1. a kind of pump-storage generator dispatching method, which is characterized in that this method comprises:
1. sensed water level;
1.1 detection upper storage reservoir water levels, obtain upper storage reservoir water level real time value U;
1.2 detections are lauched reservoir level, obtain being lauched reservoir level real time value L;
2. realizing machine unit scheduling according to water level;
2.1 judge upper storage reservoir water level real time value U whether in preset UH1 between UL1, wherein UH1 is that upper storage reservoir is high
Water level primary alerts water level, and UL1 is that upper storage reservoir low water level primary alerts water level, if it is, realizing according to actual schedule demand
Unit operates in pumping operation mode or generating operation mode;If not, i.e. U >=UH1 or U≤UL1, then judge that upper storage reservoir water level counts in real time
Whether value U is more than or equal to UH1, if it is implementation steps 2.1.1, otherwise goes to step 2.1.2;
2.1.1 judge whether upper storage reservoir water level real time value U is less than upper storage reservoir high water level middle rank alarm water level UH2, if it is,
Implementation steps 2.1.1.1;If it is not, then judging whether upper storage reservoir water level real time value U is less than the ultimate alarm of upper storage reservoir high water level
Water level UHH, if it is, implementation steps 2.1.1.2;If it is not, then stopping all units in pumping operation mode
Operation;
2.1.1.1 it is alerted to scheduling report upper storage reservoir high water level primary and pays attention to the unit quantity in pumping operation mode, Mei Ge
A period of time T1 and dispatching communication, scheduling issue the operation plan of formulation, control unit according to operation plan;
The size of first time cycle T 1 should be inversely proportional with the unit quantity in pumping operation mode, i.e., if there is more unit
It is in pumping operation mode simultaneously, then needs more frequent and dispatching communication;
Operation plan include by original place in the order out of service of one or more units of pumping operation mode, by original place in work of drawing water
One or more units of condition are changed to the order of generating operation mode;
2.1.1.2 make an original place out of service in the unit of pumping operation mode immediately, then make every second time period T2
It is out of service in the unit of pumping operation mode to obtain an original place, until all original places are in the wholly off operation of unit of pumping operation mode;
The size of second time period T2 should be inversely proportional with the unit quantity in pumping operation mode, i.e., if there is more unit
It is in pumping operation mode simultaneously, then needs more frequent to make unit out of service;
2.1.2 judge whether upper storage reservoir water level real time value U is greater than upper storage reservoir low water level middle rank alarm water level UL2, if so,
Then implementation steps 2.1.2.1;If it is not, then judging whether upper storage reservoir water level real time value U is greater than the ultimate announcement of upper storage reservoir low water level
Alert water level ULL, if it is, implementation steps 2.1.2.2;If it is not, then making all to stop in the unit of generating operation mode at once
Only run;
2.1.2.1 it is alerted to scheduling report upper storage reservoir low water level primary and pays attention to the unit quantity in generating operation mode, Mei Ge
Three period of time T 3 and dispatching communication, scheduling issue the operation plan of formulation, control unit according to operation plan;
The size of third period of time T 3 should be inversely proportional with the unit quantity in generating operation mode, i.e., if there is more unit
It is in generating operation mode simultaneously, then needs more frequent and dispatching communication;
Operation plan include by original place in the order out of service of one or more units of generating operation mode, by original place in power generation work
One or more units of condition are changed to the order of pumping operation mode;
2.1.2.2 make an original place out of service in the unit of generating operation mode immediately, then make every the 4th period of time T 4
It is out of service in the unit of generating operation mode to obtain an original place, until all original places are in the wholly off operation of unit of generating operation mode;
The size of 4th period of time T 4 should be inversely proportional with the unit quantity in generating operation mode, i.e., if there is more unit
It is in generating operation mode simultaneously, then needs more frequent to make unit out of service;
2.2 judgements be lauched reservoir level real time value L whether in preset LH1 between LL1 and not equal to flood discharge water level,
In, LH1 is that lower storage reservoir high water level primary alerts water level, and LL1 is lower storage reservoir low water level primary alarm water level, if it is, according to
Actual schedule demand realizes that unit operates in pumping operation mode or generating operation mode;If not, i.e. L >=LH1 or L≤LL1, then judge
It is lauched whether reservoir level real time value L is more than or equal to LH1, if it is implementation steps 2.2.1, otherwise goes to step 2.2.2;
2.2.1 judgement is lauched whether reservoir level real time value L is less than lower storage reservoir high water level middle rank alarm water level LH2, if so,
Then implementation steps 2.2.1.1;If it is not, then judgement is lauched whether reservoir level real time value L is less than the ultimate announcement of lower storage reservoir high water level
Alert water level LHH, if it is, implementation steps 2.2.1.2;If it is not, then making all to stop in the unit of generating operation mode at once
Only run;
2.2.1.1 it is alerted to scheduling report lower storage reservoir high water level primary and pays attention to the unit quantity in generating operation mode, Mei Ge
Five period of time T 5 and dispatching communication, scheduling issue the operation plan of formulation, control unit according to operation plan;
The size of 5th period of time T 5 should be inversely proportional with the unit quantity in generating operation mode, i.e., if there is more unit
It is in generating operation mode simultaneously, then needs more frequent and dispatching communication;
Operation plan include by original place in the order out of service of one or more units of generating operation mode, by original place in power generation work
One or more units of condition are changed to the order of pumping operation mode;
2.2.1.2 make an original place out of service in the unit of generating operation mode immediately, then make every the 6th period of time T 6
It is out of service in the unit of generating operation mode to obtain an original place, until all original places are in the wholly off operation of unit of generating operation mode;
The size of 6th period of time T 6 should be inversely proportional with the unit quantity in generating operation mode, i.e., if there is more unit
It is in generating operation mode simultaneously, then needs more frequent to make unit out of service;
2.2.2 judgement is lauched whether reservoir level real time value L is greater than lower storage reservoir low water level middle rank alarm water level LL2, if so,
Then implementation steps 2.2.2.1;If it is not, then judgement is lauched whether reservoir level real time value L is greater than the ultimate announcement of lower storage reservoir low water level
Alert water level LLL, if it is, implementation steps 2.2.2.2;If it is not, then making all to stop in the unit of pumping operation mode at once
Only run;
2.2.2.1 it is alerted to scheduling report lower storage reservoir low water level primary and pays attention to the unit quantity in pumping operation mode, Mei Ge
Seven period of time T 7 and dispatching communication, scheduling issue the operation plan of formulation, control unit according to operation plan;
The size of 7th period of time T 7 should be inversely proportional with the unit quantity in pumping operation mode, i.e., if there is more unit
It is in pumping operation mode simultaneously, then needs more frequent and dispatching communication;
Operation plan include by original place in the order out of service of one or more units of pumping operation mode, by original place in work of drawing water
One or more units of condition are changed to the order of generating operation mode;
2.2.2.2 make an original place out of service in the unit of pumping operation mode immediately, then make every the 8th period of time T 8
It is out of service in the unit of pumping operation mode to obtain an original place, until all original places are in the wholly off operation of unit of pumping operation mode;
The size of 8th period of time T 8 should be inversely proportional with the unit quantity in pumping operation mode, i.e., if there is more unit
It is in pumping operation mode simultaneously, then needs more frequent to make unit out of service.