CN108009399B - 一种流域降雨的等流时线计算方法 - Google Patents
一种流域降雨的等流时线计算方法 Download PDFInfo
- Publication number
- CN108009399B CN108009399B CN201711450161.0A CN201711450161A CN108009399B CN 108009399 B CN108009399 B CN 108009399B CN 201711450161 A CN201711450161 A CN 201711450161A CN 108009399 B CN108009399 B CN 108009399B
- Authority
- CN
- China
- Prior art keywords
- rainfall
- time line
- flow time
- drainage basin
- equal flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
- G16Z—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
- G16Z99/00—Subject matter not provided for in other main groups of this subclass
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/40—Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
Landscapes
- Complex Calculations (AREA)
- Sewage (AREA)
Abstract
本发明公开了一种流域降雨的等流时线计算方法,它包括步骤1、设定不同等级的降雨;步骤2、根据不同等级的降雨量计算出流域不同区域的流量值;步骤3、根据区域的流量值绘制出相应的等流时线;步骤4、将结果保存到数据库;步骤5、进行洪水演算时,根据流域实际降雨数据得到对应的等流时线;解决了现有技术绘制流域等流时线采用根据实时流域降雨通过公式计算不同区域的流量最终绘制流域等流时线存在的运算量大实时性差等技术问题。
Description
技术领域
本发明属于洪水预报技术,尤其涉及一种流域降雨的等流时线计算方法。
背景技术:
将流域降雨对应为不同区域的等流时线是防洪预报中常见的技术手段,现有技术是将流域降雨通过不同的换算公式计算出不同区域的流量,最终绘制出不同区域的等流时线,采用这样的方式存在的问题主要是运算量大实时性差。
发明内容:
本发明要解决的技术问题:提供一种流域降雨的等流时线计算方法,以解决现有技术绘制流域等流时线采用根据实时流域降雨通过公式计算不同区域的流量最终绘制流域等流时线存在的运算量大实时性差等技术问题。
本发明技术方案:
一种流域降雨的等流时线计算方法,它包括
步骤1、设定不同等级的降雨;
步骤2、根据不同等级的降雨量计算出流域不同区域的流量值;
步骤3、根据区域的流量值绘制出相应的等流时线;
步骤4、将结果保存到数据库;
步骤5、进行洪水演算时,根据流域实际降雨数据得到对应的等流时线。
步骤5所述根据流域实际降雨数据得到对应的等流时线的方法包括:实际降雨数据与预存的降雨量相同,则直接读取预存的降雨量对应的等流时线作为当前实际降雨数据的等流时线;当实际降雨数据与预存的降雨量不同,则根据内插法进行计算得到当前实际降雨数据的等流时线。
本发明的有益效果:
本发明为了提高运算速度,对服务的不同区域,先期计算流域不同等级降雨对应的等流时线,就结果保存到数据库中,在实际洪水演算时候,通过实际测量降雨数据得到对应的等流时线,加快了运算速度,提高了实时性效果;解决了现有技术绘制流域等流时线采用根据实时流域降雨通过公式计算不同区域的流量最终绘制流域等流时线存在的运算量大实时性差等技术问题。
具体实施方式:
一种流域降雨的等流时线计算方法,它包括
步骤1、设定不同等级的降雨;
步骤2、根据不同等级的降雨量计算出流域不同区域的流量值;
步骤3、根据区域的流量值绘制出相应的等流时线;
步骤4、将结果保存到数据库;
步骤5、进行洪水演算时,根据流域实际降雨数据得到对应的等流时线。
步骤5所述根据流域实际降雨数据得到对应的等流时线的方法包括:实际降雨数据与预存的降雨量相同,则直接读取预存的降雨量对应的等流时线作为当前实际降雨数据的等流时线;当实际降雨数据与预存的降雨量不同,则根据内插法进行计算得到当前实际降雨数据的等流时线。
Claims (1)
1.一种流域降雨的等流时线计算方法,它包括
步骤1、设定不同等级的降雨;
步骤2、根据不同等级的降雨量计算出流域不同区域的流量值;
步骤3、根据区域的流量值绘制出相应的等流时线;
步骤4、将结果保存到数据库;
步骤5、进行洪水演算时,根据流域实际降雨数据得到对应的等流时线;
步骤5所述根据流域实际降雨数据得到对应的等流时线的方法包括:实际降雨数据与预存的降雨量相同,则直接读取预存的降雨量对应的等流时线作为当前实际降雨数据的等流时线;当实际降雨数据与预存的降雨量不同,则根据内插法进行计算得到当前实际降雨数据的等流时线。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711450161.0A CN108009399B (zh) | 2017-12-27 | 2017-12-27 | 一种流域降雨的等流时线计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711450161.0A CN108009399B (zh) | 2017-12-27 | 2017-12-27 | 一种流域降雨的等流时线计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108009399A CN108009399A (zh) | 2018-05-08 |
CN108009399B true CN108009399B (zh) | 2021-09-17 |
Family
ID=62061958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711450161.0A Active CN108009399B (zh) | 2017-12-27 | 2017-12-27 | 一种流域降雨的等流时线计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108009399B (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103823936A (zh) * | 2014-03-04 | 2014-05-28 | 贵州东方世纪科技股份有限公司 | 一种确定等流时线的方法 |
CN105975672A (zh) * | 2016-04-29 | 2016-09-28 | 河海大学 | 一种小流域设计洪水计算方法 |
CN106596347A (zh) * | 2016-12-05 | 2017-04-26 | 北京工业大学 | 基于等流时线法不透水地表径流污染物冲刷效率测定方法 |
CN106706873A (zh) * | 2016-12-05 | 2017-05-24 | 北京工业大学 | 一种直接获得swmm水质模型中参数w的方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170235915A1 (en) * | 2016-02-17 | 2017-08-17 | Siemens Healthcare Gmbh | Personalized model with regular integration of data |
-
2017
- 2017-12-27 CN CN201711450161.0A patent/CN108009399B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103823936A (zh) * | 2014-03-04 | 2014-05-28 | 贵州东方世纪科技股份有限公司 | 一种确定等流时线的方法 |
CN105975672A (zh) * | 2016-04-29 | 2016-09-28 | 河海大学 | 一种小流域设计洪水计算方法 |
CN106596347A (zh) * | 2016-12-05 | 2017-04-26 | 北京工业大学 | 基于等流时线法不透水地表径流污染物冲刷效率测定方法 |
CN106706873A (zh) * | 2016-12-05 | 2017-05-24 | 北京工业大学 | 一种直接获得swmm水质模型中参数w的方法 |
Non-Patent Citations (1)
Title |
---|
降雨强度对雨水花园径流过程影响研究;周健;《中国优秀硕士学位论文全文数据库 基础科学辑》;20170715;论文第29-34页、第42-48页 * |
Also Published As
Publication number | Publication date |
---|---|
CN108009399A (zh) | 2018-05-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108108838B (zh) | 一种高水量利用率的季调节水库优化调度方法 | |
CN106204333B (zh) | 一种基于陆气耦合的水资源调度方法 | |
CN103617306A (zh) | 一种基于潮汐和径流的河口咸潮预报方法 | |
CN105373852A (zh) | 基于bim的人员疏散提示系统及方法 | |
CN103218536A (zh) | 跨越式发展地区需水预测方法 | |
CN106951674A (zh) | 一种无历史资料小流域洪水重现期推求方法 | |
CN106845116A (zh) | 一种河系的洪水预报系统 | |
CN108009399B (zh) | 一种流域降雨的等流时线计算方法 | |
CN105488572B (zh) | 一种配电设备健康状态评价方法 | |
CN102567814A (zh) | 一种区域电网降温负荷预测的计算方法 | |
CN105260586A (zh) | 一种针对架空输电线路的自动气象站风速资料处理方法 | |
CN112493100B (zh) | 基于土壤水势的棉花水分监测滴灌控制方法及系统 | |
CN103440226A (zh) | 基于hmm校正与神经网络延拓的emd端点效应抑制方法 | |
CN108154299A (zh) | 多验潮站长航道船舶乘潮安全分析系统 | |
CN115034543B (zh) | 一种溃坝生命损失动态估算方法 | |
CN115713008A (zh) | 流域洪水模拟计算的实时校正方法、系统、装置及介质 | |
CN104485054A (zh) | 一种动态洪水风险图的绘制方法 | |
CN202166899U (zh) | 一种塔釜液位控制装置 | |
CN104408272A (zh) | 一种山区环境下的直流偏磁影响评价系统及方法 | |
黎玥君 et al. | Application of downscaling forecast for the North of Zhejiang precipitation in summer based on the BP neural network model | |
CN104268700A (zh) | 一种主网工程造价投资智能预警控制系统 | |
CN204676637U (zh) | 纯水机恒压控制系统 | |
CN204540163U (zh) | 一种带自动湿控功能的培育箱 | |
CN111126646A (zh) | 一种油松生长预测预报方法 | |
CN110210091B (zh) | 一种排水模型swmm汇流宽度参数等价的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Method for Calculating the Isochronous of Rainfall in a Watershed Effective date of registration: 20230911 Granted publication date: 20210917 Pledgee: Guiyang Rural Commercial Bank Co.,Ltd. science and technology sub branch Pledgor: GUIZHOU EAST CENTURY TECHNOLOGY Co.,Ltd. Registration number: Y2023520000048 |