CN108032873A - Scene reproduction method, simulation device, system and computer-readable storage medium - Google Patents

Scene reproduction method, simulation device, system and computer-readable storage medium Download PDF

Info

Publication number
CN108032873A
CN108032873A CN201711115802.7A CN201711115802A CN108032873A CN 108032873 A CN108032873 A CN 108032873A CN 201711115802 A CN201711115802 A CN 201711115802A CN 108032873 A CN108032873 A CN 108032873A
Authority
CN
China
Prior art keywords
train control
train
control equipment
input data
automatic protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711115802.7A
Other languages
Chinese (zh)
Inventor
王建敏
于晓娜
孟凡勇
戚力为
鲍鹏宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRSC Research and Design Institute Group Co Ltd
Original Assignee
CRSC Research and Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRSC Research and Design Institute Group Co Ltd filed Critical CRSC Research and Design Institute Group Co Ltd
Priority to CN201711115802.7A priority Critical patent/CN108032873A/en
Priority to EA202091214A priority patent/EA202091214A1/en
Priority to PCT/CN2018/086027 priority patent/WO2019091064A1/en
Priority to EP18876285.0A priority patent/EP3712032A4/en
Publication of CN108032873A publication Critical patent/CN108032873A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L15/00Indicators provided on the vehicle or train for signalling purposes
    • B61L15/0072On-board train data handling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L15/00Indicators provided on the vehicle or train for signalling purposes
    • B61L15/0081On-board diagnosis or maintenance
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/60Testing or simulation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L15/00Indicators provided on the vehicle or train for signalling purposes
    • B61L15/0062On-board target speed calculation or supervision
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L15/00Indicators provided on the vehicle or train for signalling purposes
    • B61L15/0094Recorders on the vehicle

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • General Health & Medical Sciences (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

The present disclosure provides a method for reproducing a train control system scenario, the method comprising: recording input data of train control equipment; and taking the input data as the input of the train control equipment simulation device, and reproducing the train control system scene through the operation of the train control equipment simulation device. The present disclosure also provides a train control device simulation apparatus, a train control device simulation system, and a computer-readable storage medium. According to the method, the simulation device and the system for reproducing the scene and the computer-readable storage medium, the fault scene is reproduced by using the input data of the train control equipment, the fault analysis efficiency is improved, the two output results are compared, the automatic test is realized, and the test efficiency and the test accuracy are improved.

Description

Reappear scene method, simulator, system and computer-readable recording medium
Technical field
This disclosure relates to a kind of method for reappearing train control system scene, Train Control equipment simulating device, train control Control equipment simulation system and computer-readable recording medium.
Background technology
ATP (Auto Train Protection, train automatic protection) system is also known as train protection system, its work( When can exceed fixing speed for train, that is, automatic braking, when mobile unit reception ground speed-limiting messages, after information processing with reality Border speed compares, after train actual speed exceedes speed limit, by brake apparatus control train braking system braking.
ATP system detects train actual motion position automatically, automatically determines train maximum safe operation speed, continuously not between Speed supervision is carried out disconnectedly, overspeed protection is realized, monitors Train Interval automatically, to ensure to realize regulation ground running interval.
Current ATP system data record is imperfect, in the event of failure, without enough data supportings, causes to investigate Problem hard and inefficiency.
The content of the invention
An aspect of this disclosure provides a kind of method for reappearing train control system scene, and this method includes:Record The input data of Train Control equipment;Input using input data as Train Control equipment simulating device, and pass through the train The operation of control device simulator, reappears train control system scene.
Alternatively, this method further includes:The output data of Train Control equipment is recorded, output data and Train Control are set The standby postrun output of simulator is compared.
Alternatively, the input data for noting down Train Control equipment is the input number in record Train Control each cycle of equipment According to, or according to the change of the input data detected start to note down.
Alternatively, train control system scene is reappeared for reproduction train operation fault scenes.
Alternatively, Train Control equipment is train automatic protection ATP system.
Another aspect of the disclosure provides a kind of Train Control equipment simulating device, including:Receiving unit, for connecing Receive the input data of Train Control equipment;Running unit, for based on the defeated of the Train Control equipment received by receiving unit Enter data and run and obtain train control system scene;Output unit, exports the train control system obtained by running unit Scene.
Another aspect of the present disclosure provides a kind of Train Control facility simulation system, including:Tape deck, for recording The input data of Train Control equipment;Above-mentioned Train Control equipment simulating device;The reception of Train Control equipment simulating device Unit receives the input data of the Train Control equipment from tape deck.
Alternatively, the Train Control facility simulation system, further includes:Tape deck is additionally operable to record Train Control equipment Output data, comparison means, for by the output data of the Train Control equipment from tape deck and Train Control equipment mould The output for intending the output unit of device is compared.
Alternatively, the Train Control facility simulation system, further includes:Feedback device, for by the comparison knot of comparison means Fruit feeds back to Train Control equipment simulating device.
Another aspect of the present disclosure provides a kind of computer program, and the computer program can perform finger including computer Order, described instruction are used for realization method as described above when executed.
Brief description of the drawings
In order to be more fully understood from the disclosure and its advantage, referring now to being described below with reference to attached drawing, wherein:
Fig. 1 diagrammatically illustrates the processing stream of the method for reproduction train operation fault scenes in accordance with an embodiment of the present disclosure Cheng Tu;
Fig. 2 diagrammatically illustrates the processing stream of the method for reproduction train operation fault scenes in accordance with an embodiment of the present disclosure Cheng Tu;
Fig. 3 diagrammatically illustrates the structure of train automatic protection ATP system simulator in accordance with an embodiment of the present disclosure Schematic diagram;
Fig. 4 diagrammatically illustrates the structure of train automatic protection ATP system simulation system in accordance with an embodiment of the present disclosure Schematic diagram;
Fig. 5 diagrammatically illustrates the structure of train automatic protection ATP system simulation system in accordance with an embodiment of the present disclosure Schematic diagram;
Fig. 6 diagrammatically illustrates the structure of train automatic protection ATP system simulation system in accordance with an embodiment of the present disclosure Schematic diagram;
Fig. 7 diagrammatically illustrates the block diagram of train automatic protection ATP system simulation system in accordance with an embodiment of the present disclosure.
Embodiment
According to reference to attached drawing to the described in detail below of disclosure exemplary embodiment, other side, the advantage of the disclosure It will become obvious with prominent features for those skilled in the art.
In the disclosure, term " comprising " and " containing " and its derivative mean including and it is unrestricted;Term "or" is bag Containing property, mean and/or.
In the present specification, following various embodiments for being used to describe disclosure principle simply illustrate, should not be with any Mode is construed to limitation scope of disclosure.Referring to the drawings described below is used to help comprehensive understanding by claim and its equivalent The exemplary embodiment for the disclosure that thing limits.It is described below to help to understand including a variety of details, but these details should Think what is be merely exemplary.Therefore, it will be appreciated by those of ordinary skill in the art that without departing substantially from the scope of the present disclosure and spirit In the case of, embodiment described herein can be made various changes and modifications.In addition, for clarity and brevity, Eliminate the description of known function and structure.In addition, running through attached drawing, same reference numbers are used for identity function and operation.
The method that embodiment of the disclosure provides reproduction train operation fault scenes, this method include:Record train certainly The input data in dynamic protection each cycle of ATP system;Using input data as train automatic protection ATP system simulator Input, and by the operation of the train automatic protection ATP system simulator, reappear train operation fault scenes.
Fig. 1 diagrammatically illustrates the processing stream of the method for reproduction train operation fault scenes in accordance with an embodiment of the present disclosure Cheng Tu.
As shown in Figure 1, the method for reproduction train operation fault scenes in accordance with an embodiment of the present disclosure can include:
Step 101:Record the input data in train automatic protection each cycle of ATP system;
Step 102:Input using input data as train automatic protection ATP system simulator, and pass through the train The operation of automatic protection ATP system simulator, reappears train operation fault scenes.
Process flow as shown in Figure 1 is it is known that in embodiment of the disclosure, train automatic protection ATP system mould The input data in recording device records train automatic protection each cycle of ATP system in plan system.That is, utilize note The input data that recording device will enter into train automatic protection ATP system is all recorded in units of a cycle.In this way, The operation data of vehicle-mounted ATP can be effectively recorded, avoid the problem that producing because operation data record is imperfect.
Then, the input using input data as train automatic protection ATP system simulator, and it is automatic by the train The operation of ATP system simulator is protected, reappears train operation fault scenes.That is, it is recorded to train automatic protection The input data in train automatic protection each cycle of ATP system in the tape deck of ATP system simulation system is by as row The input of car automatic protection ATP system simulator, then drives the train automatic protection ATP system simulator to run, and By the operation of the train automatic protection ATP system simulator, reappear train operation fault scenes.In this way, being achieved that makes Reappear fault scenes with the input data in train automatic protection each cycle of ATP system, improve accident analysis efficiency.Especially It can help to solve the logical problem of the train automatic protection ATP systems of many profound levels.
Fig. 2 diagrammatically illustrates the processing stream of the method for reproduction train operation fault scenes in accordance with an embodiment of the present disclosure Cheng Tu.
As shown in Fig. 2, the process flow of the method for reappearing train operation fault scenes in accordance with an embodiment of the present disclosure, also It can include:
Step 101 ':Record the input data in train automatic protection each cycle of ATP system;Record train automatic protection The output data in each cycle of ATP system;
Step 102:Input using input data as train automatic protection ATP system simulator, and pass through the train The operation of automatic protection ATP system simulator, reappears train operation fault scenes;
Step 103:By output data compared with the postrun output of train automatic protection ATP system simulator.
Process flow as shown in Figure 2 is it is known that in embodiment of the disclosure, and tape deck is except recording train certainly The input data in dynamic protection each cycle of ATP system, also records the output number in train automatic protection each cycle of ATP system According to.In this way, data can be run with complete documentation vehicle-mounted ATP, avoid the problem that producing because operation data record is imperfect.
Moreover, also by the output data and train in train automatic protection each cycle of ATP system of recording device records The postrun output of automatic protection ATP system simulator is compared.That is, by train automatic protection ATP system mould Intend the postrun output of device and the reality output data of vehicle-mounted ATP compare, can so realize train automatic protection ATP systems The automatic of simulator of uniting is tested, and improves testing efficiency and the accuracy of train automatic protection ATP system simulator.
The method of above-mentioned reproduction train operation fault scenes can be implemented by that can realize the equipment of its function, such as The equipment can be train automatic protection ATP system simulation system, naturally it is also possible to be miscellaneous equipment, such as can be separately provided one Equipment is to realize its function.
Fig. 3 diagrammatically illustrates the structure of train automatic protection ATP system simulator in accordance with an embodiment of the present disclosure Schematic diagram.
As shown in figure 3, train automatic protection ATP system simulator 300 in accordance with an embodiment of the present disclosure can include:
Receiving unit 310, for receiving the input data in train automatic protection each cycle of ATP system;
Running unit 320, for based on train automatic protection each week of ATP system received by receiving unit 310 The input data of phase and run and obtain train operation fault scenes;
Output unit 330, exports the train operation fault scenes obtained by running unit 320.
The structure diagram of train automatic protection ATP system simulator as shown in Figure 3 is it is known that in the disclosure In embodiment, train automatic protection ATP system simulator includes three units, wherein, it is automatic that receiving unit 310 receives train The input data in each cycle of ATP system is protected, that is, receives the record in train automatic protection ATP system simulation system The input data in train automatic protection each cycle of ATP system recorded of device;Then, running unit 320 be based on by The input data in train automatic protection each cycle of ATP system that receiving unit 310 receives and run and obtain train fortune Row fault scenes;And then the train operation fault scenes obtained by running unit 320 are exported by output unit 330.In this way, just The input data reproduction fault scenes using train automatic protection each cycle of ATP system are realized, improve accident analysis effect Rate.It can especially help to solve the logical problem of the train automatic protection ATP systems of many profound levels.
Fig. 4 diagrammatically illustrates the structure of train automatic protection ATP system simulation system in accordance with an embodiment of the present disclosure Schematic diagram.
As shown in figure 4, train automatic protection ATP system simulation system 500 in accordance with an embodiment of the present disclosure can include:
Tape deck 510, for recording the input data in train automatic protection each cycle of ATP system;
Above-mentioned train automatic protection ATP system simulator 300;
It is automatic that the receiving unit of train automatic protection ATP system simulator 300 receives the train from tape deck 510 Protect the input data in each cycle of ATP system.
Train automatic protection ATP system simulation system as shown in Figure 4 is it is known that in embodiment of the disclosure, profit The input data that will enter into train automatic protection ATP system with tape deck 510 is all recorded in units of a cycle Come, and the input using input data as train automatic protection ATP system simulator 300.In this way, can effectively it record vehicle-mounted The operation data of ATP, avoid the problem that producing because operation data record is imperfect.
Fig. 5 diagrammatically illustrates the structure of train automatic protection ATP system simulation system in accordance with an embodiment of the present disclosure Schematic diagram.
As shown in figure 5, train automatic protection ATP system simulation system 500 in accordance with an embodiment of the present disclosure can include:
Tape deck 510 ', input data and record for recording train automatic protection each cycle of ATP system arrange The output data in car automatic protection each cycle of ATP system,
Above-mentioned train automatic protection ATP system simulator 300;
Comparison means 520, for by the output number in train automatic protection each cycle of ATP system from tape deck Compared with output according to the output unit with train automatic protection ATP system simulator.
Train automatic protection ATP system simulation system as shown in Figure 5 is remembered it is known that in embodiment of the disclosure Input data of the recording device 510 ' except recording train automatic protection each cycle of ATP system, also records train automatic protection The output data in each cycle of ATP system.In this way, data can be run with complete documentation vehicle-mounted ATP, avoid because of operation data note Record it is imperfect and the problem of produce.It is moreover, using comparison means that train automatic protection ATP system simulator is postrun defeated Go out and compared with the reality output data of vehicle-mounted ATP, can so realize the automatic of train automatic protection ATP system simulator Test, improves testing efficiency and the accuracy of train automatic protection ATP system simulator.
Fig. 6 diagrammatically illustrates the structure of train automatic protection ATP system simulation system in accordance with an embodiment of the present disclosure Schematic diagram.
As shown in fig. 6, train automatic protection ATP system simulation system 500 in accordance with an embodiment of the present disclosure can also wrap Include:
Feedback device 530, for the comparative result of comparison means to be fed back to train automatic protection ATP system simulation dress Put.
Train automatic protection ATP system simulation system as shown in Figure 6 it is known that in embodiment of the disclosure, On the basis of train automatic protection ATP system simulation system shown in Fig. 5, using feedback device 530 by the comparison of comparison means As a result train automatic protection ATP system simulator is fed back to.Train automatic protection ATP system simulator can so be formed Feedback mechanism, further improve testing efficiency and the accuracy of train automatic protection ATP system simulator.
In practical applications, the recording device in train automatic protection ATP system simulation system connects APT systems respectively Output and input, while recording device is also respectively connected with outputting and inputting for train automatic protection ATP system simulator, specifically Ground, recording device are also respectively connected with the receiving unit and output unit of train automatic protection ATP system simulator, recording device It is connected again with comparison means, by comparison means by by each cycle of train automatic protection ATP system from tape deck Output data compared with the output of the output unit of train automatic protection ATP system simulator.Comparison means leads to again Cross feedback device to be connected with train automatic protection ATP system simulator, using feedback device by the comparative result of comparison means Feed back to train automatic protection ATP system simulator.
Fig. 7 diagrammatically illustrates the block diagram of the train automatic protection ATP system simulation system according to the disclosure.
As shown in fig. 7, train automatic protection ATP system simulation system 500 includes processor 510, computer-readable storage Medium 520, sender unit 530 and signal receiver 540.The train automatic protection ATP system simulation system 500 can be with The method described above with reference to Fig. 1, Fig. 2 is performed, to reappear fault scenes, improves accident analysis efficiency.It can especially help Solve the logical problem of many profound train automatic protection ATP systems.
Specifically, processor 510 can for example include general purpose microprocessor, instruction set processor and/or related chip group And/or special microprocessor (for example, application-specific integrated circuit (ASIC)), etc..Processor 510 can also include being used to cache using The onboard storage device on way.Processor 510 can be performed for the method according to the embodiment of the present disclosure with reference to figure 1, Fig. 2 descriptions Single treatment unit either multiple processing units of the different actions of flow.
Computer-readable recording medium 520, such as can include, store, transmit, propagate or transmit appointing for instruction Meaning medium.For example, readable storage medium storing program for executing can include but is not limited to electricity, magnetic, optical, electromagnetic, infrared or semiconductor system, device, Device or propagation medium.The specific example of readable storage medium storing program for executing includes:Magnetic memory apparatus, such as tape or hard disk (HDD);Optical storage Device, such as CD (CD-ROM);Memory, such as random access memory (RAM) or flash memory;And/or wire/wireless communication chain Road.
Computer-readable recording medium 520 can include computer program 521, which can include generation Code/computer executable instructions, it by processor 510 when being performed so that processor 510 is performed for example above in conjunction with Fig. 1, Fig. 2 Described method flow and its any deformation.
Computer program 521 can be configured with such as computer program code including computer program module.Example Such as, in the exemplary embodiment, the code in computer program 521 can include one or more program modules, such as including 521A, module 521B ....It should be noted that the dividing mode and number of module are not fixed, those skilled in the art can To be combined according to actual conditions using suitable program module or program module, when these program modules are combined by processor 510 During execution so that processor 510 can be performed for example above in conjunction with the described method flow of Fig. 1, Fig. 2 and its any deformation.
In accordance with an embodiment of the present disclosure, processor 510 can be held using sender unit 530 and signal receiver 540 Row is above in conjunction with the described method flow of Fig. 1, Fig. 2 and its any deformation.
More than the disclosure each embodiment is described for reproduction train operation fault scenes, it is to be understood that, this It is open to be applied to other train control system scenes.Moreover, the embodiment each above of the disclosure is automatic for train Protection ATP system is described, it is to be understood that, the disclosure can also be applied to other Train Control equipment.In addition, record row The input data of car control device is not necessarily limited to the input data in record Train Control each cycle of equipment, can not also be with Periodic manner notes down the input data of Train Control equipment, but also can be started according to the change of the input data detected Record.
Although the disclosure, art technology has shown and described in the certain exemplary embodiments with reference to the disclosure Personnel it should be understood that in the case of the spirit and scope of the present disclosure limited without departing substantially from the following claims and their equivalents, A variety of changes in form and details can be carried out to the disclosure.Therefore, the scope of the present disclosure should not necessarily be limited by above-described embodiment, But should be not only determined by appended claims, also it is defined by the equivalent of appended claims.

Claims (10)

  1. A kind of 1. method for reappearing train control system scene, it is characterised in that this method includes:
    Record the input data of Train Control equipment;
    Input using input data as Train Control equipment simulating device, and pass through the fortune of the Train Control equipment simulating device OK, train control system scene is reappeared.
  2. 2. the method for reproduction train control system scene as claimed in claim 1, it is characterised in that this method further includes:
    The output data of Train Control equipment is recorded,
    By output data compared with the postrun output of Train Control equipment simulating device.
  3. 3. the method for reproduction train control system scene as claimed in claim 1, it is characterised in that record Train Control equipment Input data be the input data in record Train Control each cycle of equipment, or the change according to the input data detected Melt beginning record.
  4. 4. the method for reproduction train control system scene as claimed in claim 1, it is characterised in that reproduction train control system Scene is reproduction train operation fault scenes.
  5. 5. the method for reproduction train control system scene as claimed in claim 1, it is characterised in that Train Control equipment is row Car automatic protection ATP system.
  6. A kind of 6. Train Control equipment simulating device, it is characterised in that including:
    Receiving unit, for receiving the input data of Train Control equipment;
    Running unit, runs for the input data based on the Train Control equipment received by receiving unit and obtains train Control system scene;
    Output unit, exports the train control system scene obtained by running unit.
  7. A kind of 7. Train Control facility simulation system, it is characterised in that including:
    Tape deck, for recording the input data of Train Control equipment;
    Train Control equipment simulating device as claimed in claim 6;
    The receiving unit of Train Control equipment simulating device receives the input data of the Train Control equipment from tape deck.
  8. 8. Train Control facility simulation system as claimed in claim 7, it is characterised in that further include:
    Tape deck is additionally operable to the output data of record Train Control equipment,
    Comparison means, for by the output data of the Train Control equipment from tape deck and Train Control equipment simulating device The output of output unit be compared.
  9. 9. Train Control facility simulation system as claimed in claim 8, it is characterised in that further include:
    Feedback device, for the comparative result of comparison means to be fed back to Train Control equipment simulating device.
  10. 10. a kind of computer-readable recording medium, including computer program, which makes this when being computer-executed Computer performs the method according to any one of claim 1-5.
CN201711115802.7A 2017-11-13 2017-11-13 Scene reproduction method, simulation device, system and computer-readable storage medium Pending CN108032873A (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201711115802.7A CN108032873A (en) 2017-11-13 2017-11-13 Scene reproduction method, simulation device, system and computer-readable storage medium
EA202091214A EA202091214A1 (en) 2017-11-13 2018-05-08 INTEGRATED METHOD OF PLAYING TRAIN SCENARIOS, SIMULATOR, SYSTEM AND MACHINE-READABLE MEDIA
PCT/CN2018/086027 WO2019091064A1 (en) 2017-11-13 2018-05-08 Method for reproducing scenario, simulation device and system, and computer readable storage medium
EP18876285.0A EP3712032A4 (en) 2017-11-13 2018-05-08 Method for reproducing scenario, simulation device and system, and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711115802.7A CN108032873A (en) 2017-11-13 2017-11-13 Scene reproduction method, simulation device, system and computer-readable storage medium

Publications (1)

Publication Number Publication Date
CN108032873A true CN108032873A (en) 2018-05-15

Family

ID=62093358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711115802.7A Pending CN108032873A (en) 2017-11-13 2017-11-13 Scene reproduction method, simulation device, system and computer-readable storage medium

Country Status (4)

Country Link
EP (1) EP3712032A4 (en)
CN (1) CN108032873A (en)
EA (1) EA202091214A1 (en)
WO (1) WO2019091064A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110789568A (en) * 2019-10-09 2020-02-14 北京全路通信信号研究设计院集团有限公司 Fault diagnosis method and system based on train operation scene
CN111340976A (en) * 2020-02-24 2020-06-26 北京百度网讯科技有限公司 Method and device for debugging vehicle module, electronic equipment and computer-readable storage medium

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113806221A (en) * 2021-08-25 2021-12-17 通号城市轨道交通技术有限公司 Train control software simulation test system
CN113536608B (en) * 2021-09-16 2021-12-24 卡斯柯信号(北京)有限公司 Train control center dynamic baking machine test system and method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1873728A (en) * 2006-03-06 2006-12-06 成都运达创新科技有限公司 Simulator of train, and reproduction method for simulating driving procedure
CN101430738A (en) * 2008-11-13 2009-05-13 南京恩瑞特实业有限公司 Implementing method for signal system traffic simulator suitable for testing environment
CN102975749A (en) * 2012-11-21 2013-03-20 上海富欣智能交通控制有限公司 Event-driven-based rail transit automatic train supervision system and playback processing method
CN103412821A (en) * 2013-09-02 2013-11-27 上海航天电源技术有限责任公司 Software test method for realizing reproduction of actual working conditions based on CAN (controller area network) bus
CN103631257A (en) * 2013-12-05 2014-03-12 中国铁道科学研究院 Automated testing method and system for subway train signal systems
CN104461850A (en) * 2014-12-09 2015-03-25 北京全路通信信号研究设计院有限公司 Reproduction method, device and system of train control vehicular equipment and human-machine interface equipment
CN106741005A (en) * 2017-01-17 2017-05-31 河南星源信息技术有限公司 A kind of networking EMUs ATP mobile unit comprehensive training systems
CN107107934A (en) * 2014-12-23 2017-08-29 西门子公司 Apparatus and method for performing the test process for being related to rail vehicle
CN107202702A (en) * 2017-07-14 2017-09-26 深圳大学 A kind of simulation system of track traffic

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3356360B2 (en) * 1995-05-23 2002-12-16 財団法人鉄道総合技術研究所 Train running simulation device
CN100463010C (en) * 2006-03-06 2009-02-18 成都运达创新科技有限公司 Method for simulating faults of train
CN101770414A (en) * 2009-01-05 2010-07-07 英业达集团(天津)电子技术有限公司 Fault simulator
CN101722972B (en) * 2009-12-24 2012-02-29 卡斯柯信号有限公司 Processing method for playing back ATS subsystem
CN101976047B (en) * 2010-09-03 2013-09-11 北京全路通信信号研究设计院有限公司 China train control system-grade 3 fault reproduction method and system
US20170096154A1 (en) * 2015-10-02 2017-04-06 Westinghouse Air Brake Technologies Corporation Locomotive Control Signal Generator

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1873728A (en) * 2006-03-06 2006-12-06 成都运达创新科技有限公司 Simulator of train, and reproduction method for simulating driving procedure
CN101430738A (en) * 2008-11-13 2009-05-13 南京恩瑞特实业有限公司 Implementing method for signal system traffic simulator suitable for testing environment
CN102975749A (en) * 2012-11-21 2013-03-20 上海富欣智能交通控制有限公司 Event-driven-based rail transit automatic train supervision system and playback processing method
CN103412821A (en) * 2013-09-02 2013-11-27 上海航天电源技术有限责任公司 Software test method for realizing reproduction of actual working conditions based on CAN (controller area network) bus
CN103631257A (en) * 2013-12-05 2014-03-12 中国铁道科学研究院 Automated testing method and system for subway train signal systems
CN104461850A (en) * 2014-12-09 2015-03-25 北京全路通信信号研究设计院有限公司 Reproduction method, device and system of train control vehicular equipment and human-machine interface equipment
CN107107934A (en) * 2014-12-23 2017-08-29 西门子公司 Apparatus and method for performing the test process for being related to rail vehicle
CN106741005A (en) * 2017-01-17 2017-05-31 河南星源信息技术有限公司 A kind of networking EMUs ATP mobile unit comprehensive training systems
CN107202702A (en) * 2017-07-14 2017-09-26 深圳大学 A kind of simulation system of track traffic

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110789568A (en) * 2019-10-09 2020-02-14 北京全路通信信号研究设计院集团有限公司 Fault diagnosis method and system based on train operation scene
CN111340976A (en) * 2020-02-24 2020-06-26 北京百度网讯科技有限公司 Method and device for debugging vehicle module, electronic equipment and computer-readable storage medium

Also Published As

Publication number Publication date
EA202091214A1 (en) 2021-01-15
EP3712032A1 (en) 2020-09-23
WO2019091064A1 (en) 2019-05-16
EP3712032A4 (en) 2021-08-11

Similar Documents

Publication Publication Date Title
CN108032873A (en) Scene reproduction method, simulation device, system and computer-readable storage medium
US20230079450A1 (en) Systems and methods for sensor-based detection and alerting of hard braking events
US20190202486A1 (en) Railway safety critical systems with task redundancy and asymmetric communications capability
US20140074327A1 (en) Railway train critical systems having control system redundancy and asymmetric communications capability
US20200382528A1 (en) Apparatus for detecting in-vehicle external data intrusion by comparing multiple information entropy and operating method thereof
EP4191464A1 (en) Method for constructing simulation traffic flow and simulation device
US8985522B2 (en) Method for improving operation density of rail vehicles and preventing head-on collision and rear-ending collision
KR101441527B1 (en) Method and apparatus for managing and verifying traveling information of car, and system using thereof
CN109065080A (en) A kind of vehicle audio playback method and device
CN112329277B (en) Indoor roadster test sequence compiling method and device based on CTCS-2
CN110008056A (en) EMS memory management process, device, electronic equipment and computer readable storage medium
US10528257B2 (en) Method and apparatus for reproducing an I/O operation of a storage system
US11281912B2 (en) Attribute classifiers for image classification
CN109818778A (en) A kind of automatic regression test method, system, equipment and medium
CN106949902B (en) Navigation voice fault solving method, device, equipment and storage medium
EP3131804B1 (en) Railway safety critical systems with task redundancy and asymmetric communications capability
AU2022250944B2 (en) Device, method, and system for train safety management
CN104185032B (en) A kind of video frequency identifying method and system
CN103144657A (en) Main processing subsystem provided with check plate and used for general trackside safety platform
CN109960397A (en) Control method, control device, electronic equipment and computer readable storage medium
KR20170101214A (en) Smartphone motion classifier
JP2020121721A (en) Operation management device
CN112288837A (en) SVG path animation playing method, device and storage medium
JP6632362B2 (en) Operation management device
EA045855B1 (en) AN INTEGRATED METHOD FOR REPRODUCING TRAIN MOVEMENT SCENARIOS, SIMULATOR, SYSTEM AND MACHINE READABLE INFORMATION MEDIUM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180515

RJ01 Rejection of invention patent application after publication