From the point of view of safety benefits, the operation of opening the clamp can be completed with one hand when connecting the clamp-type grounding wire. To open the clamp, you only need to pinch the clamp vertically downward to complete the installation of the clamp spring. When installing the grounding wire, the trigger rate is lower. Great improvement, shortening the working time of personnel on the tower. At the same time, due to the material selection of the butt spring type grounding wire clamp, the electrical performance of the grounding wire is ensured while the lightness of the material is paid attention to. Each group (3 sets) of grounding wires is reduced by 0.42kg, which effectively reduces the load of personnel when climbing the pole tower. Physical expenditure of workers. The use of the butt spring type grounding wire not only effectively shortens the maintenance period, but also saves the physical strength of the operators, and effectively controls the safety risks on site. In the present embodiment, formulate countermeasure table for this wire clip as follows:

7.实施GIS设备回路电阻测试辅助工具的制作方法,其特征在于,所述辅助工具包括:勾型线夹及绝缘杆,所述的绝缘杆与勾型线夹之间通过锯齿咬合型旋转接头连接,勾型线夹本体是用于夹接引线的弯曲形勾状绝缘体,在其内弯侧具有与引线接触的导电材质,作为测试线的电压线、电流线分别与所述导电材质电连接,并由勾型线夹本体的尾部引出;所述的锯齿咬合型旋转接头包括上杆、与上杆一体式连接的上盘体、下杆、与下杆一体式连接的下盘体,所述的上、下盘体具有贯穿以供穿心螺栓螺纹连接的螺纹孔,所述的上、下盘体相向设置且相向面具有锯齿面,两相向的锯齿面于穿心螺栓与所述螺纹孔螺纹连接以紧固限位时相互咬合,所述的上杆与勾型线夹固定连接,所述的下杆与绝缘杆固定连接;所述的螺纹孔由穿心螺栓螺纹连接,并在穿心螺栓端部具有紧固穿心螺栓的蝶形螺母,所述的绝缘杆为接扣式绝缘拉杆;按照上述辅助工具的结构进行装配。7. Implement the manufacturing method of GIS equipment loop resistance test auxiliary tool, it is characterized in that, described auxiliary tool comprises: hook type wire clip and insulation rod, between described insulation rod and hook type wire clip through sawtooth bite type rotary joint Connection, the hook-shaped clamp body is a curved hook-shaped insulator used to clamp the lead wire, and has a conductive material in contact with the lead wire on its inner curved side, and the voltage line and current line used as the test line are respectively electrically connected to the conductive material , and is led out from the tail of the hook-type clamp body; the saw-tooth occlusal rotary joint includes an upper rod, an upper disc body integrally connected with the upper rod, a lower rod, and a lower disc body integrally connected with the lower rod. The above-mentioned upper and lower plate bodies have threaded holes for threaded connection of the through-hole bolts, the above-mentioned upper and lower plate bodies are arranged oppositely and have serrated surfaces on the opposite surfaces, and the two opposite serrated surfaces are connected between the through-center bolts and the thread. The holes are threaded to engage with each other when tightening the limit, the upper rod is fixedly connected with the hook clamp, and the lower rod is fixedly connected with the insulating rod; The end of the through-bolt has a wing nut for fastening the through-bolt, and the insulating rod is a buckle-type insulating pull rod; it is assembled according to the structure of the above-mentioned auxiliary tool.

上述方案要解决的技术问题是:针对GIS设备结构情况,应用该的辅助工具后,测试人员可以在设备停电、带电的情况下均可测试,测试人员应用该工具,通过绝缘操作杆将测试线夹悬挂在测试回路的的进、出线套管上,利用回路电阻测试仪,完成GIS设备回路电阻测试工作。一是能够避免利用回路上的两组接地开关合到待测回路测试时,频繁的操作断路器、隔离开关、接地开关等设备所引起的误操作事故;二是测试人员可以在地面进行操作,省去登高作业过程,防止出现高空坠落的危险;三是测试人员可以在设备停电、带电的情况下完成测试工作,且在地面进行操作,增大了作业时的安全距离,防止发生人身感电事故,四是省去测试人员打开接地开关接地侧与GIS外壳软连接这一过程,节省测试时间,减轻测试人员劳动强度。具有的效果:1、提高测试效率,减轻测试人员劳动强度;2、满足各种电压等级GIS设备的测试要求;3、保障测试人员人身安全,杜绝高空坠落、人身感电事故发生;4、防止GIS设备误分、误合及分合闸不到位的情况发生,保障GIS设备安全可靠运行。节约生产成本,为企业降本增效。对该方案的其他说明:1、勾型线夹的选择,外壳选用塑料材质,使夹体与引线实现电气绝缘,且保证电压线与电流线的电气隔离;2、测试线线径选择20平方毫米,以满足测试电流不小于100A;3、锯齿咬合面型旋转接头,能够使咬合接触面积大,测试线夹不发生晃动,且对不同测试方向进行调节;4、接扣式绝缘杆的选择,装拆方便,易于操作,满足不同电压等级、不同测试高度的需要。可行性分析及实施效果:该项目加工完成后,从材料的选择、机械试验、耐压试验均通过验证,证明实施可行。并先后在220kV桥北变、高官变、赫地变的GIS回路电阻测试中进行测试,测试数据合格,满足《输变电设备检修试验规程》的要求,测试效率大幅提升,单回路平均测试时间由原来的41分钟下降到22分钟,圆满实现了预期目标。The technical problem to be solved by the above scheme is: according to the structure of the GIS equipment, after applying the auxiliary tool, the tester can test the equipment under the condition of power failure or electrification, and the tester uses the tool to connect the test line to The clamp is hung on the inlet and outlet bushings of the test loop, and the loop resistance tester of the GIS equipment is used to complete the loop resistance test of the GIS equipment. One is to avoid misoperation accidents caused by frequent operation of circuit breakers, isolating switches, grounding switches and other equipment when the two sets of grounding switches on the circuit are connected to the circuit to be tested; the other is that testers can operate on the ground, Eliminate the need for climbing operations to prevent the risk of falling from high altitudes; third, testers can complete the test work when the equipment is powered off or charged, and operate on the ground, which increases the safety distance during operation and prevents personal induction Accident, the fourth is to save the tester from opening the grounding switch ground side and the soft connection process of the GIS shell, saving the test time and reducing the labor intensity of the tester. Effects: 1. Improve test efficiency and reduce the labor intensity of testers; 2. Meet the test requirements of GIS equipment with various voltage levels; 3. Ensure the personal safety of testers, prevent falling from high altitudes and personal electric shock accidents; 4. Prevent Mis-opening, mis-closing, and improper opening and closing of GIS equipment occur, ensuring the safe and reliable operation of GIS equipment. Save production costs, reduce costs and increase efficiency for enterprises. Other explanations for this plan: 1. The choice of the hook type clamp, the outer shell is made of plastic material, so that the clamp body and the lead wire can be electrically insulated, and the electrical isolation between the voltage line and the current line is guaranteed; 2. The diameter of the test line is 20 square meters mm to meet the test current not less than 100A; 3. The sawtooth occlusal surface rotary joint can make the occlusal contact area large, the test wire clamp does not shake, and can adjust different test directions; 4. The choice of buckle-type insulating rod , easy to assemble and disassemble, easy to operate, and meet the needs of different voltage levels and different test heights. Feasibility analysis and implementation effect: After the completion of the project, the selection of materials, mechanical test and pressure test have all passed the verification, which proves that the implementation is feasible. And it has been tested in the GIS loop resistance test of 220kV Qiaobei Substation, Gaoguan Substation, and Hedi Substation successively. The test data is qualified and meets the requirements of the "Test Regulations for Maintenance of Power Transmission and Transformation Equipment". The test efficiency has been greatly improved, and the average test time of a single loop The original 41 minutes dropped to 22 minutes, and the expected goal was successfully achieved.

8.实施便携式变电站设备除雪机的制作方法,所述除雪机包括发动机、与发动机的输出连接的软轴,所述的软轴与传动轴连接,传动轴与旋转毛刷连接以驱动旋转毛刷旋转,所述的传动轴置于绝缘杆内部,绝缘杆下端部为手柄,所述的绝缘杆为玻璃钢绝缘杆,所述的传动轴为玻璃钢绝缘传动轴,在旋转毛刷的下方安装有硅橡胶防水伞裙,所述的硅橡胶防水伞裙位于绝缘杆上端面的上方,所述的软轴连接在发动机与传动轴之间,所述的绝缘杆为玻璃钢制成,且其表面涂刷云母粉和/或聚四氟乙烯涂层;按照上述除雪机的结构进行装配。8. Implement the manufacturing method of portable substation equipment snow remover, described snow remover comprises engine, the flexible shaft that is connected with the output of engine, described flexible shaft is connected with transmission shaft, and transmission shaft is connected with rotating brush to drive rotating brush Rotate, the transmission shaft is placed inside the insulation rod, the lower end of the insulation rod is a handle, the insulation rod is a glass fiber reinforced plastic insulation rod, the transmission shaft is a glass fiber reinforced plastic insulation transmission shaft, and a silicon Rubber waterproof umbrella skirt, the silicone rubber waterproof umbrella skirt is located above the upper end surface of the insulating rod, the flexible shaft is connected between the engine and the transmission shaft, the insulating rod is made of glass fiber reinforced plastic, and its surface is painted Mica powder and/or Teflon coating; assemble as described above for snow blower construction.

由于用于变电站设备的除雪使用,对于其绝缘性能的考虑是一个重要因素,为此,本发明选择了绝缘性能较佳的玻璃钢作为绝缘杆,并且还充分考虑到玻璃钢的抗低温能力,一般其低温抵抗能力能达到零下35摄氏度以下,然而,由于变电站设备距离和精密要求,除雪机的质量、体积等需要被限定,如玻璃钢的厚度一般为1~3mm较佳,然而,这种厚度对于本身属于脆性材料的玻璃钢来说,会导致易损伤、断裂和受到腐蚀,即更脆,加之雪天使用必然在较低温天气,特别是我国东北地区,温度达到零下40摄氏度甚至更低,更降低了玻璃钢的抵抗能力,雪或雪水还具有腐蚀性,虽然较轻,但是对于恶劣环境的玻璃钢来说,非常不利,为此,本发明在旋转毛刷的下方安装有硅橡胶防水伞裙,所述的硅橡胶防水伞裙位于绝缘杆上端面的上方,增强遮挡能力,降低雪水或雪接触玻璃钢的可能,作为保护措施的协同措施,以使得玻璃钢的使用寿命更长,本发明在玻璃钢上涂刷云母粉,云母粉是二维片状晶体结构,阻融水汽穿透,提高漆膜的耐水汽,耐盐雾性,提高涂料的防腐性能。云母粉致密网状结构:平行排列,相互重叠,提高漆膜强度,抗龟裂,提升涂料的机械性能。云母粉优良的化学惰性:耐酸,耐碱,耐高温,电绝缘性强,提升涂料的防腐稳定性以及电绝缘性。由此,云母粉属于绝缘材料适合涂刷,且能够阻隔水汽穿透,能够更进一步保证玻璃钢的绝缘性,更为重要的是,其能够增强玻璃钢的强度,增强弹性、韧性,提升机械性能,使得除雪使用的厚度较小的处于超低温环境下的玻璃钢强度有了明显提升,更为适合在作为变电设备的雪机使用,特别是其温度的稳定区间非常大,能够适合低温使用。一些变电设备对于某些频率的振动较为敏感,因而本发明优选云母粉采用绢云母涂层,其能高效率地吸收振动能量、削弱震动波和声波。另外,震动波和声波在云母晶片之间形成反复反射,也造成削弱其能量的作用。而发动机的声波在玻璃钢内形成的发射可能会被增强,为了降低这种声波影响,使用该种云母粉涂层。除了涂层全部为云母粉,作为一种方案,该云母粉涂层为分布式涂刷,不完全覆盖于玻璃钢,优选为间隔式涂刷,即涂刷一圈云母粉,在涂刷一圈聚四氟乙烯,相互交替。原因是聚四氟乙烯在-260℃的超低温中不发脆,能够提供玻璃钢机械强度和耐低温能力,且其光滑,绝缘性能特别好,是作为本发明的较佳方案,作为一种优选方案,所述的涂层全部为聚四氟乙烯。在使用过程中,便携式变电站设备除雪机采用S35发动机,软轴与玻璃钢绝缘杆内玻璃钢绝缘传动轴相连结,传动轴前与旋转毛刷连结。软轴长度为1.5米,绝缘杆长度为3米。该实施例的机具对电站设备设施进行除雪,将大大提升工作的质量和效率,方便快捷,从而提高了变电站设备安全可靠运行。Because it is used for snow removal of substation equipment, the consideration of its insulation performance is an important factor. For this reason, the present invention selects FRP with better insulation performance as the insulation rod, and also fully considers the low temperature resistance of FRP. The low temperature resistance can reach minus 35 degrees Celsius. However, due to the distance and precision requirements of the substation equipment, the quality and volume of the snow blower need to be limited. For example, the thickness of FRP is generally 1-3mm. For FRP, which is a brittle material, it will be easily damaged, broken and corroded, that is, more brittle. In addition, it must be used in lower temperature weather in snowy weather, especially in Northeast China, where the temperature reaches minus 40 degrees Celsius or even lower. The resistance of FRP, snow or snow water is also corrosive, although it is lighter, it is very unfavorable for FRP in harsh environments. For this reason, the present invention is equipped with a silicone rubber waterproof umbrella skirt under the rotating brush, so The above-mentioned silicone rubber waterproof umbrella skirt is located above the upper end surface of the insulating rod, which enhances the shielding ability and reduces the possibility of snow water or snow contacting FRP. As a coordinated measure of protection measures, the service life of FRP is longer. Brushing mica powder, mica powder is a two-dimensional sheet crystal structure, which prevents the penetration of water vapor, improves the water vapor resistance and salt spray resistance of the paint film, and improves the anti-corrosion performance of the paint. Dense network structure of mica powder: arranged in parallel, overlapping each other, improving the strength of the paint film, resisting cracking, and improving the mechanical properties of the paint. Excellent chemical inertness of mica powder: acid resistance, alkali resistance, high temperature resistance, strong electrical insulation, improving the anti-corrosion stability and electrical insulation of coatings. Therefore, mica powder is an insulating material suitable for painting, and can block the penetration of water vapor, which can further ensure the insulation of FRP. More importantly, it can enhance the strength of FRP, enhance elasticity and toughness, and improve mechanical properties. The strength of FRP used in snow removal with a smaller thickness in ultra-low temperature environments has been significantly improved, and it is more suitable for use in snow machines as power transformation equipment, especially its temperature stability range is very large, which can be used at low temperatures. Some substation equipment is relatively sensitive to vibrations of certain frequencies, so the preferred mica powder of the present invention is coated with sericite, which can efficiently absorb vibration energy and weaken shock waves and sound waves. In addition, shock waves and sound waves are repeatedly reflected between mica chips, which also weakens their energy. The emission of the engine's sound waves in the FRP may be enhanced. In order to reduce the impact of the sound waves, this kind of mica powder coating is used. Except that the coating is all mica powder, as a solution, the mica powder coating is distributed brushing, which does not completely cover the FRP. PTFE, alternating with each other. The reason is that polytetrafluoroethylene is not brittle at an ultra-low temperature of -260°C, and can provide FRP with mechanical strength and low temperature resistance, and it is smooth and has particularly good insulation performance. , all of the coatings are polytetrafluoroethylene. During use, the portable substation equipment snow blower uses the S35 engine, the flexible shaft is connected to the FRP insulated transmission shaft inside the FRP insulating rod, and the front of the transmission shaft is connected to the rotating brush. The length of the flexible shaft is 1.5 meters, and the length of the insulating rod is 3 meters. The machine tool in this embodiment removes snow from the equipment and facilities of the power station, which will greatly improve the quality and efficiency of work, and is convenient and quick, thereby improving the safe and reliable operation of the equipment in the substation.

9.实施输电线路工程建设中锚固临时线路的组合式旋转式地锚装置的设置方法,在输电线路施工建设现场,使用组合式旋转式地锚装置时,根据现场实际情况,先选择设置所述组合式旋转式地锚装置的合适位置,将组合式旋转式地锚装置的地锚旋转杆的部分插入地面,使地锚旋转杆下部绕设的旋转片能够接触地面,然后将推杆插入地锚旋转杆顶端的旋转叉孔中,推动推杆使地锚旋转杆受力旋转,将旋转的地锚的旋转片逐渐没入土中,当地锚旋转杆插入土中的深度满足要求后,将悬挂点挂环的朝向调整到应用的方向,之后在受力方向的正前方安装固定水平支杆,在悬挂点处挂环绑扎拉线;所述的组合式旋转式地锚装置包括地锚本体,地锚旋转杆、旋转片、水平杆、水平杆支杆、悬挂点挂环、旋转杆旋转叉孔;所述地锚本体包括被地锚旋转杆贯穿并将地锚旋转杆紧固于其内部的第一本体,及与第一本体一体式固定的第二本体;所述地锚旋转杆的上端部设置所述旋转杆旋转叉孔,地锚旋转杆埋入地下的部分被旋转片绕设;悬挂点挂环被固定设置在所述第一本体侧面的偏上部,第二本体与悬挂点挂环位于同侧,并低于悬挂点挂环的安装位置;水平杆连接在第二本体的偏下端部,水平杆支杆连接在水平杆与第二本体偏上部之间,且水平杆平齐于地面。9. Implement the setting method of the combined rotary ground anchor device for anchoring the temporary line in the construction of the transmission line project. When using the combined rotary ground anchor device at the construction site of the transmission line, according to the actual situation on the site, first select the setting method. For the proper position of the combined rotary ground anchor device, insert the part of the ground anchor rotating rod of the combined rotating ground anchor device into the ground, so that the rotating piece around the lower part of the ground anchor rotating rod can touch the ground, and then insert the push rod into the ground In the rotating fork hole at the top of the anchor rotating rod, push the push rod to rotate the ground anchor rotating rod under force, gradually submerge the rotating piece of the ground anchor into the soil, and when the depth of the ground anchor rotating rod inserted into the soil meets the requirements, the hanging The orientation of the point hanging ring is adjusted to the direction of application, and then a fixed horizontal support rod is installed directly in front of the direction of force, and the hanging ring is bound at the hanging point to tie the guy wire; the combined rotary ground anchor device includes a ground anchor body, a ground Anchor rotating rod, rotating piece, horizontal rod, horizontal rod support rod, suspension point hanging ring, rotating fork hole of rotating rod; The first body, and the second body integrally fixed with the first body; the upper end of the ground anchor rotating rod is provided with the rotating fork hole of the rotating rod, and the part of the ground anchor rotating rod buried in the ground is wound by a rotating piece; The hanging point hanging ring is fixedly arranged on the upper part of the side of the first body, the second body and the hanging point hanging ring are located on the same side, and lower than the installation position of the hanging point hanging ring; At the lower end, the horizontal rod is connected between the horizontal rod and the upper part of the second body, and the horizontal rod is flush with the ground.

所述的水平杆与水平支杆的连接处距离水平杆的前端面的距离占据水平杆的2/5。所述的所述的水平杆与水平支杆的之间的夹角为30°。在水平杆的前端部具有插入地面以支撑水平杆的水平杆固定杆。所述的水平杆固定杆距水平杆前端面的距离占据水平杆1/6~1/4。所述的悬挂点挂环为由不锈钢制成的挂环,并焊接于第二本体,且其内和/或外表面设置防滑纹。所述的悬挂点挂环为放线器。所述的水平杆具有两个,分别位于第二本体的两侧,并由水平杆支撑杆支撑以隔离。由此,本发明技术解决方案的上述组合式旋转式地锚装置,适用于砂土(中砂)、耕地土(硬塑性亚粘土)、黄土(硬塑性粘土)、强风化土(粘土加砾石) 等非岩石的地质条件,使用时通过下部的旋转杆插入地面,旋转杆上装有旋转片,与土层接触面积大,能够增加承载力;在地锚受力方向的前段设置水平支杆,能够大大增加地锚的水平承载力。在输电线路施工建设现场,使用这种组合式旋转式地锚装置时,要事先确定现场的土质情况,在砂土、耕土、黄土等土质条件下可以应用。根据现场实际情况,先选择设置地锚合适位置,将组合地锚下部的旋转杆插入地面一定的深度,使旋转杆端部的旋转片能够接触地面。然后将一根推杆插入旋转杆顶端的旋转叉孔中,由两人顺时针推动推杆使旋转杆受力旋转,将旋转地锚的旋转片逐渐没入土中。当旋转杆插入土中的深度满足要求后,将悬挂点挂环调整到应用的方向。之后在受力方向的正前方安装固定好水平支杆,并调整到适当的位置。就可以通过旋转杆上方的悬挂点处挂环绑扎拉线,这时组合式旋转式地锚全部设置完成。这种组合式旋转式地锚装置现场操作简单方便,可有效地提高工作效率,节省占地赔偿,且能够长期重复使用,在输电线路施工中能取得良好的使用效果。The distance between the connection between the horizontal bar and the horizontal support bar and the front end face of the horizontal bar occupies 2/5 of the horizontal bar. The included angle between the described horizontal bar and the horizontal support bar is 30°. There is a horizontal rod fixing rod inserted into the ground to support the horizontal rod at the front end of the horizontal rod. The distance between the horizontal rod fixing rod and the front end face of the horizontal rod occupies 1/6-1/4 of the horizontal rod. The hanging point hanging ring is a hanging ring made of stainless steel, and is welded to the second body, and the inner and/or outer surface is provided with anti-slip lines. The hanging ring at the suspension point is a wire payoff. There are two horizontal rods, which are respectively located on both sides of the second body, and are supported by horizontal rod support rods for isolation. Thus, the above-mentioned combined rotary ground anchor device of the technical solution of the present invention is suitable for sandy soil (medium sand), cultivated land soil (hard plastic loam), loess (hard plastic clay), strongly weathered soil (clay plus gravel) ) and other non-rock geological conditions, when in use, it is inserted into the ground through the lower rotating rod. The rotating rod is equipped with a rotating piece, which has a large contact area with the soil layer and can increase the bearing capacity; It can greatly increase the horizontal bearing capacity of ground anchors. At the construction site of the transmission line, when using this combined rotary ground anchor device, the soil condition of the site must be determined in advance, and it can be applied in sandy soil, cultivated soil, loess and other soil conditions. According to the actual situation on site, first select a suitable location for setting the ground anchor, and insert the rotating rod at the lower part of the combined ground anchor into the ground to a certain depth, so that the rotating piece at the end of the rotating rod can touch the ground. Then a push rod is inserted into the rotary fork hole at the top of the rotary rod, and two people push the push rod clockwise to make the rotary rod rotate under force, and the rotary piece of the rotary ground anchor is gradually submerged in the soil. When the depth of the rotating rod inserted into the soil meets the requirements, adjust the suspension point hanging ring to the direction of application. Then install and fix the horizontal strut right in front of the force direction, and adjust it to an appropriate position. Just can bind backguy wire by hanging loop at the hanging point place above the rotating rod, at this moment the combination type rotary ground anchor is all set and completed. The combined rotary ground anchor device is simple and convenient to operate on site, can effectively improve work efficiency, save land occupation compensation, and can be used repeatedly for a long time, and can achieve good results in power transmission line construction.

10.实施直线塔架空地线提升器的架空地线提升方法,使用直线塔架空地线提升器,在输电线路提升直线塔架空地线的作业时,先根据架空地线挂线点上方的角铁朝向固定所述提升器的横桥铁,横桥铁与直线塔通过拧紧提升器的压板并固定牢固,再调整横桥水平加长铁上可调丝杠的具体位置,将可调丝杠的下部的挂钩勾住架空地线,旋转可调丝杠把手以调紧丝杠,将架空地线调整到合适位置再安装架空地线的线夹,所述直线塔架空地线提升器,包括横扭头角铁组合、压板、横桥铁、横桥水平加长铁、可调丝杆;横扭头角铁组合位于架空地线挂线点上方并与直线塔固定,压板固定在横扭头角铁组合上,所述的角铁组合的一对角铁,各角铁的一角铁背朝下,两角铁的另一角铁背相向靠拢,所述的压板为阶梯状,其阶梯竖面适应于朝下的角铁背的高度设置,上阶梯横面固定在角铁的朝下的角铁背上,下阶梯横面固定在所述横桥铁上,使横桥铁与直线塔通过拧紧压板固定牢固;在横桥铁上设置至少两个横桥水平加长铁,所述横桥水平加长铁水平伸展出所述的横桥铁的部分连接用于调整架空地线竖直位置高度的所述可调丝杆,所述可调丝杠的下端部具有挂钩以勾接架空地线,所述横桥铁为水平铺设,且横桥水平加长铁是在其上表面固定的水平铺设的加长铁,横桥铁的轴线方向与横桥水平加长铁的轴线方向具有相互垂直关系,所述的可调丝杠安装在横桥水平加长铁伸展出横桥铁部分的端部,所述的横桥水平加长铁就有两个,并为对称于横扭头角铁组合设置。10. Implement the overhead ground wire lifting method of the straight tower overhead ground wire lifter. Use the straight tower overhead ground wire lifter. When lifting the straight tower overhead ground wire on the transmission line, first according to the angle above the overhead ground wire hanging point The iron faces the horizontal bridge iron on which the lifter is fixed, and the horizontal bridge iron and the straight tower are fixed firmly by tightening the pressure plate of the lifter, and then adjust the specific position of the adjustable screw on the horizontal extension iron of the horizontal bridge, and the adjustable screw The lower hook hooks the overhead ground wire, rotates the adjustable screw handle to tighten the screw, adjusts the overhead ground wire to a suitable position and then installs the clamp of the overhead ground wire. The linear tower overhead ground wire lifter includes a horizontal Twisted head angle iron combination, pressure plate, horizontal bridge iron, horizontal bridge horizontal extension iron, adjustable screw rod; the horizontal twisted head angle iron combination is located above the hanging point of the overhead ground wire and fixed with the straight tower, and the pressure plate is fixed on the horizontal twisted head angle iron combination , the pair of angle irons of the angle iron combination, one angle iron back of each angle iron faces downward, and the other angle iron back of the two angle irons is close to each other, the pressure plate is stepped, and the vertical surface of the step is adapted to face downward The height of the back of the angle iron is set, the upper step horizontal surface is fixed on the angle iron back facing downward, and the lower step horizontal surface is fixed on the horizontal bridge iron, so that the horizontal bridge iron and the straight tower are fixed firmly by tightening the pressure plate At least two horizontal extension irons of the cross bridge are set on the iron of the cross bridge, and the horizontal extension irons of the cross bridge horizontally extend out of the part of the iron of the cross bridge and are connected to the adjustable adjustment device for adjusting the vertical position height of the overhead ground wire Screw rod, the lower end of the adjustable screw rod has a hook to hook up the overhead ground wire, the horizontal bridge iron is laid horizontally, and the horizontally extended iron of the horizontal bridge is fixed on the upper surface of the horizontally laid elongated iron, and the horizontal bridge iron is laid horizontally. The axis direction of the bridge iron and the axis direction of the horizontal extension iron of the cross bridge have a mutually perpendicular relationship. There are just two irons, and they are arranged symmetrically to the combination of horizontally twisted head angle irons.

在所述的横桥铁上表面设置使横桥水平加长铁能沿其自身轴线方向移动的滑道,横桥水平加长铁滑动连接于滑道上。在所述的横桥铁上表面设置使横桥水平加长铁能沿横桥铁轴线方向移动的滑道,横桥水平加长铁滑动连接于滑道上。在输电线路提升直线杆塔架空地线的作业时,先根据架空地线挂线点上方的角铁朝向固定好提升器的横桥铁,横桥铁与铁塔通过拧紧提升器压板固定牢固。再调整横桥水平铁上可调丝杠的具体位置,将丝杠的下钩勾住架空地线,旋转丝杠把手调紧丝杠,将两端的架空地线调整到合适位置即可以安装架空地线的线夹。这种新型架空地线提升器现场操作简单方便,单人即可完成复杂的工作,可有效地节省作业时间,提高工作效率。同时可以降低施工作业的风险等级,提高作业的安全性。在输电线路施工中能够取得良好的应用效果。A slideway is arranged on the upper surface of the iron of the cross bridge so that the horizontally extended iron of the crossbridge can move along its own axis direction, and the horizontally extended iron of the crossbridge is slidably connected to the slideway. A slideway is arranged on the upper surface of the iron of the cross bridge to enable the horizontal extension iron of the cross bridge to move along the axial direction of the iron axis of the cross bridge, and the horizontal extension iron of the cross bridge is slidably connected to the slideway. When lifting the overhead ground wire of the straight pole tower on the transmission line, the angle iron above the hanging point of the overhead ground wire is directed towards the cross bridge iron with the lifter fixed, and the cross bridge iron and the iron tower are fixed firmly by tightening the lifter pressure plate. Then adjust the specific position of the adjustable screw on the horizontal iron of the cross bridge, hook the lower hook of the screw to the overhead ground wire, turn the handle of the screw to tighten the screw, and adjust the overhead ground wires at both ends to the appropriate position to install the overhead Ground clamp. This new type of overhead ground wire lifter is simple and convenient to operate on site, and a single person can complete complex work, which can effectively save operating time and improve work efficiency. At the same time, it can reduce the risk level of construction operations and improve the safety of operations. Good application effect can be obtained in transmission line construction.

11.实施电缆绕、放线装置的绕、放线方法,使用电缆绕、放线装置,由电机正、反转控制插排线绕、放线,在绕、放线前,将打开插接壳体打开,由插头线出口沿所述开口将插头移出插头线出口,并将插头线及插头固定在所述转轴,使得插排线放线或绕线时插头线随转轴转动;所述实施电缆绕、放线装置,包括转轴、壳体、插排线、插头线,所述的插排线、插头线有壳体上的开孔伸出壳体外侧,所述的插排线随转轴转动收、放线,所述的转轴枢接于电机,转轴被固定于壳体内部,其轴向为沿水平方向,所述插排线轴接于转轴,且插排线与插头线导通连接,并与插排线分别位于转轴的两端,由电机正、反转以对转轴正、反转控制,使插排线实现放线或绕线,且插排线放线或绕线时,所述插头线被固定于转轴以使其随转轴转动,所述的壳体为半封闭结构,其包括本体及插接壳体,插头线侧的部分壳体为插接壳体以可活动方式插接在所述本体上,于插排线放线或绕线前以打开插接壳体,使置于壳体外侧的插头被固定于转轴上以在插排线放线或绕线时插头线随转轴转动,在插排线侧设置插排线出口,在插头线侧设置插头线出口,所述的开口不为所述的插头或插座所穿过,所述的插头线出口附近的壳体壁上具有使插头线在其中移动以至插头线出口位置的开口,以使插头能被插头线出口所限位。11. Implement the winding and paying off method of the cable winding and paying off device. Use the cable winding and paying off device. The shell is opened, and the plug is moved out of the plug wire outlet along the opening along the plug wire outlet, and the plug wire and the plug are fixed on the rotating shaft, so that the plug wire rotates with the rotating shaft when the plug wire is unwound or wound; the implementation The cable winding and unwinding device includes a rotating shaft, a housing, a plug wire, and a plug wire. The plug wire and the plug wire have openings on the housing and protrude from the outside of the housing. The plug wire follows the shaft. Rotate to take in and pay out the wires, the shaft is pivotally connected to the motor, the shaft is fixed inside the housing, and its axial direction is along the horizontal direction, the plug-in cable shaft is connected to the shaft, and the plug-in cable is connected to the plug line , and are respectively located at both ends of the rotating shaft with the plug-in cable, and the forward and reverse rotation of the motor is used to control the forward and reverse rotation of the rotating shaft, so that the plug-in cable can be unwound or wound, and when the plug-in cable is unwound or wound, The plug wire is fixed on the rotating shaft so that it rotates with the rotating shaft. The housing is a semi-closed structure, which includes a body and a plug housing. Part of the housing on the side of the plug wire is a plug housing that can be moved Inserted on the body, open the plug-in housing before unwinding or winding the plug-in cable, so that the plug placed outside the shell is fixed on the rotating shaft so that the plug can be plugged in when the plug-in cable is unwound or wound. The wire rotates with the rotating shaft, and the plug wire outlet is set on the plug wire side, and the plug wire outlet is set on the plug wire side, the opening is not passed by the plug or socket, and the shell near the plug wire outlet The body wall has an opening in which the plug wire can move to the position of the outlet of the plug wire, so that the plug can be limited by the outlet of the plug wire.

实施可行型分析:电缆绕、放线装置的电缆轴对比手动式电缆轴,不仅在使用上方便快捷,而且在使用后的整理过程中省时省力,最重要的是能够有效地避免了电线回收中打结情况的发生,给二次专业工作带来了极大地便捷。电缆绕、放线装置电缆轴可广泛地应用于电力生产工作中,为移动式电源提供了便利。且经常使用电源的工作场所,可将电缆绕、放线装置电缆轴盘固定,电源线“哪里用,抻到哪里”,用完后自动回收,工作效率将会得到很大提升。Implementation feasibility analysis: Compared with the manual cable shaft, the cable shaft of the cable winding and pay-off device is not only convenient and quick to use, but also saves time and effort in the finishing process after use. The most important thing is that it can effectively avoid wire recycling. The occurrence of knotting in the middle has brought great convenience to the secondary professional work. The cable shaft of the cable winding and paying-off device can be widely used in power production work, which provides convenience for mobile power sources. And in the workplace where the power supply is often used, the cable winding and unwinding device can be fixed on the cable reel, and the power cord can be "stretched wherever it is used", and it will be automatically recycled after use, and the work efficiency will be greatly improved.

12.实施基于统一电力视频监控平台的海量视频高密度存储与快速检索方法,所述统一视频平台包括服务模块与快速浏览模块;快速浏览模块又包括视频检索子模块、视频快速浏览子模块、视频摘要浓缩子模块;服务模块,其从流媒体服务模块获取实时视频流数据并通过调用HDFS接口实现录像文件的分布式存储功能,应用终端通过平台管理服务实现历史录像文件检索,并通过集中存储服务获取存储的历史录像文件以实现录像回放和回放控制功能;集中存储服务模块根据预先所设置的存储策略实现事件存储、手动存储和定时存储,根据触发方式不同选择不同存储数据结果,以在有限存储空间上包括更多数量、更长时间摄像历史录像文件,并且集中存储服务模块对历史录像文件进行二次加工,使用以上方式实现高密度存储;快速浏览模块,其以视频浓缩和视频标签技术为手段以实现视频检索、视频快速浏览、视频摘要浓缩功能,并建立视频标签库,为智能分析提供视频图像数据源,使用以上方式实现快速浏览;12. Implement a mass video high-density storage and fast retrieval method based on a unified electric power video monitoring platform. The unified video platform includes a service module and a quick browsing module; the quick browsing module includes a video retrieval submodule, a video quick browsing submodule, a video Abstract enrichment sub-module; service module, which obtains real-time video streaming data from the streaming media service module and realizes the distributed storage function of video files by calling the HDFS interface. Obtain stored historical video files to realize video playback and playback control functions; the centralized storage service module realizes event storage, manual storage, and timing storage according to the preset storage strategy, and selects different storage data results according to different trigger methods. In terms of space, it includes more quantity and longer time recording historical video files, and the centralized storage service module performs secondary processing on historical video files, using the above methods to achieve high-density storage; the quick browsing module uses video concentration and video tagging technology as the basis Means to achieve video retrieval, video quick browsing, and video abstract condensing functions, and establish a video tag library to provide video image data sources for intelligent analysis, and use the above methods to achieve quick browsing;

所述统一视频监控平台,其构建在SGERP一体化信息平台之内,是一体化平台的重要组成部分,主要实现音视频信息的汇集、管理并分发给业务应用使用。The unified video monitoring platform is constructed within the SGERP integrated information platform, and is an important part of the integrated platform, which mainly realizes the collection, management and distribution of audio and video information to business applications.

所述统一视频监控平台,其总体构架包括业务架构、应用架构、数据架构、逻辑构架、物理构架、安全构架和集成构架;所述的业务构架用于执行发电应用、输电应用、变电应用、配电应用、信息通信应用、综合应用;所述应用构架用于执行支撑服务、应用功能、接入服务、调用服务;所述数据架构存储平台配置数据、平台监控数据、视频设备数据、视频信息数据,并用于执行数据分布及数据管理;所述逻辑构架用于执行协议交互、服务支撑、服务实现及服务管理;所述物理构架包括主机、存储、网络及软件;所述的安全构架用于实现数据安全、主机安全、应用安全、网络安全;所述集成构架包括标准前端监视系统、非标前端监视系统、标准视频采集设备、非标视频采集设备、消防、门禁、SCADA、输变电检测系统、环境监测系统,The overall framework of the unified video monitoring platform includes a business framework, an application framework, a data framework, a logical framework, a physical framework, a security framework and an integrated framework; Power distribution applications, information communication applications, and comprehensive applications; the application framework is used to execute support services, application functions, access services, and call services; the data architecture stores platform configuration data, platform monitoring data, video equipment data, and video information data, and is used to implement data distribution and data management; the logical framework is used to implement protocol interaction, service support, service realization and service management; the physical framework includes host, storage, network and software; the security framework is used for Realize data security, host security, application security, and network security; the integrated framework includes standard front-end monitoring system, non-standard front-end monitoring system, standard video acquisition equipment, non-standard video acquisition equipment, fire protection, access control, SCADA, power transmission and transformation detection systems, environmental monitoring systems,

所述统一视频监控平台,其业务构架包括平台运维管理模块、设备运维管理模块、资源调度模块、平台服务模块、平台应用展现模块、安全与审计模块;所述的平台运维管理模块用于用户与授权管理、平台运行管理、网络管理、设备配置管理;所述设备运维管理用于设备资源管理、设备云维护管理、设备质量检测管理、设备告警管理、非标设备协议转换、设备运行情况分析;所述资源调度模块用于资源实况管理、资源使用管理;所述的平台服务模块包括用户与授权管理、平台运行管理、外部系统联动、网络管理、设备配置管理、集中存储;所述的平台应用展现模块用于视频调阅、录像回放、本体视频播放、云镜控制、大屏展示、快速浏览;所述安全与审计模块用于日志管理、权限验证;The unified video monitoring platform has a business framework including a platform operation and maintenance management module, an equipment operation and maintenance management module, a resource scheduling module, a platform service module, a platform application display module, and a security and audit module; the platform operation and maintenance management module is used for For user and authorization management, platform operation management, network management, and device configuration management; the device operation and maintenance management is used for device resource management, device cloud maintenance management, device quality inspection management, device alarm management, non-standard device protocol conversion, device Operation status analysis; the resource scheduling module is used for resource live management and resource usage management; the platform service module includes user and authorization management, platform operation management, external system linkage, network management, equipment configuration management, and centralized storage; The platform application display module described above is used for video access, video playback, main body video playback, cloud mirror control, large-screen display, and quick browsing; the security and audit module is used for log management and authority verification;

所述统一视频监控平台,其逻辑构架包括展现层、业务逻辑层、通信协议层、基础支撑层;所述的展现层用于录像检索、快速浏览、录像回放、录像上传下载;所述的业务逻辑层用于实时录像管理、录像回放管理、录像下载管理、视频浓缩、任务管理、存储管理、快速浏览、视频转码;所述通信协议层包括SIP组件、RTP 组件、RTSP组件、HTTP组件;所述的基础支撑层包括HDFS分布式文件系统、 Hbase、MapReduce;Described unified video monitoring platform, its logic framework comprises presentation layer, business logic layer, communication protocol layer, basic support layer; Described presentation layer is used for video retrieval, quick browsing, video playback, video upload and download; Described business The logic layer is used for real-time video management, video playback management, video download management, video concentration, task management, storage management, quick browsing, and video transcoding; the communication protocol layer includes SIP components, RTP components, RTSP components, and HTTP components; Described basic supporting layer comprises HDFS distributed file system, Hbase, MapReduce;

所述统一视频监控平台,系统部署架构:省公司部署电网统一视频监控平台,并部署集中存储服务,存储服务基于Hadoop大数据平台,部署主要包括主节点、数据节点集群数据节点数目根据需要进行配置,第一层包括前端设备、路由器,由专用网络接入第二层路由器,所述第二层包括协议转换服务模块、路由器、集中存储服务模块、大数据平台,所述大数据平台包括主节点、数据节点,第二层通过网络接入第三层,所述第三层包括管理服务模块、流媒体/录像回放服务模块、通信服务模块、数据库服务、综合展现客户端、管理客户端。The unified video monitoring platform, system deployment architecture: the provincial company deploys a unified video monitoring platform for the power grid, and deploys centralized storage services. The storage services are based on the Hadoop big data platform. The deployment mainly includes master nodes, data node clusters, and the number of data nodes is configured as required , the first layer includes front-end equipment and routers, and the second layer router is connected to the private network. The second layer includes a protocol conversion service module, a router, a centralized storage service module, and a big data platform. The big data platform includes a master node 1. Data nodes, the second layer accesses the third layer through the network, and the third layer includes a management service module, a streaming media/video playback service module, a communication service module, a database service, a comprehensive presentation client, and a management client.

上述方案为了解决目前电力视频监控数据主要通过采用文件系统的方式分散存储于各前端,带来诸如数据容易丢失、无法集中统一运维管理、数据价值无法有效发挥、重要数据安全性难以有效保障、单位存储成本较高等系列问题。The above solution is to solve the problem that the current power video surveillance data is mainly stored in various front-ends by means of a file system, resulting in data such as easy loss, inability to centralize unified operation and maintenance management, ineffective use of data value, and difficulty in effectively ensuring the security of important data. A series of problems such as higher unit storage costs.

以上所述,仅为本发明创造较佳的具体实施方式,但本发明创造的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明创造披露的技术范围内,根据本发明创造的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明创造的保护范围之内。The above is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto, any person familiar with the technical field within the technical scope of the disclosure of the present invention, according to the present invention Any equivalent replacement or change of the created technical solution and its inventive concept shall be covered within the scope of protection of the present invention.

Claims (6)

1.一种GIS设备回路电阻测试辅助工具,其特征在于,包括:勾型线夹及绝缘杆,所述的绝缘杆与勾型线夹之间通过锯齿咬合型旋转接头连接,勾型线夹本体是用于夹接引线的弯曲形勾状绝缘体,在其内弯侧具有与引线接触的导电材质,作为测试线的电压线、电流线分别与所述导电材质电连接,并由勾型线夹本体的尾部引出。1. A GIS equipment loop resistance test auxiliary tool is characterized in that, comprising: a hook-type wire clamp and an insulating rod, the insulating rod and the hook-type wire clamp are connected by a sawtooth-type rotary joint, and the hook-type wire clamp The main body is a curved hook-shaped insulator for clamping the lead wire, and has a conductive material in contact with the lead wire on its inwardly bent side. The tail of the clip body is drawn out. 2.所述的锯齿咬合型旋转接头包括上杆、与上杆一体式连接的上盘体、下杆、与下杆一体式连接的下盘体,所述的上、下盘体具有贯穿以供穿心螺栓螺纹连接的螺纹孔,所述的上、下盘体相向设置且相向面具有锯齿面,两相向的锯齿面于穿心螺栓与所述螺纹孔螺纹连接以紧固限位时相互咬合,所述的上杆与勾型线夹固定连接,所述的下杆与绝缘杆固定连接。2. The sawtooth occlusal rotary joint includes an upper rod, an upper disc body integrally connected with the upper rod, a lower rod, and a lower disc body integrally connected with the lower rod. The upper and lower disc bodies have the following The threaded holes for the threaded connection of the through bolts, the upper and lower discs are arranged oppositely and have serrated surfaces on the opposite surfaces, and the two opposite serrated surfaces are connected to each other when the through bolts are threaded with the threaded holes for fastening and limiting snapping, the upper rod is fixedly connected with the hook type clamp, and the lower rod is fixedly connected with the insulating rod. 3.如权利要求2所述的GIS设备回路电阻测试辅助工具,其特征在于,所述的螺纹孔由穿心螺栓螺纹连接,并在穿心螺栓端部具有紧固穿心螺栓的蝶形螺母。3. GIS equipment loop resistance test auxiliary tool as claimed in claim 2, is characterized in that, described threaded hole is threaded by through-hole bolt, and has the wing nut of fastening through-bolt at the end of through-bolt . 4.如权利要求1所述的GIS设备回路电阻测试辅助工具,其特征在于,所述的绝缘杆为接扣式绝缘拉杆。4. The auxiliary tool for testing the loop resistance of GIS equipment according to claim 1, wherein the insulating rod is a buckle-type insulating pull rod. 5.如权利要求1所述的GIS设备回路电阻测试辅助工具,其特征在于,所述接扣式的结构,其包括两个分别位于不同安装段的绝缘杆端部的接扣,接扣扣接以固定两个不同的安装段的绝缘杆。5. GIS equipment loop resistance test auxiliary tool as claimed in claim 1, is characterized in that, the structure of described buckle type, it comprises two buckles respectively positioned at the end of the insulating rod of different installation section, buckle buckle Insulating poles attached to secure two different mounting sections. 6.一种电力施工实施方法,其特征在于,包括下述方法:6. An implementation method of electric power construction, characterized in that, comprising the following methods: (1)实施用于固定光缆的方法,包括如下步骤:(1) implement the method for fixing optical cable, comprise the steps: S1.选取中间带折页以折叠的铝合金材料的台面作为工作台,在工作台的四角固定可伸缩桌腿,所述的桌腿为弹簧折叠桌腿以支撑工作台,使桌腿与工作台能成九十度角折叠;S1. Select the table with folded aluminum alloy material in the middle as the workbench, and fix the retractable table legs at the four corners of the workbench. The table legs are folded by springs to support the workbench, so that the table legs are in line with the workbench. The table can be folded at a ninety-degree angle; S2.选取光缆夹持器为接续时固定光缆之用,工作台左右侧各安装一只光缆夹持器,夹持器两面都是平的以固定工作台台面,有V型槽的一面用于固定光缆,开口方向朝向工作人员;S2. Select the fiber optic cable holder to fix the fiber optic cable during connection. One fiber optic cable holder is installed on the left and right sides of the workbench. Both sides of the holder are flat to fix the workbench. The side with V-shaped groove is used for Fix the optical cable with the opening facing the staff; (2)实施使电缆井盖防雨防盗的方法,包括如下步骤:(2) implement the method for making the cable manhole cover rain-proof and anti-theft, comprising the following steps: S1.在电缆井盖不设置孔洞以防止雨水、雪水灌入电缆井;S1. No holes are set in the cable well cover to prevent rainwater and snow water from pouring into the cable well; S2.电缆井盖的井圈制作向上的凹槽形状,井盖下表面边缘制作成向下凸起,嵌入井圈凹槽;以防止雨水进入井内并用于防止井盖移位,防止井盖被盗;S2. The well ring of the cable manhole cover is made into an upward groove shape, and the edge of the lower surface of the manhole cover is made to protrude downward, embedded in the groove of the well ring; to prevent rainwater from entering the well and to prevent the well cover from shifting and preventing the well cover from being stolen; S3.电缆井盖的上表面中心制作成直径500mm的圆平面,用于和强磁铁配合以开启井盖,并在圆平面边缘制作直径120mm的圆形凹槽用于嵌入信息标牌井号,且还制作30mm的圆形凹槽用于嵌入井内信息芯片用于扫描读取信息以实现对电缆井电缆通道的管理;S3. The center of the upper surface of the cable manhole cover is made into a circular plane with a diameter of 500mm, which is used to cooperate with a strong magnet to open the manhole cover, and a circular groove with a diameter of 120mm is made on the edge of the circular plane for embedding the information sign number, and also made The 30mm circular groove is used to embed the information chip in the well for scanning and reading information to realize the management of the cable channel in the cable well; (3)实施制备输电杆塔通用式保护帽模板的方法,用厚度为1mm的钢板焊制长度最小规格为400mm的固定模板,另外焊制多个长度为100mm的拼接模板,拼接模板的数量随杆塔基础立桩面大小相应增加,所述的固定模板由两个相互垂直的平板连接而成,并在各所述平板的背向安装垂直板面的固定板,所述的拼接模板为平板,并且部分拼接模板具有垂直板面的固定板;第一固定模板的第一固定板与第一拼接模板的固定板通过螺栓连接,该第一拼接模板与一个以上的没有固定板的接模板拼接,并且拼接的最后一个拼接模板带有固定板,其为第二拼接模板,第二拼接模板通过其固定板与第二固定模板的第一平板的固定板通过螺栓连接,第二固定模板的第二平板的固定板与第三拼接板的固定板通过螺栓连接,该第三拼接模板与一个以上的没有固定板的接模板拼接,并且拼接的最后一个拼接模板带有固定板,其为第四拼接模板,第四拼接模板通过其固定板与第三固定模板的第一平板的固定板通过螺栓连接,以此连接方式,直至一带有固定板的拼接模板,其通过固定板与第一固定模板的第二固定板螺栓连接,以将固定模板与拼接模板围接成为空心正方体形状的保护帽模板,并将所述保护帽的棱角处通过弧形棱角模板条改为弧形;(3) Implement the method for preparing the universal protective cap formwork for transmission towers, use a steel plate with a thickness of 1mm to weld a fixed formwork with a minimum specification of 400mm in length, and weld a plurality of spliced formworks with a length of 100mm in addition, and the number of spliced formworks varies with the tower The size of the foundation pile surface increases accordingly, and the described fixed formwork is formed by connecting two mutually perpendicular flat plates, and a fixed plate on the vertical plate surface is installed on the back of each of the flat plates, and the described splicing formwork is a flat plate, and Part of the splicing formwork has a fixed plate with a vertical plate surface; the first fixed plate of the first fixed formwork is connected with the fixed plate of the first spliced formwork by bolts, and the first spliced formwork is spliced with more than one joint formwork without a fixed plate, and The last splicing template of the splicing has a fixing plate, which is the second splicing template, and the second splicing template is connected by bolts to the fixing plate of the first flat plate of the second fixed template through its fixing plate, and the second flat plate of the second fixing template The fixed plate and the fixed plate of the third spliced plate are connected by bolts, the third spliced formwork is spliced with more than one spliced formwork without fixed plate, and the last spliced formwork has a fixed plate, which is the fourth spliced formwork , the fourth splicing template is connected by bolts to the fixing plate of the first flat plate of the third fixed template through its fixing plate. The two fixing plates are connected by bolts, so that the fixing formwork and the splicing formwork are surrounded to form a protective cap formwork in the shape of a hollow cube, and the corners of the protective cap are changed into arcs by arc-shaped corner formwork strips; (4)实施电力项目施工中登杆塔防坠落的方法,在现有的安全带腰带上绑扎一根直径8mm的涤尼玛绳,绳上每间隔若干米安放一个铝合金快扣环,作业人员每登杆塔所述若干米就安装一个铝合金快扣环在主材上,如果作业人员失足,坠落高度控制在所述若干米以内,调整铝合金快扣环间隔距离,以控制坠落高度;铝合金快扣环与主材的连接方法为使用涤尼玛绳与主材用死结的方法连接,再将死结的一端用铝合金快扣环锁住,人员上下杆塔时铝合金快扣环统一扣在作业人员腰间;涤尼玛绳参数:铭牌标直径Φ8mm,瞬间接断力2400KG;铝合金快扣环参数:铭牌标瞬间破坏力8KN;(4) Implement the method of preventing falling from the pole tower in the construction of electric power projects. Bind a polyester Nima rope with a diameter of 8mm on the existing safety belt belt, and place an aluminum alloy quick buckle ring every several meters on the rope. Install an aluminum alloy quick buckle ring on the main material every several meters mentioned in the climbing tower. If the operator stumbles, the falling height is controlled within the mentioned several meters, and the distance between the aluminum alloy quick buckle rings is adjusted to control the falling height; The connection method between the alloy quick buckle ring and the main material is to use the polyester Nima rope to connect the main material with a dead knot, and then lock one end of the dead knot with an aluminum alloy quick buckle ring. At the worker's waist; polyester Nima rope parameters: nameplate diameter Φ8mm, instant breaking force 2400KG; aluminum alloy quick buckle ring parameters: nameplate instant destructive force 8KN; (5)实施电力领域中巡线无人机控制的方法,在巡线无人机的机体上安装一个支撑平台,支撑平台上安装电子控制设备和起吊舵机,巡线无人机起飞后通过遥控器控制起吊舵机的开合;(5) Implement the method for the control of the line inspection UAV in the electric power field, install a support platform on the body of the line inspection UAV, install electronic control equipment and lifting steering gear on the support platform, and pass through the line inspection UAV after taking off The remote control controls the opening and closing of the lifting servo; 支撑平台的安装方法:How to install the support platform: S1.加工碳纤维板,根据巡线无人机脚架所在位置对碳纤维板进行设计加工;S1. Process the carbon fiber board, design and process the carbon fiber board according to the position of the tripod of the line patrol drone; S2.将碳纤维板与巡线无人机本体安装好;S2. Install the carbon fiber board and the line patrol drone body; S3.碳纤维板上表面安装电子设备;S3. Mount electronic equipment on the surface of the carbon fiber board; S4.碳纤维板对地表面安装舵机;S4. The carbon fiber plate is installed on the surface of the steering gear; S5.巡线无人机起飞后舵机横梁在闭合状态下以牵引重物;S5. After the line patrol UAV takes off, the beam of the steering gear is closed to pull heavy objects; S6.地面人员通过遥控器控制舵机横梁水平运动以控制重物的松脱;S6. The ground personnel control the horizontal movement of the steering gear beam through the remote control to control the loosening of the heavy objects; (6)实施制作66kV-220kV对接卡簧式接地线线夹的方法,所述线夹包括相对设置的两个线夹夹板,所述线夹夹板包括一体式依次连接的尖部、槽部及夹持部,所述槽部的内相对面是C型夹口槽,所述的各侧夹口槽内具有用于夹持线路的卡簧,两个卡簧相向设置,且卡簧通过转轴轴接于C型夹口最高边缘点附近,所述的夹持部具有突出的铰接部,并在内部开槽,相对的两个夹持部的铰接部通过销钉铰接,且销钉位于弹簧内部,弹簧被紧压在所述铰接部的所述开槽内,按照上述线夹的结构进行装配;(6) Implement the method of making 66kV-220kV docking spring type ground wire clamp, the clamp includes two clamp splints arranged oppositely, and the clamp splint includes an integrally connected tip, groove and The clamping part, the inner opposite surface of the groove part is a C-shaped clamping groove, and there are clip springs for clamping the circuit in each of the side clipping grooves. The shaft is connected near the highest edge point of the C-shaped clamp. The clamping part has a protruding hinge part and is slotted inside. The hinge parts of the two opposite clamping parts are hinged by pins, and the pins are located inside the spring. The spring is tightly pressed in the slot of the hinge part, and assembled according to the structure of the above-mentioned wire clamp; (7)实施GIS设备回路电阻测试辅助工具的制作方法,其特征在于,所述辅助工具包括:勾型线夹及绝缘杆,所述的绝缘杆与勾型线夹之间通过锯齿咬合型旋转接头连接,勾型线夹本体是用于夹接引线的弯曲形勾状绝缘体,在其内弯侧具有与引线接触的导电材质,作为测试线的电压线、电流线分别与所述导电材质电连接,并由勾型线夹本体的尾部引出;所述的锯齿咬合型旋转接头包括上杆、与上杆一体式连接的上盘体、下杆、与下杆一体式连接的下盘体,所述的上、下盘体具有贯穿以供穿心螺栓螺纹连接的螺纹孔,所述的上、下盘体相向设置且相向面具有锯齿面,两相向的锯齿面于穿心螺栓与所述螺纹孔螺纹连接以紧固限位时相互咬合,所述的上杆与勾型线夹固定连接,所述的下杆与绝缘杆固定连接;所述的螺纹孔由穿心螺栓螺纹连接,并在穿心螺栓端部具有紧固穿心螺栓的蝶形螺母,所述的绝缘杆为接扣式绝缘拉杆;按照上述辅助工具的结构进行装配;(7) implement the manufacture method of GIS equipment loop resistance test auxiliary tool, it is characterized in that, described auxiliary tool comprises: hook type wire clip and insulating rod, between described insulating rod and hook type wire clip, rotate by sawtooth bite type The hook-shaped clamp body is a curved hook-shaped insulator used to clamp the lead wire, and has a conductive material in contact with the lead wire on its inner curved side. The voltage line and current line used as the test line are respectively connected to the conductive material. connected, and lead out from the tail of the hook-type clamp body; the saw-toothed occlusal rotary joint includes an upper rod, an upper disc body integrally connected with the upper rod, a lower rod, and a lower disc body integrally connected with the lower rod, The upper and lower disc bodies have threaded holes through which the through bolts are threaded. The upper and lower disc bodies are oppositely arranged and have serrated surfaces on the opposite surfaces. The threaded holes are threaded to engage each other when tightening the limit, the upper rod is fixedly connected with the hook clamp, and the lower rod is fixedly connected with the insulating rod; the threaded holes are threadedly connected by through-hole bolts, and At the end of the through-bolt, there is a wing nut for fastening the through-bolt, and the insulating rod is a buckle-type insulating pull rod; it is assembled according to the structure of the above-mentioned auxiliary tool; (8)实施便携式变电站设备除雪机的制作方法,所述除雪机包括发动机、与发动机的输出连接的软轴,所述的软轴与传动轴连接,传动轴与旋转毛刷连接以驱动旋转毛刷旋转,所述的传动轴置于绝缘杆内部,绝缘杆下端部为手柄,所述的绝缘杆为玻璃钢绝缘杆,所述的传动轴为玻璃钢绝缘传动轴,在旋转毛刷的下方安装有硅橡胶防水伞裙,所述的硅橡胶防水伞裙位于绝缘杆上端面的上方,所述的软轴连接在发动机与传动轴之间,所述的绝缘杆为玻璃钢制成,且其表面涂刷云母粉和/或聚四氟乙烯涂层;按照上述除雪机的结构进行装配;(8) Implement the manufacturing method of portable substation equipment snow remover, described snow remover comprises motor, the flexible shaft that is connected with the output of motor, described flexible shaft is connected with transmission shaft, and transmission shaft is connected with rotating brush to drive rotating brush The brush rotates, the transmission shaft is placed inside the insulating rod, the lower end of the insulating rod is a handle, the insulating rod is a fiberglass insulating rod, the transmission shaft is a fiberglass insulating transmission shaft, and a Silicone rubber waterproof umbrella skirt, the silicone rubber waterproof umbrella skirt is located above the upper end surface of the insulating rod, the flexible shaft is connected between the engine and the transmission shaft, the insulating rod is made of glass fiber reinforced plastic, and its surface is coated with Brush with mica powder and/or PTFE coating; assemble according to the structure of the snow blower above; (9)实施输电线路工程建设中锚固临时线路的组合式旋转式地锚装置的设置方法,在输电线路施工建设现场,使用组合式旋转式地锚装置时,根据现场实际情况,先选择设置所述组合式旋转式地锚装置的合适位置,将组合式旋转式地锚装置的地锚旋转杆的部分插入地面,使地锚旋转杆下部绕设的旋转片能够接触地面,然后将推杆插入地锚旋转杆顶端的旋转叉孔中,推动推杆使地锚旋转杆受力旋转,将旋转的地锚的旋转片逐渐没入土中,当地锚旋转杆插入土中的深度满足要求后,将悬挂点挂环的朝向调整到应用的方向,之后在受力方向的正前方安装固定水平支杆,在悬挂点处挂环绑扎拉线;所述的组合式旋转式地锚装置包括地锚本体,地锚旋转杆、旋转片、水平杆、水平杆支杆、悬挂点挂环、旋转杆旋转叉孔;所述地锚本体包括被地锚旋转杆贯穿并将地锚旋转杆紧固于其内部的第一本体,及与第一本体一体式固定的第二本体;所述地锚旋转杆的上端部设置所述旋转杆旋转叉孔,地锚旋转杆埋入地下的部分被旋转片绕设;悬挂点挂环被固定设置在所述第一本体侧面的偏上部,第二本体与悬挂点挂环位于同侧,并低于悬挂点挂环的安装位置;水平杆连接在第二本体的偏下端部,水平杆支杆连接在水平杆与第二本体偏上部之间,且水平杆平齐于地面;(9) Implement the setting method of the combined rotary ground anchor device for anchoring the temporary line in the construction of the transmission line project. When using the combined rotary ground anchor device at the construction site of the transmission line, according to the actual situation on the site, first select the setting method. Describe the proper position of the combined rotary ground anchor device. Insert the part of the ground anchor rotating rod of the combined rotating ground anchor device into the ground, so that the rotating piece around the lower part of the ground anchor rotating rod can contact the ground, and then insert the push rod into the ground. In the rotating fork hole at the top of the ground anchor rotating rod, push the push rod to rotate the ground anchor rotating rod under force, and gradually sink the rotating piece of the ground anchor into the soil. After the depth of the ground anchor rotating rod inserted into the soil meets the requirements, insert The direction of the hanging ring at the suspension point is adjusted to the direction of application, and then a fixed horizontal support rod is installed directly in front of the direction of force, and the hanging ring is bound at the hanging point. The guy wire; the combined rotary ground anchor device includes a ground anchor body, Ground anchor rotating rod, rotating piece, horizontal rod, horizontal rod support rod, suspension point hanging ring, rotating fork hole of rotating rod; The first body and the second body integrally fixed with the first body; the upper end of the ground anchor rotating rod is provided with the rotating fork hole of the rotating rod, and the part of the ground anchor rotating rod buried in the ground is surrounded by a rotating piece The hanging point hanging ring is fixedly arranged on the upper part of the side of the first body, the second body and the hanging point hanging ring are located on the same side, and lower than the installation position of the hanging point hanging ring; the horizontal bar is connected to the second body At the lower end, the horizontal rod is connected between the horizontal rod and the upper part of the second body, and the horizontal rod is flush with the ground; (10)实施直线塔架空地线提升器的架空地线提升方法,使用直线塔架空地线提升器,在输电线路提升直线塔架空地线的作业时,先根据架空地线挂线点上方的角铁朝向固定所述提升器的横桥铁,横桥铁与直线塔通过拧紧提升器的压板并固定牢固,再调整横桥水平加长铁上可调丝杠的具体位置,将可调丝杠的下部的挂钩勾住架空地线,旋转可调丝杠把手以调紧丝杠,将架空地线调整到合适位置再安装架空地线的线夹,所述直线塔架空地线提升器,包括横扭头角铁组合、压板、横桥铁、横桥水平加长铁、可调丝杆;横扭头角铁组合位于架空地线挂线点上方并与直线塔固定,压板固定在横扭头角铁组合上,所述的角铁组合的一对角铁,各角铁的一角铁背朝下,两角铁的另一角铁背相向靠拢,所述的压板为阶梯状,其阶梯竖面适应于朝下的角铁背的高度设置,上阶梯横面固定在角铁的朝下的角铁背上,下阶梯横面固定在所述横桥铁上,使横桥铁与直线塔通过拧紧压板固定牢固;在横桥铁上设置至少两个横桥水平加长铁,所述横桥水平加长铁水平伸展出所述的横桥铁的部分连接用于调整架空地线竖直位置高度的所述可调丝杆,所述可调丝杠的下端部具有挂钩以勾接架空地线,所述横桥铁为水平铺设,且横桥水平加长铁是在其上表面固定的水平铺设的加长铁,横桥铁的轴线方向与横桥水平加长铁的轴线方向具有相互垂直关系,所述的可调丝杠安装在横桥水平加长铁伸展出横桥铁部分的端部,所述的横桥水平加长铁就有两个,并为对称于横扭头角铁组合设置;(10) Implement the overhead ground wire lifting method of the straight tower overhead ground wire lifter. Use the straight tower overhead ground wire lifter. The angle iron faces the horizontal bridge iron on which the lifter is fixed, and the horizontal bridge iron and the straight tower are fixed firmly by tightening the pressure plate of the lifter, and then adjust the specific position of the adjustable screw on the horizontal extension iron of the horizontal bridge, and the adjustable screw The lower part of the hook hooks the overhead ground wire, rotates the adjustable screw handle to tighten the screw, adjusts the overhead ground wire to a suitable position and then installs the clamp of the overhead ground wire. The linear tower overhead ground wire lifter includes Horizontal twist head angle iron combination, pressure plate, cross bridge iron, horizontal bridge horizontal extension iron, adjustable screw rod; horizontal twist head angle iron combination is located above the hanging point of the overhead ground wire and fixed with the straight tower, and the pressure plate is fixed on the horizontal twist head angle iron combination Above, the pair of angle irons in the angle iron combination, one angle iron back of each angle iron faces down, and the other angle iron back of the two angle irons is close to each other. The pressure plate is stepped, and the vertical surface of the step is suitable for facing The height of the lower angle iron back is set, the upper ladder cross is fixed on the angle iron facing downward, and the lower ladder cross is fixed on the horizontal bridge iron, so that the horizontal bridge iron and the straight tower are fixed by tightening the pressure plate Firm; At least two horizontal extension irons of the cross bridge are set on the iron of the cross bridge, and the horizontal extension irons of the horizontal bridge extend out of the part of the iron of the cross bridge and are connected to the movable part for adjusting the vertical position height of the overhead ground wire Adjusting the screw, the lower end of the adjustable screw has a hook to hook up the overhead ground wire, the horizontal bridge iron is laid horizontally, and the horizontally extended iron of the horizontal bridge is a horizontally laid extended iron fixed on its upper surface, The axial direction of the iron of the cross bridge and the axial direction of the horizontal extension iron of the cross bridge have a mutually perpendicular relationship. There are two extension irons, and they are set symmetrically to the combination of horizontal twisted angle irons; (11)实施电缆绕、放线装置的绕、放线方法,使用电缆绕、放线装置,由电机正、反转控制插排线绕、放线,在绕、放线前,打开插接壳体,由插头线出口沿开口将插头移出插头线出口,并将插头线及插头固定在所述转轴,使得插排线放线或绕线时插头线随转轴转动;所述实施电缆绕、放线装置,包括转轴、壳体、插排线、插头线,所述的插排线、插头线有壳体上的开孔伸出壳体外侧,所述的插排线随转轴转动收、放线,所述的转轴枢接于电机,转轴被固定于壳体内部,其轴向为沿水平方向,所述插排线轴接于转轴,且插排线与插头线导通连接,并与插排线分别位于转轴的两端,由电机正、反转以对转轴正、反转控制,使插排线实现放线或绕线,且插排线放线或绕线时,所述插头线被固定于转轴以使其随转轴转动,所述的壳体为半封闭结构,其包括本体及插接壳体,插头线侧的部分壳体为插接壳体以可活动方式插接在所述本体上,于插排线放线或绕线前以打开插接壳体,使置于壳体外侧的插头被固定于转轴上以在插排线放线或绕线时插头线随转轴转动,在插排线侧设置插排线出口,在插头线侧设置插头线出口,所述的开口不为所述的插头或插座所穿过,所述的插头线出口附近的壳体壁上具有使插头线在其中移动以至插头线出口位置的开口,以使插头能被插头线出口所限位;(11) Implement the winding and paying off method of the cable winding and paying off device, use the cable winding and paying off device, and control the winding and paying off of the plug and cable by the forward and reverse rotation of the motor. Before winding and paying off, open the plug The shell moves the plug out of the plug wire outlet along the opening along the plug wire outlet, and fixes the plug wire and the plug on the rotating shaft, so that the plug wire rotates with the rotating shaft when the plug wire is unwound or wound; the implementation of cable winding, The wire pay-off device includes a rotating shaft, a housing, a plug wire, and a plug wire. The plug wire and the plug wire have openings on the housing and protrude from the outside of the housing. The plug wire rotates with the shaft to retract, Paying off the wires, the rotating shaft is pivotally connected to the motor, the rotating shaft is fixed inside the housing, and its axial direction is along the horizontal direction, the plug-in and discharge cable shaft is connected to the rotating shaft, and the plug-in and discharge cables are conductively connected to the plug wires, and are connected to the The plug-in cable is located at both ends of the rotating shaft, and the forward and reverse rotation of the motor is used to control the forward and reverse rotation of the rotating shaft, so that the plug-in cable can be unwound or wound, and when the plug-in cable is unwound or wound, the plug The wire is fixed on the rotating shaft so that it rotates with the rotating shaft. The housing is a semi-closed structure, which includes a main body and a plug-in housing. On the body, the plug-in case is opened before the cable is unwound or wound, so that the plug placed outside the case is fixed on the shaft so that the plug line follows the shaft when the plug-in line is unwound or wound. Rotate, set the plug-in cable outlet on the side of the plug-in cable, and set the plug-line outlet on the plug-line side, the opening is not passed by the plug or socket, and the housing wall near the plug-line outlet Having an opening in which the plug wire moves to the position of the plug wire outlet so that the plug can be restrained by the plug wire outlet; (12)实施基于统一电力视频监控平台的海量视频高密度存储与快速检索方法,所述统一视频平台包括服务模块与快速浏览模块;快速浏览模块又包括视频检索子模块、视频快速浏览子模块、视频摘要浓缩子模块;服务模块,其从流媒体服务模块获取实时视频流数据并通过调用HDFS接口实现录像文件的分布式存储功能,应用终端通过平台管理服务实现历史录像文件检索,并通过集中存储服务获取存储的历史录像文件以实现录像回放和回放控制功能;集中存储服务模块根据预先所设置的存储策略实现事件存储、手动存储和定时存储,根据触发方式不同选择不同存储数据结果,以在有限存储空间上包括更多数量、更长时间摄像历史录像文件,并且集中存储服务模块对历史录像文件进行二次加工,使用以上方式实现高密度存储;快速浏览模块,其以视频浓缩和视频标签技术为手段以实现视频检索、视频快速浏览、视频摘要浓缩功能,并建立视频标签库,为智能分析提供视频图像数据源,使用以上方式实现快速浏览;(12) Implement a massive video high-density storage and fast retrieval method based on a unified power video monitoring platform, the unified video platform includes a service module and a quick browsing module; the quick browsing module includes a video retrieval submodule, a video quick browsing submodule, Video summary enrichment sub-module; service module, which obtains real-time video stream data from the streaming media service module and realizes the distributed storage function of video files by calling the HDFS interface. The service obtains the stored historical video files to realize video playback and playback control functions; the centralized storage service module realizes event storage, manual storage, and timing storage according to the preset storage strategy, and selects different storage data results according to different triggering methods. The storage space includes a larger number of historical video files for longer periods of time, and the centralized storage service module performs secondary processing on the historical video files, using the above methods to achieve high-density storage; the quick browsing module uses video concentration and video tagging technology As a means to realize video retrieval, video quick browsing, and video abstract condensing functions, and establish a video tag library to provide video image data sources for intelligent analysis, and use the above methods to achieve quick browsing; 所述统一视频监控平台主要实现音视频信息的汇集、管理并分发给业务应用使用。The unified video monitoring platform mainly realizes the collection, management and distribution of audio and video information to business applications.
CN201710995078.5A 2017-10-23 2017-10-23 GIS device loop resistance tests auxiliary tool and power construction implementation Pending CN108051616A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710995078.5A CN108051616A (en) 2017-10-23 2017-10-23 GIS device loop resistance tests auxiliary tool and power construction implementation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710995078.5A CN108051616A (en) 2017-10-23 2017-10-23 GIS device loop resistance tests auxiliary tool and power construction implementation

Publications (1)

Publication Number Publication Date
CN108051616A true CN108051616A (en) 2018-05-18

Family

ID=62118765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710995078.5A Pending CN108051616A (en) 2017-10-23 2017-10-23 GIS device loop resistance tests auxiliary tool and power construction implementation

Country Status (1)

Country Link
CN (1) CN108051616A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109066470A (en) * 2018-09-18 2018-12-21 国网江苏省电力有限公司镇江供电分公司 Insulate branch-cut bridge device
CN109116120A (en) * 2018-10-10 2019-01-01 国网河南省电力公司济源供电公司 A kind of GIS loop resistance test device
CN110988406A (en) * 2019-11-30 2020-04-10 国网河北省电力有限公司沧州供电分公司 Insulating rod with test wire safety belt
CN111456523A (en) * 2020-04-08 2020-07-28 贵州电网有限责任公司 Multipurpose tool for binding power transmission line
CN111614010A (en) * 2020-05-12 2020-09-01 中国长江电力股份有限公司 500kV Welded GIL Pipeline Busbar Decomposition Maintenance Method
CN113884715A (en) * 2021-10-26 2022-01-04 广东电网有限责任公司 GIS equipment loop resistance test appurtenance
CN115308444A (en) * 2022-07-15 2022-11-08 华能聊城热电有限公司 Special auxiliary tool for measuring insulation resistance of high-voltage equipment
CN115389876A (en) * 2022-07-29 2022-11-25 国网江苏省电力有限公司电力科学研究院 Integrated intelligent comprehensive tester for spacer equipment and testing method
CN117347700A (en) * 2023-12-05 2024-01-05 苏州华天国科电力科技有限公司 Broadband transient voltage measuring and recording instrument based on non-contact optical sensor
KR102965982B1 (en) 2024-06-28 2026-05-18 한국전력공사 Sign plate device for electric wire

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2543396Y (en) * 2001-04-04 2003-04-09 徐文澄 Flexible axle frame type high-voltage electrified cleaner
CN2581520Y (en) * 2002-11-12 2003-10-22 胡立中 Composite fibre manhole cover
CN201904568U (en) * 2010-10-29 2011-07-20 山西省电力公司晋中供电分公司 Overhead ground wire lifter
CN103293380A (en) * 2013-05-31 2013-09-11 国家电网公司 Loop Resistance Testing Lightweight Composite Insulated Rods
CN204389542U (en) * 2014-12-18 2015-06-10 国家电网公司 High-altitude converting equipment verification junction pole
CN204387075U (en) * 2015-01-06 2015-06-10 国家电网公司 Can assembled protective cap Sheet Steel Form
CN204679527U (en) * 2015-06-08 2015-09-30 国家电网公司 Telescopic high altitude test wire connector
CN105133609A (en) * 2015-09-29 2015-12-09 贵州电力设计研究院 Cone penetration test reaction device comprising variable-diameter spiral ground anchors and force exerting disc
CN204947461U (en) * 2015-09-15 2016-01-06 国网黄石供电公司运维检修部(检修分公司) A kind of large span cross-arm jig assembly
CN105353702A (en) * 2015-11-17 2016-02-24 国家电网公司 High voltage equipment intelligent monitoring system
CN205176323U (en) * 2015-11-09 2016-04-20 国网宁夏电力公司固原供电公司 Portable optical cable fusion operation panel
CN205452560U (en) * 2016-03-24 2016-08-10 南京苏秦电力设备安装有限公司 Argon arc welding machine land used fastener
CN205488877U (en) * 2016-03-07 2016-08-17 林旭亮 Cable junction line spooler
CN205982338U (en) * 2016-09-14 2017-02-22 国家电网公司 Telescopic termination that electric test used
CN106861079A (en) * 2015-12-10 2017-06-20 朱森 A kind of safety rope for cat ladder
CN106897295A (en) * 2015-12-17 2017-06-27 国网智能电网研究院 A kind of transmission line of electricity monitor video distributed search method based on Hadoop
CN107140212A (en) * 2017-05-22 2017-09-08 中国原子能科学研究院 A kind of throwing device on unmanned vehicle
CN207067250U (en) * 2017-06-09 2018-03-02 国网辽宁省电力有限公司本溪供电公司 A kind of GIS device loop resistance tests aid

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2543396Y (en) * 2001-04-04 2003-04-09 徐文澄 Flexible axle frame type high-voltage electrified cleaner
CN2581520Y (en) * 2002-11-12 2003-10-22 胡立中 Composite fibre manhole cover
CN201904568U (en) * 2010-10-29 2011-07-20 山西省电力公司晋中供电分公司 Overhead ground wire lifter
CN103293380A (en) * 2013-05-31 2013-09-11 国家电网公司 Loop Resistance Testing Lightweight Composite Insulated Rods
CN204389542U (en) * 2014-12-18 2015-06-10 国家电网公司 High-altitude converting equipment verification junction pole
CN204387075U (en) * 2015-01-06 2015-06-10 国家电网公司 Can assembled protective cap Sheet Steel Form
CN204679527U (en) * 2015-06-08 2015-09-30 国家电网公司 Telescopic high altitude test wire connector
CN204947461U (en) * 2015-09-15 2016-01-06 国网黄石供电公司运维检修部(检修分公司) A kind of large span cross-arm jig assembly
CN105133609A (en) * 2015-09-29 2015-12-09 贵州电力设计研究院 Cone penetration test reaction device comprising variable-diameter spiral ground anchors and force exerting disc
CN205176323U (en) * 2015-11-09 2016-04-20 国网宁夏电力公司固原供电公司 Portable optical cable fusion operation panel
CN105353702A (en) * 2015-11-17 2016-02-24 国家电网公司 High voltage equipment intelligent monitoring system
CN106861079A (en) * 2015-12-10 2017-06-20 朱森 A kind of safety rope for cat ladder
CN106897295A (en) * 2015-12-17 2017-06-27 国网智能电网研究院 A kind of transmission line of electricity monitor video distributed search method based on Hadoop
CN205488877U (en) * 2016-03-07 2016-08-17 林旭亮 Cable junction line spooler
CN205452560U (en) * 2016-03-24 2016-08-10 南京苏秦电力设备安装有限公司 Argon arc welding machine land used fastener
CN205982338U (en) * 2016-09-14 2017-02-22 国家电网公司 Telescopic termination that electric test used
CN107140212A (en) * 2017-05-22 2017-09-08 中国原子能科学研究院 A kind of throwing device on unmanned vehicle
CN207067250U (en) * 2017-06-09 2018-03-02 国网辽宁省电力有限公司本溪供电公司 A kind of GIS device loop resistance tests aid

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109066470A (en) * 2018-09-18 2018-12-21 国网江苏省电力有限公司镇江供电分公司 Insulate branch-cut bridge device
CN109116120A (en) * 2018-10-10 2019-01-01 国网河南省电力公司济源供电公司 A kind of GIS loop resistance test device
CN110988406A (en) * 2019-11-30 2020-04-10 国网河北省电力有限公司沧州供电分公司 Insulating rod with test wire safety belt
CN111456523A (en) * 2020-04-08 2020-07-28 贵州电网有限责任公司 Multipurpose tool for binding power transmission line
CN111614010A (en) * 2020-05-12 2020-09-01 中国长江电力股份有限公司 500kV Welded GIL Pipeline Busbar Decomposition Maintenance Method
CN113884715A (en) * 2021-10-26 2022-01-04 广东电网有限责任公司 GIS equipment loop resistance test appurtenance
CN113884715B (en) * 2021-10-26 2023-07-21 广东电网有限责任公司 An Auxiliary Tool for GIS Equipment Loop Resistance Test
CN115308444A (en) * 2022-07-15 2022-11-08 华能聊城热电有限公司 Special auxiliary tool for measuring insulation resistance of high-voltage equipment
CN115389876A (en) * 2022-07-29 2022-11-25 国网江苏省电力有限公司电力科学研究院 Integrated intelligent comprehensive tester for spacer equipment and testing method
CN117347700A (en) * 2023-12-05 2024-01-05 苏州华天国科电力科技有限公司 Broadband transient voltage measuring and recording instrument based on non-contact optical sensor
CN117347700B (en) * 2023-12-05 2024-02-09 苏州华天国科电力科技有限公司 Broadband transient voltage measuring and recording instrument based on non-contact optical sensor
KR102965982B1 (en) 2024-06-28 2026-05-18 한국전력공사 Sign plate device for electric wire

Similar Documents

Publication Publication Date Title
CN107887836A (en) Tangent tower overhead-groundwire lifter and its aerial earth wire method for improving, power construction implementation
CN108204138A (en) Portable 10kV ring main units construction operation rain-proof shelter and power construction implementation
CN108288777A (en) 66kV-220kV docks circlip type earthing wire clip and power construction implementation
CN107800063A (en) Portable transformer substation equipment snow breaker and power construction implementation
CN107968930A (en) The storage of massive video high density and method for quickly retrieving and power construction implementation based on unified video monitoring platform
CN104158120B (en) Ground wire lifter for high-tension transmission line
CN107979021A (en) Work transmission line anchors the rotatable ground anchorage of combination type rotating and setting, power construction implementation of temporary line in building
CN107036654B (en) Overhead transmission conductor windage yaw characteristic monitoring system, testing method and device
CN108054596A (en) Cable is around, actinobacillus device and method, power construction implementation
CN105932601B (en) Disconnected strand of overhead grounding wire method for repairing and mending
CN205928543U (en) Pole overhauls platform
CN205046926U (en) Join in marriage net overhead line and prevent wind draw off mechanism
CN105356371A (en) Same-tower multi-loop power transmission line strain insulator string electrification replacing method and device
CN204481391U (en) A kind of replacing double bundle conductor conductor spacer specific purpose tool
CN203760908U (en) Cement pole crossarm installation tool
CN103236656B (en) Column suspension type crossing structure and operating method thereof
CN104265067A (en) Multifunctional safety rail
CN201859587U (en) Erecting electric pole model for training
CN101378153A (en) Diverter for grounding wire
CN206116598U (en) Lever apparatus is embraced to height -adjustable mobile antenna
CN204633222U (en) Reverse bowl head spring catch replacer
CN205442567U (en) Steel -pipe pole operation platform
CN205046927U (en) Improved generation is joined in marriage net overhead line and is prevent wind draw off mechanism
CN204186137U (en) Multifunctional safe fence
CN218970722U (en) Building protection network that stability is good

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180518

RJ01 Rejection of invention patent application after publication