CN105975672A - 一种小流域设计洪水计算方法 - Google Patents

一种小流域设计洪水计算方法 Download PDF

Info

Publication number
CN105975672A
CN105975672A CN201610284081.1A CN201610284081A CN105975672A CN 105975672 A CN105975672 A CN 105975672A CN 201610284081 A CN201610284081 A CN 201610284081A CN 105975672 A CN105975672 A CN 105975672A
Authority
CN
China
Prior art keywords
basin
river
calculation
runoff
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610284081.1A
Other languages
English (en)
Inventor
周宏�
刘俊
高成
樊旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201610284081.1A priority Critical patent/CN105975672A/zh
Publication of CN105975672A publication Critical patent/CN105975672A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/36Circuit design at the analogue level
    • G06F30/367Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Abstract

本发明公开了一种小流域设计洪水计算方法,依次包括计算设计暴雨、计算产流以及计算汇流,根据流域不同河段的弗劳德系数,把整个流域进行分类,若流域某河段的弗劳德系数大于等于1,表明该河段属于上游山丘性河流,采用推理公式法求解上游山丘性河流的汇流,若流域某河段的弗劳德系数小于1,表明该河段属于下游平原性河流,采用非恒定流法求解下游平原性河流的汇流。本发明对小流域上游山区和下游平原地区河道的特点、水流特性加以区分,采用不同的产汇流计算方法进行计算,使得到的设计洪水值更加合理、准确。

Description

一种小流域设计洪水计算方法
技术领域
本发明属于工程水文技术领域,特别涉及了一种小流域设计洪水计算方法。
背景技术
城市一般位于流域的下游地势平缓的地区,由于平原地区和上游山区的河道的特点有很大的不同,水流特性也各不相同,因此水文计算方法也不一样。
对于山丘区河道,如果不考虑河道特性,仅单纯以流域上游山区河道特性或下游平原河道特性进行设计洪水计算,所得计算结果与实际相差较大。
因此,必须同时考虑流域上游和下游河道特征的差异性,采用不同的产汇流计算方法,才能得出准确合理的结果。
发明内容
为了解决上述背景技术提出的技术问题,本发明旨在提供一种小流域设计洪水计算方法,对小流域上游山区和下游平原地区河道的特点、水流特性加以区分,采用不同的产汇流计算方法进行计算,使得到的设计洪水值更加合理、准确。
为了实现上述技术目的,本发明的技术方案为:
一种小流域设计洪水计算方法,包括以下步骤:
(1)计算流域的设计暴雨;
(2)计算流域的产流;
(3)计算流域的汇流,根据流域不同河段的弗劳德系数,把整个流域进行分类,若流域某河段的弗劳德系数大于等于1,表明该河段属于上游山丘性河流,采用推理公式法求解上游山丘性河流的汇流,若流域某河段的弗劳德系数小于1,表明该河段属于下游平原性河流,采用非恒定流法求解下游平原性河流的汇流,此时将上游山丘性河流的流出口的断面值作为求解下游平原性河流的上游输入条件,采用一维非恒定流方程进行洪水演算,得到下游平原性河流各个断面的水位、流量过程。
进一步地,在步骤(1)中,对于有实测降雨资料的流域,在推求设计暴雨时,直接采用当地雨量资料进行雨量频率计算,采用年最大值法选样、点绘频率曲线、分析统计参数从而得出指定时段设计雨量,再选取典型暴雨过程,采用同频率或同倍比放大法得到设计暴雨过程;对于缺乏雨量资料的流域,采用等值线图法推求流域设计暴雨。
进一步地,所述统计参数包括雨量的均值、偏差系数和偏态系数。
进一步地,在步骤(2)中,采用径流系数折算法,或者先损后损法,或者产流模型法来计算流域产流。
进一步地,采用产流模型法来计算流域产流时,首先将流域的下垫面按土地利用类别进行分类:包括水面、水田、旱地、非耕地和城区,然后按照各自的产流计算模式进行计算;水面的产流采用水量平衡方程计算,为降雨量与蒸发量之差;水田的产流根据适宜水深范围(H1,H2)、耐淹程度H3以及最大引排水能力He计算,当由于水田蒸散发使蓄水深度H<H1时,水田引水灌溉至H2;当降雨期使蓄水深度H>H3时,水田以最大排水能力He为上限排水;当H1≤H<H3时,水田不引不排以减少动力消耗;旱地、非耕地的产流计算采用下渗曲线法或蓄满产流模型;城区将汇水面积分为水面、不透水面积、透水面积三部分,分别模拟产流过程,其中,水面的产流为降雨量与蒸发量之差,不透水面积的产流为降雨与洼蓄量之差,透水面积的产流采用下渗曲线法或蓄满产流法计算。
进一步地,在步骤(3)中,所述一维非恒定流方程用圣维南方程组来描述,即
B T ∂ Z ∂ t + ∂ Q ∂ x = q ∂ Q ∂ t + ∂ ∂ x ( Q 2 A ) + g A ∂ Z ∂ x + g A | Q | Q K 2 = 0
上式中,Q为断面流量,q为河道旁侧入流量,BT为当量河宽,Z为断面水位,A为过水面积,g为重力加速度,K为流量模数,x为沿河长的距离变量,t为时间变量。
采用上述技术方案带来的有益效果:
本发明考虑流域上游和下游河道特征的差异性,采用不同的产汇流计算方法,改进了目前仅用推理公式法由设计暴雨推求设计洪水的方法,提出了利用推理公式法、非恒定流法相耦合计算小流域设计洪水的方法,解决了在小流域设计洪水计算过程中,单纯采用推理公式法计算使得结果偏大的问题。
附图说明
图1是本发明的总体流程图。
具体实施方式
以下将结合附图,对本发明的技术方案进行详细说明。
如图1所示,一种小流域设计洪水计算方法,包括以下步骤:
(1)计算流域的设计暴雨;
(2)计算流域的产流;
(3)计算流域的汇流,根据流域不同河段的弗劳德系数,把整个流域进行分类,若流域某河段的弗劳德系数大于等于1,表明该河段属于上游山丘性河流,采用推理公式法求解上游山丘性河流的汇流,若流域某河段的弗劳德系数小于1,表明该河段属于下游平原性河流,采用非恒定流法求解下游平原性河流的汇流,此时将上游山丘性河流的流出口的断面值作为求解下游平原性河流的上游输入条件,采用一维非恒定流方程进行洪水演算,得到下游平原性河流各个断面的水位、流量过程。
在本实施例中,上述步骤(1)中,对于有实测降雨资料的流域,在推求设计暴雨时,直接采用当地雨量资料进行雨量频率计算,采用年最大值法选样、点绘频率曲线、分析统计参数(统计参数包括统计参数包括雨量的均值、偏差系数和偏态系数)从而得出指定时段设计雨量,再选取典型暴雨过程,采用同频率或同倍比放大法得到设计暴雨过程;对于缺乏雨量资料的流域,采用等值线图法推求流域设计暴雨。
在本实施例中,上述步骤(2)中,采用径流系数折算法,或者先损后损法,或者产流模型法来计算流域产流。
采用径流系数折算法计算产流时,采用地表径流系数折算得出设计净雨。
采用先损后损法计算产流时,将降雨损失分为初损I0和后损I1两部分,I0主要指汇水区域的洼蓄、植物截留、初始下渗量之和,在设计暴雨初期扣除;I1是产流后的损失量,将小于平均损失强度μ的雨量作为损失扣除。
采用产流模型法来计算流域产流时,首先将流域的下垫面按土地利用类别进行分类:包括水面、水田、旱地、非耕地和城区,然后按照各自的产流计算模式进行计算;水面的产流采用水量平衡方程计算,为降雨量与蒸发量之差;水田的产流根据适宜水深范围(H1,H2)、耐淹程度H3以及最大引排水能力He计算,当由于水田蒸散发使蓄水深度H<H1时,水田引水灌溉至H2;当降雨期使蓄水深度H>H3时,水田以最大排水能力He为上限排水;当H1≤H<H3时,水田不引不排以减少动力消耗;旱地、非耕地的产流计算采用下渗曲线法或蓄满产流模型;城区将汇水面积分为水面、不透水面积、透水面积三部分,分别模拟产流过程,其中,水面的产流为降雨量与蒸发量之差,不透水面积的产流为降雨与洼蓄量之差,透水面积的产流采用下渗曲线法或蓄满产流法计算。
在本实施例中,上述步骤(3)中,所述一维非恒定流方程用圣维南方程组来描述,即
B T ∂ Z ∂ t + ∂ Q ∂ x = q ∂ Q ∂ t + ∂ ∂ x ( Q 2 A ) + g A ∂ Z ∂ x + g A | Q | Q K 2 = 0
上式中,Q为断面流量,q为河道旁侧入流量,BT为当量河宽,Z为断面水位,A为过水面积,g为重力加速度,K为流量模数,x为沿河长的距离变量,t为时间变量。
以上实施例仅为说明本发明的技术思想,不能以此限定本发明的保护范围,凡是按照本发明提出的技术思想,在技术方案基础上所做的任何改动,均落入本发明保护范围之内。

Claims (6)

1.一种小流域设计洪水计算方法,其特征在于,包括以下步骤:
(1)计算流域的设计暴雨;
(2)计算流域的产流;
(3)计算流域的汇流,根据流域不同河段的弗劳德系数,把整个流域进行分类,若流域某河段的弗劳德系数大于等于1,表明该河段属于上游山丘性河流,采用推理公式法求解上游山丘性河流的汇流,若流域某河段的弗劳德系数小于1,表明该河段属于下游平原性河流,采用非恒定流法求解下游平原性河流的汇流,此时将上游山丘性河流的流出口的断面值作为求解下游平原性河流的上游输入条件,采用一维非恒定流方程进行洪水演算,得到下游平原性河流各个断面的水位、流量过程。
2.根据权利要求1所述一种小流域设计洪水计算方法,其特征在于:在步骤(1)中,对于有实测降雨资料的流域,在推求设计暴雨时,直接采用当地雨量资料进行雨量频率计算,采用年最大值法选样、点绘频率曲线、分析统计参数从而得出指定时段设计雨量,再选取典型暴雨过程,采用同频率或同倍比放大法得到设计暴雨过程;对于缺乏雨量资料的流域,采用等值线图法推求流域设计暴雨。
3.根据权利要求2所述一种小流域设计洪水计算方法,其特征在于:所述统计参数包括雨量的均值、偏差系数和偏态系数。
4.根据权利要求1所述一种小流域设计洪水计算方法,其特征在于:在步骤(2)中,采用径流系数折算法,或者先损后损法,或者产流模型法来计算流域产流。
5.根据权利要求4所述一种小流域设计洪水计算方法,其特征在于:采用产流模型法来计算流域产流时,首先将流域的下垫面按土地利用类别进行分类:包括水面、水田、旱地、非耕地和城区,然后按照各自的产流计算模式进行计算;水面的产流采用水量平衡方程计算,为降雨量与蒸发量之差;水田的产流根据适宜水深范围(H1,H2)、耐淹程度H3以及最大引排水能力He计算,当由于水田蒸散发使蓄水深度H<H1时,水田引水灌溉至H2;当降雨期使蓄水深度H>H3时,水田以最大排水能力He为上限排水;当H1≤H<H3时,水田不引不排以减少动力消耗;旱地、非耕地的产流计算采用下渗曲线法或蓄满产流模型;城区将汇水面积分为水面、不透水面积、透水面积三部分,分别模拟产流过程,其中,水面的产流为降雨量与蒸发量之差,不透水面积的产流为降雨与洼蓄量之差,透水面积的产流采用下渗曲线法或蓄满产流法计算。
6.根据权利要求1所述一种小流域设计洪水计算方法,其特征在于:在步骤(3)中,所述一维非恒定流方程用圣维南方程组来描述,即
B T ∂ Z ∂ t + ∂ Q ∂ x = q ∂ Q ∂ t + ∂ ∂ x ( Q 2 A ) + g A ∂ Z ∂ x + g A | Q | Q K 2 = 0
上式中,Q为断面流量,q为河道旁侧入流量,BT为当量河宽,Z为断面水位,A为过水面积,g为重力加速度,K为流量模数,x为沿河长的距离变量,t为时间变量。
CN201610284081.1A 2016-04-29 2016-04-29 一种小流域设计洪水计算方法 Pending CN105975672A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610284081.1A CN105975672A (zh) 2016-04-29 2016-04-29 一种小流域设计洪水计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610284081.1A CN105975672A (zh) 2016-04-29 2016-04-29 一种小流域设计洪水计算方法

Publications (1)

Publication Number Publication Date
CN105975672A true CN105975672A (zh) 2016-09-28

Family

ID=56994751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610284081.1A Pending CN105975672A (zh) 2016-04-29 2016-04-29 一种小流域设计洪水计算方法

Country Status (1)

Country Link
CN (1) CN105975672A (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106951674A (zh) * 2017-02-09 2017-07-14 陕西省水文水资源勘测局 一种无历史资料小流域洪水重现期推求方法
CN107886444A (zh) * 2017-10-11 2018-04-06 南京大学 一种城镇化下平原区分布式产流计算方法
CN107916646A (zh) * 2016-10-08 2018-04-17 山东省水利勘测设计院 一种雨洪资源挖潜量估算方法
CN108009399A (zh) * 2017-12-27 2018-05-08 贵州东方世纪科技股份有限公司 一种流域降雨的等流时线计算方法
CN108090618A (zh) * 2017-12-25 2018-05-29 广州地理研究所 中小流域暴雨洪水因子与降雨强度的关系模型构建方法
CN108280792A (zh) * 2018-02-08 2018-07-13 广州地理研究所 一种变化环境下设计暴雨洪水同频率假定检验方法
CN109472109A (zh) * 2018-11-23 2019-03-15 中国水利水电科学研究院 一种用于分布式水文模型的复式河道断面概化及计算方法
CN111101477A (zh) * 2019-12-30 2020-05-05 长江大学 一种无资料设计流域补充施测时枯水流量的确定方法
CN111339711A (zh) * 2020-02-24 2020-06-26 三峡大学 一种小流域设计洪水推求方法
CN112651099A (zh) * 2019-11-11 2021-04-13 四川大学 一种基于gis的中小流域设计洪水模型

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050273300A1 (en) * 2003-09-29 2005-12-08 Patwardhan Avinash S Method and system for water flow analysis
CN103366309A (zh) * 2013-06-27 2013-10-23 河海大学 基于低影响开发的城市雨水利用规模确定方法
CN104978451A (zh) * 2015-08-12 2015-10-14 河海大学 一种基于ArcGIS的复杂平原河网地区水文模型处理方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050273300A1 (en) * 2003-09-29 2005-12-08 Patwardhan Avinash S Method and system for water flow analysis
CN103366309A (zh) * 2013-06-27 2013-10-23 河海大学 基于低影响开发的城市雨水利用规模确定方法
CN104978451A (zh) * 2015-08-12 2015-10-14 河海大学 一种基于ArcGIS的复杂平原河网地区水文模型处理方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
俞芳琴: "滁河流域中下游区域城市防洪研究", 《万方学术论文库》 *
方正杰: "感潮河口城市防洪计算方法研究", 《万方学术论文库》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107916646A (zh) * 2016-10-08 2018-04-17 山东省水利勘测设计院 一种雨洪资源挖潜量估算方法
CN106951674A (zh) * 2017-02-09 2017-07-14 陕西省水文水资源勘测局 一种无历史资料小流域洪水重现期推求方法
CN106951674B (zh) * 2017-02-09 2019-07-02 陕西省水文水资源勘测局 一种无历史资料小流域洪水重现期推求方法
CN107886444A (zh) * 2017-10-11 2018-04-06 南京大学 一种城镇化下平原区分布式产流计算方法
CN108090618A (zh) * 2017-12-25 2018-05-29 广州地理研究所 中小流域暴雨洪水因子与降雨强度的关系模型构建方法
CN108009399B (zh) * 2017-12-27 2021-09-17 贵州东方世纪科技股份有限公司 一种流域降雨的等流时线计算方法
CN108009399A (zh) * 2017-12-27 2018-05-08 贵州东方世纪科技股份有限公司 一种流域降雨的等流时线计算方法
CN108280792A (zh) * 2018-02-08 2018-07-13 广州地理研究所 一种变化环境下设计暴雨洪水同频率假定检验方法
CN109472109A (zh) * 2018-11-23 2019-03-15 中国水利水电科学研究院 一种用于分布式水文模型的复式河道断面概化及计算方法
CN109472109B (zh) * 2018-11-23 2019-10-01 中国水利水电科学研究院 一种用于分布式水文模型的复式河道断面概化及计算方法
CN112651099A (zh) * 2019-11-11 2021-04-13 四川大学 一种基于gis的中小流域设计洪水模型
CN112651099B (zh) * 2019-11-11 2023-03-14 四川大学 一种基于gis的中小流域设计洪水模型
CN111101477A (zh) * 2019-12-30 2020-05-05 长江大学 一种无资料设计流域补充施测时枯水流量的确定方法
CN111339711A (zh) * 2020-02-24 2020-06-26 三峡大学 一种小流域设计洪水推求方法
CN111339711B (zh) * 2020-02-24 2021-12-07 三峡大学 一种小流域设计洪水推求方法

Similar Documents

Publication Publication Date Title
CN105975672A (zh) 一种小流域设计洪水计算方法
Singh Estimating long-term regional groundwater recharge for the evaluation of potential solution alternatives to waterlogging and salinisation
Yair et al. Hydrological processes in a small arid catchment: scale effects of rainfall and slope length
CN106599473A (zh) 一种坡面水沙过程耦合模拟方法
CN106971013A (zh) 山洪灾害小流域设计暴雨洪水计算方法
CN104090974B (zh) 展延水库后续来水的动态数据挖掘方法及系统
CN109871621A (zh) 城市暴雨内涝汇水区分析方法
Nunes et al. Numerical modeling of surface runoff and erosion due to moving rainstorms at the drainage basin scale
CN106971034A (zh) 一种基于集合卡尔曼滤波的对无资料地区径流量推求方法
Suryoputro et al. Calibration of infiltration parameters on hydrological tank model using runoff coefficient of rational method
CN103870699B (zh) 基于双层异步迭代策略的水动力学洪水演进模拟方法
Kovář et al. Surface runoff simulation to mitigate the impact of soil erosion, case study of Třebsín (Czech Republic).
Kuok et al. Investigation best number of tanks for hydrological tank model for rural catchment in humid region
Sanchez et al. Management guidelines for efficient irrigation of vegetables using closed-end level furrows
Yusof et al. Analysis of Manning’s and drag coefficients for flexible submerged vegetation
Yazdi et al. Determining Checkdams layout for flood mitigation using simulation–optimization approach
Paydar et al. A methodology for up-scaling irrigation losses
Elsheikh et al. Soil erosion risk map based on geographic information system and universal soil loss equation (case study: Terengganu, Malaysia)
Azarang Mathematical model for evaluating of sediment transport (Case study: Karkheh River in Iran)
Gupta et al. A case study of Ramgad watershed, Nainital for soil erosion risk assessment using CORINE methodology
Davis et al. Deposition of nonuniform sediment on concave slopes
CN113946964A (zh) 一种草原河流河道流量汇流计算方法
Jolánkai et al. Pilot area studies in hungary with a novel integrated hydrologic model–WateRisk
Aliakbari et al. Study and simulation of hydraulic and structural changes result of changing of section from soil to concrete.
Le Van et al. Modeling soil erosion and sediment load for Red River basin (Vietnam): impact of land use change and reservoirs operation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160928

RJ01 Rejection of invention patent application after publication