CN103306371B - Assembled-type house PC prefabricated units fabrication and installation structure - Google Patents

Assembled-type house PC prefabricated units fabrication and installation structure Download PDF

Info

Publication number
CN103306371B
CN103306371B CN201310231912.5A CN201310231912A CN103306371B CN 103306371 B CN103306371 B CN 103306371B CN 201310231912 A CN201310231912 A CN 201310231912A CN 103306371 B CN103306371 B CN 103306371B
Authority
CN
China
Prior art keywords
sleeve
prefabricated units
installation
embedded
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310231912.5A
Other languages
Chinese (zh)
Other versions
CN103306371A (en
Inventor
陈广林
黎金亮
于新平
赵亚军
陈俊杰
陈界羽
周洪涛
王桂玲
王法道
马荣全
孙建运
范新海
郭志鑫
张磊
杨晓杰
童思哲
吴宏庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction Eighth Engineering Division Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201310231912.5A priority Critical patent/CN103306371B/en
Publication of CN103306371A publication Critical patent/CN103306371A/en
Application granted granted Critical
Publication of CN103306371B publication Critical patent/CN103306371B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明公开了一种装配式住宅PC预制构件制作安装结构,主要由一安装限位系统、一支撑固定系统、一脱模吊装系统、一模板安装对拉杆连接系统、一调平系统和“I”型吊构成。通过在预制构件混凝土浇筑施工时,按照设计位置将钢质螺栓套筒预埋在预制构件内,套筒端头与混凝土构件表面平齐。利用不同规格的预埋套筒作为连结接驳器,对预制构件进行吊装、固定、安装限位等。为满足预制构件吊装及安装使用需要,在预制构件中预埋不同规格型号直螺纹套筒,用作吊装及安装拉结使用。

The invention discloses an assembly type residential PC prefabricated component production and installation structure, which mainly consists of an installation limit system, a support and fixing system, a demoulding and hoisting system, a formwork installation pair tie rod connection system, a leveling system and "I "Type hanging composition. During the concrete pouring construction of the prefabricated component, the steel bolt sleeve is pre-embedded in the prefabricated component according to the designed position, and the end of the sleeve is flush with the surface of the concrete component. Use embedded sleeves of different specifications as connecting connectors to hoist, fix, and limit installation of prefabricated components. In order to meet the needs of hoisting and installation of prefabricated components, different specifications and models of straight thread sleeves are pre-embedded in the prefabricated components for hoisting and installation tie.

Description

装配式住宅PC预制构件制作安装结构Manufacture and installation structure of PC prefabricated components for prefabricated houses

技术领域technical field

本发明涉及一种装配式住宅PC预制构件制作安装结构。The invention relates to a fabrication and installation structure of prefabricated PC components of an assembled house.

背景技术Background technique

装配式住宅PC预制构件设计施工图中,通常仅标明构件的宽度、高度、板厚及构件的造型尺寸,钢筋规格、预留甩槎钢筋、混凝土强度等级等自身信息。不能用于加工生产及进行吊装安装等作业。需要对PC预制构件进行深化设计,确定吊装及安装方案,绘制详图,确定各种预留预埋的选型、定位及做法,明确各细部节点做法,使预制构件具备吊装及安装使用功能。In the design and construction drawings of PC prefabricated components of prefabricated houses, usually only the width, height, plate thickness and shape size of the components, steel bar specifications, reserved steel bars, concrete strength grades and other self-information are indicated. It cannot be used for processing, production, hoisting and installation. It is necessary to carry out in-depth design of PC prefabricated components, determine the hoisting and installation plan, draw detailed drawings, determine the selection, positioning and methods of various reserved and pre-embedded components, and clarify the details of the node methods, so that the prefabricated components have the functions of hoisting, installation and use.

发明内容Contents of the invention

本发明所要解决的技术问题是提供一种设计简单,使用方便,安装精度高,能够提高构件安装效率的装配式住宅PC预制构件制作安装结构。The technical problem to be solved by the present invention is to provide a prefabricated residential PC prefabricated component manufacturing and installation structure with simple design, convenient use, high installation accuracy and improved component installation efficiency.

为实现上述技术效果,本发明公开了一种装配式住宅PC预制构件制作安装结构,包括:In order to achieve the above technical effects, the present invention discloses a manufacturing and installation structure of prefabricated residential PC components, including:

一安装限位系统,所述安装限位系统包括复数第一套筒,所述第一套筒预埋于所述预制构件的顶部侧立面,通过螺栓连接有复数限位角钢;An installation limit system, the installation limit system includes a plurality of first sleeves, the first sleeves are pre-embedded on the top side elevation of the prefabricated component, and a plurality of limit angle steels are connected by bolts;

一支撑固定系统,所述支撑固定系统包括复数第二套筒,所述第二套筒分别预埋于所述预制构件下部与上部,所述预制构件下部的第二套筒通过螺栓连接有复数型钢支架,所述预制构件上部的第二套筒通过螺栓连接有复数可调斜撑;A support and fixation system, the support and fixation system includes a plurality of second sleeves, the second sleeves are pre-embedded in the lower part and the upper part of the prefabricated component respectively, and the second sleeves in the lower part of the prefabricated component are connected with a plurality of steel bracket, the second sleeve on the upper part of the prefabricated component is connected with a plurality of adjustable braces through bolts;

一脱模吊装系统,所述脱模吊装系统包括复数第三套筒,所述第三套筒预埋于所述预制构件,通过螺栓连接有复数吊装钢板连接件;A demoulding and hoisting system, the demoulding and hoisting system includes a plurality of third sleeves, the third sleeves are pre-embedded in the prefabricated component, and a plurality of hoisting steel plate connectors are connected by bolts;

一模板安装对拉杆连接系统,所述模板安装对拉杆连接系统包括复数第四套筒,所述第四套筒预埋于所述预制构件与现浇结构联结处,连接有复数对拉螺杆。A formwork installation tie rod connection system, the formwork installation tie rod connection system includes a plurality of fourth sleeves, the fourth sleeves are pre-embedded at the joint between the prefabricated component and the cast-in-place structure, and are connected with a plurality of tie rods.

本发明进一步的改进在于,所述结构还包括一调平系统,所述调平系统包括复数第五套筒,所述第五套筒预埋于所述预制构件的顶部,连接有复数调节螺栓。A further improvement of the present invention is that the structure further includes a leveling system, the leveling system includes a plurality of fifth sleeves, the fifth sleeves are pre-embedded on the top of the prefabricated component, and are connected with a plurality of adjusting bolts .

本发明进一步的改进在于,对应所述调节螺栓在上层预制构件的底部垫设10mm厚钢板。A further improvement of the present invention is that a 10mm thick steel plate is laid on the bottom of the upper prefabricated component corresponding to the adjusting bolt.

本发明进一步的改进在于,在所述预制构件的顶部预埋有复数“I”型吊钉,所述“I”型吊钉型号为M20×240mm,所述“I”型吊钉下加设2根“U”型φ10HPB300钢筋锚固,锚固长度30d,且所述“I”型吊钉预埋安装采用配套的专用胶波。The further improvement of the present invention is that a plurality of "I" type hanging nails are pre-embedded on the top of the prefabricated component. The model of the "I" type hanging nails is M20×240mm, and a Two "U"-shaped φ10HPB300 steel bars are anchored, with an anchorage length of 30d, and the pre-embedded installation of the "I"-shaped hanging nails uses matching special rubber waves.

本发明进一步的改进在于,所述各套筒的下部焊接2根φ10HPB300钢筋锚固,锚固长度25d。The further improvement of the present invention is that the lower part of each sleeve is welded with two φ10HPB300 steel bars for anchorage, and the anchorage length is 25d.

本发明由于采用了以上技术方案,使其具有以下有益效果是:通过在预制构件混凝土浇筑施工时,按照设计位置将钢质螺栓套筒预埋在预制构件内,套筒端头与混凝土构件表面平齐。利用不同规格的预埋套筒作为连结接驳器,对预制构件进行吊装、固定、安装限位等。为满足预制构件吊装及安装使用需要,在预制构件中预埋不同规格型号直螺纹套筒,用作吊装及安装拉结使用。Due to the adoption of the above technical scheme, the present invention has the following beneficial effects: by embedding the steel bolt sleeve in the prefabricated component according to the designed position during the concrete pouring construction of the prefabricated component, the end of the sleeve and the surface of the concrete component flush. Use embedded sleeves of different specifications as connecting connectors to hoist, fix, and limit installation of prefabricated components. In order to meet the needs of hoisting and installation of prefabricated components, straight thread sleeves of different specifications and models are pre-embedded in prefabricated components for hoisting and installation tie.

附图说明Description of drawings

图1是本发明装配式住宅PC预制构件制作安装结构立面设计图。Fig. 1 is the facade design diagram of the fabrication and installation structure of the PC prefabricated component of the prefabricated house of the present invention.

图2是本发明装配式住宅PC预制构件制作安装结构的安装限位系统示意图。Fig. 2 is a schematic diagram of the installation limit system of the fabrication and installation structure of the PC prefabricated component of the prefabricated house of the present invention.

图3是本发明装配式住宅PC预制构件制作安装结构的安装限位系统中的限位钢板的示意图。Fig. 3 is a schematic diagram of the limit steel plate in the installation limit system of the fabrication and installation structure of the PC prefabricated component of the prefabricated house according to the present invention.

图4是本发明装配式住宅PC预制构件制作安装结构的支撑固定系统示意图。Fig. 4 is a schematic diagram of the supporting and fixing system for the manufacturing and installation structure of the PC prefabricated component of the prefabricated house according to the present invention.

图5是本发明装配式住宅PC预制构件制作安装结构的“I”型吊钉安装平面示意图。Fig. 5 is a schematic diagram of the installation plane of the "I" type hanging nail of the fabrication and installation structure of the PC prefabricated component of the prefabricated house of the present invention.

图6是本发明装配式住宅PC预制构件制作安装结构的“I”型吊钉安装平面剖视图。Fig. 6 is a sectional view of the installation plane of the "I" type hanging nail of the fabrication and installation structure of the PC prefabricated component of the prefabricated house of the present invention.

图7是本发明装配式住宅PC预制构件制作安装结构的调平系统的上层预制构件的底面示意图。Fig. 7 is a schematic bottom view of the upper prefabricated components of the leveling system for manufacturing and installing the PC prefabricated components of the prefabricated house according to the present invention.

图8是本发明装配式住宅PC预制构件制作安装结构的调平系统的下层预制构件的顶面示意图。Fig. 8 is a schematic top view of the lower prefabricated components of the leveling system for manufacturing and installing the PC prefabricated components of the prefabricated house according to the present invention.

图9是本发明装配式住宅PC预制构件制作安装结构的调平系统的示意图。Fig. 9 is a schematic diagram of a leveling system for fabricating and installing a PC prefabricated component of a prefabricated house according to the present invention.

图10是图9的剖面图。FIG. 10 is a sectional view of FIG. 9 .

图11是本发明装配式住宅PC预制构件制作安装结构的调平系统的使用状态示意图。Fig. 11 is a schematic view of the use state of the leveling system for manufacturing and installing the PC prefabricated component of the prefabricated house according to the present invention.

具体实施方式Detailed ways

下面结合附图和具体实施方式对本发明作进一步详细的说明。The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

参阅图1~图11所示,本发明的装配式住宅PC预制构件制作安装结构主要由一安装限位系统、一支撑固定系统、一脱模吊装系统、一模板安装对拉杆连接系统、一调平系统和“I”型吊钉构成。Referring to Figures 1 to 11, the fabrication and installation structure of the prefabricated residential PC components of the present invention is mainly composed of an installation limit system, a support fixing system, a demoulding and hoisting system, a formwork installation pair tie rod connection system, an adjustment Consists of flat system and "I" type hanging nails.

根据预制构件施工图,对图纸进行深化设计,确定构件的外形、尺寸、板厚;确定构件的名称、编号及数量;确定预制构件的细部节点做法;According to the construction drawings of prefabricated components, carry out in-depth design on the drawings, determine the shape, size and plate thickness of components; determine the name, number and quantity of components; determine the detailed node methods of prefabricated components;

根据各个构件形状特点,确定每个构件的安装及吊装方案。选择确定构件吊装及安装用吊钉、预埋套筒种类、位置、数量;及其他预留孔洞、预埋件的数量、位置等内容。根据设计方案对构件吊装及安装过程受力状态及配套使用的构配件进行力学验算。According to the shape characteristics of each component, determine the installation and hoisting scheme of each component. Choose to determine the type, location, and quantity of lifting nails for component hoisting and installation, embedded sleeves, and the number and location of other reserved holes and embedded parts. According to the design plan, the force state of the component hoisting and installation process and the supporting components are checked and calculated.

1)利用不同规格的预埋套筒作为连结接驳器,对预制构件进行吊装、固定、安装限位等。为满足预制构件吊装及安装使用需要,在预制构件中预埋不同规格型号直螺纹套筒,用作吊装及安装拉结使用。1) Use embedded sleeves of different specifications as connecting connectors to hoist, fix, and limit installation of prefabricated components. In order to meet the needs of hoisting and installation of prefabricated components, different specifications and models of straight thread sleeves are pre-embedded in the prefabricated components for hoisting and installation tie.

预埋套筒型号主要有三种:M16×50mm、M14×50mm,M20×150mm,壁厚4mm。预埋套筒下部焊接2根φ10HPB300钢筋锚固,锚固长度25d。There are three main types of embedded sleeves: M16×50mm, M14×50mm, M20×150mm, and the wall thickness is 4mm. The lower part of the embedded sleeve is welded with 2 φ10HPB300 steel bars for anchorage, and the anchorage length is 25d.

其中预埋套筒选型及功能如下:The selection and function of the embedded sleeve are as follows:

如图2和图3所示,安装限位系统中的第一套筒11:安装限位套筒,型号为M16×50mm,预埋于预制构件101的顶部侧立面,使用螺栓与第一套筒11将一限位角钢110固定在下层预制构件101顶部,使其与下层预制构件101贴紧;安装上层预制构件102时,使其与限位角钢110靠紧,使上层预制构件102与下层预制构件101板面在同一个平面上,提高安装精度与速度。As shown in Figure 2 and Figure 3, install the first sleeve 11 in the limit system: install the limit sleeve, the model is M16×50mm, embedded in the top side elevation of the prefabricated component 101, using bolts and the first The sleeve 11 fixes a limit angle steel 110 on the top of the lower prefabricated component 101, making it close to the lower prefabricated component 101; The panels of the lower prefabricated components 101 are on the same plane, which improves the installation accuracy and speed.

如图4所示,支撑固定系统的第二套筒12:构件安装固定连接套筒,型号为M16×50mm,分别预埋于预制构件101下部与上部,预制构件101下部的第二套筒12通过螺栓连接复数型钢支架121,固定PC预制构件101下部;预制构件101上部的第二套筒12通过螺栓连接复数可调斜撑122,调节预制构件101垂直度,并进行临时固定。As shown in Figure 4, the second sleeve 12 of the supporting and fixing system: component installation and fixing connection sleeve, the model is M16×50mm, which are embedded in the lower and upper parts of the prefabricated component 101 respectively, and the second sleeve 12 at the lower part of the prefabricated component 101 The lower part of the PC prefabricated component 101 is fixed by connecting multiple steel brackets 121 with bolts; the second sleeve 12 on the upper part of the prefabricated component 101 is connected with multiple adjustable braces 122 by bolts to adjust the verticality of the prefabricated component 101 and perform temporary fixation.

脱模吊装系统的第三套筒13:脱模吊装套筒,型号为M20×150mm,使用螺栓与第三套筒13将吊装钢板连接件固定在预制构件上,用于预制构件脱模及吊装。The third sleeve 13 of the demoulding and hoisting system: the demoulding and hoisting sleeve, the model is M20×150mm, and the bolts and the third sleeve 13 are used to fix the hoisting steel plate connector on the prefabricated component, which is used for demoulding and hoisting of the prefabricated component .

模板安装对拉杆连接系统的第四套筒14:模板安装对拉杆连结套筒,型号为M14×50mm,在PC预制构件与现浇结构联结处,支设现浇结构模板时,将对拉螺杆与第四套筒14联结,固定拉结模板。The fourth sleeve 14 of the formwork installation tie rod connection system: the formwork installation tie rod connection sleeve, the model is M14×50mm, when the PC prefabricated component and the cast-in-place structure are connected, when the cast-in-place structural formwork is supported, the tie screw Connect with the fourth sleeve 14 to fix the tie template.

2)结合图5和图6所示,采用预埋专用“I”型吊钉15的方式,配以专用吊具进行竖向吊运安装作业。吊钉15型号为M20×240mm,每个吊钉15下加设2根“U”型φ10HPB300钢筋150锚固,锚固长度30d。吊钉15预埋安装采用配套的专用胶波。2) As shown in Figure 5 and Figure 6, adopt the method of pre-embedding special "I" type lifting nails 15, and use special lifting tools for vertical lifting and installation operations. The model of 15 hanging nails is M20×240mm, and 2 "U"-shaped φ10HPB300 steel bars 150 are added under each 15 hanging nails for anchoring, and the anchoring length is 30d. The pre-embedded installation of hanging nail 15 adopts matching special rubber waves.

吊钉15布置原则:由于预制构件尺寸较大,按照外形特点,在预制构件顶部设置3~4个吊点。预制构件重心一般在预制构件中部内侧位置,按照吊点位置对称的原则,吊点设置于预制构件顶部两端,设置在墙板内有暗柱或受力情况较好的位置。Layout principle of hanging nails 15: due to the large size of prefabricated components, according to the shape characteristics, set 3 to 4 hanging points on the top of the prefabricated components. The center of gravity of the prefabricated component is generally at the inner side of the middle of the prefabricated component. According to the principle of symmetry of the hanging point position, the hanging point is set at both ends of the top of the prefabricated component, and is set at a position with hidden columns in the wall panel or a position with better stress.

3)利用预埋螺栓套筒作为安装限位使用。3) Use the embedded bolt sleeve as the installation limit.

参阅图2和图3所示,在下层预制构件101顶部侧立面预埋钢质螺栓套筒2~3个,在上层预制构件102安装时,将顺直限位角钢110用螺栓固定在下层预制构件101顶部,并高出顶部150mm。上层预制构件102安装时沿限位角钢110与下层预制构件101板面安装平齐,安装定位快,效率高,克服了通常现场量测效率低、误差大的缺点。Referring to Figures 2 and 3, 2 to 3 steel bolt sleeves are pre-embedded on the top side elevation of the lower prefabricated component 101, and when the upper prefabricated component 102 is installed, the straight limit angle steel 110 is fixed to the lower level with bolts The top of the prefabricated component 101 is 150mm higher than the top. The upper prefabricated component 102 is installed flush with the plate surface of the lower prefabricated component 101 along the limit angle steel 110 during installation, the installation and positioning are fast and the efficiency is high, which overcomes the shortcomings of low efficiency and large error in the usual on-site measurement.

4)配合图7~图11所示,在下层预制构件101顶部预埋钢质螺栓套筒:第五套筒16,安装调节螺栓160,作为上层预制构件102安装调平支撑。4) As shown in Figures 7 to 11, the steel bolt sleeve: the fifth sleeve 16 is embedded on the top of the lower prefabricated component 101, and the adjusting bolt 160 is installed as a leveling support for the upper prefabricated component 102.

根据构件形状规则,在预制构件101板顶预埋M20钢质螺栓套筒3~4个,在上层预制构件102底部该处相应位置,将板底面设计制作成平面。According to the shape rules of the components, 3 to 4 M20 steel bolt sleeves are pre-embedded on the top of the prefabricated component 101, and at the corresponding position at the bottom of the upper prefabricated component 102, the bottom surface of the plate is designed to be flat.

在预制构件102安装时,首先安装好下层预制构件101,将M20标准螺栓160拧入下层预制构件101板顶的第五套筒16内,按照上层预制构件102板底安装标高,将螺栓160顶面标高调平一致。上层预制构件102安装时,直接将上层预制构件102安装在螺栓160顶部,再复核检测上层预制构件102标高,对于标高偏差,再通过调高或调低螺栓160来调节标高。为增强上层预制构件102板底承压能力,安装时可在上层预制构件102板底垫设10mm厚钢板161。When the prefabricated component 102 is installed, the lower prefabricated component 101 is first installed, the M20 standard bolt 160 is screwed into the fifth sleeve 16 on the top of the lower prefabricated component 101, and the bolt 160 is topped according to the installation height of the upper prefabricated component 102. The elevation and leveling of the surface are consistent. When installing the upper prefabricated component 102, directly install the upper prefabricated component 102 on the top of the bolt 160, then check and detect the elevation of the upper prefabricated component 102, and adjust the elevation by adjusting the height or lowering the bolt 160 for the elevation deviation. In order to enhance the pressure bearing capacity of the bottom of the upper prefabricated component 102, a 10mm thick steel plate 161 can be placed on the bottom of the upper prefabricated component 102 during installation.

现浇结构混凝土浇筑完成后,在现浇结构能够承受构件荷载后,将螺栓160拧松,卸去上层预制构件102对下层预制构件101的荷载。After the concrete pouring of the cast-in-place structure is completed, and after the cast-in-place structure can bear the component load, the bolts 160 are loosened to remove the load of the upper prefabricated component 102 on the lower prefabricated component 101 .

以上结合附图实施例对本发明进行了详细说明,本领域中普通技术人员可根据上述说明对本发明做出种种变化例。因而,实施例中的某些细节不应构成对本发明的限定,本发明将以所附权利要求书界定的范围作为本发明的保护范围。The present invention has been described in detail above with reference to the embodiments of the accompanying drawings, and those skilled in the art can make various changes to the present invention according to the above description. Therefore, some details in the embodiments should not be construed as limiting the present invention, and the present invention will take the scope defined by the appended claims as the protection scope of the present invention.

Claims (4)

1. an assembled-type house PC prefabricated units fabrication and installation structure, is characterized in that described structure comprises:
One mounting limit system, described mounting limit system comprises plural first sleeve, and described first sleeve is pre-buried in the top side facade of described prefabricated units, has been bolted plural spacing angle steel;
One supports fixed system, described support fixed system comprises plural second sleeve, described second sleeve is embedded in described prefabricated units bottom and top respectively in advance, second sleeve of described prefabricated units bottom has been bolted complex number type steel bracket, and second sleeve on described prefabricated units top has been bolted plural adjustable diagonal bracing;
One demoulding Lift-on/Lift-off System, described demoulding Lift-on/Lift-off System comprises plural number the 3rd sleeve, and described 3rd sleeve is embedded in described prefabricated units in advance, has been bolted plural number lifting steel plate connector;
One model sheetinstallat is to ties link system, and described model sheetinstallat comprises plural number the 4th sleeve to ties link system, and described 4th sleeve is embedded in described prefabricated units and cast-in-place structural junction in advance, is connected with plural Screw arbor with nut at both-ends;
One leveling system, described leveling system comprises plural number the 5th sleeve, and described 5th sleeve is embedded in the top of described prefabricated units in advance, is connected with plural adjusting bolt;
Be embedded with plural number " I " type at the top of described prefabricated units and hang nail, add the anchoring of 2 " U " steel bars under described " I " type hangs nail, described " I " type hangs nail and is arranged in described prefabricated units and has sleeper or the good position of stressing conditions.
2. structure as claimed in claim 1, is characterized in that: corresponding described adjusting bolt establishes 10mm steel plate at the bottom pad of upper strata prefabricated units.
3. structure as claimed in claim 2, it is characterized in that: it is M20 × 240mm that described " I " type hangs nail model, add 2 " U " type φ 10HPB300 Bar Anchorages under described " I " type hangs nail, anchorage length 30d, and described " I " type hangs, and nail is pre-buried installs the supporting special glue ripple of employing.
4. structure as claimed in claim 3, is characterized in that: lower weld 2 φ 10HPB300 Bar Anchorages of described each sleeve, anchorage length 25d.
CN201310231912.5A 2013-06-09 2013-06-09 Assembled-type house PC prefabricated units fabrication and installation structure Expired - Fee Related CN103306371B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310231912.5A CN103306371B (en) 2013-06-09 2013-06-09 Assembled-type house PC prefabricated units fabrication and installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310231912.5A CN103306371B (en) 2013-06-09 2013-06-09 Assembled-type house PC prefabricated units fabrication and installation structure

Publications (2)

Publication Number Publication Date
CN103306371A CN103306371A (en) 2013-09-18
CN103306371B true CN103306371B (en) 2015-10-14

Family

ID=49132055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310231912.5A Expired - Fee Related CN103306371B (en) 2013-06-09 2013-06-09 Assembled-type house PC prefabricated units fabrication and installation structure

Country Status (1)

Country Link
CN (1) CN103306371B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982380A (en) * 2014-05-27 2014-08-13 北京金风科创风电设备有限公司 Precast concrete tower member, assembly thereof, stacking method thereof and embedded part
CN104234267A (en) * 2014-09-04 2014-12-24 中国建筑股份有限公司 Height-adjustable prefabricated reinforced concrete shear wall panel and its installation method
CN106930401A (en) * 2015-12-31 2017-07-07 中国三冶集团有限公司 A kind of assembled industrialization steel structure house
CN108086698A (en) * 2016-11-22 2018-05-29 吴方华 Levelling device and application method are fixed in a kind of prefabricated components installation
CN107034989B (en) * 2016-12-05 2018-03-27 浙江省建工集团有限责任公司 A kind of prefabrication prefabricated components exempt to support installation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201106287Y (en) * 2007-10-30 2008-08-27 上海市第二建筑有限公司 Apparatus for regulating building block verticality
CN101806095A (en) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 Full-fabricated assembly overall reinforced concrete house and building method thereof
CN201665917U (en) * 2010-03-08 2010-12-08 浙江桔乡建设有限公司 Prefabricated part fastener
CN103061505A (en) * 2013-01-14 2013-04-24 河北省第四建筑工程公司 Multifunctional split bolt and application thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201106287Y (en) * 2007-10-30 2008-08-27 上海市第二建筑有限公司 Apparatus for regulating building block verticality
CN201665917U (en) * 2010-03-08 2010-12-08 浙江桔乡建设有限公司 Prefabricated part fastener
CN101806095A (en) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 Full-fabricated assembly overall reinforced concrete house and building method thereof
CN103061505A (en) * 2013-01-14 2013-04-24 河北省第四建筑工程公司 Multifunctional split bolt and application thereof

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
住宅产业化试验楼项目的探索与实践;何兆芳等;《住宅产业》;20120831(第2012年第8期);第59-61页 *
住房和城乡建设部工程质量安全监管司等.产业化预制装配式住宅预制构件与连接结构同步施工工法.《工程建设国家级工法汇编》.中国建筑出版社,2011,116-130页. *
工具式吊装系统在装配式预制构件安装中的应用;张鹏等;《施工技术》;20120531;第41卷(第365期);第79-82页 *
预制全装配式混凝土框架结构施工技术;张晓勇等;《施工技术》;20120131;第41卷(第357期);第77-80页 *

Also Published As

Publication number Publication date
CN103306371A (en) 2013-09-18

Similar Documents

Publication Publication Date Title
CN103306371B (en) Assembled-type house PC prefabricated units fabrication and installation structure
CN103924520B (en) Construction method and device of suspension bridge main cable anchorage prestressed pipes
CN102926554B (en) Steel hanging seat formwork support and construction method thereof
CN108035554A (en) The steel column supporting frame construction method of high-rise building frame column
CN102518300B (en) Embedded conical bearing joint type steel structure support and construction method thereof
CN100424298C (en) Construction method of making laminated floor slab with upper support frame
CN108915153A (en) Assembly concrete superposed column installation method and system
CN102864934A (en) Construction method of back-bolt type dry hanging stone curtain wall
CN209585630U (en) Building construction formwork adjustable support frame
CN103174155B (en) Reverse construction method for erecting steel column and pouring concrete foundation
CN103174300B (en) Viscous damper installation construction method
CN119083734A (en) A method for installing and constructing an assembled building structure
KR101367706B1 (en) Steel Connection Structure For Self-Positioning of Composite Precast Concrete Member And Construction Method Thereof
CN204530479U (en) The interim counter-force bracing or strutting arrangement of a kind of bridge jacking
CN215519235U (en) Prefabricated formula basis pre-buried structure
CN204715362U (en) A kind of deep foundation ditch embedded column base bracing frame
CN207211182U (en) A kind of vertical substation framework basis and overhead transmission line column foot foundation bolt mounting platform
CN203546945U (en) Wallboard and shear wall with post-cast strip at floor position composed of wallboard
CN203755167U (en) Assistant mounting device of V-shaped steel pipe frame of tower bridge
CN111945790A (en) Manhole cover installation device and installation method
CN204040495U (en) A kind of suspension fixing support rack of high-order cast-in fixing bolt
CN110805141A (en) Connecting device and method for steel pipe column and shock insulation support after jacking of building
CN215055288U (en) Novel hang mould support
CN204609297U (en) Large-scale high-altitude load-bearing Cantilever Beams device
CN113089848B (en) A prefabricated foundation embedded structure and installation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA STATE CONSTRUCTION ENG. CORP. LTD.

Effective date: 20140410

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20140410

Address after: 200135 Pudong New Area Century Avenue, Shanghai, No. 27, layer 1568

Applicant after: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

Applicant after: CHINA STATE CONSTRUCTION ENGINEERING Corp.,Ltd.

Address before: 200135 Pudong New Area Century Avenue, Shanghai, No. 27, layer 1568

Applicant before: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151014

CF01 Termination of patent right due to non-payment of annual fee