CN108033415A - A kind of installation method in sintered material storehouse - Google Patents

A kind of installation method in sintered material storehouse Download PDF

Info

Publication number
CN108033415A
CN108033415A CN201711162788.6A CN201711162788A CN108033415A CN 108033415 A CN108033415 A CN 108033415A CN 201711162788 A CN201711162788 A CN 201711162788A CN 108033415 A CN108033415 A CN 108033415A
Authority
CN
China
Prior art keywords
warehouse
batch bin
jack
sintered material
segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711162788.6A
Other languages
Chinese (zh)
Inventor
王永利
张晓艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201711162788.6A priority Critical patent/CN108033415A/en
Publication of CN108033415A publication Critical patent/CN108033415A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F19/00Hoisting, lifting, hauling or pushing, not otherwise provided for

Abstract

The present invention provides a kind of installation method in sintered material storehouse, successively including S1:Pretreatment before installation;S2:The fixed jack of suspension;S3:Every section of warehouse of upside-down mounting:Discrete piece is fixed into composition first segment warehouse in frame and is lifted with jack;Composition second segment warehouse is fixed in the lower section of first segment warehouse;First segment warehouse is fallen and is welded into Part I batch bin on second segment warehouse and is promoted to frame roof with jack;S4:Remaining each several part batch bin is lifted using jack according to order from top to bottom successively by step S3.The beneficial effects of the invention are as follows knot batch bin to be fabricated to discrete piece in processing factory, quick construction, have bad luck it is light, it is smaller to place space requirement, speed of application is fast, it is convenient and efficient, can multiple sintered material storehouses construct, be independent of each other at the same time, economization machinery expenses, save big part and have bad luck process, save human time.

Description

A kind of installation method in sintered material storehouse
Technical field
The invention belongs to equipment mounting technique field, more particularly, to a kind of installation method in sintered material storehouse.
Background technology
In the installation process in current sintering machine feed proportioning system steel storehouse, since steel storehouse diameter and weight are larger, during installation, need Molding steel storehouse will be made to have bad luck to basic framework, it is in place by oblique pull lifting lifting using electronic elevator, or on basis Pause civil construction before frame is unclosed, it is first that steel storehouse is in place using large-scale crane lifting, then carry out frame closing.
This two methods, it is higher to the space requirement of periphery place that the former has bad luck lifting steel storehouse, and steel storehouse is heavy, time-consuming takes Power, the latter influence civil engineering progress and need large-scale crane to coordinate, and machine cost is larger.
The content of the invention
The invention aims to solve in the firm storehouse installation process of existing sintering machine feed proportioning system to periphery place space It is required that high, time and effort consuming and the problem of large-scale crane need to be equipped with, influence civil engineering progress and big machine cost, there is provided one kind sintering The installation method of batch bin.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of installation method in sintered material storehouse, according to It is secondary to comprise the following steps:
S1:Batch bin is pre-processed before installation:Batch bin is processed into discrete piece when manufacturing;
S2:The fixed jack of suspension, every section of warehouse being assembled into for lifting discrete piece;
S3:Warehouse described in upside-down mounting, includes successively:
S31:By the first segment warehouse of multi-disc discrete piece fixed composition cylindrical shape in frame;
S32:The first segment warehouse is lifted using the jack;
S33:The cylindric second segment warehouse of composition is fixed in the lower section of the first segment warehouse;
S34:First segment warehouse is fallen and is welded into Part I batch bin on the second segment warehouse;
S35:Part I batch bin is lifted to the frame roof using the jack.
S4:By the S31-S35 in step S3, remaining each portion is lifted using the jack according to order from top to bottom successively Distribute feed bin.
Further, further included after the S35 steps and extract the jack.
Further, after every part batch bin being installed in the S4, using jack lifting to front portion dispensing Below storehouse, it is welded and fixed with batch bin before.
Further, in the step S4, further include and build temporary platform, for last part batch bin and previous portion Distribute feed bin welding.
Further, bracket basic platform, in the step S35, the Part I batch bin are set on the frame Temperature pier is carried out with the bracket basis on the bracket basic platform frame.
Further, jack is fixed in the suspension in the step S2, is to hang motor-driven chain hoist in proportioning room roofing to fix.
Further, jack is fixed in the suspension in the step S2, is to hang motor-driven chain hoist on 20m platforms to fix.
The present invention has the advantages and positive effects of:
1. sintered material storehouse is fabricated to discrete piece in processing factory, discrete piece in basic framework burst group to installation, quick construction, Have bad luck it is light, it is smaller to place space requirement;
2. utilize motor-driven chain hoist lifting group pair, speed of application is fast, convenient and efficient, can multiple sintered material storehouses construct at the same time, It is independent of each other, economization machinery expenses, save big part and have bad luck process, save human time.
Burnt 3. this method is applied to day iron new one in improvement project, save 20 days durations.
Brief description of the drawings
Fig. 1 is the sintered material chamber structure schematic diagram after the installation of the present invention;
Fig. 2 is the structure diagram that Part I batch bin is lifted in installation process of the present invention;
Fig. 3 is the structure diagram that Part I batch bin lifting of the present invention is completed;
Fig. 4 is the structure diagram for the middle lifting Part II batch bin that the present invention installed;
Fig. 5 is the structure diagram that Part III batch bin is lifted in installation process of the present invention.
In figure:
1st, jack 2, lifting point 3, bracket platform
4th, bracket 5, frame 6,
11st, first segment warehouse 12, second segment warehouse 13, the 3rd section of warehouse
14th, the 4th section of warehouse 15, the 5th section of warehouse 16, the 6th section of warehouse
Embodiment
As shown in Figure 1, a kind of installation method in sintered material storehouse of this example, is in proportioning room basic framework, utilizes 3 10t motor-driven chain hoists, by batch bin discrete piece group pair and lift a kind of construction method in place, save have bad luck, big part hoisting process, under Face is described in detail with reference to attached drawing:
S1:Batch bin is pre-processed before installation:Sintered material storehouse is fabricated to discrete piece when processing factory manufactures, and is finished before dispatching from the factory Sequence number, discrete piece can in basic framework 5 burst group to installation, quick construction, have bad luck it is light, it is smaller to place space requirement, When batch bin is installed, according to actual needs, 3-4 piece discrete piece is assembled into one section of warehouse, and in this example, every firm storehouse is divided into when manufacturing Six sections of warehouses, every section of warehouse are made of three pieces discrete piece, it should be noted that must not exceed holding for 3 jacks per part batch bin Duplicate limit, can the according to circumstances quantity of grasp group pair temporarily during actual implementation.
S2:The fixed jack 1 of suspension, for lifting every section of warehouse, before being installed in sintered material storehouse, first, in proportioning room room Face fixes 3 10t motor-driven chain hoists suspensions, specifically, in proportioning room roof opening, motor-driven chain hoist is fixed using steel wire rope; Also jack can be arranged on 20m platforms, lifting point 2 is respectively provided with every section of warehouse, is connected with jack according to basic load-bearing conditions Hook be used cooperatively, during lifting, insert a hook into upside-down mounting point 2, every section of warehouse lifted using motor-driven chain hoist.
S3:Sintered material storehouse is installed, using the form of upside-down mounting, from top to bottom, is assembled successively, specific installation process is successively Including:
S31:The welding in basic framework 5 by three pieces discrete piece, the cylindric first segment warehouse 11 of fixed composition;
S32:First segment warehouse 11 is lifted to certain altitude using motor-driven chain hoist 1, meets slot milling in first segment warehouse 11 lower section groups are to second segment warehouse;
S33:The cylindric second segment warehouse 12 of composition is fixed in the lower section of first segment warehouse 11;
S34:As shown in Fig. 2, after 12 groups pairs of second segment warehouse, first segment warehouse 11 is fallen in second segment warehouse 12 Upper welding forms Part I batch bin;
S35:As shown in figure 3, slowly lifting Part I batch bin using motor-driven chain hoist 1 to the top of basic framework 5, adopt Behind the position that Part I batch bin is adjusted with motor-driven chain hoist 1, by the bracket on Part I batch bin and 3 frame of bracket platform 4 carry out temperature pier, and motor-driven chain hoist can decoupling device.
S4:As shown in figure 4, by the S31-S35 in step S3, lifted successively using jack 1 according to order from top to bottom Remaining each several part batch bin, i.e., first lift the 3rd section of warehouse 13, then lifts the 4th section of warehouse 14, by the 3rd section of warehouse 13 and the 4th Duan Cangti 14 forms Part II batch bin, and Part II batch bin is then slowly lifted using motor-driven chain hoist 1 to Part I The lower section of batch bin, after adjustment, and Part I batch bin butt welding, because road weld seam is on bracket platform for this Side, convenient welding, without setting up temporary platform, after welding, jack can decoupling device.
As shown in figure 5, finally lift the 5th section of warehouse 15 and the 6th section of warehouse 16, the 5th section of warehouse 15 and the 6th section of warehouse 16 composition Part III batch bins, lifting Part III batch bin use motor-driven chain hoist 1 to Part II batch bin lower section Part III batch bin is adjusted, by Part III batch bin and Part II batch bin butt welding, then reinforcement of weld, due to This road weld seam is in aerial, and when welding needs to set up interim platform.
The beneficial effects of the invention are as follows:
1. sintered material storehouse is fabricated to discrete piece in processing factory, discrete piece in basic framework burst group to installation, quick construction, Have bad luck it is light, it is smaller to place space requirement;
2. utilize motor-driven chain hoist lifting group pair, speed of application is fast, convenient and efficient, can multiple sintered material storehouses construct at the same time, It is independent of each other, economization machinery expenses, save big part and have bad luck process, save human time.
Burnt 3. this method is applied to day iron new one in improvement project, save 20 days durations.
One embodiment of the present of invention is described in detail above, but the content is only the preferable implementation of the present invention Example, it is impossible to be construed as limiting the practical range of the present invention.All all the changes and improvements made according to the present patent application scope Deng, should all still belong to the present invention patent covering scope within.

Claims (7)

  1. A kind of 1. installation method in sintered material storehouse, it is characterised in that:Comprise the following steps successively:
    S1:Batch bin is pre-processed before installation:Batch bin is processed into discrete piece when manufacturing;
    S2:The fixed jack of suspension, every section of warehouse being assembled into for lifting discrete piece;
    S3:Warehouse described in upside-down mounting, includes successively:
    S31:By the first segment warehouse of multi-disc discrete piece fixed composition cylindrical shape in frame;
    S32:The first segment warehouse is lifted using the jack;
    S33:The cylindric second segment warehouse of composition is fixed in the lower section of the first segment warehouse;
    S34:First segment warehouse is fallen and is welded into Part I batch bin on the second segment warehouse;
    S35:Part I batch bin is lifted to the frame roof using the jack;
    S4:By the S31-S35 in step S3, remaining each several part is lifted using the jack successively according to order from top to bottom and is matched somebody with somebody Feed bin.
  2. A kind of 2. installation method in sintered material storehouse according to claim 1, it is characterised in that:After the S35 steps also Including extracing the jack.
  3. A kind of 3. installation method in sintered material storehouse according to claim 2, it is characterised in that:Installed in the S4 every After the batch bin of part, below jack lifting to front portion batch bin, it is welded and fixed with batch bin before.
  4. 4. according to a kind of installation method in any sintered material storehouses of claim 1-3, it is characterised in that:The step S4 In, further include and build temporary platform, welded for last part batch bin and front portion batch bin.
  5. A kind of 5. installation method in sintered material storehouse according to claim 4, it is characterised in that:Support is set on the frame Seat basic platform, in the step S35, the Part I batch bin and the bracket basis on the bracket basic platform frame Carry out temperature pier.
  6. A kind of 6. installation method in sintered material storehouse according to claim 1, it is characterised in that:It is outstanding in the step S2 Fixed jack is hung, is to hang motor-driven chain hoist in proportioning room roofing to fix.
  7. A kind of 7. installation method in sintered material storehouse according to claim 1, it is characterised in that:It is outstanding in the step S2 Fixed jack is hung, is to hang motor-driven chain hoist on 20m platforms to fix.
CN201711162788.6A 2017-11-21 2017-11-21 A kind of installation method in sintered material storehouse Pending CN108033415A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711162788.6A CN108033415A (en) 2017-11-21 2017-11-21 A kind of installation method in sintered material storehouse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711162788.6A CN108033415A (en) 2017-11-21 2017-11-21 A kind of installation method in sintered material storehouse

Publications (1)

Publication Number Publication Date
CN108033415A true CN108033415A (en) 2018-05-15

Family

ID=62094074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711162788.6A Pending CN108033415A (en) 2017-11-21 2017-11-21 A kind of installation method in sintered material storehouse

Country Status (1)

Country Link
CN (1) CN108033415A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111730235A (en) * 2020-07-15 2020-10-02 中国二十冶集团有限公司 Modular installation method for large steel funnel in limited space
CN112064799A (en) * 2020-08-20 2020-12-11 上海二十冶建设有限公司 Rapid construction method for sintering engineering batching chamber

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101936037A (en) * 2010-08-02 2011-01-05 北京首钢建设集团有限公司 Large-diameter steel bay zoning-manufacture reverse-order lifting installation construction method
CN107352281A (en) * 2017-07-20 2017-11-17 华电重工股份有限公司 A kind of method and system of taking grain out of a granary to sun it of storage bin

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101936037A (en) * 2010-08-02 2011-01-05 北京首钢建设集团有限公司 Large-diameter steel bay zoning-manufacture reverse-order lifting installation construction method
CN107352281A (en) * 2017-07-20 2017-11-17 华电重工股份有限公司 A kind of method and system of taking grain out of a granary to sun it of storage bin

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111730235A (en) * 2020-07-15 2020-10-02 中国二十冶集团有限公司 Modular installation method for large steel funnel in limited space
CN112064799A (en) * 2020-08-20 2020-12-11 上海二十冶建设有限公司 Rapid construction method for sintering engineering batching chamber

Similar Documents

Publication Publication Date Title
CN103243930B (en) System and method for modularized construction of super high-rise steel structures
CN108033415A (en) A kind of installation method in sintered material storehouse
CN108249275A (en) A kind of prefabricated part hanging tool and lifting attitude-adjusting method
CN104973517B (en) A kind of electronic gantry platform that installs for sintering machine head device and its using method
CN211594267U (en) PC coincide floor stacking machine
CN101284626A (en) Additional weight hoisting method
CN107502690A (en) A kind of point of device and replacing options with integral replacing last furnace shell
CN109055637B (en) Hydraulic lifting process for mounting furnace shell in blast furnace overhaul
CN205637622U (en) Perpendicular unit glass curtain wall hoist and mount system
CN205224050U (en) Steel reinforcement cage is hung and is put device
CN104016260A (en) Compartment funnel slipping mounting method and slipping mounting mechanism
CN207566719U (en) Prefabricated element slings
CN207596336U (en) A kind of device for installing mixing machine
CN107503519B (en) Three layers of composite steel column sandwich heat preservation Side fascia hanging method of assembling type steel structure house
CN105387722A (en) Vertical transportation method for refractory material in dual-chamber lime kiln chamber
CN207243334U (en) A kind of long and narrow working face large-sized transversal component high-altitude system in place
CN110273039A (en) A kind of blast furnace bustle pipe hoisting structure and its installation method
CN100366832C (en) Construction technique for hoisting steel made coal hopper on-site
CN105984709A (en) Automatic line-loading device for assembling frames of direct current converter valves
CN109694010B (en) Counterweight lifting method
CN209760046U (en) Transport support and transport device
CN209583455U (en) A kind of outdoor handling machine for building
CN210505201U (en) Equipment for hoisting reinforcing steel bars in batches
CN114165061A (en) Construction method of vertical transportation system
CN107060347A (en) A kind of big encorbelmented across metal decorates prefabricated roof and air translation splicing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180515