CN206289958U - A kind of inside wall formwork erecting device and inside wall formwork formwork erecting structure - Google Patents

A kind of inside wall formwork erecting device and inside wall formwork formwork erecting structure Download PDF

Info

Publication number
CN206289958U
CN206289958U CN201621182899.4U CN201621182899U CN206289958U CN 206289958 U CN206289958 U CN 206289958U CN 201621182899 U CN201621182899 U CN 201621182899U CN 206289958 U CN206289958 U CN 206289958U
Authority
CN
China
Prior art keywords
support
inside wall
template
wall formwork
formwork erecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621182899.4U
Other languages
Chinese (zh)
Inventor
吴晶
阮洁
刘梦星
张利伟
武晨
杜峰
马承艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Aerospace Construction Group Co Ltd
Original Assignee
China Aerospace Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Aerospace Construction Group Co Ltd filed Critical China Aerospace Construction Group Co Ltd
Priority to CN201621182899.4U priority Critical patent/CN206289958U/en
Application granted granted Critical
Publication of CN206289958U publication Critical patent/CN206289958U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is related to the realm of building construction, discloses a kind of inside wall formwork erecting device, including template, substrate and support.Template is erect and is set, and substrate possesses relative first end and the second end, and substrate level is set, and the first end end face of substrate is resisted against the bottom of template.The upper surface of substrate to offer and extend to first end end face from the second end end face and depth gradually increased chute.Support includes diagonal brace, stull and erects to support, and one end interconnection of stull and perpendicular support, diagonal brace connects stull and perpendicular support, and to form the support of triangle, stull bottom is provided with multiple pulleys.Pulley and chute coordinate, erect support and template against.So that support strengthens the support force to template in the presence of self gravitation, it is ensured that support support is more firm, setting pulley can be reduced sets up recruitment.The invention also discloses inside wall formwork formwork erecting structure.

Description

A kind of inside wall formwork erecting device and inside wall formwork formwork erecting structure
Technical field
The utility model is related to the realm of building construction, in particular to a kind of inside wall formwork erecting device and interior wall mould Plate formwork erecting structure.
Background technology
Application of the building template in interior wall construction, serves very big to the raising of interior wall structure construction quality integral level Positive role.At present, building template is commonly used in architectural engineering, but the use of building template be unable to do without formwork Device, erecting device plays a supportive role to building template.
With the fast development of Building Trade in China, the deficiency of existing erecting device also shows especially out, existing formwork dress The support force that support is put to template is more single, is only fixed by bolt, causes support loosely problem;And erecting device sets up completion After can only realize being intended for single use, build erecting device when changing a face wall again again and cause and set up the more problem of recruitment.
Utility model content
The utility model aims to provide a kind of inside wall formwork erecting device, is supported with solving erecting device of the prior art Loosely and set up the more problem of recruitment.
Another object of the present utility model is to provide a kind of inside wall formwork formwork erecting structure.
What embodiment of the present utility model was realized in:
A kind of inside wall formwork erecting device, including template, substrate and support.Template is erect and is set, and substrate possesses relative First end and the second end, substrate level are set, and the first end end face of substrate is resisted against the bottom of template.The upper surface of substrate opens up Having extend to first end end face from the second end end face and depth gradually increased chute.Support includes diagonal brace, stull and perpendicular support, One end of stull and perpendicular support is connected with each other, and diagonal brace connects stull and perpendicular support, to form the support of triangle.Stull bottom is provided with Multiple pulleys, pulley and chute coordinate, erect support and template against.
The inside wall formwork erecting device that the utility model is provided, the upper surface of substrate offers depth gradually increased cunning Groove, chute has gradient so that support strengthens the support force to template in the presence of self gravitation, it is ensured that support is supported more Firmly, erecting device support of the prior art loosely problem is solved.The bottom of set girt(h) is provided with multiple pulleys, it is sliding Wheel coordinates with chute, can be by the cooperation of pulley and chute after support is set up so that support can be slided and propped up in place Hold mode plate, reduces the labour intensity of staff.The support can be promoted when other metopes are processed, the support is integrally transported Move to precalculated position, easy to use, recruitment is set up in reduction, is solved and set up in the prior art the more problem of recruitment.
In one embodiment of the present utility model:
Above-mentioned inside wall formwork erecting device, inside wall formwork erecting device also includes fixed plate and alignment pin.Fixed plate and horizontal stroke Support connection, offers the first fixing hole in fixed plate, the chute both sides of substrate offer multiple second fixing holes.Alignment pin runs through First fixing hole simultaneously enters one of them second fixing hole.
In one embodiment of the present utility model:
Above-mentioned inside wall formwork erecting device, stull possesses relative the 3rd end and the 4th end, the pulley of stull bottom, from Three ends to the 4th end, the diameter of pulley gradually increases, and makes perpendicular support parallel with template.
In one embodiment of the present utility model:
Above-mentioned inside wall formwork erecting device, support and chute are the multiple being arranged side by side, and pass through between adjacent support Connector is connected.
In one embodiment of the present utility model:
Above-mentioned inside wall formwork erecting device, diagonal brace is including shoring, waist is supportted and bottom bracing.Shore, waist is supportted and the two ends of bottom bracing are equal It is connected with stull and perpendicular support respectively.Waist support is located at bottom bracing top, shores and supports top positioned at waist.
In one embodiment of the present utility model:
Above-mentioned inside wall formwork erecting device, template is provided with the horizontal stupefied and perpendicular stupefied of intersection on the surface of support.
In one embodiment of the present utility model:
Above-mentioned inside wall formwork erecting device, it is horizontal stupefied and erect and stupefied be connected with template by gib headed bolt.
A kind of inside wall formwork formwork erecting structure, including two above-mentioned any one inside wall formwork erecting devices,
Two inside wall formwork erecting devices are oppositely arranged, and two templates limit receiving space.
In one embodiment of the present utility model:
Above-mentioned inside wall formwork formwork erecting structure, inside wall formwork formwork erecting structure also includes through-wall bolt.Through-wall bolt runs through two Template and receiving space, the two ends of through-wall bolt are provided with nut with matching.
In one embodiment of the present utility model:
Above-mentioned inside wall formwork formwork erecting structure, is arranged with plastic pipe sleeve on through-wall bolt, plastic pipe sleeve is located in receiving space.
The beneficial effect of the utility model embodiment is:
The inside wall formwork erecting device that the utility model is provided, the upper surface of substrate offers depth gradually increased cunning Groove, chute has gradient so that support strengthens the support force to template in the presence of self gravitation, it is ensured that support is supported more Firmly, erecting device support of the prior art loosely problem is solved.The bottom of set girt(h) is provided with multiple pulleys, it is sliding Wheel coordinates with chute, can be by the cooperation of pulley and chute after support is set up so that support can be slided and propped up in place Hold mode plate, reduces the labour intensity of staff.The support can be promoted when other metopes are processed, the support is integrally transported Move to precalculated position, easy to use, recruitment is set up in reduction, is solved and set up in the prior art the more problem of recruitment.
The inside wall formwork formwork erecting structure that the utility model is provided, possesses two above-mentioned inside wall formwork erecting devices, therefore Also there is firm supporting and the beneficial effect of recruitment is set up in reduction.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme of the utility model embodiment, below will be to be used needed for embodiment Accompanying drawing be briefly described, it will be appreciated that the following drawings illustrate only some embodiments of the present utility model, therefore should not be by Regard the restriction to scope as, for those of ordinary skill in the art, on the premise of not paying creative work, may be used also Other related accompanying drawings are obtained with according to these accompanying drawings.
Fig. 1 is the overall structure diagram of the inside wall formwork erecting device that the utility model embodiment 1 is provided;
Fig. 2 is enlarged drawing at the II of Fig. 1;
Fig. 3 is the formwork structure schematic diagram of the inside wall formwork erecting device that the utility model embodiment 1 is provided;
Fig. 4 is the board structure schematic diagram of the inside wall formwork erecting device that the utility model embodiment 1 is provided;
Fig. 5 is structure of the support of the inside wall formwork erecting device that the utility model embodiment 1 is provided under the first visual angle Schematic diagram;
Fig. 6 is structure of the support of the inside wall formwork erecting device that the utility model embodiment 1 is provided under the second visual angle Schematic diagram;
Fig. 7 is enlarged drawing at the VII of Fig. 6;
Fig. 8 is the structural representation of the fixed plate of the inside wall formwork erecting device that the utility model embodiment 1 is provided;
Fig. 9 is the overall structure diagram of the inside wall formwork formwork erecting structure that the utility model embodiment 2 is provided.
Icon:10- inside wall formwork erecting devices;100- templates;110- horizontal strokes are stupefied;120- erects stupefied;130- gib headed bolts;200- Substrate;210- first ends;212- chutes;The fixing holes of 214- second;The ends of 220- second;300- supports;310- stulls;312- the 3rd End;The ends of 314- the 4th;316- pulleys;The perpendicular supports of 320-;330- diagonal braces;332- shores;334- waists are supportted;336- bottom bracings;340- is connected Part;400- fixed plates;The fixed parts of 410- first;The fixed parts of 420- second;The fixing holes of 422- first;500- alignment pins;20- interior walls Template formwork erecting structure;22- through-wall bolts;23- plastic pipe sleeves;24- nuts;30- receiving spaces.
Specific embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer Accompanying drawing in type embodiment, is clearly and completely described, it is clear that retouched to the technical scheme in the utility model embodiment The embodiment stated is a part of embodiment of the utility model, rather than whole embodiments.Generally described in accompanying drawing herein and The component of the utility model embodiment for showing can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiment of the present utility model below to providing in the accompanying drawings is not intended to limit requirement The scope of the present utility model of protection, but it is merely representative of selected embodiment of the present utility model.Based in the utility model Embodiment, the every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, all Belong to the scope of the utility model protection.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it need not be further defined and explained in subsequent accompanying drawing.
, it is necessary to explanation in description of the present utility model, if occur term " on ", " vertical ", the instruction such as " level " Orientation or position relationship be that, based on orientation shown in the drawings or position relationship, or the utility model product is usual when using The orientation or position relationship put, are for only for ease of and describe the utility model and simplify to describe, rather than instruction or hint institute The device or element of finger must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this reality With new limitation.If being described additionally, occurring term " first ", " second " etc. in description of the present utility model and being only used for distinguishing, And it is not intended that indicating or implying relative importance.
If additionally, occur the term such as term " level ", " vertical " in description of the present utility model to be not offered as requiring part Abswolute level or pendency, and can be to be slightly tilted.If " level " refers to only its direction with respect to more level for " vertical ", It is not to represent that the structure must be fully horizontal, and can be to be slightly tilted.
In description of the present utility model, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, if there is art Language " setting ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or integratedly connect Connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, can be two connections of element internal.For this For the those of ordinary skill in field, concrete meaning of the above-mentioned term in the utility model can be understood with concrete condition.
Embodiment 1:
Refer to Fig. 1 and combine Fig. 2, the present embodiment provides a kind of inside wall formwork erecting device 10, including template 100, base Plate 200, support 300, fixed plate 400 and alignment pin 500.
Fig. 3 is refer to, template 100 is, with certain thickness platy structure, horizontal stupefied 110 for intersecting to be set thereon stupefied with perpendicular 120, horizontal stupefied 110 are set near template 100, and horizontal stupefied 110 are arranged on perpendicular stupefied 120 away from the side of template 100.Horizontal stupefied 110 is stupefied with perpendicular 120 are fixedly connected in template 100 by gib headed bolt 130.
Fig. 4 is refer to, substrate 200 is that, with certain thickness platy structure, it has relative first end 210 and second End 220, the end face and depth that the end face that the upper surface of substrate 200 is offered from the second end 220 extends to first end 210 gradually increases Plus multiple chutes 212, be further opened with multiple second fixing holes 214 in the both sides of chute 212.
Fig. 5 is refer to, support 300 includes stull 310, perpendicular support 320 and diagonal brace 330.Stull 310 and the one of perpendicular support 320 End is connected with each other, and stull 310 and perpendicular support 320 are set mutual vertically.Diagonal brace 330 connects stull 310 and perpendicular support 320.Stull 310th, erect support 320 and diagonal brace 330 form the support 300 of triangle, multiple supports 300 are arranged side by side, adjacent support 300 it Between connected by connector 340.
Refer to Fig. 6 and combine Fig. 7, stull 310 possesses relative the 3rd end 312 and the 4th end 314, the bottom of stull 310 It is provided with multiple pulleys 316.From the end 314 of the 3rd end 312 to the 4th, the diameter of pulley 316 gradually increases.
The both sides of stull 310 are provided with fixed plate 400.
Diagonal brace 330 includes that shoring 332, waist supports 334 and bottom bracing 336.Shore 332, waist support 334 and bottom bracing 336 be arranged in parallel. Waist support 334 is located at the top of bottom bracing 336, shores 332 and is located at the top of waist support 334.Shore the two ends of 332, waist support 334 and bottom bracing 336 Respectively it is connected with stull 310 and perpendicular support 320.
Fig. 8 is refer to, fixed plate 400 has the first fixed part 410 and the second fixed part 420, in the second fixed part 420 On offer the first fixing hole 422.
Referring once again to Fig. 1 and Fig. 2 is combined, in the course of the work, template 100 is vertically arranged on the ground, by substrate 200 are placed horizontally on ground, make the first end 210 of substrate 200 relative to template 100 perpendicularly against in the bottom of template 100 Portion.After having set up template 100 and substrate 200, the support 300 that will have been set up pushes to substrate 200, makes the bottom of stull 310 Pulley 316 enters chute 212.Support 300 is slidably matched by pulley 316 and chute 212, from the second end 220 of substrate 200 First end 210 is slided to, so as to be supported to template 100.So so that it is right that support 300 is strengthened in the presence of self gravitation The support force of template 100, it is ensured that support 300 supports more firm, solves erecting device support of the prior art and loosely asks Topic.Because the diameter of pulley 316 in stull 310 gradually increases, while the depth of chute 212 gradually increases such that it is able to ensure horizontal Support 310 is parallel with the upper surface of substrate 200.So so that support 300 is bigger with the contact area of template 100, so that more steady Admittedly support shuttering 100.First fixed part 410 of fixed plate 400 is connected in stull 310, and ensures the second fixed part 420 On the first fixing hole 422 it is corresponding with the position of the second fixing hole 214 on substrate 200.Alignment pin 500 runs through the first fixing hole 422 and support 300 is fixed with the relative position of substrate 200 into the second fixing hole 214, so as to avoid course of work medium-height trestle 300 position changes.When needing to process an other face wall, alignment pin 500 is taken out, support 300 is exited by chute 212, will Support 300 shifts another construction interior wall onto, easy to use, reduces and sets up recruitment, to solve that set up in the prior art recruitment more Problem, improve efficiency of construction.
It should be noted that in the present embodiment, fixed plate 400, the setting of the fixing hole 214 of alignment pin 500 and second are In order to avoid in the course of the work, the position of support 300 changes when the concrete pressure that template 100 is limited is larger, so that more preferably Ground support shuttering 100.In other specific embodiments, such as when the concrete pressure that template 100 is limited is smaller, it is also possible to It is not provided with fixed plate 400, the fixing hole 214 of alignment pin 500 and second.
In the present embodiment, support 300 and chute 212 are the multiple being arranged side by side, and pass through between adjacent support 300 Connector 340 is connected.It is more firm to the support of template 100 that multiple supports 300 are arranged side by side guarantee.
In the present embodiment, diagonal brace 330 includes that shoring 332, waist supports 334 and bottom bracing 336.To increase the entirety of support 300 Intensity.It should be understood that requiring that diagonal brace 330 can also be by a rod member, two rod members according to the difference to the intensity of support 300 Or the rod member of more than three is constituted.
In the present embodiment, template 100 near support 300 surface on be provided with intersection horizontal stupefied 110 and erect stupefied 120 with Improve the bulk strength of template 100.It should be understood that in the less demanding occasion of bulk strength to template 100, it is also possible to no Set horizontal stupefied 110 and perpendicular stupefied 120.
In the present embodiment, horizontal stupefied 110 and perpendicular stupefied 120 it is connected with template 100 by gib headed bolt 130.It should be understood that Horizontal stupefied 110 and perpendicular stupefied 120 can also be fixed in template 100 by modes such as welding, straight peen bolt connections.
In the present embodiment, erect support 320 and be resisted against template 100, realize the support to template 100.Can also be according to client Demand, on the basis of perpendicular support 320 is resisted against template 100, at the same using the fixing devices such as bolt be fixedly connected perpendicular support 320 with Template 100.
It should be noted that the connection of fixed plate 400 and stull 310, can use to be fixedly connected (for example weld), Can also can be wholely set with stull 310 using fixed plate 400 using detachably connected.
Embodiment 2:
Fig. 9 is refer to, in the present embodiment there is provided in a kind of inside wall formwork formwork erecting structure 20, including two embodiments 1 The inside wall formwork erecting device 10 of description, two inside wall formwork erecting devices 10 are oppositely arranged, and two templates 100 are limited and accommodate sky Between 30.
Inside wall formwork formwork erecting structure 20 also includes through-wall bolt 22.
Through-wall bolt 22 runs through two templates 100 and receiving space 30, and the two ends of through-wall bolt 22 are provided with and match therewith The nut 24 of conjunction, through-wall bolt 22 ensures there is stable distance between two templates 100.
Plastic pipe sleeve 23 is arranged with through-wall bolt 22, plastic pipe sleeve 23 is located in receiving space 30.Plastic pipe sleeve is set 23 prevent concrete spillage.
Because inside wall formwork formwork erecting structure 20 includes the inside wall formwork erecting device 10 described in two embodiments 1, therefore Also there is firm supporting and the beneficial effect of recruitment is set up in reduction.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this For the technical staff in field, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.

Claims (10)

1. a kind of inside wall formwork erecting device, it is characterised in that:
The inside wall formwork erecting device includes template, substrate and support;
The template is erect and is set;
The substrate possesses relative first end and the second end, and the substrate level is set, and the first end end face of the substrate is supported It is against the bottom of the template;The upper surface of the substrate offers from the second end end face and extends to the first end end face and depth Spend gradually increased chute;
The support includes diagonal brace, stull and perpendicular support;One end of the stull and the perpendicular support is connected with each other, and the diagonal brace connects The stull and the perpendicular support are connect, to form the support of triangle;
The stull bottom is provided with multiple pulleys;
The pulley coordinates with the chute;It is described it is perpendicular support with the template against.
2. a kind of inside wall formwork erecting device according to claim 1, it is characterised in that:
The inside wall formwork erecting device also includes fixed plate and alignment pin;The fixed plate is connected with the stull, described solid The first fixing hole is offered in fixed board, the chute both sides of the substrate offer multiple second fixing holes;The alignment pin runs through First fixing hole simultaneously enters one of them described second fixing hole.
3. a kind of inside wall formwork erecting device according to claim 2, it is characterised in that:
The stull possesses relative the 3rd end and the 4th end, and the 4th end is near the template;From the 3rd end to institute The 4th end is stated, the diameter of the pulley gradually increases, make the perpendicular support parallel with the template.
4. a kind of inside wall formwork erecting device according to claim 1, it is characterised in that:
The support and the chute are the multiple being arranged side by side, and are connected by connector between the adjacent support.
5. a kind of inside wall formwork erecting device according to claim 1, it is characterised in that:
The diagonal brace is including shoring, waist is supportted and bottom bracing;It is described shore, the waist support and the bottom bracing two ends respectively with it is described Stull and the perpendicular support connection;The waist support is located at bottom bracing top, and described shoring supports top positioned at the waist.
6. a kind of inside wall formwork erecting device according to claim 1, it is characterised in that:
The template is provided with the horizontal stupefied and perpendicular stupefied of intersection on the surface of the support.
7. a kind of inside wall formwork erecting device according to claim 6, it is characterised in that:
The horizontal stroke is stupefied and described perpendicular stupefied is connected with the template by gib headed bolt.
8. inside wall formwork formwork erecting structure, it is characterised in that:
Including the inside wall formwork erecting device described in any one in two claims 1 to 7;
The template of two inside wall formwork erecting devices is oppositely arranged, and two templates limit receiving space.
9. inside wall formwork formwork erecting structure according to claim 8, it is characterised in that:
The inside wall formwork formwork erecting structure also includes through-wall bolt;The through-wall bolt runs through two templates and the receiving Space, the two ends of the through-wall bolt are provided with nut with matching.
10. inside wall formwork formwork erecting structure according to claim 9, it is characterised in that:
Plastic pipe sleeve is arranged with the through-wall bolt, the plastic pipe sleeve is located in the receiving space.
CN201621182899.4U 2016-10-27 2016-10-27 A kind of inside wall formwork erecting device and inside wall formwork formwork erecting structure Active CN206289958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621182899.4U CN206289958U (en) 2016-10-27 2016-10-27 A kind of inside wall formwork erecting device and inside wall formwork formwork erecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621182899.4U CN206289958U (en) 2016-10-27 2016-10-27 A kind of inside wall formwork erecting device and inside wall formwork formwork erecting structure

Publications (1)

Publication Number Publication Date
CN206289958U true CN206289958U (en) 2017-06-30

Family

ID=59100607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621182899.4U Active CN206289958U (en) 2016-10-27 2016-10-27 A kind of inside wall formwork erecting device and inside wall formwork formwork erecting structure

Country Status (1)

Country Link
CN (1) CN206289958U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035546A (en) * 2017-11-09 2018-05-15 李强 A kind of shear wall formwork for placing fixing device for building
CN109129841A (en) * 2018-08-01 2019-01-04 广东亿安居环保建材有限公司 A kind of construction of ceramsite concrete wall panel is with pouring mold and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035546A (en) * 2017-11-09 2018-05-15 李强 A kind of shear wall formwork for placing fixing device for building
CN108035546B (en) * 2017-11-09 2020-05-22 中铁十四局集团建筑工程有限公司 Template fixing device is pour to shear force wall for building
CN109129841A (en) * 2018-08-01 2019-01-04 广东亿安居环保建材有限公司 A kind of construction of ceramsite concrete wall panel is with pouring mold and its construction method

Similar Documents

Publication Publication Date Title
CN102808509B (en) Pouring construction method for anchor assembly of prefabricated concrete prefabricated external wall panel
CN102535672B (en) Novel hybrid huge anti-seismic structure and construction method thereof
CN206289958U (en) A kind of inside wall formwork erecting device and inside wall formwork formwork erecting structure
CN207348095U (en) The special bearing diagonal component of piping lane
CN208618791U (en) A kind of construction formwork for placing
CN104989098A (en) Laminated plate support frame
CN204040450U (en) A kind of for angle connector in tools type section steel builder's jack
CN202466883U (en) Novel combined type large-size anti-seismic structure
CN203889888U (en) Steel plate hoisting clamp
CN205778885U (en) A kind of shield machine reaction frame
CN206352397U (en) A kind of auxiliary mould for being used to connect pillar and take over a business
CN108756221B (en) Form and position joint and switching vertical pipe, switching frame and switching frame thereof
CN210414501U (en) Mounting structure of civil engineering pipeline placing frame
CN210563529U (en) Reinforcing apparatus and brickwork assembly for brickwork
CN209799425U (en) adjustable foundation construction positioning frame
CN206645698U (en) A kind of Portable multi-functional lifting device
CN203420470U (en) Installation construction structure of short-limb shear-wall formwork supporting system
CN206646649U (en) The connecting joint structure of column and girder steel
CN206233540U (en) Regulation hoisting type elevator job platform
CN204626964U (en) Concreting leak-proof device
CN205348759U (en) Shear wall template system for construction
CN204738546U (en) PC component stands up uses device
CN205777502U (en) Tool-type beam forms fixes support system
CN219568947U (en) Multifunctional foundation positioning frame
CN202689539U (en) Novel plastic exterior angle template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant