Summary of the invention
Aiming at the shortcomings in the prior art, the present invention provides a kind of shuttlecock training place, practices to solve existing shuttlecock
It is single to practise field structure, cannot achieve automatically picking up balls, single can not practice the problem of playing ball.
The invention is realized by the following technical scheme.
A kind of shuttlecock training place, including upper half court and lower half court, between the upper half court and lower half court
It is provided with mounting base, is flushed when the mounting base does not rise with upper half court and lower half court, the mounting base passes through liter
Falling unit controls oscilaltion, and the lifting device includes rack gear, the side setting driving gear of the rack gear, described
Wheel and rack engagement is driven, the driving gear is driven by stepper motor, it is provided with mounting base above the rack gear,
The two sides of the mounting base are provided with multiple first ventholes and the second venthole, first venthole and the second ventilation
Air pump is provided between hole, multiple first ventholes and the second venthole are aligned one by one, the upper half court and lower half court
Outside surrounds first conveyer belt, the second conveyer belt and third conveyer belt, the second conveying of tail end connection of the first conveyer belt
Vibrating disc is arranged in the head end of band, the head end of the tail end connection third conveyer belt of the second conveyer belt, the third conveyer belt lower section,
The third conveying band connection irreversibly delivers band, the side setting delivery device for irreversibly delivering band, the dispensing
Device includes spring, and permanent magnet plate is arranged in the front end of the spring, and electromagnet is arranged in the rear end of the spring, and described is upper
The side in half court and lower half court is additionally provided with equipment of playing ball automatically, and the equipment of playing ball automatically includes ejection band, described
Delivery device and ejection band on the same line, the ejection takes the multiple ejection holes of setting, under the ejection hole
Multiple beating devices are arranged in side's setting ejection plate, rear end, each beating device is aligned with ejection hole, on the same line.Energy
Enough realize that one plays ball practice, and without picking up ball manually, whole device can be practised a ball game at random, with automatically picking up balls in a short time
Playing skill is improved to be very helpful.
Preferably, baffle is arranged in the two sides in the upper half court and lower half court, the baffle is apart from episphere
10 ~ 20 centimetres of the upper surface of field and lower half court.On the one hand baffle prevents shuttlecock to be splashed to outside, on the other hand apart from upper half
The interval in court and lower half court smoothly can make shuttlecock be pushed out.
Preferably, the first conveyer belt is higher than the second conveyer belt, second conveyer belt is conveyed higher than third
Band, the third conveyer belt are identical as band height is irreversibly delivered.Just shuttlecock can be made successively to pass through the first conveying in this way
Band, the second conveyer belt, third conveyer belt, arrival irreversibly deliver band.
Preferably, the beating device includes racket, the lower end of the racket connects turning handle, the turning handle
Rotating electric machine is arranged in lower section.Realize impact of the racket for shuttlecock, rotation angle control is within 45 degree to 90 degree.
Compared with prior art: the shuttlecock on court can be received automatically, be recycled at equipment of playing ball automatically, formation follows
Ring, saves artificial, realizes that one plays ball practice.
Specific embodiment
With reference to the accompanying drawing with specific embodiment, the present invention is described further.
A kind of shuttlecock training place, including upper half court 1 and lower half court 2, the upper half court 1 and lower half court 2
Between be provided with mounting base 31, the mounting base 31 flushes when not rising with upper half court 1 and lower half court 2, the peace
It fills seat 31 and oscilaltion is controlled by lifting device 3, the lifting device 3 includes rack gear 33, the side of the rack gear 33
Setting driving gear 34, the driving gear 34 are engaged with rack gear 33, and the driving gear 34 is driven by stepper motor,
Mounting base 31 is provided with above the rack gear 33, the two sides of the mounting base 31 are provided with multiple first venthole, 41 Hes
Second venthole 42 is provided with air pump, multiple first ventholes 41 between first venthole 41 and the second venthole 42
It is aligned one by one with the second venthole 42, first conveyer belt 6, second is surrounded on the outside of the upper half court 1 and lower half court 2 and is conveyed
Band 7 and third conveyer belt 8, the tail end of the first conveyer belt 6 connect the head end of the second conveyer belt 7, the tail of the second conveyer belt 7
End connects the head end of third conveyer belt 8, and vibrating disc 10 is arranged below the third conveyer belt 8, and the third conveyer belt 8 connects
Order is to conveyer belt 11, and the side setting delivery device 15 for irreversibly delivering band 11, the delivery device 15 includes bullet
Permanent magnet plate is arranged in spring, the front end of the spring, and electromagnet, 1 He of upper half court is arranged in the rear end of the spring
The side in lower half court 2 is additionally provided with equipment of playing ball automatically, and the equipment of playing ball automatically includes ejection band 13, the dispensing
On the same line, multiple ejection holes 14, the ejection hole 14 is arranged in device 15 and ejection band 13 on the ejection band 13
Lower section ejection plate is set, multiple beating devices 12 are arranged in rear end, each beating device 12 is aligned with hole 14 is launched, same
On straight line, baffle 9 is arranged in the two sides in the upper half court 1 and lower half court 2, and the baffle 9 is apart from upper half court 1 under
10 ~ 20 centimetres of the upper surface in half court 2, the first conveyer belt 6 are higher than the second conveyer belt 7, and second conveyer belt 7 is high
In third conveyer belt 8, the third conveyer belt 8 is identical as 11 height of band is irreversibly delivered, and the beating device 12 includes ball
It claps, the lower end of the racket connects turning handle, and rotating electric machine is arranged in the lower section of the turning handle.
In use, launching on band 13 just has many shuttlecocks originally, has a plumage in each ejection hole 14
Ball top, wherein the ejection plate starting in some ejection hole 14, the lower section of ejection plate include an ejection-spring, ejection-spring bullet
Out, drive ejection plate upward, the shuttlecock launched in hole 14 is ejected, and is risen in the air, at this time the photaesthesia outside racket
It should sense shuttlecock, rotating electric machine starting drives turning handle to rotate 45 degree, and the racket of script and ground are in 45 degree of angles, after rotation
In vertical state, equipment of playing ball automatically includes a control system, some ejection hole of the driving which can be random
14 ejection plate starting, has ensured the randomness of automatic release in this way.
When user is with the shuttlecock air exercise come is flown over, some can smoothly return serve, and then fall under ejection band 13
In the blanking basket of side, some cannot smoothly return serve, and disperse on court then will lead to shuttlecock, and user does not need to spend
It is time-consuming to go special to pick up ball, it is only necessary to which that the shuttlecock come is flown in continuous impact.
After a period of time, there is a large amount of shuttlecock to be scattered in upper half court 1 and lower half court 2, people can be at this time
The station of selectivity is in one of upper half court 1 or lower half court 2, if people station is in upper half court 1, people can actively be pressed
Pressure is located at the button on limiting slot 5, and driving gear 34 rotates clockwise, and upwards, the driving gear 34 is logical for band carry-over bar 33
Stepper motor driving is crossed, which can be effectively controlled the height of rising, and can be with return, rack gear with positive and negative rotation
33 tops are fixedly connected with mounting base 31, and mounting base 31 becomes pacifying from flushing with upper half court 1 and lower half court 2 for script at this time
It fills seat 31 to rise, and the first venthole 41 of two sides and the second venthole 42 are all located at upper half court 1 and lower half court 2 and flush
On face.
If what user pressed is the button on the limiting slot 5 in upper half court 1, first venthole in lower half court 2
41 become venthole, and second venthole 42 in upper half court 1 becomes suction hole, internal air pump starting, suction hole air-breathing, suction
Gas is discharged from venthole, and the gas push shuttlecock of discharge, shuttlecock moves closer to 9 position of baffle under powerful wind-force,
In moving process, the limited block 323 of 322 two sides of push rod is fastened in limiting slot 5, before having ensured that push rod 322 can be along straight line
Into, due to baffle 9 on the one hand protect shuttlecock should not out-of-bounds, on the one hand protect people not encounter multiple conveyer belts, on the other hand
It is exactly upper surface 10-20 centimetre of the baffle 9 apart from upper half court 1 and lower half court 2, therefore push rod 322 is being pushed into below baffle 9
When, shuttlecock can all be released out of 10-20 centimetres spacing, first conveyer belt 6 is located just at the side of baffle 9,
Shuttlecock is shifted onto first conveyer belt 6, and the shuttlecock on lower half court 2 is all proposed by push rod 322 at this time, and 9 lower section of baffle
Limit switches 91 are set, which controls the reverse rotation of idler wheel 321, so that push rod 322 returns to original position.
Feather ball warp first conveyer belt 6 is transported to the head end of the second conveyer belt 7, is then transported through the second conveyer belt 7 to the
Vibrating disc 10 is arranged in three conveyer belts 8, the lower section of third conveyer belt 8, and vibrating disc 10 makes a large amount of shuttlecock after shaking, and disperses
It opens, and entrance one by one irreversibly delivers band 11, the width for irreversibly delivering band 11 is smaller, and it is identical as the width of shuttlecock, because
This passes through the effect of vibrating disc 10, and all shuttlecocks are all arranged in perfect order, and the tail portion of shuttlecock is towards delivery device
15, the front of delivery device 15 is then reached, the spring of delivery device 15 is to store power originally, and permanent magnetism is arranged in the front end of spring
Electromagnet is arranged in the rear end of body plate, spring, when being powered, generates and generates suction with the magnetic opposite magnetic force of permanent magnet plate, the two,
So that spring stores power by compression, when electromagnet is under power blackout situation, the effect of power does not occur for nonmagnetic and permanent magnet plate, in spring
Acting in opposition under, permanent magnet plate pulls open at a distance from electromagnet, and permanent magnet plate carries out impact work to the shuttlecock of most side
With shuttlecock being got on the ejection hole 14 of ejection plate 13, delivery device 15 is internally provided with control unit, can control electric current
Size, the suction between electromagnet and permanent magnet plate is controlled with this, changes the opposition of spring, reaches and enable to
Shuttlecock can enter any one ejection hole 14, guarantee the randomness of connection.
After lower semisphere field 2 is cleaned, people can reach lower half court 2 across mounting base 31, then press accordingly
Button on the limiting slot 5 in lower lower half court 2, then first venthole 41 in lower half court 2 becomes suction hole, upper half court 1
The second venthole 42 become venthole, internal air pump starting, suction hole air-breathing is discharged air-breathing from venthole, discharge
Gas push shuttlecock clears up the shuttlecock on upper half court 1.
The shuttlecock in upper half court 1 is pushed into third conveyer belt 8, then transports through third conveyer belt 8 to irreversibly delivering
Band 11.
By delivery device the shuttlecock that irreversibly delivers on band 11 launch to, in the ejection hole 14 for launching band 13, wherein certain
The ejection plate starting in one ejection hole 14, the lower section of ejection plate include an ejection-spring, and ejection-spring pop-up drives ejection plate
Upwards, the shuttlecock launched in hole 14 is ejected, and is risen in the air, the light-inductive outside racket senses feather at this time
Ball, rotating electric machine starting drive turning handle to rotate 45 degree, and the racket of script and ground are in 45 degree of angles, after rotation in vertical state, complete
It is recycled at one.Protection scope of the present invention includes but is not limited to embodiment of above, and protection scope of the present invention is wanted with right
It asks subject to book, replacement, deformation, the improvement that those skilled in the art that any pair of this technology is made is readily apparent that each fall within this hair
Bright protection scope.