The content of the invention
For deficiency of the prior art, the present invention provides a kind of shuttlecock training place, practices to solve existing shuttlecock
It is single to practise field structure, can not realize automatically picking up balls, can not single the problem of practicing playing ball.
The present invention is achieved through the following technical solutions.
A kind of shuttlecock training place, including upper half court and lower half court, between the upper half court and lower half court
Mounting base is provided with, is flushed when the mounting base does not rise with upper half court and lower half court, the mounting base passes through liter
Falling unit controls oscilaltion, and the lifting gear includes rack, and the side of the rack sets drive gear, described
Sliding tooth wheel and rack engages, and the drive gear is provided with mounting base by driving stepper motor, rack top,
The both sides of the mounting base are provided with multiple first ventholes and the second venthole, first venthole and the second ventilation
Air pump is provided between hole, multiple first ventholes and the second venthole align one by one, the upper half court and lower half court
Outside surrounds first conveyer belt, the second conveyer belt and the 3rd conveyer belt, the second conveying of tail end connection of the first conveyer belt
The head end of band, the tail end of the second conveyer belt connect the head end of the 3rd conveyer belt, vibrating disc are set below the 3rd conveyer belt,
The 3rd conveying band connection irreversibly delivers band, and the side for irreversibly delivering band sets delivery device, the dispensing
Device includes spring, and the front end of the spring sets permanent magnet plate, and the rear end of the spring sets electromagnet, and described is upper
The side in half court and lower half court is additionally provided with automatic equipment of playing ball, and the automatic equipment of playing ball includes ejection band, described
Delivery device and ejection band on the same line, the ejection, which takes, sets multiple ejection holes, under the ejection hole
Side sets ejection plate, and rear end sets multiple beating devices, each beating device aligns with ejection hole, on the same line.Energy
Enough realize that one plays ball practice, and without pick up ball manually, whole device can be practised a ball game, in a short time at random with automatically picking up balls
Playing skill is improved to be very helpful.
Preferably, the upper half court and the both sides in lower half court set baffle, the baffle is apart from episphere
Field and 10 ~ 20 centimetres of the upper surface in lower half court.On the one hand baffle prevents shuttlecock to be splashed to outside, on the other hand apart from upper half
Court and the interval in lower half court, can be smoothly so that shuttlecock be pushed out.
Preferably, the first conveyer belt is higher than the second conveyer belt, second conveyer belt is higher than the 3rd conveying
Band, the 3rd conveyer belt are highly identical with irreversibly delivering band.It so can just cause shuttlecock successively by the first conveying
Band, the second conveyer belt, the 3rd conveyer belt, arrival irreversibly deliver band.
Preferably, the beating device includes racket, the lower end of the racket connects turning handle, the turning handle
Lower section sets electric rotating machine.Realize impact of the racket for shuttlecock, rotation angle is controlled within 45 degree to 90 degree.
Compared with prior art:The shuttlecock on court can be received automatically, be recycled at automatic equipment of playing ball, formation follows
Ring, saves artificial, realizes that one plays ball practice.
Embodiment
Below in conjunction with the accompanying drawings with embodiment, the present invention is described further.
A kind of shuttlecock training place, including upper half court 1 and lower half court 2, the upper half court 1 and lower half court 2
Between be provided with mounting base 31, the mounting base 31 flushes when not rising with upper half court 1 and lower half court 2, the peace
Fill seat 31 and oscilaltion is controlled by lifting gear 3, the lifting gear 3 includes rack 33, the side of the rack 33
Drive gear 34 is set, the drive gear 34 engages with rack 33, the drive gear 34 by driving stepper motor,
The top of rack 33 is provided with mounting base 31, and the both sides of the mounting base 31 are provided with multiple first venthole, 41 Hes
Second venthole 42, air pump, multiple first ventholes 41 are provided between first venthole 41 and the second venthole 42
Align one by one with the second venthole 42, the upper half court 1 and the outside of lower half court 2 surround first conveyer belt 6, second and convey
7 and the 3rd conveyer belt 8 of band, the tail end of the first conveyer belt 6 connect the head end of the second conveyer belt 7, the tail of the second conveyer belt 7
The head end of the 3rd conveyer belt 8 of end connection, the lower section of the 3rd conveyer belt 8 set vibrating disc 10, and the 3rd conveyer belt 8 connects
Order sets delivery device 15 to conveyer belt 11, the side for irreversibly delivering band 11, and the delivery device 15 includes bullet
Spring, the front end of the spring set permanent magnet plate, and the rear end of the spring sets electromagnet, 1 He of upper half court
The side in lower half court 2 is additionally provided with automatic equipment of playing ball, and the automatic equipment of playing ball includes ejection band 13, the dispensing
Device 15 and ejection band 13 on the same line, set multiple ejection holes 14, the ejection hole 14 on the ejection band 13
Lower section ejection plate is set, rear end sets multiple beating devices 12, each beating device 12 aligns with launching hole 14, same
On straight line, the both sides in the upper half court 1 and lower half court 2 set baffle 9, and the baffle 9 is apart from upper half court 1 with
10 ~ 20 centimetres of the upper surface in half court 2, the first conveyer belt 6 are higher than the second conveyer belt 7, and second conveyer belt 7 is high
In the 3rd conveyer belt 8, for the 3rd conveyer belt 8 with irreversibly delivering that band 11 is highly identical, the beating device 12 includes ball
121 are clapped, the lower end connection turning handle 122 of the racket 121, the lower section of the turning handle 122 sets electric rotating machine 123.
In use, launch on band 13 just has many shuttlecocks originally, has a plumage in each ejection hole 14
Ball top, the ejection plate in wherein some ejection hole 14 start, and the lower section of ejection plate includes an ejection-spring, ejection-spring bullet
Go out, drive ejection plate upward, the shuttlecock launched in hole 14 is ejected, and is risen in the air, photosensitive outside racket 121 at this time
Sensitive starts to shuttlecock, electric rotating machine 123, drives turning handle 122 to rotate 45 degree, racket 121 and the ground of script are in 45
Angle is spent, after rotation in vertical state, equipment of playing ball automatically includes a control system, the driving which can be random
The ejection plate in one ejection hole 14 starts, and has so ensured the randomness of automatic release.
When user is with the shuttlecock air exercise come is flown over, some can smoothly return serve, and then fall under ejection band 13
In the blanking basket of side, some cannot smoothly return serve, then and it may result in shuttlecock and disperse on court, and user need not spend
It is time-consuming to go special to pick up ball, it is only necessary to which that constantly the shuttlecock come is flown in impact.
After a period of time, there is substantial amounts of shuttlecock to be scattered here and there in upper half court 1 and lower half court 2, people can be with this time
The station of selectivity is in one of upper half court 1 or lower half court 2, if people station, in upper half court 1, people can actively press
Button of the pressure on limiting slot 5, drive gear 34 rotate clockwise, and band carry-over bar 33 is upward, and the drive gear 34 is logical
Driving stepper motor is crossed, which with rotating, can be effectively controlled the height of rising, and can be with return, rack
33 tops are fixedly connected with mounting base 31, and mounting base 31 flushes with upper half court 1 and lower half court 2 from script and is changed into pacifying at this time
Dress seat 31 rises, and the first venthole 41 of both sides and the second venthole 42 are all located at upper half court 1 and lower half court 2 and flush
On face.
What if user pressed is the button on the limiting slot 5 in upper half court 1, then first venthole in lower half court 2
41 are changed into venthole, and second venthole 42 in upper half court 1 is changed into suction hole, and internal air pump starts, suction hole air-breathing, suction
Gas is discharged from venthole, and the gas push shuttlecock of discharge, shuttlecock moves closer to 9 position of baffle under powerful wind-force,
In moving process, the limited block 323 of 322 both sides of push rod is fastened in limiting slot 5, has ensured that push rod 322 can be along before straight line
Into, due to baffle 9 on the one hand protect shuttlecock should not out-of-bounds, on the one hand protect people not encounter multiple conveyer belts, on the other hand
Be exactly baffle 9 apart from upper half court 1 and 10-20 centimetres of the upper surface in lower half court 2, therefore push rod 322 is being pushed into below baffle 9
When, shuttlecock can all be released out of 10-20 centimetres spacing, first conveyer belt 6 is located just at the side of baffle 9,
Shuttlecock is shifted onto in first conveyer belt 6, and the shuttlecock on lower half court 2 is all proposed by push rod 322 at this time, and the lower section of baffle 9
Limit switches 91 are set, which controls roller 321 to reversely rotate so that push rod 322 returns to original position.
Feather ball warp first conveyer belt 6 is transported to the head end of the second conveyer belt 7, is then transported through the second conveyer belt 7 to
Three conveyer belts 8, the lower section of the 3rd conveyer belt 8 set vibrating disc 10, vibrating disc 10 to cause substantial amounts of shuttlecock after shaking, disperse
Open, and entrance one by one irreversibly delivers band 11, irreversibly deliver that the width of band 11 is smaller, it is identical with the width of shuttlecock, because
This passes through the effect of vibrating disc 10, and all shuttlecocks are all arranged in perfect order, and the afterbody of shuttlecock is towards delivery device
15, the front of delivery device 15 is then reached, the spring of delivery device 15 is to store power originally, and the front end of spring sets permanent magnetism
Body plate, the rear end of spring set electromagnet, when being powered, produce the magnetic force opposite with permanent magnet plate magnetism, both produce suction,
So that spring stores power by compression, when electromagnet is under powering-off state, the effect of power does not occur for nonmagnetic and permanent magnet plate, in spring
Acting in opposition under, permanent magnet plate pulls open the distance with electromagnet, and permanent magnet plate carries out impact work to the shuttlecock of most side
With shuttlecock being got on the ejection hole 14 of ejection plate 13, delivery device 15 is internally provided with control unit, can control electric current
Size, the suction between electromagnet and permanent magnet plate is controlled with this, changes the opposition of spring, reaches and enable to
Shuttlecock can enter any one ejection hole 14, ensure the randomness of contact.
After lower semisphere field 2 is cleaned, people can reach lower half court 2 across mounting base 31, then press accordingly
Button on the limiting slot 5 in lower lower half court 2, then first venthole 41 in lower half court 2 is changed into suction hole, upper half court 1
The second venthole 42 be changed into venthole, internal air pump starts, suction hole air-breathing, and air-breathing is discharged from venthole, discharge
Gas push shuttlecock, clears up the shuttlecock on upper half court 1.
The shuttlecock in upper half court 1 is pushed into the 3rd conveyer belt 8, is then transported through the 3rd conveyer belt 8 to irreversibly delivering
Band 11.
By delivery device the shuttlecock that irreversibly delivers on band 11 launch to, in the ejection hole 14 for launching band 13, wherein certain
The ejection plate in one ejection hole 14 starts, and the lower section of ejection plate includes an ejection-spring, and ejection-spring pop-up, drives ejection plate
Upwards, the shuttlecock launched in hole 14 is ejected, and is risen in the air, the light-inductive outside racket 121 senses plumage at this time
Ball top, electric rotating machine 123 start, and drive turning handle 122 to rotate 45 degree, racket 121 and the ground of script are in 45 degree of angles, are in after rotation
Plumbness, completes a circulation.Protection scope of the present invention includes but not limited to embodiment of above, protection model of the invention
Enclose and be subject to claims, any replacement being readily apparent that to those skilled in the art that this technology is made, deformation, improvement
Each fall within protection scope of the present invention.