CN108045990A - A kind of bulk goods charging planarization system - Google Patents

A kind of bulk goods charging planarization system Download PDF

Info

Publication number
CN108045990A
CN108045990A CN201711342469.3A CN201711342469A CN108045990A CN 108045990 A CN108045990 A CN 108045990A CN 201711342469 A CN201711342469 A CN 201711342469A CN 108045990 A CN108045990 A CN 108045990A
Authority
CN
China
Prior art keywords
belt feeder
shunting
bulk goods
railway carriage
charge mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711342469.3A
Other languages
Chinese (zh)
Inventor
李勇智
韦浩
胡志辉
王贡献
袁建明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN K-CRANE OCEAN LIFTING TECHNOLOGY Co Ltd
Original Assignee
WUHAN K-CRANE OCEAN LIFTING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN K-CRANE OCEAN LIFTING TECHNOLOGY Co Ltd filed Critical WUHAN K-CRANE OCEAN LIFTING TECHNOLOGY Co Ltd
Priority to CN201711342469.3A priority Critical patent/CN108045990A/en
Publication of CN108045990A publication Critical patent/CN108045990A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G69/00Auxiliary measures taken, or devices used, in connection with loading or unloading
    • B65G69/04Spreading out the materials conveyed over the whole surface to be loaded; Trimming heaps of loose materials
    • B65G69/045Spreading out the materials conveyed over the whole surface to be loaded; Trimming heaps of loose materials with scraping devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/34Devices for discharging articles or materials from conveyor 
    • B65G47/44Arrangements or applications of hoppers or chutes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G67/00Loading or unloading vehicles
    • B65G67/02Loading or unloading land vehicles
    • B65G67/04Loading land vehicles
    • B65G67/08Loading land vehicles using endless conveyors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Abstract

A kind of bulk goods charging planarization system provided by the invention, including:Main belt feeder (4) weighs belt feeder (3) and shunting charge mechanism (7);One end of the main belt feeder (4) is communicated with supplied materials end, and the other end of the main belt feeder (4) is communicated with the feed end of the weighing belt feeder (3);The top for weighing belt feeder (3) and being transversely arranged on track for a train, and the delivery end for weighing belt feeder (3) is communicated with the feed inlet of the shunting charge mechanism (7);The shunting charge mechanism (7) is located at region of the weighing belt feeder (3) between railway carriage, and the discharge port face railway carriage of the shunting charge mechanism (7).Bulk goods provided by the invention charging planarization system is carried out at the same time materials in carriage leveling operation, it can be achieved that high-precision continuous and quantitative entrucking, so as to avoid railway carriage is overweight, short weight or the phenomenon that unbalance loading.

Description

A kind of bulk goods charging planarization system
Technical field
The present invention relates to harbour bulk material entrucking technical field, more particularly, to a kind of bulk goods charging planarization system.
Background technology
Ore materials based on coal and iron ore are the important raw and processed materials of the national economic development, with ore in harbour The continuous increase of material handling capacity, the requirement to entrucking efficiency are also higher and higher.The shipment level of bulk material is port and pier Modernization, the one of the important signs that of the degree of automation, conclusive effect is played to the production operation level at harbour.
At present, large amount bulk cargo harbour bulk material ration loading system is mostly using train loading building loading system, but fills The entrucking of vehicle building has the following disadvantages:
1) entrucking building is complicated, and maintenance cost is high.Complicated, the master of entrucking building hydraulic system and various actuating mechanisms Want component expensive from external import price, core technology is difficult to grasp at home.The impact wear that acts frequently is serious, is often claiming Batch box, entrucking elephant trunk etc. generate buildup, particularly fine ore, and the normal work in entrucking building is directly influenced after material is stained with.
2) need to determine the final loading of freight waggon with track scale after entrucking, such as overload, it is necessary to arrive train traction is loaded Overweight vehicle processing line carries out artificial off-load.Entrucking building can be directly reached in theory by the way of scale hooper static weighing The requirement of business metering, but ore materials can generally slip after scale hooper weighs during entrucking in scale hooper and entrucking Pipe etc. generates buildup, and the material of actual load to railway carriage can not determine, is adjusted in addition, the precision of scale hooper metering is difficult calibrating Whole, this results in the accuracy that can not judge weighing balance.In real work, it can only ensure that most entrucking Weight control exists Within the scope of the overload that railway allows, there are the phenomenon that overweight or short weight for part railway carriage.
3) entrucking cannot be balanced, it is necessary to a large amount of manpower flatcars.Since entrucking building is semi-automatic loading system, it can only lean on people's Feel that vehicle speed and discharging are led in control manually, can not determine railway carriage current location and weight, there are larger inclined in real work Weight, it is also difficult to realize balance entrucking, material loads uneven, it is necessary to a large amount of manpower flatcars in compartment.
4) whole high energy consumption, whole system cost are also relatively high.Entrucking buffering hopper is up to forties meters, entrucking belt Machine climb altitude is larger, and corresponding conversion room steel construction complexity cost is relatively high.
The content of the invention
For it is above-mentioned the technical issues of, the present invention provides a kind of bulk goods charging planarization system.
A kind of bulk goods charging planarization system is provided according to an aspect of the present invention, including:Main belt feeder 4 weighs belt feeder 3 With shunting charge mechanism 7;One end of the main belt feeder 4 is communicated with supplied materials end, the other end and the title of the main belt feeder 4 The feed end of amount belt feeder 3 communicates;The top for weighing belt feeder 3 and being transversely arranged on track for a train, and the weighing belt The delivery end of machine 3 is communicated with the feed inlet of the shunting charge mechanism 7;The shunting charge mechanism 7 is located at the weighing belt Region between machine 3 and railway carriage, and the discharge port face railway carriage of the shunting charge mechanism 7.
Wherein, bulk goods charging planarization system, further includes:The scraper plate Ping Liao mechanisms being arranged in directly over track for a train 6, and the scraper plate Ping Liao mechanisms 6 are located at the rear of the shunting charge mechanism 7.
Wherein, bulk goods charging planarization system, further includes:It is used to support the main belt feeder steel of the main belt feeder 4 Structure stent 5;And it is used to support the master of the weighing belt feeder 3, the shunting charge mechanism 7 and the scraper plate Ping Liao mechanisms 6 Building structure 2;The main belt feeder steel structure stent (5) is fixed on ground, and is connected with the main building structure 2;The main building knot Structure 2 is across in track for a train both sides, and the main building structure 2 is fixed on ground.
Wherein, bulk goods charging planarization system, further includes:Drivers' cab 1 above railway carriage side, and it is described Drivers' cab 1 is in the same plane perpendicular to track for a train with the shunting charge mechanism 7.
Wherein, suspension peel & belt scale, and the weighing belt are equipped at the middle part of the length direction of the weighing belt feeder 3 Weight sensor is arranged at four base angles of 4 pedestal of machine.
Wherein, the shunting charge mechanism 7 includes distributing T-pipe device 13, shunting chute 12 caches funnel 14 and switching valve Door;The feed inlet of the distributing T-pipe device 13 is communicated with the delivery end of the weighing belt feeder 3, and the of the distributing T-pipe device 13 One discharge port is communicated with the feed inlet of the shunting chute 12, and the second discharge port of the distributing T-pipe device 13 is leaked with the caching The feed inlet of bucket 14 communicates;And first discharge port and second discharge port are arranged along track for a train direction;The shunting The discharge port of chute 12 is arranged in above railway carriage, and the discharge port of the caching funnel 14 is arranged in the upper of adjacent railway carriage Side;The conversion valve is arranged on the discharge outlet of the distributing T-pipe device 13.
Wherein, the scraper plate Ping Liao mechanisms 6 include:Lifting cylinder 8 lifts support guide structure 9, lifting column 10, scrapes Plate 11;The first end of the lifting cylinder 8 is fixed in the main building structure 2, and the second end of the lifting cylinder 8 stretches into described In the top for lifting support guide structure 9;The first end of the lifting column 10 is stretched under the lifting support guide structure 9 In portion, the second end of the lifting column 10 is connected with the middle part of the scraper plate 11;The second end of the lifting cylinder 8 with it is described The first end of lifting column 10 is hinged, and the lifting cylinder 8, the lifting support guide structure 9 and the lifting column 10 are equal Vertical arrangement.
Wherein, the shunting charge mechanism 7 further includes the hopper valve 15 for the discharge outlet for setting the caching funnel 14.
Wherein, the chute 12 that shunts is people's font structure, and the upper opening of the shunting chute 12 and the threeway First discharge port of current divider 13 is connected, and two lower openings of the shunting chute 12 are symmetrically arranged in the train vehicle Above compartment.
Wherein, the scraper plate 11 is " Π " type structure, and the forepart of the scraper plate (11) has symmetrical needle pattern Protrusion.
A kind of bulk goods charging planarization system provided by the invention, by being set between main belt feeder and shunting charge mechanism Belt feeder is weighed, then the material on main belt feeder is delivered to weighing belt feeder, through weighing after belt feeder weighs, then is delivered to point Charge mechanism is flowed, and then material dosing is distributed into railway carriage;Since the weighing belt feeder under this kind of arrangement is one Kind unsteady flow formula weighs belt feeder, and by mainstream static weighing, the mode of head and the tail Dynamic Weighting can accurately measure loading train Weight of material in compartment, so as to control each the phenomenon that saving compartment loading material total amount, avoiding overweight railway carriage or short weight. Arrangement shunting charge mechanism is, it can be achieved that the uninterrupted continuous loading of bulk material above railway carriage, and makes needed for entrucking Material lifting height be reduced to more than ten meters of height by forties meters of height in traditional entrucking building, be effectively simplified the structure of equipment, pole Reduce energy consumption needed for operation greatly.And wherein one bypass of distributing T-pipe device is provided with caching bucket, can effectively solve when dress The material system failure shut down or operation after the completion of when shutting down, the storage of the partial material additionally conveyed due to the inertia of belt feeder is asked Topic.As a result of forepart there is the scraper plate Ping Liao mechanisms of symmetrical needle pattern protrusion, coordinate lambdoid shunting chute, It can realize the flat material operation that two-way tracing type is carried out while compartment feeds, flat material effect is preferable and has been greatly saved operation Time simplifies operation technique flow, and entire entrucking, flatcar flow is enable to be synchronously completed in a setting.
Description of the drawings
It in order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair Some bright embodiments, for those of ordinary skill in the art, without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the structure chart of bulk goods provided in an embodiment of the present invention charging planarization system;
Fig. 2 is the partial sectional view along A-A directions of bulk goods shown in FIG. 1 charging planarization system;
Fig. 3 is the partial sectional view along B-B directions of bulk goods shown in Fig. 2 charging planarization system;
Fig. 4 is the structure chart of the scraper plate Ping Liao mechanisms in bulk goods shown in Fig. 2 charging planarization system;
Fig. 5 is the structure chart of the shunting charge mechanism in bulk goods shown in Fig. 2 charging planarization system;
Fig. 6 is the structure chart of the scraper plate in bulk goods shown in FIG. 1 charging planarization system.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, the technical solution in the embodiment of the present invention is explicitly described, it is clear that described embodiment be the present invention Part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not having All other embodiments obtained under the premise of creative work are made, belong to the scope of protection of the invention.
Fig. 1 is the structure chart of bulk goods provided in an embodiment of the present invention charging planarization system, as depicted in figs. 1 and 2, the system Including:Main belt feeder 4 weighs belt feeder 3 and shunting charge mechanism 7;One end of the main belt feeder 4 is communicated with supplied materials end, institute The other end for stating main belt feeder 4 is communicated with the feed end of the weighing belt feeder 3;The weighing belt feeder 3 is transversely arranged on fire The top in track road, and the delivery end for weighing belt feeder 3 is communicated with the feed inlet of the shunting charge mechanism 7;Described point Flow the region that charge mechanism 7 is located between the weighing belt feeder 3 and railway carriage, and the discharging of the shunting charge mechanism 7 Mouth face railway carriage.
Wherein, belt feeder is the abbreviation of ribbon conveyer, have it is fixed and portable, it is simple in structure, it is efficient.With flexibility Conveyer belt makees the continuous conveyor of material carrying and driving component.One conveyer belt for no reason is rolled around driving drum and changed course Cylinder.Upper inferior division between two rollers is respectively with several idler stands.Material is placed in top set, using between driving drum and band Frictional force traction conveyer belt and material operation.Suitable for horizontal and inclined direction conveying bulk granular material and work piece, also may be used For carrying out the processing line of certain technological operation.Simple in structure, stable working is reliable, adaptable to material, conveys energy Power is larger, and small power consumption is widely used.
Specifically, the material at supplied materials end is delivered to and weighs belt feeder 3 by main belt feeder 4, weighs belt feeder 3 and material is carried out Detection weighs, and the material after weighing falls into shunting charge mechanism 7 through weighing the delivery end of belt feeder 3.Then, charge mechanism is shunted Material is unloaded and is filled in railway carriage by 7, and train keeps forward travel state at a slow speed in entire charging process, and pace is with being packed into The real-time traffic of material is related.When the total amount that the loading material total amount that weighing belt feeder 3 is measured is loaded with railway carriage needs When consistent, at this time by the control to speed, two discharge port one of shunting charge mechanism 7 are located on the compartment to feed Side, another is located at next section and treats above charging car compartment, and shunting charge mechanism 7 is then made to switch over to another section railway carriage It feeds, so cycles, to ensure the total amount for often saving the material total amount loaded in railway carriage and railway carriage needs load Unanimously.
In embodiments of the present invention, belt feeder is weighed by being set between main belt feeder and shunting charge mechanism, then will Material on main belt feeder is delivered to weighing belt feeder, after weighing belt feeder dynamic weighing, then is delivered to shunting charge mechanism, And then material dosing is distributed into railway carriage;Since the material being packed into railway carriage have passed through the title of weighing belt feeder Weight, and then can accurately obtain the total amount for being packed into material in railway carriage, so as to avoid railway carriage is overweight or short weight shows As, you can improve the efficiency of transported material.
On the basis of above-described embodiment, with reference to Fig. 2, the bulk goods charging planarization system further includes:It is arranged in railway rail Scraper plate Ping Liao mechanisms 6 directly over road, and the scraper plate puts down the rear that material machine 6 is located at the shunting charge mechanism 7;Wherein, with Train direction of advance is front.
Specifically, scraper plate Ping Liao mechanisms 6 are set in the front of shunting charge mechanism 7 so that material is through shunting charge mechanism 7 It unloads after being filled to railway carriage, then is flattened through scraper plate Ping Liao mechanisms 6.Then material more uniform can be distributed in railway carriage, It avoids railway carriage and situation about laying particular stress on occurs.
In embodiments of the present invention, by setting scraper plate Ping Liao mechanisms at the rear of shunting charge mechanism, and scraped using this Ban Pingliao mechanisms flatten the material for being packed into railway carriage so that material is more uniform to be placed in railway carriage, is avoided There is situation about laying particular stress in railway carriage, and improves the turnover conevying efficiency of bulk material, while it is flat to also improve bulk goods charging The intelligent level of whole system.
On the basis of the various embodiments described above, the bulk goods charging planarization system further includes:It is used to support the main belt The main belt feeder steel structure stent 5 of machine 4;And it is used to support the weighing belt feeder 3, the shunting charge mechanism 7 and described scrapes The main building structure 2 of Ban Pingliao mechanisms 6;The main belt feeder steel structure stent 5 is fixed on ground, and is connected with the main building structure 2 It connects;The main building structure 2 is across in track for a train both sides, and the main building structure 2 is fixed on ground.
Specifically, main belt feeder steel structure stent 5 and main building structure 2 are the support constructions in bulk goods charging, you can with It is referred to as main body steel construction.Main building structure 2 can be frame steel structure, across in the both sides of track for a train, be fixed on ground, For fixing supporting weighing belt feeder 3, the shunting charge mechanism 7 and the scraper plate Ping Liao mechanisms 6, to ensure passing through for train Property.And main belt feeder steel structure stent 5 is fixed on ground, and be connected with main building structure 2.Its form can be top droop Support frame structure, inclination angle is consistent with the conveying inclination angle of main belt feeder 4, is used to support main belt feeder 4 according to certain inclination angle, Promotion conveying is carried out to material.
On the basis of the various embodiments described above, the bulk goods charging planarization system further includes:Positioned at railway carriage side Drivers' cab 1, and the drivers' cab 1 is in the same plane perpendicular to track for a train with the shunting charge mechanism 7.
Specifically, drivers' cab 1 is located at railway carriage side, and is in same perpendicular to train with shunting charge mechanism 7 The plane of track, i.e. drivers' cab 1 faces shunting charge mechanism, facilitates real time monitoring and control of the driver to the flat material operation that feeds System.Then, the real-time traffic that driver can detect according to belt feeder 3 is weighed controls the hauling speed of draft gear;And according to The real-time entrucking weight that belt feeder 3 detects is weighed, control is packed into weight of material of railway carriage etc..
On the basis of the various embodiments described above, suspension peel & belt scale, the title are equipped at the middle part of the weighing belt feeder 3 It measures and is arranged with weight sensor at four base angles of 4 pedestal of belt feeder.
Wherein, belt conveyer scale, also known as belted electronic balance mainly make in metering process unit or as making in feed proportioning system With the flow of material can be monitored in real time by belt conveyer scale.
Wherein, weight sensor can obtain the weight of supported objects thereon in real time.
Specifically, along the length direction for weighing belt feeder 3, and suspension peel & belt scale is set at the middle part for weighing belt feeder 3, That is, suspension peel & belt scale is arranged along the length direction for weighing belt feeder 3, and positioned at the middle part for weighing belt feeder 3.So that through main skin The material for weighing belt feeder 3 is delivered to machine 4, the flow of material can in real time be examined using the suspension peel & belt scale It surveys.And weight sensor is arranged at four base angles for weighing 4 pedestal of belt feeder, the weight sensor weighing can be utilized The all materials transported on belt feeder 4 are weighed in real time.It is a kind of sound coupling for being packed into the metering of materials in carriage total amount Combinatorial weighing mode is closed, during metering length small for this kind of total amount that is packed into of train loading, the high measuring fixed amount demand of required precision It is especially suitable, by above-mentioned suspension peel & belt scale and the combination arrangement form of weight sensor, entire metering cycle is divided into Head and the tail section and mainstream section, using mainstream section static weighing, the metering method of head and the tail section dynamic measurement can relatively accurately be got The weight of material in railway carriage is packed into, railway carriage is avoided and overweight or short weight phenomenon occurs.
In addition, main belt feeder 4 and weighing belt feeder 3 could be provided as groove profile belt feeder, for example, by main belt feeder 4 and claiming Amount belt feeder 3 is arranged to 35 ° of groove profile belt feeders.
On the basis of the various embodiments described above, with reference to Fig. 3, the shunting charge mechanism 7 includes distributing T-pipe device 13, shunting Chute 12, caching funnel 14 and conversion valve;The delivery end of the feed inlet of the distributing T-pipe device 13 and the weighing belt feeder 3 It communicates, the first discharge port of the distributing T-pipe device 13 is communicated with the feed inlet of the shunting chute 12, the distributing T-pipe device 13 the second discharge port is communicated with the feed inlet of the caching funnel 14;And first discharge port and the second discharge port edge Track for a train direction arranges;The discharge port of the shunting chute 12 is arranged in above railway carriage, and the caching funnel 14 goes out Material mouth is arranged in the top of adjacent railway carriage;The conversion valve is arranged on the discharge outlet of the distributing T-pipe device 13.
Specifically, be arranged in shunting charge mechanism 7 above railway carriage include distributing T-pipe device 13, shunting chute 12, Cache funnel 14 and conversion valve.The feed inlet of distributing T-pipe device 13 is communicated with weighing the delivery end of belt feeder 3, for example, by three The feed inlet of logical current divider 13 passes through flanged joint with weighing the dump skip of belt feeder 3.The discharge port bifurcated of distributing T-pipe device 13 It for two, is arranged along on train running direction, the length of the second discharge port is shorter, and the length of the first discharge port is longer.
First discharge port is extended in caching funnel 14;Second discharge port is communicated with shunting the feed inlet of chute 12, for example, Second discharge port is connected by flange with shunting the feed inlet of chute 12.Caching funnel 14 is fixed in main building structure 2, the upper end Feed inlet is docked with the second discharge port of distributing T-pipe device 13, receives the material from distributing T-pipe device 13, lower end discharge port is just To railway carriage.The conversion valve of distributing T-pipe device 13 can control the opening and closing of the first discharge port and the second discharge port, can reach control The purpose of flow direction of material processed, so that material continual can be packed into each section railway carriage.
On the basis of the various embodiments described above, with reference to Fig. 4, the scraper plate Ping Liao mechanisms 6 include:Lifting cylinder 8, lifting branch Support guide frame 9, lifting column 10, scraper plate 11;One end of the lifting cylinder 8 is fixed in the main building structure 2, the liter The other end end of drop oil cylinder 8 is stretched into the top of the lifting support guide structure 9;Institute is stretched into one end of the lifting column 10 In the lower part for stating lifting support guide structure 9, the other end of the lifting column 10 is connected with the middle part of the scraper plate 11;It is described The other end of lifting cylinder 8 and one end of the lifting column 10 are hinged, the lifting cylinder 8, the lifting support guide knot Structure 9 and the vertical arrangement of the lifting column 10.
Specifically, scraper plate Ping Liao mechanisms 6 include lifting cylinder 8, lifting support guide structure 9, lifting column 10, scraper plate 11.8 one end of lifting cylinder is fixed in main building structure, and the top of the other end and lifting column 10 is hinged.Lift support guide knot Structure 9 is fixed in main building structure 2, directly over railway carriage, after shunting charge mechanism 7 is located in train direction of advance Side is used to support lifting column 10 and controls the up and down motion of lifting column 10.Lifting column 10 can be elongated rectangular shape structure, It moves up and down under the driving of lifting cylinder 8.Scraper plate 11 is used for mounted on the lower part of lifting column 10 will be in railway carriage Material strikes off.
In addition, lifting support guide structure 9 could be provided as frame structure, and back-up roller wheel there are four arrangement on it, It is symmetrical two-by-two, it moves up and down beneficial to support lifting column 10 and control lifting column 10.
On the basis of the various embodiments described above, the shunting chute 12 is people's font structure, and the shunting chute 12 Upper opening is connected with the first discharge port of the distributing T-pipe device 13, two lower openings of the shunting chute 12 or so pair Title is arranged in above the railway carriage.
Specifically, shunting chute 12 is arranged to chevron shaped, that is, shunts the upper opening of chute 12 as feed inlet, shunting is slipped Two lower openings of cylinder 12 are discharge port, and two lower openings are bilateral symmetry compared with the upper opening.Point The upper opening of stream chute 12 is connected with the first discharge port of distributing T-pipe device 13, for the first of distributing T-pipe device 13 to be discharged The material of mouth discharge, unloads and is filled in railway carriage;Shunt the material left side that two lower openings of chute 12 convey upper opening Right uniformly unload is filled in railway carriage, and shunting chute 12 is set to chevron shaped, improves the leveling operation efficiency of material.
On the basis of the various embodiments described above, the shunting charge mechanism 7, which further includes, sets going out for the caching funnel 14 Hopper valve 15 at material mouth.
Specifically, hopper valve 15 is set in the discharge outlet of caching funnel 14, can be controlled by the hopper valve 15 slow The opening and closing of the discharge port of funnel 14 is deposited, and then makes caching funnel 14 that there is certain storing ability, when charging system disorderly closedown Or after the completion of operation when shutting down, belt feeder due to shut down inertia can additional transport portion material, caching funnel bottom funnel at this time Valve 15 is closed, and the material additionally conveyed to this part caches, and is facilitated after troubleshooting or lower subjob advance row clout It removes.
On the basis of the various embodiments described above, the scraper plate 11 is " Π " type structure, i.e., the forepart of described scraper plate 11 has Symmetrical needle pattern protrusion.
Specifically, scraper plate 11 is arranged to " Π " type structure, for example, the scraper plate of similar plow harrow type, and before the scraper plate 11 There is symmetrical needle pattern protrusion in portion, and each correspondence in the needle pattern protrusion position is shunted in two discharge ports of chute 12 Portion so that two will formed due to material charging in railway carriage and after shunting chute 12 shunts that scraper plate 11 can be faster Continuous mountain peak shape material heap pushes flat, the leveling operation of realization two-way tracing type, improves the work efficiency of scraper plate 11.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:It still may be used To modify to the technical solution recorded in foregoing embodiments or carry out equivalent substitution to which part technical characteristic; And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical solution spirit and Scope.

Claims (10)

  1. The planarization system 1. a kind of bulk goods feeds, which is characterized in that including:Main belt feeder (4) weighs belt feeder (3) and shunting dress Expect mechanism (7);
    One end of the main belt feeder (4) is communicated with supplied materials end, the other end and the weighing belt feeder of the main belt feeder (4) (3) feed end communicates;
    The top for weighing belt feeder (3) and being transversely arranged on track for a train, and the delivery end for weighing belt feeder (3) and institute The feed inlet for stating shunting charge mechanism (7) communicates;
    The shunting charge mechanism (7) is located at region of the weighing belt feeder (3) between railway carriage, and the shunting dress Expect the discharge port face railway carriage of mechanism (7).
  2. The planarization system 2. bulk goods according to claim 1 feeds, which is characterized in that further include:It is arranged in track for a train just The scraper plate Ping Liao mechanisms (6) of top, and the scraper plate Ping Liao mechanisms (6) are located at the rear of the shunting charge mechanism (7);
    Wherein, using train direction of advance as front.
  3. The planarization system 3. bulk goods according to claim 2 feeds, which is characterized in that further include:It is used to support the main skin Main belt feeder steel structure stent (5) with machine (4);And it is used to support the weighing belt feeder (3), the shunting charge mechanism (7) and the main building structure of the scraper plate Ping Liao mechanisms (6) (2);
    The main belt feeder steel structure stent (5) is fixed on ground, and is connected with the main building structure (2);The main building structure (2) across in track for a train both sides, and the main building structure (2) is fixed on ground.
  4. The planarization system 4. bulk goods according to claim 1 feeds, which is characterized in that further include:Positioned at railway carriage side Drivers' cab (1), and the drivers' cab (1) is in same perpendicular to the flat of track for a train with the shunting charge mechanism (7) Face.
  5. The planarization system 5. bulk goods according to claim 1 feeds, which is characterized in that in the weighing belt feeder (3) Portion is equipped with suspension peel & belt scale, and is arranged with weight sensor at four base angles for weighing belt feeder (4) pedestal.
  6. The planarization system 6. bulk goods according to claim 1 feeds, which is characterized in that the shunting charge mechanism (7) includes Distributing T-pipe device (13), shunting chute (12), caching funnel (14) and conversion valve;
    The feed inlet of the distributing T-pipe device (13) is communicated with the delivery end of the weighing belt feeder (3), the distributing T-pipe device (13) the first discharge port is communicated with the feed inlet of the shunting chute (12), the second discharge port of the distributing T-pipe device (13) It is communicated with the feed inlet of the caching funnel (14);And first discharge port and second discharge port are along track for a train direction Arrangement;
    The discharge port of the shunting chute (12) is arranged in above railway carriage, and the discharge port of the caching funnel (14) is arranged in The top of adjacent railway carriage;
    The conversion valve is arranged on the discharge outlet of the distributing T-pipe device (13).
  7. The planarization system 7. bulk goods according to claim 3 feeds, which is characterized in that the scraper plate Ping Liao mechanisms (6) include: Lifting cylinder (8), lifting support guide structure (9), lifting column (10) and scraper plate (11);
    One end of the lifting cylinder (8) is fixed on the main building structure (2), and the other end of the lifting cylinder (8) stretches into In the top of the lifting support guide structure (9);
    One end of the lifting column (10) is stretched into the lower part of the lifting support guide structure (9), the lifting column (10) another two end is connected with the middle part of the scraper plate (11);
    One end of the other end and the lifting column (10) of the lifting cylinder (8) is hinged, the lifting cylinder (8), described Lift the vertical arrangement of support guide structure (9) and the lifting column (10).
  8. The planarization system 8. bulk goods according to claim 6 feeds, which is characterized in that the shunting charge mechanism (7) is also wrapped Include the hopper valve (15) for the discharge outlet that the caching funnel (14) is set.
  9. The planarization system 9. bulk goods according to claim 6 feeds, which is characterized in that the shunting chute (12) is chevron shaped Structure, and the upper opening of the shunting chute (12) is connected with the first discharge port of the distributing T-pipe device (13), described point Two lower openings of stream chute (12) are symmetrically arranged above the railway carriage.
  10. The planarization system 10. bulk goods according to claim 7 feeds, which is characterized in that the scraper plate (11) is Π type structures, And the forepart of the scraper plate (11) has symmetrical needle pattern protrusion.
CN201711342469.3A 2017-12-14 2017-12-14 A kind of bulk goods charging planarization system Pending CN108045990A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711342469.3A CN108045990A (en) 2017-12-14 2017-12-14 A kind of bulk goods charging planarization system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711342469.3A CN108045990A (en) 2017-12-14 2017-12-14 A kind of bulk goods charging planarization system

Publications (1)

Publication Number Publication Date
CN108045990A true CN108045990A (en) 2018-05-18

Family

ID=62132380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711342469.3A Pending CN108045990A (en) 2017-12-14 2017-12-14 A kind of bulk goods charging planarization system

Country Status (1)

Country Link
CN (1) CN108045990A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109592437A (en) * 2019-01-15 2019-04-09 武汉开锐海洋起重技术有限公司 A kind of efficient boxing system of bulk material container
CN110187690A (en) * 2019-06-18 2019-08-30 淮北矿业股份有限公司 The accurate automatic loading control system of railway freight
CN112441429A (en) * 2019-09-05 2021-03-05 中国铁建高新装备股份有限公司 Chain-pulling type new ballast dump vehicle for railway and construction method
CN115108352A (en) * 2022-05-09 2022-09-27 劲牌有限公司 Special equipment and method for material spreading in tank entering vehicle in brewing link

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4152029A (en) * 1976-10-01 1979-05-01 Babcock Hydro-Pneumatics Limited Fluent solid material handling means
US4284380A (en) * 1979-08-27 1981-08-18 Allen & Garcia Company Multi-car train loading station
DE4438135A1 (en) * 1994-10-27 1996-05-02 Zeppelin Schuettguttech Gmbh Bulk goods loading device for road or rail vehicle
US6329613B1 (en) * 1999-09-07 2001-12-11 Bryan Tomlinson Portable conveyor belt scale
CN201432999Y (en) * 2009-01-22 2010-03-31 赵敬彬 Storage yard loose unpacked materials conveying and loading system
CN101941599A (en) * 2010-09-14 2011-01-12 无锡工力工程机械厂 Bulk material loading machine
CN201756349U (en) * 2010-07-21 2011-03-09 大连世达重工有限公司 Bent surge hopper
CN202245393U (en) * 2011-09-02 2012-05-30 山西晋城无烟煤矿业集团有限责任公司 Vehicle flattening device for coal mine
CN202296443U (en) * 2011-09-30 2012-07-04 山东博润工业技术有限公司 Automatic coal leveling device for loading station
CN202765872U (en) * 2012-07-02 2013-03-06 中国矿业大学 Automatic ration loading and unloading system of movable heavy haul train
CN103569691A (en) * 2013-11-13 2014-02-12 青岛四方车辆研究所有限公司 Movable type vehicle loader with double-telescopic-boom structure
CN203903518U (en) * 2014-01-03 2014-10-29 武汉开锐海洋起重技术有限公司 Overhead fixed type efficient spiral material leveling machine
CN105565002A (en) * 2016-03-09 2016-05-11 深圳市安顺节能科技发展有限公司 Train bulk cargo loading system of rail break type rail meter
CN205916808U (en) * 2016-08-29 2017-02-01 青岛港国际股份有限公司前港分公司 Standdle carrier railway carriage or compartment doffer on loading funnel
CN207618671U (en) * 2017-12-14 2018-07-17 武汉开锐海洋起重技术有限公司 A kind of bulk goods charging planarization system

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4152029A (en) * 1976-10-01 1979-05-01 Babcock Hydro-Pneumatics Limited Fluent solid material handling means
US4284380A (en) * 1979-08-27 1981-08-18 Allen & Garcia Company Multi-car train loading station
DE4438135A1 (en) * 1994-10-27 1996-05-02 Zeppelin Schuettguttech Gmbh Bulk goods loading device for road or rail vehicle
US5660215A (en) * 1994-10-27 1997-08-26 Zeppelin Schuettguttechnik Gmbh Loading apparatus for bulk materials
US6329613B1 (en) * 1999-09-07 2001-12-11 Bryan Tomlinson Portable conveyor belt scale
CN201432999Y (en) * 2009-01-22 2010-03-31 赵敬彬 Storage yard loose unpacked materials conveying and loading system
CN201756349U (en) * 2010-07-21 2011-03-09 大连世达重工有限公司 Bent surge hopper
CN101941599A (en) * 2010-09-14 2011-01-12 无锡工力工程机械厂 Bulk material loading machine
CN202245393U (en) * 2011-09-02 2012-05-30 山西晋城无烟煤矿业集团有限责任公司 Vehicle flattening device for coal mine
CN202296443U (en) * 2011-09-30 2012-07-04 山东博润工业技术有限公司 Automatic coal leveling device for loading station
CN202765872U (en) * 2012-07-02 2013-03-06 中国矿业大学 Automatic ration loading and unloading system of movable heavy haul train
CN103569691A (en) * 2013-11-13 2014-02-12 青岛四方车辆研究所有限公司 Movable type vehicle loader with double-telescopic-boom structure
CN203903518U (en) * 2014-01-03 2014-10-29 武汉开锐海洋起重技术有限公司 Overhead fixed type efficient spiral material leveling machine
CN105565002A (en) * 2016-03-09 2016-05-11 深圳市安顺节能科技发展有限公司 Train bulk cargo loading system of rail break type rail meter
CN205916808U (en) * 2016-08-29 2017-02-01 青岛港国际股份有限公司前港分公司 Standdle carrier railway carriage or compartment doffer on loading funnel
CN207618671U (en) * 2017-12-14 2018-07-17 武汉开锐海洋起重技术有限公司 A kind of bulk goods charging planarization system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李德发等: "《配合饲料制造工艺与技术》", 中国农业大学出版社, pages: 175 - 176 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109592437A (en) * 2019-01-15 2019-04-09 武汉开锐海洋起重技术有限公司 A kind of efficient boxing system of bulk material container
CN109592437B (en) * 2019-01-15 2023-12-29 武汉开锐海洋起重技术有限公司 High-efficient automatic vanning system of bulk cargo material container
CN110187690A (en) * 2019-06-18 2019-08-30 淮北矿业股份有限公司 The accurate automatic loading control system of railway freight
CN112441429A (en) * 2019-09-05 2021-03-05 中国铁建高新装备股份有限公司 Chain-pulling type new ballast dump vehicle for railway and construction method
CN115108352A (en) * 2022-05-09 2022-09-27 劲牌有限公司 Special equipment and method for material spreading in tank entering vehicle in brewing link
CN115108352B (en) * 2022-05-09 2023-11-17 劲牌有限公司 Special equipment and method for feeding materials into tank wagon in brewing link

Similar Documents

Publication Publication Date Title
CN108045990A (en) A kind of bulk goods charging planarization system
CN110817485B (en) Anti-unbalance-loading system and method for throwing type unloading of railway loading station
CN201301134Y (en) Colliery railway quick loading gauge addition device
CN105565002A (en) Train bulk cargo loading system of rail break type rail meter
CN201901432U (en) Super large measuring belt feeder
CN207618671U (en) A kind of bulk goods charging planarization system
CN101497402A (en) Fixed-weight loading device
CN1245317C (en) Three-batch coal and coke loading system and method
CN204872930U (en) Take gate -type scraper blade reclaimer of windrow arm
CN205274749U (en) Disconnected rail formula track measurement weighing apparatus train bulk cargo loading system
CN103245404B (en) Movable type weighing and metering hopper
CN202296112U (en) Belt conveying system for shield machine
CN201817083U (en) Tray type belt feeder with high-precision measure
CN201259437Y (en) Chain plate scales
CN108341276B (en) Bucket-wheel reclaimer applied to bulk cargo blending operation
WO2017152604A1 (en) Train bulk cargo loading system having disconnected railroad track measurement scale
US5927924A (en) Silo removal and discharge plate conveyer with automatic bulk material weighing and metering arrangement
CA3099175C (en) System for manipulating the load in bulk rail trains and method for operating such a system
CN203903429U (en) Material receiving belt conveyer of tripper car
CN207329508U (en) A kind of scraper conveyor
CN203231802U (en) Mobile weightometer measuring hopper
CN202784763U (en) Link plate type high temperature automatic constant weight feeder
CN206751002U (en) The arm-type ship loader of circular arc
CN202038661U (en) Heavy belt type quantitative feeder
CN211225349U (en) Material conveying device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination