CN108014464B - Air-sweeping type shuttlecock recycles training place - Google Patents

Air-sweeping type shuttlecock recycles training place Download PDF

Info

Publication number
CN108014464B
CN108014464B CN201711313719.0A CN201711313719A CN108014464B CN 108014464 B CN108014464 B CN 108014464B CN 201711313719 A CN201711313719 A CN 201711313719A CN 108014464 B CN108014464 B CN 108014464B
Authority
CN
China
Prior art keywords
conveyer belt
half court
venthole
court
upper half
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711313719.0A
Other languages
Chinese (zh)
Other versions
CN108014464A (en
Inventor
胡澜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinchang County Grand City Wan Yi Machinery Factory
Original Assignee
Xinchang County Grand City Wan Yi Machinery Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinchang County Grand City Wan Yi Machinery Factory filed Critical Xinchang County Grand City Wan Yi Machinery Factory
Priority to CN201711313719.0A priority Critical patent/CN108014464B/en
Publication of CN108014464A publication Critical patent/CN108014464A/en
Application granted granted Critical
Publication of CN108014464B publication Critical patent/CN108014464B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B47/00Devices for handling or treating balls, e.g. for holding or carrying balls
    • A63B47/02Devices for handling or treating balls, e.g. for holding or carrying balls for picking-up or collecting
    • A63B47/025Installations continuously collecting balls from the playing areas, e.g. by gravity, with conveyor belts
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B67/00Sporting games or accessories therefor, not provided for in groups A63B1/00 - A63B65/00
    • A63B67/18Badminton or similar games with feathered missiles
    • A63B67/183Feathered missiles
    • A63B67/187Shuttlecocks
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B69/00Training appliances or apparatus for special sports
    • A63B69/40Stationarily-arranged devices for projecting balls or other bodies
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B47/00Devices for handling or treating balls, e.g. for holding or carrying balls
    • A63B47/02Devices for handling or treating balls, e.g. for holding or carrying balls for picking-up or collecting
    • A63B47/025Installations continuously collecting balls from the playing areas, e.g. by gravity, with conveyor belts
    • A63B2047/028Installations continuously collecting balls from the playing areas, e.g. by gravity, with conveyor belts pneumatic ball transport
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B2102/00Application of clubs, bats, rackets or the like to the sporting activity ; particular sports involving the use of balls and clubs, bats, rackets, or the like
    • A63B2102/04Badminton
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B2220/00Measuring of physical parameters relating to sporting activity
    • A63B2220/50Force related parameters
    • A63B2220/51Force
    • A63B2220/52Weight, e.g. weight distribution

Abstract

Air-sweeping type shuttlecock recycles training place, including upper half court and lower half court, mounting base is provided between upper half court and lower half court, the two sides of mounting base are provided with multiple first ventholes and the second venthole, air pump is provided between first venthole and the second venthole, multiple first ventholes and the second venthole are aligned one by one, upper half court and the over-the-counter side of lower semisphere surround first conveyer belt, second conveyer belt and third conveyer belt, the side in upper half court and lower half court is additionally provided with equipment of playing ball automatically, automatically equipment of playing ball includes the 4th conveyer belt, multiple delivery devices are arranged in the front end of 4th conveyer belt, multiple downward putting devices are arranged in rear end.The invention has the following advantages: the shuttlecock on court can be received automatically, it is recycled at equipment of playing ball automatically, forms circulation, save artificial, realizes that one plays ball practice.

Description

Air-sweeping type shuttlecock recycles training place
Technical field
The invention belongs to shuttlecock place fields, and in particular to air-sweeping type shuttlecock recycles training place.
Background technique
Existing shuttlecock place can not structure it is very simple, need two people to go to fight each other, but sometimes gather less than two Individual, possible one-man want to play badminton, and there are no a kind of plumages for specially capableing of the single practice of a people on the market at present Ball top place, although Japanese has invented the robot that plays badminton, that robot limitation is high, and manufacture is complicated, cost It is high, and just as people is to playing badminton when fight each other, time interval is longer, and position is single, and power is single, therefore not It is suitble to a people to practice for a long time.
Court on the ground, there is also a huge problem, beyond user, often have and do not receive very much Or the ball of out-of-bounds, therefore pick up shuttlecock and can also waste a large amount of time and efforts.
Summary of the invention
Aiming at the shortcomings in the prior art, the present invention provides air-sweeping type shuttlecock and recycles training place, to solve existing plumage Ball top practice field structure is single, cannot achieve automatically picking up balls, single can not practice the problem of playing ball.
The invention is realized by the following technical scheme.
Air-sweeping type shuttlecock recycles training place, including upper half court and lower half court, the upper half court and lower semisphere It is provided with mounting base between, is flushed when the mounting base does not rise with upper half court and lower half court, the mounting base Oscilaltion is controlled by lifting device, the lifting device includes body cradle, and the side of the body cradle lower end is fixed, The other side is connect with pushing block, is provided with mounting base above the body cradle, and the two sides of the mounting base are provided with multiple the One venthole and the second venthole are provided with air pump, multiple first ventilations between first venthole and the second venthole Hole and the second venthole are aligned one by one, and the upper half court and the over-the-counter side of lower semisphere surround first conveyer belt, the second conveyer belt With third conveyer belt, the tail end of the first conveyer belt connects the head end of the second conveyer belt, the tail end connection of the second conveyer belt The side in the head end of third conveyer belt, the upper half court and lower half court is additionally provided with plays ball equipment automatically, it is described from Dynamic equipment of playing ball includes the 4th conveyer belt, and multiple delivery devices are arranged in the front end of the 4th conveyer belt, and rear end setting is multiple Downward putting device, each lower section device are aligned with delivery device, on the same line.Air blowing device can be realized one and play ball white silk It practises, and without picking up ball manually, whole device can be practised a ball game at random with automatically picking up balls, has to raising playing skill in a short time very big It helps.
Preferably, baffle is arranged in the two sides in the upper half court and lower half court, the baffle is apart from episphere 10 ~ 20 centimetres of the upper surface of field and lower half court.On the one hand baffle prevents shuttlecock to be splashed to outside, on the other hand apart from upper half The interval in court and lower half court smoothly can make shuttlecock be pushed out.
Preferably, the first conveyer belt is higher than the second conveyer belt, second conveyer belt is conveyed higher than third Band, the third conveyer belt are higher than the 4th conveyer belt.Just shuttlecock can be made successively to pass through first conveyer belt, second in this way Conveyer belt, third conveyer belt reach the 4th conveyer belt.
Preferably, the delivery device includes racket, ball handle, the racket is horizontally disposed, with the 4th conveyer belt In parallel, the ball handle is driven by rotating electric machine.Rotating electric machine can control racket be rotated by 90 ° or 0 ~ 90 degree between, To realize different shuttlecock parabola.
Preferably, the downward putting device includes cylinder, telescopic rod is arranged in the front end of the cylinder, and described is flexible The front end fixed setting decentralization plate of bar.Decentralization plate is for pushing shuttlecock, so that shuttlecock falls into delivery device.
Compared with prior art: the shuttlecock on court can be received automatically, be recycled at equipment of playing ball automatically, formation follows Ring, saves artificial, realizes that one plays ball practice.
Detailed description of the invention
Structural schematic diagram when Fig. 1 is lower half court cleaning of the invention.
Structural schematic diagram when Fig. 2 is upper half court cleaning of the invention.
Fig. 3 is structural schematic diagram when mounting base of the invention rises.
Fig. 4 is structural schematic diagram when mounting base of the invention does not rise.
Specific embodiment
With reference to the accompanying drawing with specific embodiment, the present invention is described further.
Air-sweeping type shuttlecock recycles training place, including upper half court 1 and lower half court 2, the upper half court 1 and lower half Mounting base 31 is provided between court 2, the mounting base 31 flushes when not rising with upper half court 1 and lower half court 2, described Mounting base 31 by lifting device 3 control oscilaltion, the lifting device 3 include body cradle 33, the body cradle The side of 33 lower ends is fixed, and the other side is connect with pushing block 34, and mounting base 31, the peace are provided with above the body cradle 33 The two sides of dress seat 31 are provided with multiple first ventholes 41 and the second venthole 42, first venthole 41 and the second ventilation Air pump is provided between hole 42, multiple first ventholes 41 and the second venthole 42 are aligned one by one, and the upper half court 1 is under First conveyer belt 6, the second conveyer belt 7 and third conveyer belt 8 are surrounded on the outside of half court 2, the tail end of the first conveyer belt 6 connects Connect the head end of the second conveyer belt 7, the head end of the tail end connection third conveyer belt 8 of the second conveyer belt 7,1 He of upper half court The side in lower half court 2 is additionally provided with equipment of playing ball automatically, and the equipment of playing ball automatically includes the 4th conveyer belt 10, described Multiple delivery devices 11 are arranged in the front end of 4th conveyer belt 10, and multiple downward putting devices 12 are arranged in rear end, each lower section device 12 It is aligned with delivery device 11, on the same line, the two sides of the push rod 322 are provided with limited block 323, the episphere The two sides in field 1 and lower half court 2 are provided with limiting slot 5, and the limited block 323 is fastened in limiting slot 5, the episphere 1 and the two sides in lower half court 2 baffle 9 is set, the baffle 9 apart from the upper surface 10 in upper half court 1 and lower half court 2 ~ 20 centimetres, limit switch 91 is set, and the first conveyer belt 6 is higher than the second conveyer belt 7, described below the baffle 9 Second conveyer belt 7 is higher than third conveyer belt 8, and the third conveyer belt 8 is higher than the 4th conveyer belt 10, the delivery device 11 Including racket, ball handle, the racket is horizontally disposed, parallel with the 4th conveyer belt 10, and the ball handle is driven by rotating electric machine Dynamic, the downward putting device 12 includes cylinder, and telescopic rod is arranged in the front end of the cylinder, and the front end of the telescopic rod is fixed Setting decentralization plate.
In use, 10 script of the 4th conveyer belt just has many shuttlecocks, wherein some downward putting devices 12 Cylinder starting, cylinder drive telescopic rod elongation, and decentralization plate pushes the shuttlecock being located on the 4th conveyer belt 10, are pushed into dispensing dress It sets on 11 racket, racket is located just at the front of the 4th conveyer belt 10, and is located along the same line with delivery device 11, therefore When lower plate pushes away shuttlecock, shuttlecock is just fallen on racket, and gravity sensor is provided on racket, when gravity sensor incudes To after shuttlecock, rotating electric machine starting is rotated by 90 °, and racket reaches vertical state by original horizontality, to shuttlecock into The effect of swinging the bat of row power.
Shuttlecock flies out under the action of racket, flies into episphere field 1 and lower half court 2, and downward putting device 12 includes One control system, the cylinder starting which can drive some downward putting device 12 at random, has ensured certainly in this way The randomness of dynamic release.
When user is with the shuttlecock air exercise come is flown over, some can smoothly return serve, and then fall to delivery device 11 In the blanking basket of lower section, some cannot smoothly return serve, and disperse on court then will lead to shuttlecock, and user does not need The time is spent to go special to pick up ball, it is only necessary to which the shuttlecock come is flown in continuous impact.
After a period of time, there is a large amount of shuttlecock to be scattered in upper half court 1 and lower half court 2, people can be at this time The station of selectivity is in one of upper half court 1 or lower half court 2, if people station is in upper half court 1, people can actively be pressed Pressure is located at the button on limiting slot 5, and pushing block 34 is moved to the left, and the side of 33 lower end of body cradle is fixed, and the other side and pushing block 34 connect It connects, pushes the other end of body cradle 33 to draw close to fixing end in moving process, the two angle becomes smaller, and body cradle 33 is got higher, pushing block 34 when stopping pushing, and body cradle 34 rises to highest point, and mounting base 31 is from script and upper half court 1 and lower half court 2 at this time Flushing becomes the rising of mounting base 31, and the first venthole 41 of two sides and the second venthole 42 are all located at upper half court 1 under On half court, 2 flush.
If what user pressed is the button on the limiting slot 5 in upper half court 1, then first venthole in lower half court 2 41 become venthole, and second venthole 42 in upper half court 1 becomes suction hole, internal air pump starting, suction hole air-breathing, suction Gas is discharged from venthole, and the gas push shuttlecock of discharge, shuttlecock moves closer to 9 position of baffle under powerful wind-force, In moving process, the limited block 323 of 322 two sides of push rod is fastened in limiting slot 5, before having ensured that push rod 322 can be along straight line Into, due to baffle 9 on the one hand protect shuttlecock should not out-of-bounds, on the one hand protect people not encounter multiple conveyer belts, on the other hand It is exactly upper surface 10-20 centimetre of the baffle 9 apart from upper half court 1 and lower half court 2, therefore push rod 322 is being pushed into below baffle 9 When, shuttlecock can all be released out of 10-20 centimetres spacing, first conveyer belt 6 is located just at the side of baffle 9, Shuttlecock is shifted onto first conveyer belt 6, and the shuttlecock on lower half court 2 is all proposed by push rod 322 at this time, and 9 lower section of baffle Limit switches 91 are set, which controls the reverse rotation of idler wheel 321, so that push rod 322 returns to original position.
Feather ball warp first conveyer belt 6 is transported to the head end of the second conveyer belt 7, is then transported through the second conveyer belt 7 to the Then three conveyer belts 8 are transported through third conveyer belt 8 to the 4th conveyer belt 10.
After lower semisphere field 2 is cleaned, people can reach lower half court 2 across mounting base 31, then press accordingly Button on the limiting slot 5 in lower lower half court 2, then first venthole 41 in lower half court 2 becomes suction hole, upper half court 1 The second venthole 42 become venthole, internal air pump starting, suction hole air-breathing is discharged air-breathing from venthole, discharge Gas push shuttlecock clears up the shuttlecock on upper half court 1.
The shuttlecock in upper half court 1 is pushed into third conveyer belt 8, then transports through third conveyer belt 8 to the 4th conveying Band 10, wherein the cylinder starting of some downward putting device 12, cylinder drive telescopic rod elongation, and decentralization plate, which pushes, is located at the 4th conveying With the shuttlecock on 10, be pushed on the racket of delivery device 11, racket is located just at the front of the 4th conveyer belt 10, and with throwing It puts device 11 to be located along the same line, therefore when lower plate pushes away shuttlecock, shuttlecock is just fallen on racket, is provided on racket Gravity sensor, after gravity sensor senses shuttlecock, rotating electric machine starting is rotated by 90 °, racket is by original level State reaches vertical state, and the effect of swinging the bat of power is carried out to shuttlecock.
Shuttlecock flies out under the action of racket, flies into episphere field 1 and lower half court 2, and downward putting device 12 includes One control system, the cylinder starting which can drive some downward putting device 12 at random, has ensured certainly in this way The randomness of dynamic release, completes the cyclic process of a shuttlecock.
Protection scope of the present invention includes but is not limited to embodiment of above, and protection scope of the present invention is with claims Subject to, replacement, deformation, the improvement that those skilled in the art that any pair of this technology is made is readily apparent that each fall within of the invention Protection scope.

Claims (5)

1. air-sweeping type shuttlecock recycles training place, which is characterized in that including upper half court (1) and lower half court (2), described is upper It is provided between half court (1) and lower half court (2) mounting base (31), when the mounting base (31) does not rise and upper half court (1) it is flushed with lower half court (2), the mounting base (31) controls oscilaltion, the lifting dress by lifting device (3) Setting (3) includes body cradle (33), and the side of the body cradle (33) lower end is fixed, and the other side is connect with pushing block (34), described Body cradle (33) above be provided with mounting base (31), the two sides of the mounting base (31) are provided with multiple first ventholes (41) and the second venthole (42) it, is provided with air pump between first venthole (41) and the second venthole (42), it is multiple First venthole (41) and the second venthole (42) are aligned one by one, are surrounded on the outside of the upper half court (1) and lower half court (2) First conveyer belt (6), the second conveyer belt (7) and third conveyer belt (8), the tail end connection second of the first conveyer belt (6) The head end of conveyer belt (7), the head end of tail end connection third conveyer belt (8) of the second conveyer belt (7), the upper half court (1) It is additionally provided with equipment of playing ball automatically with the side of lower half court (2), the equipment of playing ball automatically includes the 4th conveyer belt (10), Multiple delivery devices (11) are arranged in the front end of 4th conveyer belt (10), and multiple downward putting devices (12) are arranged in rear end, each A lower section device (12) is aligned with delivery device (11), on the same line.
2. the air-sweeping type shuttlecock recycles training place according to claim 1, which is characterized in that the upper half court (1) and baffle (9) are arranged in the two sides of lower half court (2), and the baffle (9) is apart from upper half court (1) and lower half court (2) 10 ~ 20 centimetres of upper surface.
3. the air-sweeping type shuttlecock recycles training place according to claim 1, which is characterized in that first conveying Band (6) is higher than the second conveyer belt (7), and second conveyer belt (7) is higher than third conveyer belt (8), the third conveyer belt (8) it is higher than the 4th conveyer belt (10).
4. the air-sweeping type shuttlecock recycles training place according to claim 1, which is characterized in that the delivery device It (11) include racket, ball handle, the racket is horizontally disposed, and parallel with the 4th conveyer belt (10), the ball handle passes through rotation Motor driven.
5. the air-sweeping type shuttlecock recycles training place according to claim 1, which is characterized in that the downward putting device It (12) include cylinder, telescopic rod, the front end fixed setting decentralization plate of the telescopic rod is arranged in the front end of the cylinder.
CN201711313719.0A 2017-12-12 2017-12-12 Air-sweeping type shuttlecock recycles training place Active CN108014464B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711313719.0A CN108014464B (en) 2017-12-12 2017-12-12 Air-sweeping type shuttlecock recycles training place

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711313719.0A CN108014464B (en) 2017-12-12 2017-12-12 Air-sweeping type shuttlecock recycles training place

Publications (2)

Publication Number Publication Date
CN108014464A CN108014464A (en) 2018-05-11
CN108014464B true CN108014464B (en) 2019-05-10

Family

ID=62072836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711313719.0A Active CN108014464B (en) 2017-12-12 2017-12-12 Air-sweeping type shuttlecock recycles training place

Country Status (1)

Country Link
CN (1) CN108014464B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108926820A (en) * 2018-08-28 2018-12-04 安徽省蓝翔体育用品有限公司 A kind of shuttlecock detection clipping device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5330175A (en) * 1992-07-15 1994-07-19 Samuel Kim Basketball assembly with rotable and linearly displaceable hoop
CN2573004Y (en) * 2002-09-30 2003-09-17 刘宣 Combined multifunctional bounce height metering stand
CN2928164Y (en) * 2006-04-11 2007-08-01 姜赢 Portable multipurpose ball net frame
CN101732841A (en) * 2008-11-12 2010-06-16 张善清 Badminton net hanging and spreading mode and net rack

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5330175A (en) * 1992-07-15 1994-07-19 Samuel Kim Basketball assembly with rotable and linearly displaceable hoop
CN2573004Y (en) * 2002-09-30 2003-09-17 刘宣 Combined multifunctional bounce height metering stand
CN2928164Y (en) * 2006-04-11 2007-08-01 姜赢 Portable multipurpose ball net frame
CN101732841A (en) * 2008-11-12 2010-06-16 张善清 Badminton net hanging and spreading mode and net rack

Also Published As

Publication number Publication date
CN108014464A (en) 2018-05-11

Similar Documents

Publication Publication Date Title
KR101069272B1 (en) Table tennis exercise device
CN106512361A (en) Automatic football training device
CN109999455B (en) Table tennis sport auxiliary device
CN105688386A (en) Electric sweep board type volleyball collection cleaning vehicle
CN108014464B (en) Air-sweeping type shuttlecock recycles training place
CN107854832B (en) Air-sweeping type shuttlecock recycles place automatically
CN108014463B (en) Shuttlecock recycles place automatically
CN108837453B (en) Football clamping and ejecting device
CN108031102B (en) The single training field of air-sweeping type shuttlecock
CN108031099B (en) Air-sweeping type shuttlecock training place
CN109621360A (en) A kind of circulating basketball throwing is received training device
CN108031098B (en) Shuttlecock recycles training place
CN107890661B (en) Air-sweeping type shuttlecock recycles place automatically
CN107854834B (en) Shuttlecock training place
CN108014477B (en) The single training field of shuttlecock
KR101389157B1 (en) Automatic baseball training device
CN108525267A (en) A kind of sport fixed point shootaround teeing apparatus
CN108014487B (en) A kind of shuttlecock training place
CN210473010U (en) Table tennis training device
CN108031100B (en) Push-down shuttlecock training place
CN108014486B (en) A kind of shuttlecock recycling training place
CN107982887B (en) A kind of single training field of shuttlecock
KR101241707B1 (en) Baseball batting training apparatus
CN107854833B (en) Push-down shuttlecock recycles training place
CN108031103B (en) The single training field of push-down shuttlecock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190418

Address after: 312000 Shuizhu 55, Xishan Village, Juzhen, Xinchang County, Shaoxing City, Zhejiang Province

Applicant after: Xinchang County Grand City Wan Yi Machinery Factory

Address before: 315032 No. 699 Ningci East Road, Zhuangqiao Street, Jiangbei District, Ningbo City, Zhejiang Province

Applicant before: NINGBO JIANGBEI YIHE INDUSTRIAL DESIGN CO., LTD.

GR01 Patent grant
GR01 Patent grant