CN108009399A - 一种流域降雨的等流时线计算方法 - Google Patents
一种流域降雨的等流时线计算方法 Download PDFInfo
- Publication number
- CN108009399A CN108009399A CN201711450161.0A CN201711450161A CN108009399A CN 108009399 A CN108009399 A CN 108009399A CN 201711450161 A CN201711450161 A CN 201711450161A CN 108009399 A CN108009399 A CN 108009399A
- Authority
- CN
- China
- Prior art keywords
- rainfall
- isochrone
- basin
- data
- actual
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
- G16Z—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
- G16Z99/00—Subject matter not provided for in other main groups of this subclass
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/40—Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
Abstract
本发明公开了一种流域降雨的等流时线计算方法,它包括步骤1、设定不同等级的降雨;步骤2、根据不同等级的降雨量计算出流域不同区域的流量值;步骤3、根据区域的流量值绘制出相应的等流时线;步骤4、将结果保存到数据库;步骤5、进行洪水演算时,根据流域实际降雨数据得到对应的等流时线;解决了现有技术绘制流域等流时线采用根据实时流域降雨通过公式计算不同区域的流量最终绘制流域等流时线存在的运算量大实时性差等技术问题。
Description
技术领域
本发明属于洪水预报技术,尤其涉及一种流域降雨的等流时线计算方法。
背景技术:
将流域降雨对应为不同区域的等流时线是防洪预报中常见的技术手段,现有技术是将流域降雨通过不同的换算公式计算出不同区域的流量,最终绘制出不同区域的等流时线,采用这样的方式存在的问题主要是运算量大实时性差。
发明内容:
本发明要解决的技术问题:提供一种流域降雨的等流时线计算方法,以解决现有技术绘制流域等流时线采用根据实时流域降雨通过公式计算不同区域的流量最终绘制流域等流时线存在的运算量大实时性差等技术问题。
本发明技术方案:
一种流域降雨的等流时线计算方法,它包括
步骤1、设定不同等级的降雨;
步骤2、根据不同等级的降雨量计算出流域不同区域的流量值;
步骤3、根据区域的流量值绘制出相应的等流时线;
步骤4、将结果保存到数据库;
步骤5、进行洪水演算时,根据流域实际降雨数据得到对应的等流时线。
步骤5所述根据流域实际降雨数据得到对应的等流时线的方法包括:实际降雨数据与预存的降雨量相同,则直接读取预存的降雨量对应的等流时线作为当前实际降雨数据的等流时线;当实际降雨数据与预存的降雨量不同,则根据内插法进行计算得到当前实际降雨数据的等流时线。
本发明的有益效果:
本发明为了提高运算速度,对服务的不同区域,先期计算流域不同等级降雨对应的等流时线,就结果保存到数据库中,在实际洪水演算时候,通过实际测量降雨数据得到对应的等流时线,加快了运算速度,提高了实时性效果;解决了现有技术绘制流域等流时线采用根据实时流域降雨通过公式计算不同区域的流量最终绘制流域等流时线存在的运算量大实时性差等技术问题。
具体实施方式:
一种流域降雨的等流时线计算方法,它包括
步骤1、设定不同等级的降雨;
步骤2、根据不同等级的降雨量计算出流域不同区域的流量值;
步骤3、根据区域的流量值绘制出相应的等流时线;
步骤4、将结果保存到数据库;
步骤5、进行洪水演算时,根据流域实际降雨数据得到对应的等流时线。
步骤5所述根据流域实际降雨数据得到对应的等流时线的方法包括:实际降雨数据与预存的降雨量相同,则直接读取预存的降雨量对应的等流时线作为当前实际降雨数据的等流时线;当实际降雨数据与预存的降雨量不同,则根据内插法进行计算得到当前实际降雨数据的等流时线。
Claims (2)
1.一种流域降雨的等流时线计算方法,它包括
步骤1、设定不同等级的降雨;
步骤2、根据不同等级的降雨量计算出流域不同区域的流量值;
步骤3、根据区域的流量值绘制出相应的等流时线;
步骤4、将结果保存到数据库;
步骤5、进行洪水演算时,根据流域实际降雨数据得到对应的等流时线。
2.根据权利要求1所述的一种流域降雨的等流时线计算方法,其特征在于:
步骤5所述根据流域实际降雨数据得到对应的等流时线的方法包括:实际降雨数据与预存的降雨量相同,则直接读取预存的降雨量对应的等流时线作为当前实际降雨数据的等流时线;当实际降雨数据与预存的降雨量不同,则根据内插法进行计算得到当前实际降雨数据的等流时线。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711450161.0A CN108009399B (zh) | 2017-12-27 | 2017-12-27 | 一种流域降雨的等流时线计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711450161.0A CN108009399B (zh) | 2017-12-27 | 2017-12-27 | 一种流域降雨的等流时线计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108009399A true CN108009399A (zh) | 2018-05-08 |
CN108009399B CN108009399B (zh) | 2021-09-17 |
Family
ID=62061958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711450161.0A Active CN108009399B (zh) | 2017-12-27 | 2017-12-27 | 一种流域降雨的等流时线计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108009399B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103823936A (zh) * | 2014-03-04 | 2014-05-28 | 贵州东方世纪科技股份有限公司 | 一种确定等流时线的方法 |
CN105975672A (zh) * | 2016-04-29 | 2016-09-28 | 河海大学 | 一种小流域设计洪水计算方法 |
CN106596347A (zh) * | 2016-12-05 | 2017-04-26 | 北京工业大学 | 基于等流时线法不透水地表径流污染物冲刷效率测定方法 |
CN106706873A (zh) * | 2016-12-05 | 2017-05-24 | 北京工业大学 | 一种直接获得swmm水质模型中参数w的方法 |
US20170235915A1 (en) * | 2016-02-17 | 2017-08-17 | Siemens Healthcare Gmbh | Personalized model with regular integration of data |
-
2017
- 2017-12-27 CN CN201711450161.0A patent/CN108009399B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103823936A (zh) * | 2014-03-04 | 2014-05-28 | 贵州东方世纪科技股份有限公司 | 一种确定等流时线的方法 |
US20170235915A1 (en) * | 2016-02-17 | 2017-08-17 | Siemens Healthcare Gmbh | Personalized model with regular integration of data |
CN105975672A (zh) * | 2016-04-29 | 2016-09-28 | 河海大学 | 一种小流域设计洪水计算方法 |
CN106596347A (zh) * | 2016-12-05 | 2017-04-26 | 北京工业大学 | 基于等流时线法不透水地表径流污染物冲刷效率测定方法 |
CN106706873A (zh) * | 2016-12-05 | 2017-05-24 | 北京工业大学 | 一种直接获得swmm水质模型中参数w的方法 |
Non-Patent Citations (1)
Title |
---|
周健: "降雨强度对雨水花园径流过程影响研究", 《中国优秀硕士学位论文全文数据库 基础科学辑》 * |
Also Published As
Publication number | Publication date |
---|---|
CN108009399B (zh) | 2021-09-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Jiang et al. | Sustainability of water resources for agriculture considering grain production, trade and consumption in China from 2004 to 2013 | |
CN103617306B (zh) | 一种基于潮汐和径流的河口咸潮预报方法 | |
WO2008109085A3 (en) | System and method for updating forecast model | |
CN103258235B (zh) | 一种基于改进人工鱼群算法的供水管网改扩建优化方法 | |
CN106951674B (zh) | 一种无历史资料小流域洪水重现期推求方法 | |
CN106845116A (zh) | 一种河系的洪水预报系统 | |
CN113367056A (zh) | 基于数据分析的现代化农业种植灌溉智能调控方法 | |
CN108009399A (zh) | 一种流域降雨的等流时线计算方法 | |
CN107918713A (zh) | 基于Copula函数的洪水双变量改进联合重现期推求方法 | |
Spurdle et al. | Common genetic variation at BARD1 is not associated with breast cancer risk in BRCA1 or BRCA2 mutation carriers | |
EA201491536A1 (ru) | Повышение устойчивости к засухе у растений: upl4 | |
CN110362726A (zh) | 一种城市地下排水管网数据补充完善方法及系统 | |
CN103366099A (zh) | 一种水文模型参数调试方法 | |
CN102289605A (zh) | 一种等值线插值方法 | |
CN104778335B (zh) | 利用自动分层技术来实现图形局部布局和整体布局的方法 | |
CN108044047B (zh) | 一种欧盟标准高锰钢辙叉铸造工艺 | |
CN106780742A (zh) | 一种用于蜗壳结构的三维布筋的方法 | |
Celano et al. | The carbon dynamics in the experimental plots. Use of 13C-and 15N-labelled compounds for the soil-plant balance in carbon sequestration | |
CN115344999A (zh) | 渠系的智能化管控方法和装置 | |
CN103093064A (zh) | 一种pcb高速信号线轨迹控制方法 | |
CN105595390B (zh) | 一种提高润梗机料头阶段出口水分稳定性的方法 | |
JPWO2021038626A5 (zh) | ||
CN104809361B (zh) | 一种分子模拟中基于原子位置的流动速度计算方法 | |
CN110130183A (zh) | 用于雪橇竞赛项目的制冷管道的安装方法 | |
CN107065780A (zh) | 一种根据加工路径生成操作代码的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Method for Calculating the Isochronous of Rainfall in a Watershed Effective date of registration: 20230911 Granted publication date: 20210917 Pledgee: Guiyang Rural Commercial Bank Co.,Ltd. science and technology sub branch Pledgor: GUIZHOU EAST CENTURY TECHNOLOGY Co.,Ltd. Registration number: Y2023520000048 |