CN107979021A - Work transmission line anchors the rotatable ground anchorage of combination type rotating and setting, power construction implementation of temporary line in building - Google Patents
Work transmission line anchors the rotatable ground anchorage of combination type rotating and setting, power construction implementation of temporary line in building Download PDFInfo
- Publication number
- CN107979021A CN107979021A CN201710993236.3A CN201710993236A CN107979021A CN 107979021 A CN107979021 A CN 107979021A CN 201710993236 A CN201710993236 A CN 201710993236A CN 107979021 A CN107979021 A CN 107979021A
- Authority
- CN
- China
- Prior art keywords
- swingle
- earth anchor
- bar
- wire
- video
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 66
- 238000010276 construction Methods 0.000 title claims abstract description 46
- 239000012634 fragment Substances 0.000 claims abstract description 27
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 102
- 238000007726 management method Methods 0.000 claims description 54
- 229910052742 iron Inorganic materials 0.000 claims description 50
- 238000000034 method Methods 0.000 claims description 44
- 238000003780 insertion Methods 0.000 claims description 31
- 230000037431 insertion Effects 0.000 claims description 31
- 229910000838 Al alloy Inorganic materials 0.000 claims description 28
- 230000001681 protective effect Effects 0.000 claims description 25
- 239000000463 material Substances 0.000 claims description 24
- 238000003860 storage Methods 0.000 claims description 23
- 238000009434 installation Methods 0.000 claims description 21
- 239000002689 soil Substances 0.000 claims description 21
- 238000012360 testing method Methods 0.000 claims description 21
- 230000003287 optical effect Effects 0.000 claims description 20
- 238000012544 monitoring process Methods 0.000 claims description 19
- 239000011152 fibreglass Substances 0.000 claims description 15
- 229910000831 Steel Inorganic materials 0.000 claims description 13
- 239000010959 steel Substances 0.000 claims description 13
- 241000606750 Actinobacillus Species 0.000 claims description 12
- 239000010445 mica Substances 0.000 claims description 12
- 229910052618 mica group Inorganic materials 0.000 claims description 12
- 238000003825 pressing Methods 0.000 claims description 12
- 238000000576 coating method Methods 0.000 claims description 11
- 239000000843 powder Substances 0.000 claims description 11
- 238000004080 punching Methods 0.000 claims description 11
- 229920000049 Carbon (fiber) Polymers 0.000 claims description 10
- 239000004917 carbon fiber Substances 0.000 claims description 10
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 claims description 10
- 238000004804 winding Methods 0.000 claims description 10
- 239000011248 coating agent Substances 0.000 claims description 9
- 230000005611 electricity Effects 0.000 claims description 8
- 238000005516 engineering process Methods 0.000 claims description 8
- 238000004891 communication Methods 0.000 claims description 7
- 238000003032 molecular docking Methods 0.000 claims description 7
- 229920002430 Fibre-reinforced plastic Polymers 0.000 claims description 6
- 235000005121 Sorbus torminalis Nutrition 0.000 claims description 6
- 244000152100 Sorbus torminalis Species 0.000 claims description 6
- 239000003365 glass fiber Substances 0.000 claims description 6
- 238000012423 maintenance Methods 0.000 claims description 6
- 230000036961 partial effect Effects 0.000 claims description 6
- 230000008093 supporting effect Effects 0.000 claims description 6
- 239000004020 conductor Substances 0.000 claims description 5
- 238000009826 distribution Methods 0.000 claims description 5
- 238000004519 manufacturing process Methods 0.000 claims description 5
- 229920002379 silicone rubber Polymers 0.000 claims description 5
- 230000009466 transformation Effects 0.000 claims description 5
- 241000209094 Oryza Species 0.000 claims description 4
- 235000007164 Oryza sativa Nutrition 0.000 claims description 4
- 238000004458 analytical method Methods 0.000 claims description 4
- 238000012550 audit Methods 0.000 claims description 4
- 230000010354 integration Effects 0.000 claims description 4
- 235000009566 rice Nutrition 0.000 claims description 4
- 239000010935 stainless steel Substances 0.000 claims description 4
- 229910001220 stainless steel Inorganic materials 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 239000000956 alloy Substances 0.000 claims description 3
- 238000004873 anchoring Methods 0.000 claims description 3
- 238000006243 chemical reaction Methods 0.000 claims description 3
- 230000033001 locomotion Effects 0.000 claims description 3
- 238000010248 power generation Methods 0.000 claims description 3
- 238000012795 verification Methods 0.000 claims description 3
- 238000013523 data management Methods 0.000 claims description 2
- 238000001514 detection method Methods 0.000 claims description 2
- 230000005764 inhibitory process Effects 0.000 claims description 2
- 239000012212 insulator Substances 0.000 claims description 2
- 230000003993 interaction Effects 0.000 claims description 2
- 238000002955 isolation Methods 0.000 claims description 2
- 238000012545 processing Methods 0.000 claims description 2
- 230000007613 environmental effect Effects 0.000 claims 1
- 230000000694 effects Effects 0.000 description 14
- 238000010586 diagram Methods 0.000 description 9
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 8
- 239000004033 plastic Substances 0.000 description 7
- 229920003023 plastic Polymers 0.000 description 7
- 230000008569 process Effects 0.000 description 7
- 239000004576 sand Substances 0.000 description 7
- 238000003466 welding Methods 0.000 description 7
- 230000008901 benefit Effects 0.000 description 6
- 230000001976 improved effect Effects 0.000 description 5
- 230000001965 increasing effect Effects 0.000 description 5
- 238000009413 insulation Methods 0.000 description 5
- 229920001343 polytetrafluoroethylene Polymers 0.000 description 5
- 230000001680 brushing effect Effects 0.000 description 4
- 238000005266 casting Methods 0.000 description 4
- 239000004927 clay Substances 0.000 description 4
- 239000004810 polytetrafluoroethylene Substances 0.000 description 4
- 230000003796 beauty Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 230000002829 reductive effect Effects 0.000 description 3
- 239000011083 cement mortar Substances 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 230000002708 enhancing effect Effects 0.000 description 2
- 239000011521 glass Substances 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 239000003973 paint Substances 0.000 description 2
- -1 polytetrafluoroethylene Polymers 0.000 description 2
- 238000004064 recycling Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 238000007493 shaping process Methods 0.000 description 2
- 230000035939 shock Effects 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- ZLMJMSJWJFRBEC-UHFFFAOYSA-N Potassium Chemical compound [K] ZLMJMSJWJFRBEC-UHFFFAOYSA-N 0.000 description 1
- XUIMIQQOPSSXEZ-UHFFFAOYSA-N Silicon Chemical compound [Si] XUIMIQQOPSSXEZ-UHFFFAOYSA-N 0.000 description 1
- 206010053615 Thermal burn Diseases 0.000 description 1
- 229910000754 Wrought iron Inorganic materials 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000002421 anti-septic effect Effects 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 210000000078 claw Anatomy 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 239000013078 crystal Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000034994 death Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000004069 differentiation Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 229920001971 elastomer Polymers 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 238000011049 filling Methods 0.000 description 1
- 238000004079 fireproofing Methods 0.000 description 1
- 238000012812 general test Methods 0.000 description 1
- 230000012010 growth Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 229910052700 potassium Inorganic materials 0.000 description 1
- 239000011591 potassium Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 210000003456 pulmonary alveoli Anatomy 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 150000003839 salts Chemical class 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 229910052710 silicon Inorganic materials 0.000 description 1
- 239000010703 silicon Substances 0.000 description 1
- 238000002791 soaking Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
- 238000013519 translation Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 230000003313 weakening effect Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
Work transmission line anchors the rotatable ground anchorage of combination type rotating and setting, power construction implementation of temporary line in building, belong to work transmission line construction field, cumbersome for solving traditional earth anchor construction, takes up an area the problems such as reparation is high, technical essential is:Including earth anchor body, earth anchor swingle, revolving fragment, horizon bar, horizon bar strut, hitch point link, swingle rotation entry;The earth anchor body includes being run through by earth anchor swingle and earth anchor swingle is anchored on its internal the first noumenon, and the second body fixed with the first noumenon integral type.
Description
Technical field
The invention belongs to work transmission line construction field, it is related to and a kind of be used to anchoring temporary guy and lead, the side such as ground wire
The pivotably anchor device in face.
Background technology
Earth anchor is often needed to use in the group tower of work transmission line construction and Poling Construction scene at present, is faced for anchoring
When bracing wire, third wheel anchor etc., in order to ensure that the stress of earth anchor disclosure satisfy that requirement, common method is first to dig earth anchor
Hole, lower earth anchor, backfill, using earth anchor is dug out again after completing, backfills again.So do there are the shortcomings that have:
1st, ground anchor pit takes up a large area, and damages is high;
2nd, tedious process is time-consuming, takes a lot of work, arduously;
Life mellow soil does not have back-filling in layers when the 3rd, backfilling, and influences crops growth;
Landslide easily occurs when the 4th, digging pit, the security risk such as eminence junk, Work tool are hurted sb.'s feelings.
The content of the invention
The present invention is primarily intended to solve the problems such as traditional earth anchor construction is cumbersome, and occupation of land reparation is high, it provides following technical side
Case:
A kind of work transmission line anchors the rotatable ground anchorage of combination type rotating of temporary line, including earth anchor sheet in building
Body, earth anchor swingle, revolving fragment, horizon bar, horizon bar strut, hitch point link, swingle rotation entry;
The earth anchor body includes being run through by earth anchor swingle and earth anchor swingle is anchored on its internal the first noumenon,
And the second body fixed with the first noumenon integral type;
The upper end of the earth anchor swingle sets the swingle rotation entry, the buried part of earth anchor swingle
By revolving fragment winding;
Hitch point link is fixedly installed on the portion on the upper side of the first noumenon side, the second body and hitch point link position
In homonymy, and less than the installation site of hitch point link;
Horizon bar is connected to the end on the lower side of the second body, and horizon bar strut is connected to horizon bar and the second body portion on the upper side
Between, and horizon bar flushes in ground.
The horizon bar and the junction of horizontal strut are apart from the front end face of horizon bar apart from the 2/ of occupancy level bar
5。
Angle between the horizon bar and horizontal strut is 30 °.
There is insertion ground with the horizon bar fixed link of support level bar in the front end of horizon bar.
The horizon bar fixed link is away from horizon bar front end face apart from occupancy level bar 1/6~1/4.
The hitch point link is the link made of stainless steel, and is welded in the second body, and its is inner and/or outer
Surface sets anti-skid chequer.
The hitch point link is wire dispenser.
The horizon bar have two, respectively positioned at the both sides of the second body, and by horizon bar they sup-port with every
From.
The rotatable earth anchor of combination type rotating of temporary line is anchored in being built the invention further relates to a kind of work transmission line
The method to set up of device, in transmission line construction construction site, ground anchorage rotatable using the combination type rotating, according to scene
Actual conditions, first selection sets the suitable position of the rotatable ground anchorage of combination type rotating, by the rotatable ground anchorage of combination type rotating
Earth anchor swingle partial insertion ground, the revolving fragment of earth anchor swingle lower part winding is contacted ground, then will push away
In the rotation entry on bar insertion earth anchor swingle top, push rod is promoted to rotate earth anchor swingle stress, by rotating earth anchor
During revolving fragment does not bury gradually, after the depth in earth anchor swingle insertion soil is met the requirements, by the direction tune of hitch point link
The whole direction to application, afterwards in the fixed horizontal strut of the front of Impact direction installation, the link binding pulling wires at hitch point.
Beneficial effect:The earth anchor of the present invention is inserted into ground by the swingle of lower part, and when field application does not have to dig pit, do not have to
Backfill, floor space is small, easy to operate, convenient and efficient, and practical is very strong.
Use the rotatable ground anchorage of this combination type rotating, it is ensured that quickly carried out in the soil property such as sand, cultivated soil, loess
The setting of earth anchor, can not only ensure the pulling force of earth anchor, but also can be at the scene without digging pit, without backfill.Using when due to accounting for
Ground area is small, without the excavation of soil property, it is possible to reduce the reparation taken up an area temporarily.Site setup is very simple when operating, convenient
Fast, it is possible to increase work efficiency, can save human and material resources, man-hour, expense.Earth anchor is light and handy in itself, flexibly, be readily transported,
Storage, application.Can be long-term to reuse with one-time investment, good using effect can be obtained in transmission line construction.
Brief description of the drawings
Fig. 1 is the structure diagram of cable well lid;
Fig. 2 is the structure diagram of transmission tower general-purpose type protective cap template;
Fig. 3 is the structure diagram of support platform;
Fig. 4 is the structure diagram that 66kV-220kV docks circlip type earthing wire clip;
Fig. 5 is the structure diagram that GIS device loop resistance tests auxiliary tool;
Fig. 6 is the structure diagram of Portable transformer substation equipment snow breaker;
Fig. 7 is the structure diagram of the rotatable ground anchorage of combination type rotating;
Fig. 8 is the structure diagram of tangent tower overhead-groundwire lifter;
Fig. 9 is structure diagram of the cable around, actinobacillus device;
Figure 10 is first interior view of the cable around, actinobacillus device;
Figure 11 is second interior view of the cable around, actinobacillus device;
Figure 12 is the overall architecture figure of electric power video monitor supervision platform;
Figure 13 is the business framework figure of electric power video monitor supervision platform;
Figure 14 is the Logic Architecture figure of electric power video monitor supervision platform;
Figure 15 is the deployment Organization Chart of electric power video monitor supervision platform.
Wherein:
3-1. fixed forms, 3-2. splice templates, the first tablets of 3-3., the second tablets of 3-4., 3-5. fixed plates, 3-6.
Tablet;
6-1. tips, 6-2. groove portions, 6-3. blessings portion, 6-4.C type clamping opening grooves, 6-5. clamp springs, 6-6. shafts, 6-7. is most
High rim point, 6-8. articulated sections, 6-9. pins;
7-1. hook wire clamps, 7-2. insulating bars, 7-3. conductive materials, 7-4. pressure-wires, 7-5. current lines, 7-6. punchings
Bolt, 7-7. wing nuts, 7-8. serrated faces;
8-1. engines, 8-2. flexible axles, 8-3. insulating bars, 8-4. rotating brushes, 8-5. handles, 8-6. waterproof full skirts;
9-1. earth anchor swingles, 9-2. revolving fragments, 9-3. horizon bars, 9-4. horizon bar struts, 9-5. horizon bar fixed links,
9-6. hitch point links, 9-7. swingles rotation entry;
The horizontal angle bar combinations of turning one's head of 10-1., 10-2. pressing plates, 10-3. adjustable screws, 10-4. cross-bridges is horizontal to lengthen iron, 10-
5. cross-bridges iron;
11-1. plug cords export, 11-2. openings, 11-3. shafts, 11-4. housings, 11-5. insert row lines, 11-6. plugs
Line, 11-7. insertion shells.
Embodiment
A kind of work transmission line anchors the rotatable ground anchorage of combination type rotating of temporary line, including earth anchor sheet in building
Body, earth anchor swingle, revolving fragment, horizon bar, horizon bar strut, hitch point link, swingle rotation entry;
The earth anchor body includes being run through by earth anchor swingle and earth anchor swingle is anchored on its internal the first noumenon,
And the second body fixed with the first noumenon integral type;
The upper end of the earth anchor swingle sets the swingle rotation entry, the buried part of earth anchor swingle
By revolving fragment winding;
Hitch point link is fixedly installed on the portion on the upper side of the first noumenon side, the second body and hitch point link position
In homonymy, and less than the installation site of hitch point link;
Horizon bar is connected to the end on the lower side of the second body, and horizon bar strut is connected to horizon bar and the second body portion on the upper side
Between, and horizon bar flushes in ground, the first noumenon, the second body flush in ground, i.e., generally can be downward by earth anchor swingle
Below ground can be inserted into by stretching out the part of the first noumenon.
The horizon bar and the junction of horizontal strut are apart from the front end face of horizon bar apart from the 2/ of occupancy level bar
5。
Angle between the horizon bar and horizontal strut is 30 °.
There is insertion ground with the horizon bar fixed link of support level bar in the front end of horizon bar.
The horizon bar fixed link is away from horizon bar front end face apart from occupancy level bar 1/6~1/4.
The hitch point link is the link made of stainless steel, and is welded in the second body, and its is inner and/or outer
Surface sets anti-skid chequer.
The hitch point link is wire dispenser.
The horizon bar have two, respectively positioned at the both sides of the second body, and by horizon bar they sup-port with every
From.
The rotatable ground anchorage of combination type rotating of temporary line is anchored during work transmission line is built as described in any of the above-described
Method to set up, it is characterised in that in transmission line construction construction site, ground anchorage rotatable using the combination type rotating,
According to on-site actual situations, first selection sets the suitable position of the rotatable ground anchorage of combination type rotating, and combination type rotating is rotatable
The partial insertion ground of the earth anchor swingle of ground anchorage, enables the revolving fragment of earth anchor swingle lower part winding to contact ground,
Then by the rotation entry on push rod insertion earth anchor swingle top, promote push rod to rotate earth anchor swingle stress, will rotate
The revolving fragment of earth anchor do not bury gradually, after the depth in earth anchor swingle insertion soil is met the requirements, by hitch point link
Direction be adjusted to the direction of application, afterwards in the fixed horizontal strut of the front of Impact direction installation, and be adjusted to appropriate
Position, the link binding pulling wires at hitch point.
Thus, the combinations thereof formula of the technology of the present invention solution pivotably anchor device, suitable for sand (sand), is ploughed
The geological conditions of the non-rock such as ground soil (stiff plastic lam), loess (stiff plastic clay), severely-weathered native (clay adds gravel),
Ground is inserted into by the swingle of lower part during use, revolving fragment is housed on swingle, it is big with soil layer contact area, by increasing capacitance it is possible to increase to hold
Carry power;Horizontal strut is set in the leading portion of earth anchor Impact direction, the horizontal bearing capacity of earth anchor can be greatly increased.
In transmission line construction construction site, ground anchorage rotatable using this combination type rotating, scene is determined in advance
Soil property situation, in sand, plough under the soil condition such as soil, loess and can apply.According to on-site actual situations, first selection is configured
Anchor suitable position, is inserted into the certain depth in ground by the swingle for combining earth anchor lower part, enables the revolving fragment of rotation boom end
Contact ground.Then a push rod is inserted into the rotation entry on swingle top, makes rotation by two people's urged clockwise push rods
Bar stress rotates, during the revolving fragment for rotating earth anchor is not buried gradually., will after the depth in swingle insertion soil is met the requirements
Hitch point link is adjusted to the direction of application.In the front of Impact direction, installation fixes horizontal strut afterwards, and is adjusted to
Appropriate position.Can be by link binding pulling wires at the hitch point above swingle, at this moment the rotatable earth anchor of combination type rotating is complete
Portion is provided with.
This rotatable ground anchorage execute-in-place of combination type rotating is simple and convenient, can effectively improve work efficiency, saving accounts for
Ground is compensated, and can be reused for a long time, and good using effect can be obtained in transmission line construction.
In another embodiment, a kind of power construction implementation is which described, gives a comprehensive electric power
Implementation in work progress, can more convenient and efficient progress power construction implementation using the implementation.
The electric power implements the technical solution of implementation, is to include one or more of following method.
1. implementing to be used for the method for fixing optical cable, include the following steps:
S1. the table top for the aluminum alloy materials for choosing Intermediate Gray folding to fold is consolidated as workbench in the corner of workbench
Determine Extensible desk leg, the table leg is spring folding table leg to support workbench, enables table leg and workbench into 90 degree of angles
Fold;
Fix optical cable when S2. choosing optical cable clamp to continue to be used, the respectively one optical cable clamping of installation of workbench left and right sides
Device, clamper two sides are all flat with stationary work-table table top, and the one side for having V-groove is used to fix optical cable, opening direction direction
Staff.
Information communication branch company safeguards that lightguide cable link reaches 3000 kilometers at present, needs welding optical cable operation up to several every year
Hundred times, optical cable welding personnel do not have dedicated optical cable welding operation console when welding optical cable operates, and are carried out using Simple folding table
Weld job.On optical cable welding work multidigit Yushan Hill, folding table uses very heavy and inconvenient.This method is to develop
The folding table of 800cm × 600cm × 500cm aluminum alloy materials, centre can fold, and table leg can arbitrarily stretch to adapt to mountain area etc.
Physical features injustice construction site, antiskid claw is installed under table leg, is developed cable fixing clip tool and is installed on desk both sides, on desktop design consolidate
Determine the groove position of optical cable welding machine, equipment when ensureing to use is stablized, and recommendation tools groove position can be placed by being designed in folding table, to apply
Light instrument can be placed in folding table by man-hour.Communications optical cable subsequent duty platform, stent are welded using high intensity potassium steel pipe
Form, have the characteristics that light, sturdy and durable, folding and unfolding is simple, table top uses plastic uptake new process by water-proof high-strength aluminium alloy plate
Plastic uptake veneer forms.It is using size:Long 800mm, wide 600mm, high 500mm, can meet connecing for any gauge size completely
Head cartridge, termination box, puts any a heat sealing machine and instrument, and clamper is formed using light wear-resistant aluminium alloy compression casting, its structure
It is firm with fixed mesa, remove and install conveniently, the position on table top is random strong the features such as, clamper is adapted to all at present
The general optical cable constructions of diameter 7mm~28mm, the optical cable coupling platform have the characteristics that light, applicable any landform, workbench
Table top is fire proofing material, is not afraid of to bake and scalds, is not afraid of hard thing and collides with, cut and draw, be adapted to field work scene, can be very big in cable connection
Raising work efficiency, shorten the time of cable connection, ensured the welding quality in field optical cable job execution well.
2. the method for implementing to make cable well lid rain-proof anti-theft, includes the following steps:
S1. hole is not provided with cable well lid to prevent rainwater, snow-broth from pouring into cable shaft;
S2. the walling crib of cable well lid makes upward groove shapes, and well lid lower surface edge is fabricated to downwardly convex, insertion
Walling crib groove;To prevent rainwater from entering in well and for preventing well lid from shifting, well lid is prevented to be stolen;
S3. the upper surface center of cable well lid is fabricated to the disk of diameter 500mm, for coordinating with strong magnet to open
Well lid, and it is used for embedding information label pound sign in the circular groove of disk edge making diameter 120mm, and also make 30mm's
Circular groove is used to be embedded in information chip in well and is used to scan reading information to realize the management to cable shaft cable passage.
Distribution line cable machinery is increasing in urban district at present, and cable shaft is numerous, and no unified information is managed, electricity
Ponding is more inside cable well, it is difficult to clears up, hole causes in rainwater access wall above well lid, and irony well lid often damages
Phenomenon that is bad, losing, easily occurs the danger that personnel fall well.There are following problem for original well lid:1st, there are two holes on well lid
Hole, easily water inlet.2nd, property right is marked for " electric power " printed words on well lid, time length is fuzzy, and information is unclear.3rd, well cover lockset is often ground
Press easy to failure.4th, walling crib, the design of well lid alveolus are simple, easily displacement or stolen.The present invention develops a new cable well lid, well
No hole is covered, prevents rainwater, snow-broth from pouring into cable shaft.Walling crib makes upward groove shapes, the design of well lid lower surface edge
It is fabricated to downwardly convex, embedded walling crib groove, prevents well lid from shifting, prevent well lid to be stolen while preventing rainwater from entering in well.
Well lid upper surface center makes the disk as diameter 500mm, and for coordinating open manhole cover with strong magnet, horizontal edge makes
The circular groove of diameter 120mm is used for embedding information label pound sign, and the circular groove for making 30mm is used to be embedded in information core in well
Piece, information is read with scanning.Facilitate the management of cable shaft cable passage, the cable well lid can effectively prevent rainwater, snow-broth
Into cable shaft, ponding inside cable shaft is effectively reduced, prevents power cable from soaking the fault outage of initiation in water for a long time.Newly
Type well lid can effectively prevent that well lid is in situ by pressure hour offset, and no specific purpose tool can not open well lid, play anti-theft function, have
Effect prevents the generation of personnel, vehicle falling accident.Novel cable well lid has fixed mark installation region, and embedded label is wear-resisting
Damage, instruction is clear, information is complete, and other unit well lid has obvious differentiation.Insertion can scan chip, considerably increase information
Amount, personnel, which make an inspection tour, can understand that grasping equipment situation and tour records when passing by.Help is played for cable run operation and maintenance to make
With.The manhole cover structure is simple, and investment is small, convenient to make, and convenient installation, plan batch production, matches somebody with somebody in Guo Wang Benxi Power Supply Co., Ltd.
Electric specialty promotes and applies, and improves cable machinery operation and management level, improves cable machinery security, improves power supply reliability, drop
Low personnel's vehicle falls well risk.
3. the method that implementation prepares transmission tower general-purpose type protective cap template, with thickness be 1mm welded steel plate length most
Small dimension is the fixed form of 400mm, is in addition welded the splice template that multiple length are 100mm, the quantity of splice template is with bar
Tower foundation staking out face size accordingly increases, and the fixed form is formed by connecting by two orthogonal tablets, and in each institute
The fixed plate for installing vertical plate face backwards of tablet is stated, the splice template is tablet, and part splice template is with vertical
The fixed plate in straight panel face;The first fixed plate and the fixed plate of the first splice template of first fixed form are bolted, should
First splice template and the template splicing that connects of more than one no fixed plate, and last splice template spliced carries
Fixed plate, it is the second splice template, and the second splice template is consolidated by its fixed plate and the first tablet of the second fixed form
Fixed board is bolted, and the fixed plate and the fixed plate of the 3rd splice plate of the second tablet of the second fixed form are connected by bolt
Connect, the 3rd splice template and the template splicing that connects of more than one no fixed plate, and last the splicing mould spliced
Plate carries fixed plate, it is the 4th splice template, and the 4th splice template is first flat by its fixed plate and the 3rd fixed form
The fixed plate of plate is bolted, with this connection mode, until one carries the splice template of fixed plate, its by fixed plate with
The second bolt of fixing plate connection of first fixed form, fixed form and splice template are enclosed and are connected into as hollow square shape
Protective cap template, and the edges and corners of the protective cap are changed to arc by arc corner angle template bar.
Such scheme is after electric power line pole tower construction, and template is carried out according to the size in concrete protective cap staking out face
After installation, carrying out casting concrete makes protective cap shape and conserve, and makes up to some strength to bear the provisional knot of dead weight
Structure, and a kind of transmission tower general-purpose type protective cap template reused can be removed.
At present, as the construction that transmission line of electricity standardizes, column foot protective cap are also a wherein important content, protective cap
Have to firm, flawless, shape not only wants standard will also beauty.The effect of protective cap is:In electric power line pole tower construction group
After vertical, for protect the nut of foundation bolt be not removed and avoid tower seat ponding need at column foot casting cement mortar, guarantor is made
Sheath.The template of present casting concrete protective cap is mostly wood materials, manufactures latter use of shaping, waste of materials can not
It is adjusted with protective cap size, not reproducible use.Secondly, it is few qualified after the shaping of shaft tower protective cap, wherein most heavy
Will the reason for be exactly without qualified template.Now using glued board, flitch as template, nail joint, so
It is easy to extract nail after cement mortar expansion, causes protective cap to deform, in addition glued board, flitch are disposable, and
And each protective cap is of different sizes, to carry out re-working wooden template, thus considerably increase construction cost every time,
Protective cap appearance does not reach standard shape yet.In order to ensure that the concrete protective cap after construction is beautiful, save material, reduction construction
Cost.By the disposable wooden template that the rigidity template of reusable assembling substitutes original glued board, flitch is material, the hair
It is bright that a kind of transmission tower general-purpose type protective cap template is provided, reach easy to assembly, the purpose of reuse.The thin steel of the above method
Plate is welded the fixed form of protective cap minimum gauge, is in addition welded multiple splice templates, fixed form and splice template spiral shell
Tether and connect, can accordingly increase with pole and tower foundation staking out face size, edges and corners are changed to arc by template, it is so not only not fragile
Damage and beauty, and reach easy to assembly, reuse.The minimum rule of welded steel plate length that it is 1mm with thickness that concrete operations, which are,
Lattice are the fixed form of 400mm, are in addition welded the splice template of multiple 100mm, can accordingly increase with pole and tower foundation staking out face size
Add, fixed form is connected with splice template.In order to make protective cap sturdy and durable, the edges and corners of protective cap are passed through into arc
Corner angle template bar is changed to arc, so not only not cracky but also beauty, and reach easy to assembly, reuse, reducing and apply
The purpose of work cost.Its advantage, which is that size specification is adjustable, is adapted to pouring for any shaft tower protective cap, using reuse
Steel material instead of wood materials, greatly reduce construction cost, avoids nut and is not removed and avoids tower seat ponding, ensure
Line security is run.
4. implementing the method for rod-rising tower fall arrest in Power Project construction, one is bound on existing safety belt waistband directly
Footpath 8mm's washs Nima rope, and rope is upper to put a fast retaining ring of aluminium alloy at interval of some meter amperes, and operating personnel is often some described in rod-rising tower
Rice just install a fast retaining ring of aluminium alloy in main material, if operating personnel slips, the height of fall control some rice with
It is interior, the fast retaining ring spacing distance of aluminium alloy is adjusted, to control the height of fall;The connection method of the fast retaining ring of aluminium alloy and main material is use
Wash Nima rope to be connected with main material with the method for fast knot, then the fast retaining ring of one end aluminium alloy of fast knot is pinned, shaft tower above and below personnel
When the fast retaining ring of aluminium alloy be uniformly buckled in operating personnel's loins;Wash Nima rope parameter:Nameplate lable diameter of phi 8mm, moment connect disconnected power
2400KG;The fast retaining ring parameter of aluminium alloy:Nameplate lable flash disruption power 8KN.
In power line construction and maintenance work, it is often required to carry out high-rise working.Made among these with power transmission lines overhauling
Industry is the most universal, and the upper and lower shaft tower of operating personnel is all single-handedly to carry out all the time, without any safety prevention measure.One load is lost
Hand is stepped on and sliding is possible to that human casualty accident occurs.Some units occur to prevent such event in recent years, pacify on shaft tower
The whole slideway of dress or fence, positive effect but investment is huge.The steel tower of existing Liaoning Province area 220kV and following transmission line of electricity 90%
All without safe runner device, and cause the tight of personal death because climbing steel tower is unshielded during causing -2016 years 2010
Weight accident is up to 7.We have developed the anti-fall device that a kind of small investment, effect are good, economical and practical.The country does not have at present
This project development and application.Such scheme main purpose is to provide a kind of rod-rising tower falling proof device, to solve in power transmission line
Rod-rising tower unprotect, more unshielded problems of people Deng Ta in rod-rising tower operation process.To achieve these goals, there is provided a kind of
Rod-rising tower falling proof device, its technical principle is to bind a Φ 8MM on existing safety belt waistband to wash Nima rope, on rope
At interval of 5 meters by putting a fast retaining ring of aluminium alloy.Operating personnel just installs a fast retaining ring of aluminium alloy in main material for 5 meters per rod-rising tower
On, at this time if operating personnel slips, the height of fall can be controlled within 5 meters.If adjust the fast retaining ring interval of aluminium alloy
Distance, it might even be possible to control the effect of the height of fall (1 meter).Wash Nima rope parameter:Nameplate lable diameter of phi 8MM, moment connect disconnected power
2400KG.The fast retaining ring parameter of aluminium alloy:Nameplate lable flash disruption power 8KN.The connection method of the fast retaining ring of aluminium alloy and main material:Wash Buddhist nun
Agate rope is connected with main material with the method for fast knot, then the fast retaining ring of one end aluminium alloy of fast knot is pinned.Washing Nima rope length degree will fit
When can not be too short or long.Diameter of phi 8MM 50 meters long washs Nima rope and weighs about 2KG, and 10 fast retaining rings of aluminium alloy weigh about 0.5KG.People
The fast retaining ring of aluminium alloy is uniformly buckled in operating personnel's loins during shaft tower above and below member.Beneficial effect is mainly comprising following five aspects:1、
Making material should select heat-resisting, anti-corrosion, resistant to rust section bar material.2nd, the operation of rod-rising tower falling proof device flexibly, conveniently.3rd, bar is stepped on
Tower falling proof device can substitute steel tower slideway completely.4th, rod-rising tower falling proof device can be controlled in height of fall 1m.5、
Service life is grown.6th, during more people's rod-rising tower operations, it is only necessary to which the people of first rod-rising tower carries rod-rising tower anti-falling safe rope
It can ensure the safety of all rod-rising tower operating personnels.The shape of the device, construction:Transmission line of electricity rod-rising tower falling proof device is former
Part includes:Diameter of phi 8MM 50 meters long washs 1, Nima rope, and aluminium alloy retaining ring 10, safety rope self-locking device (it is every to step on tower operating personnel
People carries one).In in August, 2014 to during in November, 2015, inventor carries out operation 26 times using the present apparatus altogether, really
Accomplish the protection of upper and lower tower full safety, in order to promote rod-rising tower falling proof device to use comprehensively, by live practice examining,
Group formulates《Rod-rising tower falling proof device fire protection technology》, and work out《Rod-rising tower falling proof device is applied and maintenance guidance
Book》, fire protection technology is refined, the training of abundance has been carried out to related personnel, it is ensured that the reliable of the technology is implemented, and is allowed to more
Add the demand that operating personnel climbs steel tower that adapts to.Rod-rising tower falling proof device instead of iron tower of power transmission line without speed difference protective device
The drawbacks of, fill up the domestic blank in this field.
5. implementing the method that patrol UAV controls in power domain, a support is installed on the body of patrol UAV
Platform, control electronics and lifting steering engine are installed in support platform, and patrol UAV is lifted by crane after taking off by remote control control
The folding of steering engine;The installation method of support platform:
S1. carbon fiber board is processed, processing is designed carbon fiber board according to patrol UAV foot stool position;
S2. carbon fiber board and patrol UAV body are installed;
S3. carbon fiber board upper surface installation electronic equipment;
S4. carbon fiber board installs steering engine to ground surface;
S5. steering engine crossbeam is in closed state with traction after patrol UAV is taken off;
S6. ground staff by remote control control steering engine crossbeam horizontal movement to control loosening for weight.
After taking off, steering engine below platform can be with hoisting heavy, and the free-open-close under the action of remote controler.
6. the method for implementing to make 66kV-220kV docking circlip type earthing wire clips, the wire clamp include what is be oppositely arranged
Two wire clamp clamping plates, the wire clamp clamping plate include the sequentially connected tip of integral type, groove portion and clamping part, the interior phase of the groove portion
Opposite is C-type clamp mouth groove, has the clamp spring for being used for clamping circuit in each side clamp port groove, and two clamp springs are oppositely arranged, and
Clamp spring is connected near C-type clamp mouth highest marginal point by shaft axis, and the clamping part has prominent articulated section, and in inside
Fluting, the articulated section of opposite two clamping parts is by pin-hinges, and pin is located at spring inner, and spring is pressed on described
In the fluting of articulated section, assembled according to the structure of above-mentioned wire clamp.
Such scheme is excessive for solving conventional portable order clamp spring wire clamp ground wire triggering torque, can not ensure that wire clamp presss from both sides
Line success rate, existing wire clamp installing success rate is relatively low caused by, and conventional portable order clamp spring wire clamp ground wire wire clamp is opened
Resultant moment is excessive, it is difficult to one-handed performance, the problem of bringing dangerous hidden danger.Under the conditions of identical operation, since conventional portable connects
Single deck tape-recorder spring wire clamp ground wire wire clamp clamp spring backway is smaller, thus trigger force is larger in trigger process.It can be blocked by lengthening
Spring triggers the arm of force and makes traditional single deck tape-recorder spring into double card spring, further reduces trigger force, improves wire clamp clamp success rate.Due to
During installing ground wire, operating personnel need to be at cross arm of tower position, and operating condition is subject to larger limitation, conventional portable order clamp spring
The adjustment of wire clamp ground wire wire clamp needs both hands to carry out, and larger inconvenience is brought to operating personnel.Circlip type ground wire is docked by varying biography
System cable clamp structure, clamp spring shaft is moved forward, makes it easier to one-handed performance, improves operation ease.Further scheme is:Institute
The tip stated is that inwardly gradually increase cutting distance is formed at place concordant with groove portion outer wall.Its maximum width and groove of the tip
Portion's outer wall is concordantly located at a distance of 5mm.The clamping part has anti-skid chequer, and the anti-skid chequer is the combination of strip pattern, rectangle line.
By such scheme, available beneficial effect, including economic benefit and safety benefit, from economic benefit for, this implementation
After example is using the docking circlip type ground wire newly developed, traditional process is reformed, has simplified work flow, ensure that dress
If the security of ground wire.Operation procedure is simplified, shortens the installing ground wire time, it is time saving and energy saving to accomplish, so as to shorten inspection
Repair the phase.To be calculated from having a power failure to save on the time, mounting docking circlip type ground wire can save 3 in each upkeep operation~
The 10min activity durations.Exemplified by 2015, yearly plan interruption maintenance 66kV~220kV power transmission lines 102 times, according to right
Connect circlip type ground wire will shorten load stop for the time 5~22 it is small when, create certain economic benefit for enterprise.
Said from safety benefit, docking circlip type ground wire singlehanded can be completed to open wire clamp operation, and opening wire clamp only needs
Wire clamp is pinched out vertically downward can complete clamp spring installing, and toggle rate improves a lot when installing is grounded, and shorten personnel in bar
Activity duration on tower.Simultaneously because docking circlip type ground lead, which is clipped in material and selects, is ensureing that be grounded electric property notes at the same time
The lightness of heavy material, every group of (3 sets) ground wires mitigate 0.42kg, effectively mitigate heavy burden during personnel's rod-rising tower, reduce work
Industry personnel muscle power expenditure.The use of docking circlip type ground wire not only effectively shortened turn(a)round, but also saved operating personnel's muscle power, had
The security risk for controlling scene of effect.It is as follows for wire clamp table of gameeing in the present embodiment:
7. implement the production method of GIS device loop resistance test auxiliary tool, it is characterised in that the auxiliary tool bag
Include:Shaped cable clamp and insulating bar are hooked, is connected between the insulating bar and hook shaped cable clamp by sawtooth occlusal pattern swivel joint, hook type
Wire clip body is the Curved hook insulator for clamping connection lead, and curved side has the conductive material with wire contacts in it,
Pressure-wire, current line as p-wire are electrically connected with the conductive material respectively, and are drawn by the afterbody of hook shaped cable clamp body;
The sawtooth occlusal pattern swivel joint includes upper boom, the upper plate being connected with upper boom integral type, lower beam and lower beam integral type and connects
The lower plate connect, the upper and lower disk body, which has, to be run through for the threaded hole of punching bolt thread connection, the upper and lower disk
Body is oppositely arranged and forward surface has serrated face, and two opposite serrated faces are threadedly coupled with tight in punching bolt with the threaded hole
Gu being mutually twisted when spacing, the upper boom is fixedly connected with hooking shaped cable clamp, and the lower beam is fixedly connected with insulating bar;It is described
Threaded hole connected by punching bolt thread, and punching bolt end have fastening punching bolt wing nut, it is described
Insulating bar is to connect button insulated tension pole;Structure according to above-mentioned auxiliary tool is assembled.
Such scheme technical problems to be solved are:For GIS device structure situation, after this auxiliary tool, survey
Examination personnel can equipment have a power failure, it is powered in the case of can test, tester apply the instrument, pass through insulating bar general
Test clamp be suspended on test loop into and out of on thread casing, utilize circuit resistance tester, complete GIS device circuit electricity
Hinder test job.When can avoid closing to loop-around test to be measured using two groups of earthing switches on circuit, frequently operation
Misoperation fault caused by the equipment such as breaker, disconnecting switch, earthing switch;Second, tester can be grasped on ground
Make, save operation process of ascending a height, prevent the danger of falling from high altitude;Third, tester can have a power failure in equipment, is powered
In the case of complete test job, and operated on ground, increase safe distance during operation, prevent human body electrification thing
Therefore four are to leave out tester and open ground switch earthing side and GIS shells being flexible coupling this process, save the testing time, subtract
Light tester's labor intensity.The effect having:1st, testing efficiency is improved, mitigates tester's labor intensity;2nd, meet various
The test request of voltage class GIS device;3rd, ensure tester's personal safety, prevent falling from high altitude, human body electrification accident hair
It is raw;4th, prevent GIS device by mistake point, close by mistake and divide-shut brake situation not in place occurs, ensure GIS device safe and reliable operation.Section
About production cost, is enterprise's cost efficiency.To other explanations of the program:1st, the selection of shaped cable clamp is hooked, shell selects plastics material
Matter, makes clamp realize electric insulation with lead, and ensures the electrical isolation of pressure-wire and current line;2nd, p-wire line footpath selection 20
Square millimeter, to meet that test electric current is not less than 100A;3rd, serrated grip faces type swivel joint, can make occlusal contact condition area
Greatly, test clamp does not shake, and different measurement directions are adjusted;4th, the selection of button insulating bar is connect, is convenient to mount and dismount,
It is easily operated, meet different voltages grade, the needs of different test heights.Feasibility analysis and implementation result:The project is processed
After the completion of, pass through verification from the selection of material, mechanical test, pressure test, it was demonstrated that implement feasible.And successively in 220kV bridges
Tested in northern change, the GIS loop resistance test of Gao Guanbian, He Dibian, test data is qualified, meets《Power transmission and transforming equipment is examined
Repair testing regulations》Requirement, testing efficiency is substantially improved, and single loop mean test time dropped to 22 points by original 41 minutes
Clock, satisfactorily realizes target.
8. implementing the production method of Portable transformer substation equipment snow breaker, the snow breaker includes engine and engine
Output connection flexible axle, the flexible axle and transmission axis connection, transmission shaft is connected with rotating brushes to drive rotating brushes to revolve
Turning, the transmission shaft is placed in inside insulating bar, and insulating bar bottom is handle, and the insulating bar is glass fibre reinforced plastic insulating bar,
The transmission shaft is glass fibre reinforced plastic insulating transmission shaft, and silicon rubber waterproof full skirt, the silicon are provided with below rotating brushes
Rubber waterproof full skirt is located at the top of insulating bar upper surface, and the flexible axle is connected between engine and transmission shaft, described
Insulating bar is made of fiberglass, and its external coating mica powder and/or polytetrafluorethylecoatings coatings;According to the structure of above-mentioned snow breaker
Assembled.
Due to the snow removing use for substation equipment, the consideration for its insulation performance is a key factor, for this reason,
The present invention have selected the preferable fiberglass of insulation performance as insulating bar, and also fully take into account the low-temperature resistance energy of fiberglass
Power, its general low temperature resistant ability can reach subzero less than 35 degrees Celsius, however, since substation equipment distance and precision will
Ask, the needs such as the quality of snow breaker, volume are defined, and such as the thickness of fiberglass, to be generally 1~3mm preferable, however, this thickness
Belong to for itself for the fiberglass of fragile material, easy damaged can be caused, be broken and corroded, i.e., more crisp, snowy day in addition
Using certainty compared with microthermal climate, particularly the Northeast of China, temperature reach subzero 40 degrees Celsius it is even lower, more reduce
The resistivity of fiberglass, snow or snow-broth also have corrosivity, although relatively light, for the fiberglass of adverse circumstances,
It is very unfavorable, for this reason, the present invention is provided with silicon rubber waterproof full skirt, the silicon rubber waterproof full skirt below rotating brushes
Positioned at the top of insulating bar upper surface, ability is blocked in enhancing, the possibility of snow-broth or snow contact fiberglass is reduced, as safeguard measure
Collaboration measure so that the service life of fiberglass is longer, present invention brushing mica powder on fiberglass, mica powder is two dimension
Flat crystal structure, resistance melt water vapour penetrate, and improve the resistance to steam of paint film, salt fog resistance, improve the antiseptic property of coating.Mica powder
Fine and close net structure:It is arranged in parallel, it is overlapped, paint film intensity is improved, freedom from cracking, lifts the mechanical performance of coating.Mica powder
Excellent chemical inertness:Acidproof, alkaline-resisting, high temperature resistant, electrical insulating property is strong, lifts the anti-corrosion stability and electrical insulating property of coating.
Thus, mica powder belongs to insulating materials and is adapted to brush, and can obstruct steam and penetrate, and can further ensure the exhausted of fiberglass
Edge, it is even more important that it is capable of the intensity of reinforcing glass steel, enhancing elasticity, toughness, elevating mechanism performance so that snow removing
The less glass hardness of steel being under ultra-low temperature surroundings of thickness used, which has, to be obviously improved, and is more suitable for setting as power transformation
Standby snow machine uses, and the stable region of particularly its temperature is very big, low temperature can be adapted to use.Some transformer equipments are to Mr. Yu
The vibration of a little frequencies is more sensitive, thus the present invention preferably mica powder uses sericite coating, it can expeditiously absorb vibration
Energy, weaken shock wave and sound wave.In addition, shock wave and sound wave are formed between mica chip and reflected repeatedly, weakening is also resulted in
The effect of its energy.And the transmitting that the sound wave of engine is formed in fiberglass may be enhanced, in order to reduce this sound wave
Influence, use this kind of mica powder coating.Except all mica powders of coating, as a kind of scheme, which is distribution
Formula brushing, is not exclusively covered in fiberglass, is preferably compartment brushing, that is, brushes a circle mica powder, is brushing a circle polytetrafluoro
Ethene, alternates.The reason is that polytetrafluoroethylene (PTFE) not embrittlement in -260 DEG C of ultralow temperature, using the teaching of the invention it is possible to provide fiberglass mechanical strength
And low temperature tolerance ability, and its is smooth, insulation performance is especially good, is the preferred version as the present invention, as a preferred embodiment,
The all polytetrafluoroethylene (PTFE) of the coating.In use, Portable transformer substation equipment snow breaker uses S35 engines,
Flexible axle is connected with glass fibre reinforced plastic insulating transmission shaft in glass fibre reinforced plastic insulating bar, links before transmission shaft with rotating brushes.Flexible axle length is
1.5 meters, insulation pole length is 3 meters.The equipment of the embodiment removes the snow power station equipment facility, will greatly promote the matter of work
Amount and efficiency, it is convenient and efficient, so as to improve substation equipment safe and reliable operation.
9. implement to anchor the method to set up of the rotatable ground anchorage of combination type rotating of temporary line in work transmission line construction,
In transmission line construction construction site, ground anchorage rotatable using combination type rotating, according to on-site actual situations, first selection is set
The suitable position of the rotatable ground anchorage of combination type rotating, the part of the earth anchor swingle of the rotatable ground anchorage of combination type rotating is inserted
Enter ground, the revolving fragment of earth anchor swingle lower part winding is contacted ground, then by push rod insertion earth anchor swingle top
Rotation entry in, promote push rod make earth anchor swingle stress rotate, during the revolving fragment of rotating earth anchor is not buried gradually, when
After depth in earth anchor swingle insertion soil is met the requirements, the direction of hitch point link is adjusted to the direction of application, Zhi Hou
The fixed horizontal strut of front installation of Impact direction, the link binding pulling wires at hitch point;The combination type rotating is rotatablely
Anchor device includes earth anchor body, earth anchor swingle, revolving fragment, horizon bar, horizon bar strut, hitch point link, swingle rotation
Entry;The earth anchor body includes being run through by earth anchor swingle and earth anchor swingle is anchored on its internal the first noumenon, and
The second body fixed with the first noumenon integral type;The upper end of the earth anchor swingle sets the swingle rotation entry,
The buried part of earth anchor swingle is by revolving fragment winding;Hitch point link is fixedly installed on the first noumenon side
Portion on the upper side, the second body are located at homonymy with hitch point link, and less than the installation site of hitch point link;Horizon bar is connected to
The end on the lower side of two bodies, horizon bar strut is connected between horizon bar and the second body portion on the upper side, and horizon bar flushes in ground
Face.
The horizon bar and the junction of horizontal strut are apart from the front end face of horizon bar apart from the 2/ of occupancy level bar
5.Angle between the horizon bar and horizontal strut is 30 °.There is insertion ground in the front end of horizon bar
With the horizon bar fixed link of support level bar.The horizon bar fixed link is away from horizon bar front end face apart from occupancy level bar 1/
6~1/4.The hitch point link is the link made of stainless steel, and is welded in the second body, and its inner and/or outer table
Face sets anti-skid chequer.The hitch point link is wire dispenser.The horizon bar has two, respectively positioned at the second body
Both sides, and by horizon bar they sup-port to isolate.Thus, the rotary earth anchor of combinations thereof formula of the technology of the present invention solution
Device, suitable for sand (sand), arable land native (stiff plastic lam), loess (stiff plastic clay), (clay adds gravel to severely-weathered soil
Stone) etc. non-rock geological conditions, ground is inserted into by the swingle of lower part during use, revolving fragment is housed on swingle, with soil
Layer contact area is big, by increasing capacitance it is possible to increase bearing capacity;Horizontal strut is set in the leading portion of earth anchor Impact direction, earth anchor can be greatly increased
Horizontal bearing capacity.In transmission line construction construction site, ground anchorage rotatable using this combination type rotating, to be determined in advance
The soil property situation at scene, can apply under the soil condition such as sand, cultivated soil, loess.According to on-site actual situations, first selection is set
Earth anchor suitable position is put, the swingle for combining earth anchor lower part is inserted into the certain depth in ground, makes the revolving fragment of rotation boom end
Ground can be contacted.Then a push rod is inserted into the rotation entry on swingle top, is made by two people's urged clockwise push rods
Swingle stress rotates, during the revolving fragment for rotating earth anchor is not buried gradually.When the depth in swingle insertion soil is met the requirements
Afterwards, hitch point link is adjusted to the direction of application.In the front of Impact direction, installation fixes horizontal strut afterwards, and adjusts
It is whole to arrive appropriate position.Can be by link binding pulling wires at the hitch point above swingle, at this moment combination type rotating is rotatablely
Anchor is all provided with.This rotatable ground anchorage execute-in-place of combination type rotating is simple and convenient, can effectively improve work efficiency,
Save and take up an area reparation, and can reuse for a long time, good using effect can be obtained in transmission line construction.
10. implementing the aerial earth wire method for improving of tangent tower overhead-groundwire lifter, lifted using tangent tower aerial earth wire
Device, in the operation of transmission line of electricity lifting tangent tower aerial earth wire, first according to the angle bar above aerial earth wire hanging wire point towards admittedly
The cross-bridges iron of the fixed lifter, cross-bridges iron and tangent tower are by tightening pressing plate and the fixation of lifter, then adjust cross-bridges
Level lengthens the specific location of adjustable screw on iron, and the hook of the lower part of adjustable screw is caught on aerial earth wire, rotates adjustable silk
Thick stick handle is adjusted to the wire clamp that suitable position installs aerial earth wire again to tighten leading screw, by aerial earth wire, and the tangent tower is maked somebody a mere figurehead
Ground wire raiser, including horizontal angle bar combination of turning one's head, pressing plate, cross-bridges iron, the horizontal lengthening iron of cross-bridges, adjustable screw;Horizontal angle bar of turning one's head
Combination is fixed above aerial earth wire hanging wire point and with tangent tower, and pressing plate is fixed on horizontal angle bar of turning one's head and combines, the angle
A pair of of angle bar of iron combination, an angle bar of each angle bar is facing away under, and another angle bar back of the body of two angle bar is drawn close in opposite directions, and the pressing plate is
Stepped, the height that its ladder vertical plane is adapted to the angle bar back of the body directed downwardly is set, and upper ladder plane of structure is fixed on the angle directed downwardly of angle bar
Iron back, downstairs plane of structure are fixed on the cross-bridges iron, make cross-bridges iron with tangent tower by tightening pressing plate fixation;In horizontal stroke
Set at least two cross-bridges are horizontal to lengthen iron, the horizontal portion for lengthening iron level and stretching out the cross-bridges iron of the cross-bridges on bridge iron
Divide the adjustable screw for being connected to adjustment aerial earth wire vertical position height, the bottom of the adjustable screw has hook
With hook joint aerial earth wire, the cross-bridges iron is laid with to be horizontal, and the horizontal iron that lengthens of cross-bridges is the horizontal paving that surface is fixed on it
If lengthening iron, the axis direction of cross-bridges iron has with the horizontal axis direction for lengthening iron of cross-bridges is mutually perpendicular to relation, described
Adjustable screw is installed on the horizontal end for lengthening iron and stretching out cross-bridges iron part of cross-bridges, and the horizontal iron that lengthens of the cross-bridges just has two
It is a, and to be symmetrical with horizontal angle bar combination settings of turning one's head.
Being set in the cross-bridges iron upper surface enables the horizontal slideway for lengthening iron and being moved along its own axis direction of cross-bridges,
The horizontal iron that lengthens of cross-bridges is slidably connected on slideway.Being set in the cross-bridges iron upper surface enables the horizontal iron that lengthens of cross-bridges along horizontal stroke
The slideway of bridge iron axis direction movement, the horizontal iron that lengthens of cross-bridges are slidably connected on slideway.Straight line pole is lifted in transmission line of electricity
During the operation of aerial earth wire, the cross-bridges iron of lifter, cross-bridges are first fixed according to the angle bar direction above aerial earth wire hanging wire point
Iron is with steel tower by tightening lifter pressing plate fixation.The specific location of adjustable screw on the horizontal iron of cross-bridges is adjusted again, by silk
The lower hook of thick stick catches on aerial earth wire, and rotating threaded shaft handle tightens leading screw, and the aerial earth wire at both ends is adjusted to suitable position
To install the wire clamp of aerial earth wire.This new overhead-groundwire lifter execute-in-place is simple and convenient, one can complete complexity
Work, can be effectively saved the activity duration, improve work efficiency.The risk class of construction operation can be reduced at the same time, improved
The security of operation.Good application effect can be obtained in transmission line construction.
11. implement cable around, actinobacillus device around, line-putting method, using cable around, actinobacillus device, by motor forward and backward
Insert row line is controlled around, unwrapping wire, before, unwrapping wire, insertion shell will be opened and opened, by plug cord outlet along the opening by plug
Remove plug cord outlet, and plug cord and plug be fixed on the shaft so that when insert row line unwrapping wire or coiling plug cord with
Shaft rotates;Around, actinobacillus device, including shaft, housing, insert row line, plug cord, the insert row line, insert the implementation cable
Head line has the perforate on housing to stretch out hull outside, and the insert row line rotates retractable line with shaft, and the shaft is articulated in
Motor, shaft are fixed in enclosure interior, and, axially in the horizontal direction, the insert row spool is connected to shaft for it, and insert row line with
Plug cord conducting connection, and controlled with insert row line respectively positioned at the both ends of shaft by motor forward and backward with countershaft forward and backward,
Insert row line is set to realize unwrapping wire or coiling, and when insert row line unwrapping wire or coiling, the plug cord is fixed in shaft so that it is with turning
Axis rotates, and the housing is semi-closed structure, it includes body and insertion shell, and the partial shell of plug line side is grafting shell
Body grafting in a manner of movable on the body, to open insertion shell before insert row line unwrapping wire or coiling, makes to be placed in housing
The plug in outside be fixed in shaft with insert row line unwrapping wire or coiling plug cord rotated with shaft, insert row line side set
Insert row line exports, and sets plug cord to export in plug line side, the opening is not passed through by the plug or socket, described
Plug cord near exit housing wall on have make plug cord it is movable within so that plug cord outlet port opening so that
It is spacing that plug can be exported institute by plug cord.
Implement feasibility analysis:Cable contrasts hand cable axis around the cable axis of, actinobacillus device, not only above use
Just it is quick and time saving and energy saving during arrangement after use, it is most important that can to efficiently avoid in electric wire recycling
The occurrence of knotting, it is greatly convenient to be brought to secondary professional work.Cable can be answered widely around, actinobacillus device cable axis
In working for power generation, provide convenience for portable power supply.And commonly using the workplace of power supply, can be by cable
Fixed around, actinobacillus device cable reel, power cord " where use, where stretch ", automatic recycling, work efficiency will obtain after being finished
To very big lifting.
12. implement the storage of massive video high density and the method for quickly retrieving based on Unified Power video monitoring platform, institute
Stating unified video platform includes service module and fast browsing module;Fast browsing module includes video frequency searching submodule, regards again
Frequency fast browsing submodule, video frequency abstract concentration submodule;Service module, it obtains live video stream from streaming media service module
Data simultaneously realize the distributed storage function of video file by calling HDFS interfaces, and it is real that application terminal passes through platform management service
Existing history video file retrieval, and the history video file stored by centrally stored service acquisition is to realize playing back videos and return
Put control function;Centrally stored service module is realized event storage, manually storage according to advance set storage strategy and is determined
When store, different storage data results are selected according to triggering mode is different, to include greater number, more on limited storage space
For a long time shooting history video file, and centrally stored service module to history video file carry out secondary operation, use with
Upper type realizes that high density stores;Fast browsing module, its using video concentration and video tab technology as means to realize video
Retrieval, video fast browsing, video frequency abstract concentrating function, and video tab storehouse is established, provide video image number for intellectual analysis
According to source, use and fast browsing is realized with upper type;
The unified video monitoring platform, it is built within SGERP integrated information platforms, is the weight of unified platform
Part is wanted, that mainly realizes audio/video information collects, manages and be distributed to service application use.
The unified video monitoring platform, its overall architecture include business structure, application architecture, data framework, logic structure
Frame, physics framework, Security Architecture and integration framework;The business framework be used for perform power generation applications, power transmission application, power transformation should
With, distribution applications, information communications applications, integrated application;The application frame is used to perform supporting, application function, access
Service, call service;The data framework storage platform configuration data, platform monitoring data, video equipment data, video information
Data, and for performing data distribution and data management;The Logic Architecture is used to perform protocol interaction, supporting, service
Realization and service management;The physics framework includes host, storage, network and software;The Security Architecture is used for realization number
According to safety, Host Security, using safety, network security;The integration framework includes standard front monitoring system, nonstandard front end is supervised
Viewing system, normal video collecting device, nonstandard video capture device, fire-fighting, gate inhibition, SCADA, power transmission and transformation detecting system, environment
Monitoring system,
The unified video monitoring platform, its business framework include platform operation management module, equipment operation management module,
Scheduling of resource module, platform service module, platform application display module, safety and Audit Module;The platform operation management
Module is used for user and empowerment management, platform operational management, network management, device configuration management;The equipment operation management is used
In equipment resource management, the maintenance management of equipment cloud, equipment quality detection management, device Alarm Management, non-standard equipment protocol conversion,
Equipment operation condition is analyzed;The scheduling of resource module is used for the live management of resource, resource uses management;The platform service
Module is deposited including user with empowerment management, platform operational management, external system linkage, network management, device configuration management, concentration
Storage;The platform application display module is had access to for video, playing back videos, body video playing, Yun Jing are controlled, large-size screen monitors exhibition
Show, fast browsing;The safety is used for log management, Authority Verification with Audit Module;
The unified video monitoring platform, its Logic Architecture include represent layer, Business Logic, communications protocol layers, basis
Supporting layer;The represent layer is used for video retrieval, fast browsing, playing back videos, video recording and uploads download;The service logic
Layer be used for real-time recording management, playing back videos management, video recording download management, video concentration, task management, storage management, quickly
Browse, video code conversion;The communications protocol layers include SIP components, RTP components, RTSP components, HTTP components;The basis
Supporting layer includes HDFS distributed file systems, Hbase, MapReduce;
The unified video monitoring platform, system deployment framework:Provincial company deployment power grid unifies video monitoring platform, and portion
Centrally stored service is affixed one's name to, storage service is based on Hadoop big data platforms, and deployment mainly includes host node, back end cluster number
Configured as needed according to interstitial content, first layer includes headend equipment, router, by dedicated network access second layer route
Device, the second layer include protocol translation service module, router, centrally stored service module, big data platform, the big number
Include host node, back end according to platform, the second layer includes management service mould by network insertion third layer, the third layer
Block, Streaming Media/playing back videos service module, communication service module, database service, synthesis show client, management client.
Such scheme mainly disperses to deposit to solve current electric power video monitoring data by using the mode of file system
Be stored in each front end, bring such as data to be easily lost, can not centralized and unified operation management, data value can not effectively play, again
Information Security is wanted to be difficult to the series of problems such as effective guarantee, unit carrying cost be higher.
The above, is only the preferable embodiment of the invention, but the protection domain of the invention is not
This is confined to, any one skilled in the art is in the technical scope that the invention discloses, according to the present invention
The technical solution of creation and its inventive concept are subject to equivalent substitution or change, should all cover the invention protection domain it
It is interior.
Claims (10)
1. a kind of work transmission line anchors the rotatable ground anchorage of combination type rotating of temporary line in building, it is characterised in that bag
Include earth anchor body, earth anchor swingle, revolving fragment, horizon bar, horizon bar strut, hitch point link, swingle rotation entry;
The earth anchor body includes being run through by earth anchor swingle and earth anchor swingle is anchored on to the first noumenon of its inside, and with
The second body that the first noumenon integral type is fixed;
The upper end of the earth anchor swingle sets the swingle rotation entry, and the buried part of earth anchor swingle is revolved
Rotor winding;
Hitch point link is fixedly installed on the portion on the upper side of the first noumenon side, and the second body is with hitch point link positioned at same
Side, and less than the installation site of hitch point link;
Horizon bar is connected to the end on the lower side of the second body, horizon bar strut be connected to horizon bar and the second body portion on the upper side it
Between, and horizon bar flushes in ground.
2. work transmission line as claimed in claim 1 anchors the rotatable ground anchorage of combination type rotating of temporary line in building,
It is characterized in that, the horizon bar and the junction of horizontal strut apart from the front end face of horizon bar apart from occupancy level bar
2/5。
3. work transmission line as claimed in claim 1 anchors the rotatable ground anchorage of combination type rotating of temporary line in building,
It is characterized in that, the angle between the horizon bar and horizontal strut is 30 °.
4. work transmission line as claimed in claim 1 anchors the rotatable ground anchorage of combination type rotating of temporary line in building,
It is characterized in that, the front end in horizon bar has insertion ground with the horizon bar fixed link of support level bar.
5. work transmission line as claimed in claim 1 anchors the rotatable ground anchorage of combination type rotating of temporary line in building,
It is characterized in that, the horizon bar fixed link away from horizon bar front end face apart from occupancy level bar 1/6~1/4.
6. work transmission line as claimed in claim 1 anchors the rotatable ground anchorage of combination type rotating of temporary line in building,
It is characterized in that, the hitch point link is the link made of stainless steel, and be welded in the second body, and in it and/or
Outer surface sets anti-skid chequer.
7. work transmission line as claimed in claim 1 anchors the rotatable ground anchorage of combination type rotating of temporary line in building,
It is characterized in that, the hitch point link is wire dispenser.
8. work transmission line as claimed in claim 1 anchors the rotatable ground anchorage of combination type rotating of temporary line in building,
It is characterized in that, the horizon bar have two, respectively positioned at the both sides of the second body, and by horizon bar they sup-port with
Isolation.
9. the combination type rotating that temporary line is anchored in being built such as work transmission line any one of claim 1-6 is rotatable
The method to set up of anchor device, it is characterised in that in transmission line construction construction site, filled using the rotatable earth anchor of the combination type rotating
When putting, according to on-site actual situations, first selection sets the suitable position of the rotatable ground anchorage of combination type rotating, by combination type rotating
The partial insertion ground of the earth anchor swingle of rotatable ground anchorage, enables the revolving fragment of earth anchor swingle lower part winding contiguously
Face, then by the rotation entry on push rod insertion earth anchor swingle top, promotes push rod to rotate earth anchor swingle stress, will revolve
During the revolving fragment of the earth anchor turned does not bury gradually, after the depth in earth anchor swingle insertion soil is met the requirements, hitch point is hung
The direction of ring is adjusted to the direction of application, afterwards in the fixed horizontal strut of the front of Impact direction installation, is hung at hitch point
Ring binding pulling wires.
10. a kind of power construction implementation, it is characterised in that including following methods:
(1) implement to be used for the method for fixing optical cable, include the following steps:
S1. the table top for the aluminum alloy materials for choosing Intermediate Gray folding to fold, can in the Corner Strapped of workbench as workbench
Telescopic table legs, the table leg are spring folding table leg to support workbench, table leg is folded with workbench into 90 degree of angles;
Fix optical cable when S2. choosing optical cable clamp to continue to be used, workbench left and right sides respectively installs an optical cable clamp, folder
Holder two sides is all flat with stationary work-table table top, and the one side for having V-groove is used to fix optical cable, opening direction direction work people
Member;
(2) method for implementing to make cable well lid rain-proof anti-theft, includes the following steps:
S1. hole is not provided with cable well lid to prevent rainwater, snow-broth from pouring into cable shaft;
S2. the walling crib of cable well lid makes upward groove shapes, and well lid lower surface edge is fabricated to downwardly convex, embedded walling crib
Groove;To prevent rainwater from entering in well and for preventing well lid from shifting, well lid is prevented to be stolen;
S3. the upper surface center of cable well lid is fabricated to the disk of diameter 500mm, for coordinating with strong magnet to open well
Lid, and it is used for embedding information label pound sign in the circular groove of disk edge making diameter 120mm, and also make the circle of 30mm
Connected in star is used to be embedded in information chip in well and is used to scan reading information to realize the management to cable shaft cable passage;
(3) method that implementation prepares transmission tower general-purpose type protective cap template, the minimum rule of welded steel plate length for being 1mm with thickness
Lattice are the fixed form of 400mm, are in addition welded the splice template that multiple length are 100mm, the quantity of splice template is with shaft tower base
Plinth staking out face size accordingly increases, and the fixed form is formed by connecting by two orthogonal tablets, and each described flat
The fixed plate for installing vertical plate face backwards of plate, the splice template is tablet, and part splice template has vertical panel
The fixed plate in face;The first fixed plate and the fixed plate of the first splice template of first fixed form are bolted, this first
Splice template and the template splicing that connects of more than one no fixed plate, and last splice template spliced is with fixation
Plate, it is the second splice template, and the second splice template passes through its fixed plate and the fixed plate of the first tablet of the second fixed form
It is bolted, the fixed plate and the fixed plate of the 3rd splice plate of the second tablet of the second fixed form are bolted,
3rd splice template and the template splicing that connects of more than one no fixed plate, and last the splice template band spliced
There is fixed plate, it is the 4th splice template, and the 4th splice template passes through the first tablet of its fixed plate and the 3rd fixed form
Fixed plate is bolted, and with this connection mode, until one carries the splice template of fixed plate, it passes through fixed plate and first
Fixed form and splice template, are enclosed the guarantor being connected into as hollow square shape by the second bolt of fixing plate connection of fixed form
Helmet template, and the edges and corners of the protective cap are changed to arc by arc corner angle template bar;
(4) implement the method for rod-rising tower fall arrest in Power Project construction, a diameter is bound on existing safety belt waistband
8mm's washs Nima rope, and rope is upper to put a fast retaining ring of aluminium alloy at interval of some meter amperes, the every some rice described in rod-rising tower of operating personnel
With regard to one fast retaining ring of aluminium alloy of installation in main material, if operating personnel slips, the height of fall is controlled within some rice,
The fast retaining ring spacing distance of aluminium alloy is adjusted, to control the height of fall;The connection method of the fast retaining ring of aluminium alloy and main material is washed for use
Nima rope is connected with main material with the method for fast knot, then the fast retaining ring of one end aluminium alloy of fast knot is pinned, above and below personnel during shaft tower
The fast retaining ring of aluminium alloy is uniformly buckled in operating personnel's loins;Wash Nima rope parameter:Nameplate lable diameter of phi 8mm, moment connect disconnected power
2400KG;The fast retaining ring parameter of aluminium alloy:Nameplate lable flash disruption power 8KN;
(5) implement the method that patrol UAV controls in power domain, it is flat that a support is installed on the body of patrol UAV
Platform, installs control electronics and lifting steering engine in support platform, and patrol UAV by remote control control plays hanging rudder after taking off
The folding of machine;
The installation method of support platform:
S1. carbon fiber board is processed, processing is designed carbon fiber board according to patrol UAV foot stool position;
S2. carbon fiber board and patrol UAV body are installed;
S3. carbon fiber board upper surface installation electronic equipment;
S4. carbon fiber board installs steering engine to ground surface;
S5. steering engine crossbeam is in closed state with traction after patrol UAV is taken off;
S6. ground staff by remote control control steering engine crossbeam horizontal movement to control loosening for weight;
(6) method for implementing to make 66kV-220kV docking circlip type earthing wire clips, the wire clamp include two be oppositely arranged
A wire clamp clamping plate, the wire clamp clamping plate include the sequentially connected tip of integral type, groove portion and clamping part, the groove portion it is interior opposite
Face is C-type clamp mouth groove, has the clamp spring for being used for clamping circuit in each side clamp port groove, and two clamp springs are oppositely arranged, and are blocked
Spring is connected near C-type clamp mouth highest marginal point by shaft axis, and the clamping part has prominent articulated section, and is opened in inside
Groove, the articulated section of opposite two clamping parts is by pin-hinges, and pin is located at spring inner, and spring is pressed on the hinge
In the fluting of socket part, assembled according to the structure of above-mentioned wire clamp;
(7) production method of GIS device loop resistance test auxiliary tool is implemented, it is characterised in that the auxiliary tool includes:
Shaped cable clamp and insulating bar are hooked, is connected between the insulating bar and hook shaped cable clamp by sawtooth occlusal pattern swivel joint, hooks molded line
Folder body is the Curved hook insulator for clamping connection lead, and curved side has the conductive material with wire contacts in it, is made
Pressure-wire, current line for p-wire are electrically connected with the conductive material respectively, and are drawn by the afterbody of hook shaped cable clamp body;Institute
The sawtooth occlusal pattern swivel joint stated includes upper boom, the upper plate being connected with upper boom integral type, lower beam, is connected with lower beam integral type
Lower plate, the upper and lower disk body have run through for punching bolt thread connection threaded hole, the upper and lower disk body
It is oppositely arranged and forward surface has serrated face, two opposite serrated faces is threadedly coupled to fasten in punching bolt with the threaded hole
It is mutually twisted when spacing, the upper boom is fixedly connected with hooking shaped cable clamp, and the lower beam is fixedly connected with insulating bar;Described
Threaded hole is connected by punching bolt thread, and has the wing nut of fastening punching bolt in punching bolt end, and described is exhausted
Edge bar is to connect button insulated tension pole;Structure according to above-mentioned auxiliary tool is assembled;
(8) production method of Portable transformer substation equipment snow breaker is implemented, the snow breaker includes engine, defeated with engine
Go out the flexible axle of connection, the flexible axle is connected to drive rotating brushes to rotate with transmission axis connection, transmission shaft with rotating brushes, institute
The transmission shaft stated is placed in inside insulating bar, and insulating bar bottom is handle, and the insulating bar is glass fibre reinforced plastic insulating bar, described
Transmission shaft is glass fibre reinforced plastic insulating transmission shaft, and silicon rubber waterproof full skirt is provided with below rotating brushes, and the silicon rubber is prevented
Water full skirt is located at the top of insulating bar upper surface, and the flexible axle is connected between engine and transmission shaft, the insulating bar
It is made of fiberglass, and its external coating mica powder and/or polytetrafluorethylecoatings coatings;According to the structure of above-mentioned snow breaker into luggage
Match somebody with somebody;
(9) method to set up of the rotatable ground anchorage of combination type rotating of anchoring temporary line in work transmission line construction is implemented,
Transmission line construction construction site, during ground anchorage rotatable using combination type rotating, according to on-site actual situations, first selection sets institute
The suitable position of the rotatable ground anchorage of combination type rotating is stated, by the partial insertion of the earth anchor swingle of the rotatable ground anchorage of combination type rotating
Ground, enables the revolving fragment of earth anchor swingle lower part winding to contact ground, then by push rod insertion earth anchor swingle top
Rotate in entry, promote push rod to rotate earth anchor swingle stress, it is local during the revolving fragment of rotating earth anchor is not buried gradually
Anchor swingle insertion soil in depth meet the requirements after, by the direction of hitch point link be adjusted to application direction, afterwards by
The fixed horizontal strut of front installation of force direction, the link binding pulling wires at hitch point;The rotatable earth anchor of the combination type rotating
Device includes earth anchor body, earth anchor swingle, revolving fragment, horizon bar, horizon bar strut, hitch point link, swingle swing fork
Hole;The earth anchor body includes being run through by earth anchor swingle and earth anchor swingle is anchored on to the first noumenon of its inside, and with
The second body that the first noumenon integral type is fixed;The upper end of the earth anchor swingle sets the swingle rotation entry, ground
The buried part of anchor swingle is by revolving fragment winding;Hitch point link is fixedly installed on the inclined of the first noumenon side
Top, the second body are located at homonymy with hitch point link, and less than the installation site of hitch point link;Horizon bar is connected to second
The end on the lower side of body, horizon bar strut is connected between horizon bar and the second body portion on the upper side, and horizon bar flushes in ground;
(10) the aerial earth wire method for improving of tangent tower overhead-groundwire lifter is implemented, using tangent tower overhead-groundwire lifter,
In the operation of transmission line of electricity lifting tangent tower aerial earth wire, first according to the fixed institute of angle bar direction above aerial earth wire hanging wire point
State the cross-bridges iron of lifter, cross-bridges iron and tangent tower are by tightening pressing plate and the fixation of lifter, then adjust cross-bridges level
The specific location of adjustable screw on iron is lengthened, the hook of the lower part of adjustable screw is caught on into aerial earth wire, rotates adjustable screw handle
Hand is adjusted to the wire clamp that suitable position installs aerial earth wire again, the tangent tower aerial earth wire to tighten leading screw, by aerial earth wire
Lifter, including horizontal angle bar combination of turning one's head, pressing plate, cross-bridges iron, the horizontal lengthening iron of cross-bridges, adjustable screw;Horizontal angle bar combination of turning one's head
Fixed above aerial earth wire hanging wire point and with tangent tower, pressing plate is fixed on horizontal angle bar of turning one's head and combines, the angle bar group
A pair of of angle bar of conjunction, an angle bar of each angle bar is facing away under, and another angle bar back of the body of two angle bar is drawn close in opposite directions, and the pressing plate is ladder
Shape, the height that its ladder vertical plane is adapted to the angle bar back of the body directed downwardly are set, and upper ladder plane of structure is fixed on the angle bar directed downwardly back of the body of angle bar
On, downstairs plane of structure is fixed on the cross-bridges iron, makes cross-bridges iron with tangent tower by tightening pressing plate fixation;In cross-bridges iron
At least two cross-bridges of upper setting are horizontal to lengthen iron, and the part that the horizontal lengthening iron level of the cross-bridges stretches out the cross-bridges iron connects
The adjustable screw for adjusting aerial earth wire vertical position height is connect, there is hook to hook for the bottom of the adjustable screw
Aerial earth wire is connect, the cross-bridges iron is horizontal laying, and the horizontal iron that lengthens of cross-bridges is the horizontal laying that surface is fixed on it
Iron is lengthened, the axis direction of cross-bridges iron has with the horizontal axis direction for lengthening iron of cross-bridges is mutually perpendicular to relation, and described is adjustable
Leading screw is installed on the horizontal end for lengthening iron and stretching out cross-bridges iron part of cross-bridges, and the horizontal iron that lengthens of the cross-bridges just has two,
And to be symmetrical with horizontal angle bar combination settings of turning one's head;
(11) cable is implemented around, actinobacillus device around, line-putting method, using cable around, actinobacillus device, by motor forward and backward control
Insert row line processed before, unwrapping wire, opens insertion shell, is gone out plug removal plug cord along opening by plug cord outlet around, unwrapping wire
Mouthful, and plug cord and plug are fixed on the shaft so that plug cord is rotated with shaft when insert row line unwrapping wire or coiling;It is described
Implement cable has on housing around, actinobacillus device, including shaft, housing, insert row line, plug cord, the insert row line, plug cord
Hull outside is stretched out in perforate, and the insert row line rotates retractable line with shaft, and the shaft is articulated in motor, and shaft is consolidated
Due to enclosure interior, it is axially in the horizontal direction, the insert row spool is connected to shaft, and insert row line turns on company with plug cord
Connect, and be located at the both ends of shaft respectively with insert row line, controlled by motor forward and backward with countershaft forward and backward, realize insert row line
Unwrapping wire or coiling, and when insert row line unwrapping wire or coiling, the plug cord is fixed in shaft so that it is rotated with shaft, described
Housing is semi-closed structure, it includes body and insertion shell, and the partial shell of plug line side is insertion shell with movable side
Formula grafting on the body, to open insertion shell before insert row line unwrapping wire or coiling, makes the plug quilt for being placed in hull outside
Be fixed in shaft with insert row line unwrapping wire or coiling plug cord rotated with shaft, in insert row line side, the outlet of insert row line is set,
Plug cord is set to export in plug line side, the opening is not passed through by the plug or socket, and the plug cord goes out
There is the opening for making plug cord movable within down to plug cord outlet port, so that plug can be inserted on housing wall near mouthful
Head line outlet institute is spacing;
(12) storage of massive video high density and method for quickly retrieving based on Unified Power video monitoring platform, the system are implemented
One video platform includes service module and fast browsing module;It is fast that fast browsing module includes video frequency searching submodule, video again
Speed browses submodule, video frequency abstract concentration submodule;Service module, it obtains real-time video flow data from streaming media service module
And by calling HDFS interfaces to realize the distributed storage function of video file, application terminal services realization by platform management and goes through
History video file is retrieved, and the history video file stored by centrally stored service acquisition is controlled with realizing playing back videos and playing back
Function processed;Centrally stored service module realizes that event storage, manually storage and timing are deposited according to storage strategy set in advance
Storage, different storage data results are selected according to triggering mode is different, with include on limited storage space greater number, it is longer when
Between image history video file, and centrally stored service module to history video file carry out secondary operation, use with top
Formula realizes that high density stores;Fast browsing module, its using video concentration and video tab technology as means with realize video frequency searching,
Video fast browsing, video frequency abstract concentrating function, and video tab storehouse is established, vedio data source is provided for intellectual analysis,
Use realizes fast browsing with upper type;
The unified video monitoring platform mainly realizes that the service application of collecting, manage and be distributed to of audio/video information uses;
The unified video monitoring platform, its overall architecture include business structure, application architecture, data framework, Logic Architecture, thing
Manage framework, Security Architecture and integration framework;The business framework be used for perform power generation applications, power transmission application, power transformation application, match somebody with somebody
Electric application, information communications applications, integrated application;The application frame be used for perform supporting, application function, access service,
Call service;The data framework storage platform configuration data, platform monitoring data, video equipment data, video information data,
And for performing data distribution and data management;The Logic Architecture be used for perform protocol interaction, supporting, service realize and
Service management;The physics framework includes host, storage, network and software;The Security Architecture be used for realization data safety,
Host Security, using safety, network security;The integration framework include standard front monitoring system, nonstandard front end monitoring system,
Normal video collecting device, nonstandard video capture device, fire-fighting, gate inhibition, SCADA, power transmission and transformation detecting system, environmental monitoring system
System;
The unified video monitoring platform, its business framework include platform operation management module, equipment operation management module, resource
Scheduler module, platform service module, platform application display module, safety and Audit Module;The platform operation management module
For user and empowerment management, platform operational management, network management, device configuration management;The equipment operation management is used to set
Standby resource management, the maintenance management of equipment cloud, equipment quality detection management, device Alarm Management, non-standard equipment protocol conversion, equipment
Operating condition is analyzed;The scheduling of resource module is used for the live management of resource, resource uses management;The platform service module
Including user and empowerment management, platform operational management, external system linkage, network management, device configuration management, centrally stored;
The platform application display module is had access to for video, playing back videos, body video playing, Yun Jing are controlled, large-size screen monitors are shown, fast
Speed browses;The safety is used for log management, Authority Verification with Audit Module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710993236.3A CN107979021A (en) | 2017-10-23 | 2017-10-23 | Work transmission line anchors the rotatable ground anchorage of combination type rotating and setting, power construction implementation of temporary line in building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710993236.3A CN107979021A (en) | 2017-10-23 | 2017-10-23 | Work transmission line anchors the rotatable ground anchorage of combination type rotating and setting, power construction implementation of temporary line in building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107979021A true CN107979021A (en) | 2018-05-01 |
Family
ID=62012581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710993236.3A Pending CN107979021A (en) | 2017-10-23 | 2017-10-23 | Work transmission line anchors the rotatable ground anchorage of combination type rotating and setting, power construction implementation of temporary line in building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107979021A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108840215A (en) * | 2018-08-14 | 2018-11-20 | 国网辽宁省电力有限公司辽阳供电公司 | Mounting hanger for fixed screw of winning in succession |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105133609A (en) * | 2015-09-29 | 2015-12-09 | 贵州电力设计研究院 | Cone penetration test reaction device comprising variable-diameter spiral ground anchors and force exerting disc |
-
2017
- 2017-10-23 CN CN201710993236.3A patent/CN107979021A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105133609A (en) * | 2015-09-29 | 2015-12-09 | 贵州电力设计研究院 | Cone penetration test reaction device comprising variable-diameter spiral ground anchors and force exerting disc |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108840215A (en) * | 2018-08-14 | 2018-11-20 | 国网辽宁省电力有限公司辽阳供电公司 | Mounting hanger for fixed screw of winning in succession |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107887836A (en) | Tangent tower overhead-groundwire lifter and its aerial earth wire method for improving, power construction implementation | |
CN108051616A (en) | GIS device loop resistance tests auxiliary tool and power construction implementation | |
CN108204138A (en) | Portable 10kV ring main units construction operation rain-proof shelter and power construction implementation | |
CN107968930A (en) | The storage of massive video high density and method for quickly retrieving and power construction implementation based on unified video monitoring platform | |
CN108054596A (en) | Cable is around, actinobacillus device and method, power construction implementation | |
CN107800063A (en) | Portable transformer substation equipment snow breaker and power construction implementation | |
CN108288777A (en) | 66kV-220kV docks circlip type earthing wire clip and power construction implementation | |
US8446034B1 (en) | Electric power generation using a wind chute | |
CN207588019U (en) | Power distribution network earth potential live takes fiery T binding clips | |
CN107228780B (en) | A kind of multizone water sample acquisition device | |
CN107979021A (en) | Work transmission line anchors the rotatable ground anchorage of combination type rotating and setting, power construction implementation of temporary line in building | |
CN108708537A (en) | A kind of fast scaffolding and its installation method of insulating | |
CN112436434A (en) | Electric power construction tensioner bullwheel | |
CN205297003U (en) | Stake of high stability rail | |
CN202333674U (en) | Wire-erecting device | |
CN210074185U (en) | Earthing device for electric power construction | |
CN208089466U (en) | A kind of vertical axis aerogenerator | |
CN207650423U (en) | One kind being convenient for fixed environmental monitoring weather station | |
CN207198214U (en) | A kind of three-phase intelligent electric-energy meter | |
CN205985722U (en) | Cable peeling apparatus | |
CN107934702A (en) | Deployable and collapsible grounding wire device | |
CN205637789U (en) | Portable wire pole | |
CN205036149U (en) | Cable terminal steel pipe pole | |
CN107453278A (en) | A kind of 10kV high-altitudes stringing tractor | |
CN206712339U (en) | Power distribution line maintenance safety wire clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180501 |
|
RJ01 | Rejection of invention patent application after publication |