CN108035546B - Template fixing device is pour to shear force wall for building - Google Patents

Template fixing device is pour to shear force wall for building Download PDF

Info

Publication number
CN108035546B
CN108035546B CN201711096510.3A CN201711096510A CN108035546B CN 108035546 B CN108035546 B CN 108035546B CN 201711096510 A CN201711096510 A CN 201711096510A CN 108035546 B CN108035546 B CN 108035546B
Authority
CN
China
Prior art keywords
supporting
shear wall
fixedly connected
fixing device
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711096510.3A
Other languages
Chinese (zh)
Other versions
CN108035546A (en
Inventor
李强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of China Railway 14th Bureau Group Co Ltd
Original Assignee
Construction Engineering Co Ltd of China Railway 14th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of China Railway 14th Bureau Group Co Ltd filed Critical Construction Engineering Co Ltd of China Railway 14th Bureau Group Co Ltd
Priority to CN201711096510.3A priority Critical patent/CN108035546B/en
Publication of CN108035546A publication Critical patent/CN108035546A/en
Application granted granted Critical
Publication of CN108035546B publication Critical patent/CN108035546B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a shear wall pouring template fixing device for a building, which comprises templates, wherein the outer sides of the templates are respectively connected with a supporting plate, the upper parts of the outer sides of the supporting plates are fixedly connected with a first transverse plate, the lower parts of the outer sides of the supporting plates are fixedly connected with a second transverse plate, a first supporting device is arranged on one side of the first transverse plate, a second supporting device is arranged on one side of the second transverse plate, the first supporting device comprises a first supporting rod, a second supporting rod is arranged below the first supporting rod, and a first groove is formed in the bottom of the first supporting rod. Make first strutting arrangement and second strutting arrangement bottom can be fixed by stable subaerial through setting up of supporting shoe and antiskid nail, go up the clamp and also can make clamping device can fix the reinforcing bar more firmly with the spike tooth at the internal top of lower clamp for the device is whole can be more stable, and this device has also alleviateed the fixed mounting of staff to the template when having improved work efficiency low.

Description

Template fixing device is pour to shear force wall for building
Technical Field
The invention relates to the field of buildings, in particular to a fixing device for a pouring template of a shear wall for a building.
Background
Shear walls (shear walls) are also known as wind resistant walls, earthquake resistant walls or structural walls. The wall body mainly bears horizontal load and vertical load (gravity) caused by wind load or earthquake action in a house or a structure, and the structure is prevented from being sheared (sheared) and damaged. Also known as earthquake resistant walls, are generally made of reinforced concrete.
It is divided into a plane shear wall and a cylinder shear wall. The plane shear wall is used in reinforced concrete frame structure, plate lifting structure and flat slab system. In order to increase the rigidity, strength and collapse resistance of the structure, the reinforced concrete shear wall can be cast in situ or prefabricated in some parts. The cast-in-place shear wall, the peripheral beams and the columns are simultaneously poured, and the integrity is good. The cylinder shear wall is used in high-rise buildings, high-rise structures and suspension structures and is formed by enclosing of partition walls of elevator rooms, staircases, equipment and auxiliary rooms, the cylinder wall is a cast-in-place reinforced concrete wall body, and the rigidity and the strength of the cylinder shear wall are higher than those of a plane shear wall in bearing of larger horizontal load.
The wall can be divided into a bearing wall and a shear wall according to the stress characteristics, wherein the bearing wall mainly bears vertical load, such as a masonry wall; the latter is mainly to bear horizontal loads. In earthquake-proof shelters, horizontal loads are primarily generated by horizontal seismic action, and shear walls are sometimes referred to as earthquake-proof walls. The shear wall can be divided into a steel plate shear wall, a reinforced concrete shear wall and a reinforced block shear wall according to structural materials. Among them, the reinforced concrete shear wall is most commonly used.
In the shear wall template fixing device (publication No. CN206319600U, publication No. 20170711) of the invention patent, although the structure can effectively fix the template, the fixing effect is poor, so that the shear wall template fixing device for construction is necessary to solve the problems.
Disclosure of Invention
The invention aims to provide a fixing device for a pouring template of a shear wall for a building, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a shear wall pouring template fixing device for buildings comprises templates, wherein the outer sides of the templates are respectively connected with a supporting plate, the upper part of the outer side of the supporting plate is fixedly connected with a first transverse plate, the lower part of the outer side of the supporting plate is fixedly connected with a second transverse plate, one side of the first transverse plate is provided with a first supporting device, one side of the second transverse plate is provided with a second supporting device, the first supporting device comprises a first supporting rod, a second supporting rod is arranged below the first supporting rod, the bottom of the first supporting rod is provided with a first groove, the top of the second supporting rod is provided with a second groove, the inner part of the second groove is in threaded connection with a lead screw, the top end of the lead screw is movably connected with the first groove, the lead screw is in threaded connection with a lead screw seat, the supporting plate and the two sides of the templates are respectively provided with a through hole, a steel, clamping device fixed connection is in backup pad one side, clamping device is including lower clamp, the clamp top is equipped with the clamp down, it is equipped with the fixed block to go up the clamp top, the fixed block with lower clamp one side equal fixed connection in backup pad, it rotates above the clamp to be connected with adjusting bolt, adjusting bolt runs through in the fixed block, and adjusting bolt threaded connection is in the fixed block.
Preferably, the bottom ends of the first supporting device and the second supporting device are fixedly connected with supporting blocks, and anti-skid nails are arranged at the bottom ends of the supporting blocks.
Preferably, the first transverse plate and the second transverse plate are both internally provided with a third groove, and the top end of the first supporting rod is movably connected to the third groove.
Preferably, the first support means is structurally identical to the second support means.
Preferably, the upper end of the screw rod seat is fixedly connected with a ring cover through a bolt.
Preferably, the through hole is internally provided with a rubber clamping sleeve, the bottom of the lower clamp body is fixedly connected with a supporting angle block, and the supporting angle block is fixedly connected to the supporting plate.
Preferably, the outer sides of the first supporting rod and the second supporting rod are fixedly connected with reinforcing ribs.
Preferably, the top in the upper clamp body and the lower clamp body is provided with nail teeth.
Compared with the prior art, the invention has the beneficial effects that: the shear wall pouring template fixing device for the building is novel in structure, convenient to use and convenient to disassemble, the distance between the upper clamp body and the lower clamp body is adjusted through the adjusting bolt on the clamping device, so that the clamping device can well fix the steel bars, the distance between the templates can be stably fixed, the rubber clamping sleeve is arranged, when concrete is poured, the concrete cannot seep out from the through hole, the first supporting rods on the first supporting device and the second supporting device are movably connected into the third groove through the third grooves on the first transverse plate and the second transverse plate, the first supporting device and the second supporting device can support the column template from the side, the adjusting screw rod seat can be rotated to enable a worker to adjust the supporting length according to needs, the templates can be clamped and fixed more stably, and the bottom ends of the first supporting device and the second supporting device can be firmly clamped on the ground through the arrangement of the supporting blocks and the anti-skid nails The stable fixed, go up the clamp and also can make clamping device can fix the reinforcing bar more firmly with the spike tooth at the internal top of clamp down for the device is whole can be more stable, and this device has also alleviateed the fixed mounting of staff to the template when having improved work efficiency low.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a clamping device according to the present invention;
FIG. 3 is an enlarged partial view of part A of the present invention;
FIG. 4 is a partially enlarged view of the part B of the present invention;
FIG. 5 is an enlarged view of a portion C of the present invention.
In the figure: the device comprises a template 1, a supporting plate 2, a first transverse plate 3, a second transverse plate 4, a first supporting device 5, a second supporting device 6, a clamping device 7, a reinforcing steel bar 8, a first supporting rod 9, a second supporting rod 10, a third groove 11, a first groove 12, a second groove 13, a screw rod 14, a screw rod seat 15, a ring cover 16, a through hole 17, a lower clamp 18, an upper clamp 19, a fixing block 20, an adjusting bolt 21, a supporting angle block 22, a rubber clamping sleeve 23 and a supporting block 24.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a shear wall pouring template fixing device for a building comprises a template 1, wherein supporting plates 2 are connected to the outer sides of the template 1, a first transverse plate 3 is fixedly connected to the upper portion of the outer side of the supporting plates 2, a second transverse plate 4 is fixedly connected to the lower portion of the outer side of the supporting plates 2, a first supporting device 5 is arranged on one side of the first transverse plate 3, a second supporting device 6 is arranged on one side of the second transverse plate 4, the first supporting device 5 comprises a first supporting rod 9, a second supporting rod 10 is arranged below the first supporting rod 9, a first groove 12 is formed in the bottom of the first supporting rod 9, a second groove 13 is formed in the top of the second supporting rod 10, a lead screw 14 is in threaded connection with the inside of the second groove 13, the top end of the lead screw 14 is movably connected to the first groove 12, a lead screw seat 15 is in threaded connection with the lead screw 14, through holes 17 are formed in the two, the inside reinforcing bar 8 that has run through of through-hole 17, 8 both ends of reinforcing bar all are equipped with clamping device 7, clamping device 7 fixed connection is in backup pad 2 one side, clamping device 7 is including lower clamp 18, clamp 18 top is equipped with clamp 19 down, it is equipped with fixed block 20 to go up clamp 19 top, fixed block 20 and the equal fixed connection in backup pad 2 in clamp 18 one side down, it is connected with adjusting bolt 21 to go up clamp 19 top rotation, adjusting bolt 21 runs through in fixed block 20, and adjusting bolt 21 threaded connection is in fixed block 20.
The bottom ends of the first supporting device 5 and the second supporting device 6 are fixedly connected with supporting blocks 24, and anti-skid nails are arranged at the bottom ends of the supporting blocks 24. Third grooves 11 are formed in the first transverse plate 3 and the second transverse plate 4, and the top ends of the first supporting rods 9 are movably connected to the third grooves 11. The first support device 5 and the second support device 6 are identical in structure. The upper end of the screw rod seat 15 is fixedly connected with a ring cover 16 through a bolt. The inside rubber cutting ferrule 23 that is equipped with of through-hole 17, lower clamp 18 bottom fixedly connected with supports angle block 22, support angle block 22 fixed connection in backup pad 2. The outer sides of the first supporting rod 9 and the second supporting rod 10 are fixedly connected with reinforcing ribs. Nail teeth are arranged at the top of the inner parts of the upper clamp body 19 and the lower clamp body 18.
The working principle is as follows: the shear wall pouring template fixing device for the building is novel in structure, convenient to use and convenient to disassemble, the distance between an upper clamp body 19 and a lower clamp body 18 is adjusted through an adjusting bolt 21 on a clamping device 7, so that the clamping device 7 can well fix a steel bar 8, the distance between templates 1 can be stably fixed, the arrangement of a rubber clamping sleeve 23 ensures that concrete cannot seep out from a through hole 17 when the concrete is poured, a first supporting rod 9 on a first supporting device 5 and a second supporting device 6 is movably connected inside a third groove 11 through the third groove 11 on the first transverse plate 3 and the second transverse plate 4, the first supporting device 5 and the second supporting device 6 can both support a column template 1 from the side surface, and a worker can adjust the supporting length according to the requirement by rotating and adjusting a screw seat, make template 1 can be firm by more stable card, make first strutting arrangement 5 and second strutting arrangement 6 bottom can be fixed by stable subaerial through setting up of supporting shoe 24 and antiskid nail, go up the 19 nail teeth at the top in clamp 19 and the lower clamp 18 also can make clamping device 7 can fix reinforcing bar 8 more firmly for the device is whole can be more stable, and this device has also alleviateed the fixed mounting of staff to the template when having improved work efficiency low.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a template fixing device is pour to shear wall for building, includes template (1), its characterized in that: the template is characterized in that the outer side of the template (1) is connected with a supporting plate (2), the upper part of the outer side of the supporting plate (2) is fixedly connected with a first transverse plate (3), the lower part of the outer side of the supporting plate (2) is fixedly connected with a second transverse plate (4), one side of the first transverse plate (3) is provided with a first supporting device (5), one side of the second transverse plate (4) is provided with a second supporting device (6), the first supporting device (5) comprises a first supporting rod (9), a second supporting rod (10) is arranged below the first supporting rod (9), the bottom of the first supporting rod (9) is provided with a first groove (12), the top of the second supporting rod (10) is provided with a second groove (13), the inside of the second groove (13) is connected with a lead screw (14), the top end of the lead screw (14) is movably connected with the first groove (12), and the lead screw (14), backup pad (2) all are equipped with through-hole (17) with template (1) both sides, through-hole (17) inside runs through has reinforcing bar (8), reinforcing bar (8) both ends all are equipped with clamping device (7), clamping device (7) fixed connection is in backup pad (2) one side, clamping device (7) are including lower clamp (18), clamp (18) top is equipped with down clamp (19), it is equipped with fixed block (20) to go up clamp (19) top, fixed block (20) and the equal fixed connection in backup pad (2) of clamp (18) one side down, it is connected with adjusting bolt (21) to go up clamp (19) top rotation, adjusting bolt (21) run through in fixed block (20), and adjusting bolt (21) threaded connection in fixed block (20).
2. The shear wall pouring template fixing device for the building according to claim 1, characterized in that: the bottom ends of the first supporting device (5) and the second supporting device (6) are fixedly connected with supporting blocks (24), and anti-skid nails are arranged at the bottom ends of the supporting blocks (24).
3. The shear wall pouring template fixing device for the building according to claim 1, characterized in that: first diaphragm (3) and second diaphragm (4) are inside all to be equipped with third recess (11), third recess (11) in first diaphragm (3) are connected to first bracing piece (9) top swing joint.
4. The shear wall pouring template fixing device for the building according to claim 1, characterized in that: the first supporting device (5) and the second supporting device (6) are identical in structure.
5. The shear wall pouring template fixing device for the building according to claim 1, characterized in that: the upper end of the screw rod seat (15) is fixedly connected with a ring cover (16) through a bolt.
6. The shear wall pouring template fixing device for the building according to claim 1, characterized in that: the rubber cutting ferrule (23) is arranged in the through hole (17), the bottom of the lower clamp body (18) is fixedly connected with a supporting angle block (22), and the supporting angle block (22) is fixedly connected to the supporting plate (2).
7. The shear wall pouring template fixing device for the building according to claim 1, characterized in that: and reinforcing ribs are fixedly connected to the outer sides of the first supporting rod (9) and the second supporting rod (10).
8. The shear wall pouring template fixing device for the building according to claim 1, characterized in that: the top of the inner parts of the upper clamp body (19) and the lower clamp body (18) are provided with nail teeth.
CN201711096510.3A 2017-11-09 2017-11-09 Template fixing device is pour to shear force wall for building Active CN108035546B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711096510.3A CN108035546B (en) 2017-11-09 2017-11-09 Template fixing device is pour to shear force wall for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711096510.3A CN108035546B (en) 2017-11-09 2017-11-09 Template fixing device is pour to shear force wall for building

Publications (2)

Publication Number Publication Date
CN108035546A CN108035546A (en) 2018-05-15
CN108035546B true CN108035546B (en) 2020-05-22

Family

ID=62093245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711096510.3A Active CN108035546B (en) 2017-11-09 2017-11-09 Template fixing device is pour to shear force wall for building

Country Status (1)

Country Link
CN (1) CN108035546B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083408A (en) * 2018-08-17 2018-12-25 庐江荣睿建设工程有限公司 A kind of shear wall pours device for fixing module and construction method
CN111663552A (en) * 2020-06-15 2020-09-15 中国一冶集团有限公司 Prefabricated brick fetal membrane of assembled
CN112523088B (en) * 2020-11-04 2022-07-29 北京中交桥宇科技有限公司 Template supporting device for building bridge construction
CN113833164A (en) * 2021-09-27 2021-12-24 中建八局第一建设有限公司 Construction method of super high-rise core tube cone variable cross-section shear wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203547142U (en) * 2013-10-31 2014-04-16 中建八局大连建设工程有限公司 Adjustable type metal wall formwork inclined support device
CN106088587A (en) * 2016-08-16 2016-11-09 山东天齐置业集团股份有限公司 A kind of Combined formwork support system
CN206289958U (en) * 2016-10-27 2017-06-30 中国航天建设集团有限公司 A kind of inside wall formwork erecting device and inside wall formwork formwork erecting structure
CN206458091U (en) * 2016-08-27 2017-09-01 莫少南 A kind of constructional form fixing apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203547142U (en) * 2013-10-31 2014-04-16 中建八局大连建设工程有限公司 Adjustable type metal wall formwork inclined support device
CN106088587A (en) * 2016-08-16 2016-11-09 山东天齐置业集团股份有限公司 A kind of Combined formwork support system
CN206458091U (en) * 2016-08-27 2017-09-01 莫少南 A kind of constructional form fixing apparatus
CN206289958U (en) * 2016-10-27 2017-06-30 中国航天建设集团有限公司 A kind of inside wall formwork erecting device and inside wall formwork formwork erecting structure

Also Published As

Publication number Publication date
CN108035546A (en) 2018-05-15

Similar Documents

Publication Publication Date Title
CN108035546B (en) Template fixing device is pour to shear force wall for building
CN103306371B (en) Assembled-type house PC prefabricated units fabrication and installation structure
CN211369597U (en) Construction is with recoverable bearing diagonal structure
CN202090577U (en) Template supporting construction platform for lift wells in high-rise buildings
CN201158932Y (en) Self-chucking platform especially for high-rise building elevator shaft formwork supports
CN104005476B (en) Be easy to fabrication and installation precast frame system and construction method
CN105422140A (en) Template supporting device for concrete supporting construction of shaft and lane engineering
RU128636U1 (en) BASE ASSEMBLY JOINT REINFORCED CONCRETE COLUMN WITH FOUNDATION
CN211447857U (en) Civil construction is with recoverable bearing diagonal structure
CN204435833U (en) Operation platform wall-attached supporting seat
CN208884770U (en) A kind of steel plate shear force wall anchor bolt fixing bracket system
CN105839912A (en) Molding bracket for shear wall of building
CN203441075U (en) Ground anchor for overhung scaffold
JP2812178B2 (en) Bridge pier construction method by self-elevating formwork method
CN106436996B (en) A kind of pre-stress floor
CN112443052A (en) Indoor wall frame connection structure of assembly type building
CN206607706U (en) A kind of drawing shore for shear wall construction
CN112482561B (en) Wall structure attaches in core section of thick bamboo
CN214615428U (en) Hoisting template structure for pouring steel reinforced concrete beam
CN208151976U (en) Formwork support arrangement structure suitable for large volume gravity dam
CN216840706U (en) Quick adjustment frock of assembled trompil steel sheet shear force wall
CN219138197U (en) Fixed support type wall connection structure of prefabricated staircase
CN212026688U (en) High-rise building shear wall barrel overhanging wall cap building structure
CN212866319U (en) Building structure design wall column base quick connecting device
CN212336473U (en) Supporting structure of wood structure building roof modelled after an antique

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200420

Address after: Lixia District, Shandong city of Ji'nan province 250000 Olympic road No. 2666, building A, railway construction

Applicant after: CHINA RAILWAY 14TH CONSTRUCTION BUREAU GROUP BUILDING ENGINEERING Co.,Ltd.

Address before: 100124, Chaoyang District 100 Beijing Ping Park, Beijing University of Technology

Applicant before: Li Qiang

GR01 Patent grant
GR01 Patent grant