CN108016575A - A kind of floating wind turbine and TLP platforms transport installation integrated ship and its transportation installation method - Google Patents

A kind of floating wind turbine and TLP platforms transport installation integrated ship and its transportation installation method Download PDF

Info

Publication number
CN108016575A
CN108016575A CN201810004986.8A CN201810004986A CN108016575A CN 108016575 A CN108016575 A CN 108016575A CN 201810004986 A CN201810004986 A CN 201810004986A CN 108016575 A CN108016575 A CN 108016575A
Authority
CN
China
Prior art keywords
wind turbine
tlp
floating wind
integrated ship
platforms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810004986.8A
Other languages
Chinese (zh)
Inventor
王河汇
张开华
陆梅兴
张成芹
张智伟
刘璐
时蓓玲
黄琛
黄超
鲁进亮
王俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
In Sanhang (shanghai) New Energy Engineering Co Ltd
SHANGHAI LVSE ENVIRONMENTAL PROTECTION ENERGY CO Ltd
China Construction Third Engineering Bureau Co Ltd
Original Assignee
In Sanhang (shanghai) New Energy Engineering Co Ltd
SHANGHAI LVSE ENVIRONMENTAL PROTECTION ENERGY CO Ltd
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by In Sanhang (shanghai) New Energy Engineering Co Ltd, SHANGHAI LVSE ENVIRONMENTAL PROTECTION ENERGY CO Ltd, China Construction Third Engineering Bureau Co Ltd filed Critical In Sanhang (shanghai) New Energy Engineering Co Ltd
Priority to CN201810004986.8A priority Critical patent/CN108016575A/en
Publication of CN108016575A publication Critical patent/CN108016575A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/003Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B17/00Vessels parts, details, or accessories, not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B17/00Vessels parts, details, or accessories, not otherwise provided for
    • B63B2017/0054Rests or supports for movable ship-borne equipment

Abstract

The present invention provides a kind of floating wind turbine and TLP platforms transport installation integrated ship and its transportation installation method, including hull, the deck of the hull is equipped with a pylon, and the short transverse of the pylon is equipped with two pile holding mechanisms perpendicular to pylon, and pile holding mechanism is used for the cylinder for clamping floating wind turbine;The stem of the hull is equipped with a U-shaped opening, and U-shaped opening is used to accommodate TLP platforms, and the deck that hull is located above U-shaped opening is equipped with least one positioner, and positioner is used to TLP platforms being fixed in U-shaped opening.After floating wind turbine of the present invention is good in wharf apron and TLP stage+modules, integrated ship is directly adjacent to floating wind turbine and TLP platforms, and completion is started shipment and installed;Integrated ship ensures to have in installation process is transported enough stabilities by the pile holding mechanism and positioner of itself and is tenacity;The present invention can disposably complete the problems such as base shipment, towage transport and mooring are installed, and ship machine equipment and cost of labor be saved, so as to improve the efficiency of assembling.

Description

A kind of floating wind turbine and TLP platforms transport installation integrated ship and its transportation installation method
Technical field
The present invention relates to floating wind turbine to transport installation integrated ship, more particularly to a kind of floating wind turbine and TLP platforms transport peace Fill integrated ship and its transportation installation method.
Background technology
China's offshore wind energy resource enriches, and the widely used pile foundation of sea wind field wind turbine and gravity type foundation etc. are fixed at present Formula foundation pattern, applies in general to the shallow sea area that depth of water scope is less than 50m;And as the construction of wind power plant is to more deep-sea domain Development, the wind turbine of buoyant foundation structure have huge exploitation advantages.
TLP (tension leg) platform is a kind of pattern of floating fan foundation structure, in wharf apron base together with wind turbine sheet Installed after body preassembling, it is necessary to be transported wind turbine to wind field together with basic platform structure;The means of transportation of platform is generally wrapped Include and wet drag and dry drag two kinds of construction technologies;It is dry to drag scheme to carry out binding reinforcing after needing bulk transport bullk reform, and filling The ship such as large-scale floating crane ship and tugboat machine equipment is needed to coordinate in ship, transport and field-mounted process.
The wet scheme dragged is usually what can not be realized for TLP platforms, because TLP platforms are typically all mooring stability, often The TLP platforms of rule oneself can not keep floading condition, can not drag scheme using directly wet;Foreign countries have binds pressure on each pile Pouring weight, to reach the height that lowers the center of gravity, is improved stability, the case dragged then is tied up using tugboat;Ye You companies propose to pass through increase Ballast tank, adjusts platform center of gravity, improves stability, easy to the purpose of direct towage transport.
It is dry to drag scheme to be suitable for the wind field that coastal waters sea conditions are preferable, offshore is closer to the distance, there is sea for far-reaching marine site Condition complicated condition, operating difficulties during installation;In addition, in transport barge loading vessel floating wind turbine (including fan foundation structure), weight The heart is high, is that solid difficulty is big;And it is required for large-scale lifting appliance and tugboat to coordinate in shipment, transport and field-mounted process, This mode auxiliary ship station is more, and process is complicated, less efficient.
It is wet to drag scheme not to be suitable for not possessing the TLP platform infrastructures for depositing stability condition certainly, and improved use Saddle weight tugboat is tied up to drag does not apply to extensive wind turbine transport installation, and difficulty of construction and cost with itself ballast arrangement and method for construction Increase.
The content of the invention
The technical problem to be solved in the present invention is to provide one kind can solve terminal base TLP platforms with being filled after wind turbine assembly Ship problem, solve the problems, such as wind turbine and TLP platforms from base transport to the stability during far-reaching marine site wind field and be it is solid and A kind of the floating wind turbine and TLP platforms for solving transport to the installation question of TLP platforms and underwater mooring system after wind field transport peace Fill integrated ship and its transportation installation method.
To reach above-mentioned purpose, technical scheme is as follows:
A kind of floating wind turbine and TLP platforms transport installation integrated ship, including hull, the deck of the hull are equipped with a tower Frame, the short transverse of the pylon are equipped with two pile holding mechanisms perpendicular to pylon, and pile holding mechanism is used to clamp floating wind turbine Cylinder;The stem of the hull is equipped with a U-shaped opening, and U-shaped opening is used to accommodate TLP platforms, is located at hull above U-shaped opening Deck be equipped with least one positioner, positioner is used to TLP platforms being fixed in U-shaped opening.
In one embodiment of the invention, each pile holding mechanism includes four pushing tow oil of 90 ° of direction arrangements of surrounding Cylinder, four pipe bending cylinders two-by-two crossed-symmetrical set, behind two pipe bending cylinders be fixed on pylon, before two pipe bending cylinders It is installed on respectively by the way that pipe bending cylinder telescopic oil cylinder is contractile on pylon in one embodiment of the invention, positioner is Three, in angular distribution on the deck of hull.
In one embodiment of the invention, positioner is a hydraulic capstan, and hydraulic capstan is put down by steel wire rope and TLP The lifting lug connection carried on platform.
In one embodiment of the invention, the madial wall of U-shaped opening is equipped with anticollision device, collision-prevention device.
In one embodiment of the invention, anticollision device, collision-prevention device is made of elastomeric material.
In one embodiment of the invention, pile holding mechanism further includes three first positioners into angular distribution, just fixed Position device is used for Primary Location during tower entry pile holding mechanism and uses.
In one embodiment of the invention, pile holding mechanism further includes two locking devices, and two locking devices are used respectively It is spacing in being carried out to the pipe bending cylinder telescopic oil cylinder under open configuration.
A kind of transportation installation method of floating wind turbine and TLP platforms transport installation integrated ship, transportation installation method are included such as Lower step:
(1) first by integrated ship close to harbour over-assemble good floating wind turbine and TLP platforms, floating wind turbine and TLP platforms bottom The TLP platforms in portion enter in the U-shaped opening of hull stem, its bottom is swum on the water surface;Pile holding mechanism on pylon is by floating The cylinder of wind turbine is embraced and clamped, and hydraulic capstan is connected by steel wire rope with the lifting lug on floating wind turbine and TLP platforms, and voluntarily Tightening is fixed;
(2) towage when adjusting ballast water to designed draft in integrated ship and floating wind turbine and TLP platforms;
(3) behind towage to scene, make integrated ship in place using the DP dynamic positionings of integrated ship, floating wind turbine and TLP platforms Near traction to installation center position, it is connected with mooring system;
(4) TLP stage+modules are connected with mooring system by tension tendon in place, after TLP platform stables, lock whole muscle Tendon, adjusts the water ballast of TLP platforms, tendon pulling force is reached design load;Integrated ship is sunk by quick ballast, is opened on pylon Pile holding mechanism and deck on positioner, integrated ship exits, and completes installation.
Through the above technical solutions, the beneficial effects of the invention are as follows:
1st, after floating wind turbine is good in wharf apron and TLP stage+modules, integrated ship is directly adjacent to the floating wind turbine assembled And TLP platforms, completion are started shipment and installed.
2nd, integrated ship ensures there are enough stabilities in installation process is transported by the pile holding mechanism and positioner of itself Be tenacity.
3rd, integrated ship can be positioned by self power and quick ballast function completes scene positioning and installation.
4th, the present invention can disposably complete the problems such as base shipment, towage transport and mooring are installed, and save ship machine equipment And cost of labor, so as to improve the efficiency of assembling.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is attached drawing needed in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without creative efforts, can be with Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the structure diagram that integrated ship of the present invention installs floating wind turbine and TLP platforms;
Fig. 2 is pile holding mechanism structure schematic diagram of the present invention;
Part-structure top view when Fig. 3 is TLP stage+modules;
Part-structure side view when Fig. 4 is TLP stage+modules;
Corresponding component title of the numeral represented by with letter in figure:
10th, hull 20, deck 30, pylon 40, supporting structure 50, pile holding mechanism 51, pipe bending cylinder 52, pushing tow oil Cylinder telescopic oil cylinder 53, first positioner 54, locking device 60, cylinder 70, U-shaped opening 71, anticollision device, collision-prevention device 80, TLP are put down Platform 81, lifting lug 90, hydraulic capstan 100, steel wire rope 110, leading block.
Embodiment
In order to make the technical means, the creative features, the aims and the efficiencies achieved by the present invention easy to understand, tie below Conjunction is specifically illustrating, and the present invention is further explained.
Integrated ship to be installed referring to shown in Fig. 1 to Fig. 4, the invention discloses a kind of floating wind turbine and the transport of TLP platforms, including Hull 10, the deck 20 of hull 10 are equipped with a pylon 30, and pylon 30 is supported by a supporting structure 40, supporting structure 40 It is not specifically limited herein, it can play the function of further fixed pylon, can be supporting rod of the prior art; The short transverse of pylon 30 is equipped with two pile holding mechanisms 50 perpendicular to pylon, the parallel installation about 50 of Liang Ge pile holdings mechanism, Pile holding mechanism 50 is used for the cylinder 60 for clamping floating wind turbine;The stem of hull 10 is equipped with a U-shaped opening 70, U-shaped opening 70 it is interior Side wall is equipped with anticollision device, collision-prevention device 71, and anticollision device, collision-prevention device is made of elastomeric material, can effectively avoid between TLP platforms and Ship Structure Hard contact, reduce the damage produced between the two by collision, improve service life and security;Anticollision device, collision-prevention device 71 can also It is made of other materials with buffering effect, is not added with repeating herein;U-shaped opening 70 is used to accommodate TLP platforms 80, U-shaped to open The top of mouth 70 is equipped with three positioners positioned at the deck of hull, and three positioners are in angular distribution on the deck of hull 10 On 20, for TLP platforms 80 to be fixed in U-shaped opening 70.
Each pile holding mechanism 50 of the invention includes four pipe bending cylinders 51 of 90 ° of direction arrangements of surrounding, four pushing tow oil Cylinder 51 two-by-two crossed-symmetrical set, behind two pipe bending cylinders 51 be fixed on pylon 30, before two pipe bending cylinders 51 distinguish It is installed on by the way that pipe bending cylinder telescopic oil cylinder 52 is contractile on pylon 30;Pile holding mechanism further includes three into the first of angular distribution Positioner 53, first positioner 53 are used for Primary Location during tower entry pile holding mechanism and use, can prevent since integrated ship shakes Tower is contacted with the hard of pile holding mechanism when dynamic, can also further improve stability during tower installation;Pile holding mechanism further includes Two locking devices 54, two locking devices are respectively used to carry out the pipe bending cylinder telescopic oil cylinder under open configuration on spacing, top For push oil cylinder telescopic oil cylinder in open configuration, wave can cause integrated ship to rock, so that drive pipe bending cylinder to rock, pipe bending cylinder Again the output shaft of pipe bending cylinder telescopic oil cylinder can be driven to rock, the output shaft of pipe bending cylinder telescopic oil cylinder is easy to damage at this time, Therefore need to set locking device to control the output shaft of push oil cylinder telescopic oil cylinder to rock.
The operation principle of pile holding mechanism is:Two pipe bending cylinder telescopic oil cylinders 52 for starting pile holding mechanism 50 before installing are in Contraction state, the mechanism of pile holding at this time 50 are in open mode;With the displacement of integrated ship, the cylinder 60 of floating wind turbine enters pile holding Mechanism 50, first positioner 53 carry out Primary Location to cylinder 60, two pipe bending cylinder telescopic oil cylinders 52 open, positioned above Two pipe bending cylinders 51 are pushed ahead under the drive of pipe bending cylinder telescopic oil cylinder 52, when pipe bending cylinder 51 reaches precalculated position When, locking device 54 locks pipe bending cylinder telescopic oil cylinder 52, then, the stretching that four pipe bending cylinders 51 pass through piston rod Contact and lock with drum surface, Liang Ge pile holdings mechanism 50 grips two layers of cylinder up and down of floating wind turbine;Pacify to scene Install into opening locking device 54 afterwards, pipe bending cylinder telescopic oil cylinder 52 withdraws, before two pipe bending cylinders 51 with pipe bending cylinder Telescopic oil cylinder 52 is together withdrawn, and the piston rod of 4 pipe bending cylinders 51 is shunk, and pile holding mechanism is exited with hull, completes installation.
Positioner of the present invention is a hydraulic capstan 90, and hydraulic capstan 90 on steel wire rope 100 and TLP platforms 80 by carrying Lifting lug 81 connect, come realize TLP platforms 80 be solid by controlling hydraulic capstan 90;Hydraulic capstan 90 is additionally provided with lifting lug 81 One leading block 110, leading block 110 are arranged on the deck 20 of hull 10, between hydraulic capstan 90 and lifting lug 81, steel Cord 100 bypasses leading block 110 when connecting hydraulic capstan 90 and lifting lug 81, and leading block 110 has guiding role, and can The stress that steel wire rope is subject to is reduced, improves service life.
The transportation installation method of floating wind turbine and TLP platforms transport installation integrated ship of the present invention, includes the following steps:
(1) first by integrated ship close to harbour over-assemble good floating wind turbine and TLP platforms, floating wind turbine and TLP platforms bottom The TLP platforms 80 in portion enter in the U-shaped opening 70 of 10 stem of hull, its bottom is swum on the water surface;Two on pylon 30 are embraced Stake mechanism 50 works, and pile holding mechanism 50 is in open mode, and with the displacement of hull, the cylinder 60 of floating wind turbine enters pile holding machine Structure 50, first positioner 53 carry out Primary Location to cylinder 60, and two pipe bending cylinder telescopic oil cylinders 52 open, positioned at two above A pipe bending cylinder 51 is pushed ahead under the drive of pipe bending cylinder telescopic oil cylinder 52, when pipe bending cylinder 51 reaches precalculated position, Locking device 54 locks pipe bending cylinder telescopic oil cylinder 52, then, four pipe bending cylinders 51 by the stretching of piston rod with 60 surface of cylinder contacts and locks, and Liang Ge pile holdings mechanism 50 grips two layers of cylinder up and down of floating wind turbine, most floats at last The cylinder 60 of formula wind turbine is embraced and clamped;Hydraulic capstan 90 passes through the lifting lug on steel wire rope 100 and floating wind turbine and TLP platforms 80 81 connections, and voluntarily tightening system is solid;
(2) towage when adjusting ballast water to designed draft in integrated ship and floating wind turbine and TLP platforms;
(3) behind towage to scene, make integrated ship in place using the DP dynamic positionings of integrated ship, floating wind turbine and TLP platforms Near traction to installation center position, it is connected with mooring system;
(4) TLP stage+modules are connected with mooring system by tension tendon in place, after TLP platform stables, lock whole muscle Tendon, adjusts the water ballast of TLP platforms, tendon pulling force is reached design load;Integrated ship is sunk by quick ballast, is opened on pylon Pile holding mechanism (open locking device 54, pipe bending cylinder telescopic oil cylinder 52 withdraws, before two pipe bending cylinders 51 with pipe bending cylinder Telescopic oil cylinder 52 is together withdrawn, and the piston rod of 4 pipe bending cylinders 51 is shunk, and pile holding mechanism is exited with hull) and deck 20 On positioner (steel wire rope 100 being unclamped by hydraulic capstan 90, hydraulic capstan 90 and lifting lug 81 depart from), integrated ship exits, Complete installation.
The basic principles, main features and the advantages of the invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (9)

1. a kind of floating wind turbine and TLP platforms transport installation integrated ship, including hull, it is characterised in that the deck of the hull A pylon is equipped with, the short transverse of the pylon is equipped with two pile holding mechanisms perpendicular to pylon, and pile holding mechanism is used to press from both sides Hold the cylinder of floating wind turbine;The stem of the hull is equipped with a U-shaped opening, and U-shaped opening is used to accommodating TLP platforms, in U-shaped opening Orientation is equipped with least one positioner in the deck of hull, and positioner is used to TLP platforms being fixed in U-shaped opening.
2. a kind of floating wind turbine TLP platforms transport installation integrated ship according to claim 1, it is characterised in that each to embrace Stake mechanism includes four pipe bending cylinders of 90 ° of directions of surrounding arrangement, and crossed-symmetrical is set four pipe bending cylinders two-by-two, behind two A pipe bending cylinder is fixed on pylon, before two pipe bending cylinders be installed on respectively by the way that pipe bending cylinder telescopic oil cylinder is contractile On pylon.
3. a kind of floating wind turbine according to claim 1 and TLP platforms transport installation integrated ship, it is characterised in that positioning Device is three, in angular distribution on the deck of hull.
4. a kind of floating wind turbine according to claim 3 and TLP platforms transport installation integrated ship, it is characterised in that positioning Device is a hydraulic capstan, and hydraulic capstan is connected by steel wire rope with the lifting lug carried on TLP platforms.
5. a kind of floating wind turbine according to claim 1 and TLP platforms transport installation integrated ship, it is characterised in that U-shaped to open The madial wall of mouth is equipped with anticollision device, collision-prevention device.
6. a kind of floating wind turbine according to claim 1 and TLP platforms transport installation integrated ship, it is characterised in that anticollision Device is made of elastomeric material.
7. a kind of floating wind turbine according to claim 2 and TLP platforms transport installation integrated ship, it is characterised in that pile holding Mechanism further includes three first positioners into angular distribution, and first positioner is used for Primary Location during tower entry pile holding mechanism With.
8. a kind of floating wind turbine according to claim 2 and TLP platforms transport installation integrated ship, it is characterised in that pile holding Mechanism further includes two locking devices, and two locking devices are respectively used to carry out the pipe bending cylinder telescopic oil cylinder under open configuration It is spacing.
A kind of 9. transportation installation method of floating wind turbine and TLP platforms transport installation integrated ship, it is characterised in that:Transport installation side Method includes the following steps:
(1) first by integrated ship close to harbour over-assemble good floating wind turbine and TLP platforms, floating wind turbine and TLP mesa bases TLP platforms enter in the U-shaped opening of hull stem, its bottom is swum on the water surface;Pile holding mechanism on pylon is by floating wind turbine Cylinder embrace and clamp, hydraulic capstan is connected by steel wire rope with the lifting lug on floating wind turbine and TLP platforms, and is voluntarily tightened It is fixed;
(2) towage when adjusting ballast water to designed draft in integrated ship and floating wind turbine and TLP platforms;
(3) behind towage to scene, make integrated ship in place using the DP dynamic positionings of integrated ship, floating wind turbine and TLP platform tractions To installation center position, it is connected with mooring system;
(4) TLP stage+modules are connected with mooring system by tension tendon in place, after TLP platform stables, lock whole tendon, The water ballast of TLP platforms is adjusted, tendon pulling force is reached design load;Integrated ship is sunk by quick ballast, is opened on pylon Positioner in pile holding mechanism and deck, integrated ship exit, and complete installation.
CN201810004986.8A 2018-01-03 2018-01-03 A kind of floating wind turbine and TLP platforms transport installation integrated ship and its transportation installation method Pending CN108016575A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810004986.8A CN108016575A (en) 2018-01-03 2018-01-03 A kind of floating wind turbine and TLP platforms transport installation integrated ship and its transportation installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810004986.8A CN108016575A (en) 2018-01-03 2018-01-03 A kind of floating wind turbine and TLP platforms transport installation integrated ship and its transportation installation method

Publications (1)

Publication Number Publication Date
CN108016575A true CN108016575A (en) 2018-05-11

Family

ID=62071189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810004986.8A Pending CN108016575A (en) 2018-01-03 2018-01-03 A kind of floating wind turbine and TLP platforms transport installation integrated ship and its transportation installation method

Country Status (1)

Country Link
CN (1) CN108016575A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108909950A (en) * 2018-05-17 2018-11-30 中交航局第二工程有限公司 A kind of method of gravity type foundation and complete blower transport installation
CN108951593A (en) * 2018-07-24 2018-12-07 中国电建集团华东勘测设计研究院有限公司 Offshore wind turbine installation system and installation method based on four barrels of jacket composite foundations
CN109204702A (en) * 2018-09-18 2019-01-15 海洋石油工程股份有限公司 Method of the tension leg platform (TLP) tension tendon segmentation group to spreading
CN109334878A (en) * 2018-11-30 2019-02-15 中国科学院海洋研究所 The light raft of float-type marine steel pile anticorrosive construction
CN109537613A (en) * 2019-01-21 2019-03-29 中交航局第二工程有限公司 Large Caisson transport installation integrative construction device and construction technology
CN109625185A (en) * 2018-11-13 2019-04-16 南通市海洋水建工程有限公司 Suspension on the outside of a kind of high energy efficiency ship deck
CN109989402A (en) * 2019-05-17 2019-07-09 华电重工股份有限公司 A kind of pile holding system
CN111535995A (en) * 2020-05-29 2020-08-14 中交第一航务工程局有限公司 Novel integral transportation and installation device and method for offshore wind turbine
CN114183310A (en) * 2021-12-09 2022-03-15 天津大学 Transportation device for offshore wind power barrel type foundation
CN114872844A (en) * 2022-05-31 2022-08-09 中国华能集团清洁能源技术研究院有限公司 Upright column fan transport ship and offshore fan installation equipment
CN115180064A (en) * 2022-07-29 2022-10-14 广船国际有限公司 Pile fixing guide structure and ship
CN115258068A (en) * 2022-08-29 2022-11-01 三峡新能源海上风电运维江苏有限公司 Composite double-body wind power operation and maintenance ship

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003066426A1 (en) * 2001-11-21 2003-08-14 Mpu Enterprise As Ballastable lifting vessel and method for lifting, transporting, positioning and installation of a marine structure, particularly one or several windmills
WO2010059489A1 (en) * 2008-11-19 2010-05-27 Sydney Belinsky Stationary positioned offshore windpower plant (owp) and methods and means for its assembly, transportation, installation and servicing
DE102010020995A1 (en) * 2010-05-11 2011-11-17 Werner Möbius Engineering GmbH off-shore wind energy plant establishment system, has supporting structure connected to foundation piles embedded in seabed, and protection plate attached to foundation piles at seabed
CN203066071U (en) * 2013-01-30 2013-07-17 武桥重工集团股份有限公司 Hydraulic pile holder for pile driving barge
KR101297669B1 (en) * 2013-01-22 2013-08-21 문용석 Installation method using vessel for installing sea wind power generator
CN103332269A (en) * 2013-05-22 2013-10-02 江苏道达海上风电工程科技有限公司 Transportation and mounting ship of knapsack complete offshore wind power machine
US20140133921A1 (en) * 2012-11-14 2014-05-15 Ship And Ocean Industries R&D Center Offshore installation method of a wind power generator and its fabrication segments
CN104843142A (en) * 2015-05-29 2015-08-19 中国海洋石油总公司 Offshore platform module demounting and mounting system
WO2016063210A1 (en) * 2014-10-20 2016-04-28 GeoSea N.V. Method for transporting a structure with buoyancy over water using a vessel, and vessel applied in the method
CN106794887A (en) * 2014-07-17 2017-05-31 三井海洋开发株式会社 The construction method and offshore structures of offshore structures
CN107165167A (en) * 2017-06-19 2017-09-15 上海衡拓船舶设备有限公司 Marine guidance piling pile gripper
CN208085949U (en) * 2018-01-03 2018-11-13 中交第三航务工程局有限公司 A kind of floating wind turbine and TLP platforms transport installation integrated ship

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003066426A1 (en) * 2001-11-21 2003-08-14 Mpu Enterprise As Ballastable lifting vessel and method for lifting, transporting, positioning and installation of a marine structure, particularly one or several windmills
WO2010059489A1 (en) * 2008-11-19 2010-05-27 Sydney Belinsky Stationary positioned offshore windpower plant (owp) and methods and means for its assembly, transportation, installation and servicing
DE102010020995A1 (en) * 2010-05-11 2011-11-17 Werner Möbius Engineering GmbH off-shore wind energy plant establishment system, has supporting structure connected to foundation piles embedded in seabed, and protection plate attached to foundation piles at seabed
US20140133921A1 (en) * 2012-11-14 2014-05-15 Ship And Ocean Industries R&D Center Offshore installation method of a wind power generator and its fabrication segments
KR101297669B1 (en) * 2013-01-22 2013-08-21 문용석 Installation method using vessel for installing sea wind power generator
CN203066071U (en) * 2013-01-30 2013-07-17 武桥重工集团股份有限公司 Hydraulic pile holder for pile driving barge
CN103332269A (en) * 2013-05-22 2013-10-02 江苏道达海上风电工程科技有限公司 Transportation and mounting ship of knapsack complete offshore wind power machine
CN106794887A (en) * 2014-07-17 2017-05-31 三井海洋开发株式会社 The construction method and offshore structures of offshore structures
WO2016063210A1 (en) * 2014-10-20 2016-04-28 GeoSea N.V. Method for transporting a structure with buoyancy over water using a vessel, and vessel applied in the method
CN104843142A (en) * 2015-05-29 2015-08-19 中国海洋石油总公司 Offshore platform module demounting and mounting system
CN107165167A (en) * 2017-06-19 2017-09-15 上海衡拓船舶设备有限公司 Marine guidance piling pile gripper
CN208085949U (en) * 2018-01-03 2018-11-13 中交第三航务工程局有限公司 A kind of floating wind turbine and TLP platforms transport installation integrated ship

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108909950A (en) * 2018-05-17 2018-11-30 中交航局第二工程有限公司 A kind of method of gravity type foundation and complete blower transport installation
CN108951593B (en) * 2018-07-24 2023-12-08 中国电建集团华东勘测设计研究院有限公司 Marine fan installation system and installation method based on four-barrel jacket composite foundation
CN108951593A (en) * 2018-07-24 2018-12-07 中国电建集团华东勘测设计研究院有限公司 Offshore wind turbine installation system and installation method based on four barrels of jacket composite foundations
CN109204702A (en) * 2018-09-18 2019-01-15 海洋石油工程股份有限公司 Method of the tension leg platform (TLP) tension tendon segmentation group to spreading
CN109204702B (en) * 2018-09-18 2020-06-12 海洋石油工程股份有限公司 Method for segmental assembling and lengthening tension tendon of tension leg platform
CN109625185A (en) * 2018-11-13 2019-04-16 南通市海洋水建工程有限公司 Suspension on the outside of a kind of high energy efficiency ship deck
CN109334878A (en) * 2018-11-30 2019-02-15 中国科学院海洋研究所 The light raft of float-type marine steel pile anticorrosive construction
CN109537613A (en) * 2019-01-21 2019-03-29 中交航局第二工程有限公司 Large Caisson transport installation integrative construction device and construction technology
CN109989402A (en) * 2019-05-17 2019-07-09 华电重工股份有限公司 A kind of pile holding system
CN111535995A (en) * 2020-05-29 2020-08-14 中交第一航务工程局有限公司 Novel integral transportation and installation device and method for offshore wind turbine
CN114183310B (en) * 2021-12-09 2023-07-28 天津大学 Conveying device for offshore wind torch type foundation
CN114183310A (en) * 2021-12-09 2022-03-15 天津大学 Transportation device for offshore wind power barrel type foundation
CN114872844A (en) * 2022-05-31 2022-08-09 中国华能集团清洁能源技术研究院有限公司 Upright column fan transport ship and offshore fan installation equipment
CN115180064A (en) * 2022-07-29 2022-10-14 广船国际有限公司 Pile fixing guide structure and ship
CN115180064B (en) * 2022-07-29 2023-06-16 广船国际有限公司 Pile fixing guide structure and ship
CN115258068A (en) * 2022-08-29 2022-11-01 三峡新能源海上风电运维江苏有限公司 Composite double-body wind power operation and maintenance ship

Similar Documents

Publication Publication Date Title
CN108016575A (en) A kind of floating wind turbine and TLP platforms transport installation integrated ship and its transportation installation method
EP2917097B1 (en) Floatable transportation and installation structure for transportation and installation of a floating wind turbine, a floating wind turbine and method for transportation and installation of the same
US9856621B2 (en) Method of construction, installation, and deployment of an offshore wind turbine on a concrete tension leg platform
US8820254B2 (en) Catamaran ship used for assembling, transporting and installing a marine wind turbine on the seafloor
CN101598246B (en) Method for splicing flanges of offshore oil delivery pipes underwater
KR20120047740A (en) Deck ascent and descent type worktable ship and construction method of shore wind power generation facility using the same
CN102079476A (en) Fan-holding equipment and mobile waterborne platform
CN102079477A (en) Fan holding and lifting device and mobile overwater operation platform
KR101352096B1 (en) Tripod suction pile substructure
CN102491162A (en) Hoisting equipment and hoisting method
WO2009005357A1 (en) Device and method for marine tower structure
CN208085949U (en) A kind of floating wind turbine and TLP platforms transport installation integrated ship
KR20210010997A (en) Wind turbine and method for installing wind turbine
CN101793106A (en) Installing mechanism of intertidal belt wind generator upright post without crane and operation method thereof
CN201268389Y (en) Multifunctional construction platform
US20120201608A1 (en) Foundation for offshore wind turbine and method and means for its transportation and installation in deepwaters
WO2011102738A2 (en) A method and vessel for offshore transport and installation of windmill assemblies
CN103883273A (en) Method for utilizing two cranes on saturation diving support vessel to mount vertical pipe
CN108999975A (en) A kind of sealing stake plug device for the floating transport of offshore wind turbine piling bar
CN101428712B (en) Method for integrally dragging and loading wind generator set onto boat
KR101352095B1 (en) Suction pile substructure
US20240117788A1 (en) Delivery of a high volume of floating systems for wind
Chatzigiannakou et al. Offshore deployments of wave energy converters by Uppsala University, Sweden
KR101338358B1 (en) Wind turbine installation vessel
CN102787988A (en) Method for installing offshore wind generating set

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination