CN108020860A - A kind of establishment method of the seismic survey lines of seismic observation system - Google Patents

A kind of establishment method of the seismic survey lines of seismic observation system Download PDF

Info

Publication number
CN108020860A
CN108020860A CN201711288355.5A CN201711288355A CN108020860A CN 108020860 A CN108020860 A CN 108020860A CN 201711288355 A CN201711288355 A CN 201711288355A CN 108020860 A CN108020860 A CN 108020860A
Authority
CN
China
Prior art keywords
cmp
point
coordinate
axis
lines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711288355.5A
Other languages
Chinese (zh)
Inventor
崔伟
张俊杰
张立树
杨阳
陈静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEFEI GUOWEI ELECTRONICS CO Ltd
Original Assignee
HEFEI GUOWEI ELECTRONICS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI GUOWEI ELECTRONICS CO Ltd filed Critical HEFEI GUOWEI ELECTRONICS CO Ltd
Priority to CN201711288355.5A priority Critical patent/CN108020860A/en
Publication of CN108020860A publication Critical patent/CN108020860A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/003Seismic data acquisition in general, e.g. survey design

Landscapes

  • Engineering & Computer Science (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Acoustics & Sound (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention discloses the establishment method of the seismic survey lines of seismic observation system, is determining big gun line position perpendicular to the direction of lay of the land first, is once drawing common point substantially(CMP)Position and CMP bin sizes, it is reference point then to choose the curved flex point of big gun line, obtains shot point and receiving point coordinate position, and then obtains common point coordinate, finally obtains the specific location of survey line.Survey line position measurement of the present invention is accurate, so as to improve the resolution ratio and signal-to-noise ratio of seismic observation system test earthquake initial data, it is ensured that the accuracy of test.

Description

A kind of establishment method of the seismic survey lines of seismic observation system
Technical field
The present invention relates to seismic observation system field, be specifically a kind of seismic survey lines of seismic observation system really cube Method.
Background technology
At present, during seismic prospecting data collecting, high-resolution and the initial data of high s/n ratio are generally required, but Influenced by field complicated landform, tend not to obtain preferable effect.Therefore the quality that observation system is established will directly affect To the quality of final data collection, and then the precision of underground geologic bodies inversion imaging is influenced, this just needs well-designed one Cover field layout.
The design philosophy of observation system is to be based on subsurface geological structure, earth's surface landform, execution conditions, ensures that survey line is linear Distribution, big gun spacing and degree of covering are uniformly distributed.Need first to analyze the superficial landform, geologic body size, depth in known work area etc. Geologic parameter, and then offset distance, track pitch, survey line length, line direction are proved, obtain accurate observation system ginseng Number.
Traditional linear pattern observation system is larger by the earth's surface influence of topography, and difficult point generally is divided at 2 points, one is rising Constructional difficulties caused by table of throwing oneself on the ground and later stage static correction problem, the second is excitation acceptable conditions are poor, once effective wave energy is weaker, Bigger difficulty is brought to later data processing.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of establishment method of the seismic survey lines of seismic observation system, improves The resolution ratio and signal-to-noise ratio of shake initial data.
The technical scheme is that:
A kind of establishment method of the seismic survey lines of seismic observation system, has specifically included following steps:
(1), determine each shot position first, it is that the geodetic coordinates of the point is recorded with reference to shot point to choose big gun line corner position, then root A CMP line is chosen according to terrain conditions situation, in this, as X-axis, wherein high order end is coordinate origin, then establishes Y according to X-axis Axis, and record the geodetic coordinates of coordinate origin;
(2), contrast with reference to shot point and X-axis, the relative position of Y-axis, two-dimensional coordinate will be converted into reference to the geodetic coordinates of shot point, i.e., Reference coordinate, then calculates the two-dimensional coordinate of each shot point along X-direction and Y-axis method to reference coordinate both sides;
(3), assume CMP trace gathers be entirely located in CMP lines i.e. in X-axis, utilize step(2)Obtained shot point coordinate and the CMP assumed The coordinate of each CMP in trace gather, is calculated the coordinate of the receiving point of each shot point;
(4), by the reception point coordinates of known shot point coordinate and calculating, real CMP point coordinates is calculated, finally by real CMP point coordinates determines the specific location of survey line.
The selection of the CMP lines in favor of focus triggering be standard, consider site contour can condition of construction with Lay of the land factor, chooses CMP lines the most appropriate.
According to the coordinate and CMP lines of each CMP in the CMP trace gathers of the hypothesis, inverting is carried out to shot point and receiving point Iterative calculation, so as to obtain accurate survey line position after carrying out the iterative calculation of inverting several times and correcting.
Advantages of the present invention:
The present invention is determining big gun line position perpendicular to the direction of lay of the land first, once draws common point substantially (CMP)Position and CMP bin sizes, it is reference point then to choose the curved flex point of big gun line, obtains shot point and receives point coordinates Position, and then common point coordinate is obtained, finally obtain the specific location of survey line.Survey line position measurement of the present invention is accurate, so that Improve the resolution ratio and signal-to-noise ratio of seismic observation system test earthquake initial data, it is ensured that the accuracy of test.
Embodiment
The technical solution in the embodiment of the present invention is clearly and completely described below, it is clear that described embodiment Only part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, the common skill in this area Art personnel all other embodiments obtained without making creative work, belong to the model that the present invention protects Enclose.
A kind of establishment method of the seismic survey lines of seismic observation system, has specifically included following steps:
(1), determine each shot position first, it is that the geodetic coordinates of the point is recorded with reference to shot point to choose big gun line corner position, then root A CMP line is chosen according to terrain conditions situation, in this, as X-axis, wherein high order end is coordinate origin, then establishes Y according to X-axis Axis, and record the geodetic coordinates of coordinate origin;
(2), contrast with reference to shot point and X-axis, the relative position of Y-axis, two-dimensional coordinate will be converted into reference to the geodetic coordinates of shot point, i.e., Reference coordinate, then calculates the two-dimensional coordinate of each shot point along X-direction and Y-axis method to reference coordinate both sides;
(3), assume CMP trace gathers be entirely located in CMP lines i.e. in X-axis, utilize step(2)Obtained shot point coordinate and the CMP assumed The coordinate of each CMP in trace gather, is calculated the coordinate of the receiving point of each shot point;
(4), by the reception point coordinates of known shot point coordinate and calculating, real CMP point coordinates is calculated, finally by real CMP point coordinates determines the specific location of survey line.
Wherein, so that focus triggering is standard, consider site contour can condition of construction and ground for the selection of CMP lines Shape moves towards factor, chooses CMP lines the most appropriate.
The coordinate and CMP lines of each CMP in CMP trace gathers of the invention according to hypothesis, inverting is carried out to shot point and receiving point Iterative calculation, so as to obtain accurate survey line position after carrying out the iterative calculation of inverting several times and correcting.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of changes, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (3)

  1. A kind of 1. establishment method of the seismic survey lines of seismic observation system, it is characterised in that:Following steps are specifically included:
    (1), determine each shot position first, it is that the geodetic coordinates of the point is recorded with reference to shot point to choose big gun line corner position, then root A CMP line is chosen according to terrain conditions situation, in this, as X-axis, wherein high order end is coordinate origin, then establishes Y according to X-axis Axis, and record the geodetic coordinates of coordinate origin;
    (2), contrast with reference to shot point and X-axis, the relative position of Y-axis, two-dimensional coordinate will be converted into reference to the geodetic coordinates of shot point, i.e., Reference coordinate, then calculates the two-dimensional coordinate of each shot point along X-direction and Y-axis method to reference coordinate both sides;
    (3), assume CMP trace gathers be entirely located in CMP lines i.e. in X-axis, utilize step(2)Obtained shot point coordinate and the CMP assumed The coordinate of each CMP in trace gather, is calculated the coordinate of the receiving point of each shot point;
    (4), by the reception point coordinates of known shot point coordinate and calculating, real CMP point coordinates is calculated, finally by real CMP point coordinates determines the specific location of survey line.
  2. A kind of 2. establishment method of the seismic survey lines of seismic observation system according to claim 1, it is characterised in that:It is described CMP lines selection in favor of focus triggering be standard, consider site contour can condition of construction and lay of the land factor, Choose CMP lines the most appropriate.
  3. A kind of 3. establishment method of the seismic survey lines of seismic observation system according to claim 1, it is characterised in that:According to The coordinate and CMP lines of each CMP in the CMP trace gathers of the hypothesis, inverting iterative calculation is carried out to shot point and receiving point, into So as to obtain accurate survey line position after the row iterative calculation amendment of inverting several times.
CN201711288355.5A 2017-12-07 2017-12-07 A kind of establishment method of the seismic survey lines of seismic observation system Pending CN108020860A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711288355.5A CN108020860A (en) 2017-12-07 2017-12-07 A kind of establishment method of the seismic survey lines of seismic observation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711288355.5A CN108020860A (en) 2017-12-07 2017-12-07 A kind of establishment method of the seismic survey lines of seismic observation system

Publications (1)

Publication Number Publication Date
CN108020860A true CN108020860A (en) 2018-05-11

Family

ID=62079023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711288355.5A Pending CN108020860A (en) 2017-12-07 2017-12-07 A kind of establishment method of the seismic survey lines of seismic observation system

Country Status (1)

Country Link
CN (1) CN108020860A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102778689A (en) * 2011-05-13 2012-11-14 中国石油化工股份有限公司 Wide curved line seismic data underground reflection line building method
CN103454680A (en) * 2013-08-27 2013-12-18 中国石油集团川庆钻探工程有限公司地球物理勘探公司 Method for calculating vertical coverage times of Walk-away VSP observing system
CN107290776A (en) * 2016-03-30 2017-10-24 中国石油化工股份有限公司 A kind of relief surface curved line design method centered on exciting

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102778689A (en) * 2011-05-13 2012-11-14 中国石油化工股份有限公司 Wide curved line seismic data underground reflection line building method
CN103454680A (en) * 2013-08-27 2013-12-18 中国石油集团川庆钻探工程有限公司地球物理勘探公司 Method for calculating vertical coverage times of Walk-away VSP observing system
CN107290776A (en) * 2016-03-30 2017-10-24 中国石油化工股份有限公司 A kind of relief surface curved line design method centered on exciting

Similar Documents

Publication Publication Date Title
CN107167786A (en) Laser satellite surveys high data assisted extraction vertical control point method
CN104536043B (en) Depth domain overall velocity model fusion method and device
CN102841379B (en) Method for analyzing pre-stack time migration and speed based on common scatter point channel set
CN107817523B (en) The analysis method and device of diffracted wave migration velocity
CN105093319B (en) Ground micro-seismic static correcting method based on 3D seismic data
CN107367761B (en) A kind of massive desert deep carbonate reservoirs wideangle reflection wave imaging method
CN106291725A (en) A kind of method of fast inversion underground geologic bodies locus
CN110146924B (en) Submarine seismograph position and orientation inversion method based on water wave first arrival polarization orientation
CN102901985A (en) Depth domain layer speed correcting method suitable for undulating surface
CN104360396B (en) A kind of three kinds of preliminary wave Zoumaling tunnel methods of TTI medium between offshore well
CN108710148A (en) The steady phase prestack depth migration method in three-dimensional dip domain and device
CN104808242B (en) A kind of imaging of seismic data processing method
CN102877828A (en) CT (Computed Tomography) imaging method of three-dimensional multi-well combined well land
CN108303736A (en) Anisotropy TI medium Shortest path ray tracing forward modeling methods
CN105353406B (en) A kind of method and apparatus for generating angle gathers
CN102798893B (en) Three-dimensional superimposed tomography inversion static correction method
CN113759426A (en) Artificial source electromagnetic exploration method and system based on reference channel
CN111399031B (en) Method for acquiring and processing mountain land seismic data
CN108020860A (en) A kind of establishment method of the seismic survey lines of seismic observation system
CN104155690B (en) The 3D seismic data stack velocity acquiring method deployed based on ellipsoid
CN108051858B (en) The method of seismic prospecting and device of optimization
CN104142513B (en) Method for improving chromatography inversion accuracy in seismic exploration
CN114545495A (en) OVT trace gather processing method and device for PS wave seismic trace data and electronic equipment
CN107918147A (en) Diffraction wave imaging method and device
CN104199104B (en) 3D seismic data surface wave attenuation method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180511