Embodiment two.
A kind of pump-storage generator dispatching method, this method include:
1. sensed water level;
1.1 detection upper storage reservoir water levels, obtain upper storage reservoir water level real time value U;
1.2 detection lower storage reservoir water levels, obtain lower storage reservoir water level real time value L;
2. machine unit scheduling is realized according to water level;
2.1 judge upper storage reservoir water level real time value U whether in UH1 set in advance between UL1, wherein, UH1 is upper water
The primary alarm water level of storehouse high water level, UL1 is the primary alarm water level of upper storage reservoir low water level, if it is, according to actual schedule demand
Realize unit operation in pumping operation mode or generating operation mode;If not, i.e. U >=UH1 or U≤UL1, then judge upper storage reservoir water level reality
When numerical value U whether be more than or equal to UH1, if it is implementation steps 2.1.1, otherwise goes to step 2.1.2;
2.1.1 judge whether upper storage reservoir water level real time value U is less than upper storage reservoir high water level middle rank alarm water level UH2, if
It is, then implementation steps 2.1.1.1;If it is not, then it is ultimate to judge whether upper storage reservoir water level real time value U is less than upper storage reservoir high water level
Water level UHH is alerted, if it is, implementation steps 2.1.1.2;If it is not, then at once so that all units in pumping operation mode
It is out of service;
2.1.1.1 alerted to scheduling report upper storage reservoir high water level primary and pay attention to the unit quantity in pumping operation mode, often
Every first time cycle T 1 and dispatching communication, dispatch and issue the operation plan of formulation, unit is controlled according to operation plan;
The size of first time cycle T 1 should be inversely proportional with the unit quantity in pumping operation mode, i.e., if more
Unit is in pumping operation mode at the same time, then needs frequent and dispatching communication;
Operation plan include by original place in the order out of service of one or more units of pumping operation mode, by original place in pumping
One or more units of water condition are changed to the order of generating operation mode;
2.1.1.2 immediately so that an original place is out of service in the unit of pumping operation mode, then every second time period
T2 make it that an original place is out of service in the unit of pumping operation mode, until all original places are in the wholly off fortune of unit of pumping operation mode
OK;
The size of second time period T2 should be inversely proportional with the unit quantity in pumping operation mode, i.e., if more
Unit is in pumping operation mode at the same time, then needs frequent so that unit is out of service;
2.1.2 judge whether upper storage reservoir water level real time value U is more than upper storage reservoir low water level middle rank alarm water level UL2, if
It is, then implementation steps 2.1.2.1;If it is not, then it is ultimate to judge whether upper storage reservoir water level real time value U is more than upper storage reservoir low water level
Water level ULL is alerted, if it is, implementation steps 2.1.2.2;If it is not, then at once so that all units in generating operation mode
It is out of service;
2.1.2.1 alerted to scheduling report upper storage reservoir low water level primary and pay attention to the unit quantity in generating operation mode, often
Every the 3rd period of time T 3 and dispatching communication, dispatch and issue the operation plan of formulation, unit is controlled according to operation plan;
The size of 3rd period of time T 3 should be inversely proportional with the unit quantity in generating operation mode, i.e., if more
Unit is in generating operation mode at the same time, then needs frequent and dispatching communication;
Operation plan include by original place in the order out of service of one or more units of generating operation mode, by original place in hair
One or more units of electrician's condition are changed to the order of pumping operation mode;
2.1.2.2 immediately so that an original place is out of service in the unit of generating operation mode, then every the 4th time cycle
T4 make it that an original place is out of service in the unit of generating operation mode, until all original places are in the wholly off fortune of unit of generating operation mode
OK;
The size of 4th period of time T 4 should be inversely proportional with the unit quantity in generating operation mode, i.e., if more
Unit is in generating operation mode at the same time, then needs frequent so that unit is out of service;2.2 judge lower storage reservoir water level real time value
L whether in LH1 set in advance between LL1 and being not equal to flood discharge water level, wherein, LH1 is the primary alarm of lower storage reservoir high water level
Water level, LL1 is the primary alarm water level of lower storage reservoir low water level, if it is, realizing that unit operation is being taken out according to actual schedule demand
Water condition or generating operation mode;If not, i.e. L >=LH1 or L≤LL1, then judge whether lower storage reservoir water level real time value L is more than
Equal to LH1, if it is implementation steps 2.2.1, otherwise goes to step 2.2.2;
2.2.1 judge whether lower storage reservoir water level real time value L is less than lower storage reservoir high water level middle rank alarm water level LH2, if
It is, then implementation steps 2.2.1.1;If it is not, then it is ultimate to judge whether lower storage reservoir water level real time value L is less than lower storage reservoir high water level
Water level LHH is alerted, if it is, implementation steps 2.2.1.2;If it is not, then at once so that all units in generating operation mode
It is out of service;
2.2.1.1 alerted to scheduling report lower storage reservoir high water level primary and pay attention to the unit quantity in generating operation mode, often
Every the 5th period of time T 5 and dispatching communication, dispatch and issue the operation plan of formulation, unit is controlled according to operation plan;
The size of 5th period of time T 5 should be inversely proportional with the unit quantity in generating operation mode, i.e., if more
Unit is in generating operation mode at the same time, then needs frequent and dispatching communication;
Operation plan include by original place in the order out of service of one or more units of generating operation mode, by original place in hair
One or more units of electrician's condition are changed to the order of pumping operation mode;
2.2.1.2 immediately so that an original place is out of service in the unit of generating operation mode, then every the 6th time cycle
T6 make it that an original place is out of service in the unit of generating operation mode, until all original places are in the wholly off fortune of unit of generating operation mode
OK;
The size of 6th period of time T 6 should be inversely proportional with the unit quantity in generating operation mode, i.e., if more
Unit is in generating operation mode at the same time, then needs frequent so that unit is out of service;
2.2.2 judge whether lower storage reservoir water level real time value L is more than lower storage reservoir low water level middle rank alarm water level LL2, if
It is, then implementation steps 2.2.2.1;If it is not, then it is ultimate to judge whether lower storage reservoir water level real time value L is more than lower storage reservoir low water level
Water level LLL is alerted, if it is, implementation steps 2.2.2.2;If it is not, then at once so that all units in pumping operation mode
It is out of service;
2.2.2.1 alerted to scheduling report lower storage reservoir low water level primary and pay attention to the unit quantity in pumping operation mode, often
Every the 7th period of time T 7 and dispatching communication, dispatch and issue the operation plan of formulation, unit is controlled according to operation plan;
The size of 7th period of time T 7 should be inversely proportional with the unit quantity in pumping operation mode, i.e., if more
Unit is in pumping operation mode at the same time, then needs frequent and dispatching communication;
Operation plan include by original place in the order out of service of one or more units of pumping operation mode, by original place in pumping
One or more units of water condition are changed to the order of generating operation mode;
2.2.2.2 immediately so that an original place is out of service in the unit of pumping operation mode, then every the 8th time cycle
T8 make it that an original place is out of service in the unit of pumping operation mode, until all original places are in the wholly off fortune of unit of pumping operation mode
OK;
The size of 8th period of time T 8 should be inversely proportional with the unit quantity in pumping operation mode, i.e., if more
Unit is in pumping operation mode at the same time, then needs frequent so that unit is out of service.