CN108005108A - Pipe gallery - Google Patents

Pipe gallery Download PDF

Info

Publication number
CN108005108A
CN108005108A CN201610930010.4A CN201610930010A CN108005108A CN 108005108 A CN108005108 A CN 108005108A CN 201610930010 A CN201610930010 A CN 201610930010A CN 108005108 A CN108005108 A CN 108005108A
Authority
CN
China
Prior art keywords
pedestal
glass steel
top plate
pipe gallery
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610930010.4A
Other languages
Chinese (zh)
Inventor
储力军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610930010.4A priority Critical patent/CN108005108A/en
Publication of CN108005108A publication Critical patent/CN108005108A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

The present invention relates to a kind of piping lane, specially a kind of pipe gallery, including glass steel top plate, glass steel pedestal, glass steel top plate include top plate body and supporting item, top plate body is integrally formed for " bow " shape and with supporting item, glass steel top plate and glass steel pedestal releasable connection;Prefabricated component is produced by using fiberglass, including glass steel top plate and glass steel pedestal, binding rivet rivets, cost is greatly reduced from consumptive material, the assembly method between assembly method and pedestal one and pedestal two between glass steel top plate and glass steel pedestal is got by many experiments, water proofing property, the mode of even more than traditional steel and concreting is all up in rigidity and shearing strength, not only for production by way of prefabricated component from assembly method, production cost has both greatly been saved for transport and construction, cost of transportation also a saving construction period at the same time, reduce difficulty of construction, also substantially increase construction site adaptability at the same time.

Description

Pipe gallery
Technical field
The present invention relates to a kind of piping lane, is specially a kind of pipe gallery.
Background technology
Pipe gallery (Japan claims " common trench ", TaiWan, China to claim " Common Ducts "), is exactly that underground urban duct synthesis is walked Corridor.A tunnel space is built in Urban Underground, by electric power, the various utilities pipeline collection such as communication, combustion gas, heat supply, plumbing In one, equipped with special access hole, hoisting port and monitoring system, implement unified planning, Uniting, unified construction and pipe Reason, is the important infrastructure and " lifeline " for ensureing city operations.
With the growth and expanding economy of China human mortality, incident is that the planning of various municipal pipelines and cloth are put up a question The quantity of the pipelines such as topic, various water supply, draining, electric power, communication is more and more, is uniformly coordinated and plans due to lacking, often goes out Existing ground excavation and filling phenomenon, has seriously affected the daily life of resident and the orderly operation in city.Pipe gallery solves Above-mentioned puzzlement government and citizen for many years the problem of, unified planning, design, construction and dimension can be implemented to various municipal public use pipelines Shield, is a kind of significant public utility.But the pipe gallery construction period of current cast in situs is longer, when construction, can be to city City's traffic and resident living affect, these problems limit pipe gallery in old town and people to a certain extent The further genralrlization of mouth dense urban centers uses.
At present, it is many country all using it is prefabricated as technology development an important symbol, using prefabricated component not only Construction quality can be improved, can also shorten the construction period, reduce cost, improves the industrialization degree of engineering construction, especially to improving The construction environment of municipal works is even more obvious.There are certain research and application, its mesh in terms of engineering prefabricating technique both at home and abroad Be to improve the quality of structure, reduce the construction cost of material consumption and engineering.Although the country is to pipe gallery assembled knot Structure has certain research, but the research to pipe gallery fabricated construction is still in infancy, waterproof, rigidity and shearing strength Aspect is also at the experiment stage of fumbling, and current referential engineering experience is less.
Such as Chinese patent CN204753627U discloses a kind of prefabricated pipe gallery, its composition includes:Prefabricated panel, One group of outer surbase is provided with the prefabricated panel, the outer surbase is connected with precast facade, the prefabricated bottom Be connected with one group of prefabricated interior wall in the middle part of plate, the top of the top of the precast facade and the prefabricated interior wall with prefabricated top Plate connects.
But its structure and materials can find out to be still the traditional approach such as steel and concreting from above-mentioned file, Still it is difficult to the requirement for meeting prefabricated component, that is, still results in that the duration is longer, cost is higher.
The content of the invention
For above-mentioned deficiency of the prior art, the present invention substitutes traditional steel by fiberglass and pours the side of combination Formula, and carry out exquisite design to crucial connecting portion, the one kind proved by many experiments can quick assemblings, of low cost And the pipe gallery with high intensity, high waterproof and high shear strength.
To realize above technical purpose, the technical scheme is that:A kind of pipe gallery, including glass steel top plate, Glass steel pedestal, the glass steel top plate include top plate body and supporting item, the top plate body for " bow " shape and with branch Support member is an integral molding structure, the glass steel top plate and the removable connection of glass steel pedestal.
Preferably, the glass steel pedestal includes pedestal one and pedestal two, the pedestal one and pedestal two are removable Connection.
Preferably, the glass steel top plate refers to the glass steel pedestal with the removable connection of glass steel pedestal Equipped with card slot, the supporting item is equipped with fixture block, and the supporting item is clamped by the card slot of fixture block and glass steel pedestal.
Preferably, the inner wall of the card slot is equipped with the steel spacer layer one that surface is rough surface, the fixture block surface It also is provided with the steel spacer layer two that surface is rough surface.
Preferably, the fixture block is the slope surface of taper type and frustum and the angle of vertical plane is 15 degree to 35 degree, it is described Block fast height for 10-30 centimetres.
Preferably, further including rivet one, the rivet one sequentially passes through fast card slot, card, steel spacer layer one and steel Spacer layer two rivets supporting item and glass steel pedestal.
Preferably, the pedestal one refers to further include the horizontal anchor plate of glass steel, riveting with the removable connection of pedestal two Nail two, the pedestal one and pedestal two are equipped with the groove for being used for placing the horizontal anchor plate of glass steel, the glass steel water Flat anchor plate is clamped by groove and pedestal one and pedestal two, while rivet two passes through the horizontal anchor plate of glass steel, pedestal one By pedestal one and pedestal two, anchor plate horizontal with glass steel rivets respectively with pedestal two.
Preferably, the pedestal one and the edge of pedestal two are additionally provided with wedge-shaped impression, the wedge-shaped recess with Angle C is formed between horizontal plane.
Preferably, the angle C is 10-30 degree.
Preferably, the corner of the glass steel pedestal is additionally provided with armpit angle.
From the above, it can be seen that the present invention possesses advantages below:The present invention is prefabricated by using fiberglass production Part, including glass steel top plate and glass steel pedestal, in combination with the riveting method of rivet, greatly reduce from consumptive material Cost, while the dress between assembly method between glass steel top plate and glass steel pedestal and pedestal one and pedestal two Get, can whether reach from water proofing property, rigidity and shearing strength or even super by substantial amounts of experiment with mode Cross the mode of traditional steel and concreting, at the same from assembly method by way of prefabricated component not only for production, Production cost, cost of transportation were both greatly saved for transport and construction to also a saving construction period at the same time, reduce construction Difficulty, while also substantially increase the adaptability of construction site.
Brief description of the drawings
Fig. 1 is the structure diagram of the pipe gallery of the present invention;
Fig. 2 is the structure diagram of the pipe gallery of the present invention;
Fig. 3 is the structure diagram of the pipe gallery of the present invention;
Fig. 4 is the structure enlargement diagram of the A of the pipe gallery of the present invention;
Fig. 5 is the structure enlargement diagram of the B of the pipe gallery of the present invention;
Fig. 6 is the structure enlargement diagram of the D of the pipe gallery of the present invention.
Brief description of the drawings:1st, glass steel top plate, 11, top plate body, 12, supporting item, 2, glass steel pedestal, 21, pedestal One, 22, pedestal two, 23, card slot, 24, fixture block, 25, steel spacer layer one, 26, steel spacer layer two, 27, rivet one, 28, glass The horizontal anchor plate of glass steel, 29, rivet two, 210, armpit angle, 211, outer wall, 212, inner wall, 213, reinforcing rib.
Embodiment
As shown in drawings, a kind of pipe gallery, including glass steel top plate 1, glass steel pedestal 2, the glass steel Top plate 1 includes top plate body 11 and supporting item 12, and the top plate body 11 is integrally formed knot for " bow " shape and with supporting item 12 Structure, the glass steel top plate 1 and the 2 removable connection of glass steel pedestal;The glass steel pedestal 2 includes one 21 He of pedestal Pedestal 2 22, the pedestal 1 and 2 22 removable connection of pedestal;The glass steel top plate 1 can with glass steel pedestal 2 Tear formula connection open and refer to that the glass steel pedestal 2 is equipped with card slot 23, the supporting item 12 is equipped with fixture block 24, the supporting item 12 It is clamped by fixture block 24 and the card slot 23 of glass steel pedestal 2;The inner wall of the card slot 23 is equipped with the steel that surface is rough surface Gasket layer 1,24 surface of fixture block also are provided with the steel spacer layer 2 26 that surface is rough surface;The fixture block 24 is cone The angle of the slope surface and vertical plane of platform shape and frustum is 15 degree to 35 degree, and the fast height of the card is 10-30 centimetres;Further include riveting 1 are followed closely, the rivet 1 sequentially passes through card slot 23, blocks fast 24, steel spacer layer 1 and steel spacer layer 2 26 by support Part 12 is riveted with glass steel pedestal 2;The pedestal 1 refers to further include glass steel water with the removable connection of pedestal 2 22 Flat anchor plate 28, rivet 2 29, the pedestal 1 and pedestal 2 22, which are equipped with, to be used to place the horizontal anchor plate 28 of glass steel Groove, the horizontal anchor plate 28 of glass steel is clamped by groove and pedestal 1 and pedestal 2 22, while rivet 2 29 Through the horizontal anchor plate 28 of glass steel, pedestal 1 and pedestal 2 22 by pedestal 1 and pedestal 2 22 respectively with glass steel Horizontal anchor plate 28 rivets;The pedestal 1 and the edge of pedestal 2 22 are additionally provided with wedge-shaped impression 23, the wedge shape Angle C is formed between depression 23 and horizontal plane;The angle C is 10-30 degree;The corner of the glass steel pedestal 2 also sets There is armpit angle 210.
When it is implemented, in order to ensure the rigidity and applicability of its glass steel top plate 1, its thickness control is at least 30 lis Rice is thick, while the bottom thickness of glass steel pedestal 2 is also at least 30 cm thicks, and supporting item 12 and glass steel pedestal 2 Vertical portion using hollow out shape structure as shown in Figure 6, including outer wall 211, inner wall 212 and reinforcing rib 213, while institute The thickness for stating outer wall 211 and inner wall 212 is controlled at least 4 centimetres, and the spacing between outer wall 211 and inner wall 212 is controlled extremely It is 22 centimetres few, while the spacing between adjacent said rib 213, at least at 45 centimetres, such design can be whole comprehensive in guarantee Close piping lane weight it is most light in the case of, intensity, rigidity and shearing strength can reach very high degree.
Strength demand when at the same time in order to meet to construct on the spot, and on the premise of using glass steel material, application People has found that connection mode, glass steel pedestal between glass steel top plate 1 and glass steel pedestal 2 are by many experiments Using the connection mode between integral structure or split structure and pedestal 1 and pedestal 2 22 these problems its It is unusual difficulty in fact, reason is not only to need to resist external hard plastic soil for pipe using pipe gallery made of fiberglass Pressure of corridor etc., will also ensure the resistance to deformation degree of whole piping lane, once deforming for whole engineering occurs in piping lane Can be that extremely unstable factor even causes the leakage of gas piping, electric wire, sewer pipe even to explode.
First have to ensure cannot bending for glass steel pedestal in design, but had out using the structure of integral type The risk now deformed, particularly after the width of glass steel pedestal reaches one fixed width, whole glass steel pedestal can become Flesh must be compared, warpage easily occur, so the structure of multisection type must be used, but for the structure of multisection type then more Trouble, reason is that the node possibilities that occur deforming and damage also bigger more, so for pedestal 1 and pedestal For connection mode between 2 22, applicant is had found only by connection side as representative of the present invention by substantial amounts of experiment On the one hand formula, the benefit of such connection mode are different construction sites, the thickness of the horizontal anchor plate 28 of glass steel and The length of rivet 2 29 can be adjusted as needed, and the level height of the horizontal anchor plate 28 of glass steel can exceed pedestal one 21 and the level height of pedestal 2 22, while the wedge-shaped impression on pedestal 1 and pedestal 2 22 and the horizontal anchor plate of glass steel The isosceles triangle or equilateral triangle formed between 28 can with exterior one very strong confrontation of pressure initiation, it is this It is non-that confrontation allows whole pedestal 1, pedestal 2 22 and the horizontal anchor plate 28 of glass steel to bear in all directions The drag of Chang Qiang can also keep stable at the same time.
Similarly, for glass steel top plate 1 and glass steel pedestal 2, resist soil cutting intensity and downwards Pressure be also that variation occurs, so glass steel top plate 1 describes to adopt as already mentioned with peeling off steel pedestal 2 structure of itself With hollow type glass steel structure, while reinforcing rib 213 also is provided with armpit angle between outer wall 211 and inner wall 212 respectively;In order to protect Loosening is occurred without between card glass steel top plate 1 and glass steel pedestal 2, applicant is also by substantial amounts of experiment, passes through reality Connection mode of the present invention tested for glass steel top plate 1 and glass steel pedestal 2.
In conclusion the prefabricated component that the present invention is produced by using fiberglass, including glass steel top plate and glass steel Pedestal, in combination with the riveting method of rivet, greatly reduces cost from consumptive material, while in glass steel top plate and glass The assembly method between assembly method and pedestal one and pedestal two between steel pedestal is got by substantial amounts of experiment, Whether the side of traditional steel and concreting can be met or exceeded from water proofing property, rigidity and shearing strength Formula, while both greatly saved not only for for production, transport and construction by way of prefabricated component from assembly method Production cost, cost of transportation also a saving construction period, reduce difficulty of construction at the same time, while also substantially increase construction site Adaptability.
Above to the present invention and embodiments thereof be described, this describe it is no restricted, shown in attached drawing also only It is one of embodiments of the present invention, actual structure is not limited thereto.All in all if the ordinary skill people of this area Member is enlightened by it, without departing from the spirit of the invention, is not inventively designed similar to the technical solution Frame mode and embodiment, be within the scope of protection of the invention.

Claims (10)

  1. A kind of 1. pipe gallery, it is characterised in that:Including glass steel top plate (1), glass steel pedestal (2), the fiberglass Top plate (1) processed includes top plate body (11) and supporting item (12), the top plate body (11) for " bow " shape and with supporting item (12) It is an integral molding structure, the glass steel top plate (1) and glass steel pedestal (2) removable connection.
  2. 2. pipe gallery according to claim 1, it is characterised in that:The glass steel pedestal (2) includes pedestal one (21) and pedestal two (22), the pedestal one (21) and the removable connection of pedestal two (22).
  3. 3. pipe gallery according to claim 1, it is characterised in that:The glass steel top plate (1) and glass steel base The removable connection of seat (2) refers to that the glass steel pedestal (2) is equipped with card slot (23), and the supporting item (12) is equipped with fixture block (24), the supporting item (12) is clamped by the card slot (23) of fixture block (24) and glass steel pedestal (2).
  4. 4. pipe gallery according to claim 3, it is characterised in that:The inner wall of the card slot (23) is thick equipped with surface The steel spacer layer one (25) of matte, fixture block (24) surface also are provided with the steel spacer layer two (26) that surface is rough surface.
  5. 5. pipe gallery according to claim 3, it is characterised in that:The fixture block (24) is the slope surface of taper type and frustum Angle with vertical plane is 15 degree to 35 degree, and the fast height of the card is 10-30 centimetres.
  6. 6. the pipe gallery according to claim 1 or 4, it is characterised in that:Further include rivet one (27), the rivet one (27) card slot (23), card fast (24), steel spacer layer one (25) and steel spacer layer two (26) are sequentially passed through by supporting item (12) Riveted with glass steel pedestal (2).
  7. 7. pipe gallery according to claim 2, it is characterised in that:The pedestal one (21) and pedestal two (22) are removable Connection refers to further include the horizontal anchor plate of glass steel (28), rivet two (29), on the pedestal one (21) and pedestal two (22) Equipped with the groove for placing the horizontal anchor plate of glass steel (28), the horizontal anchor plate of glass steel (28) by groove with Pedestal one (21) and pedestal two (22) clamping, while rivet two (29) passes through the horizontal anchor plate of glass steel (28), pedestal one (21) pedestal one (21) and pedestal two (22) are riveted with the horizontal anchor plate of glass steel (28) respectively with pedestal two (22).
  8. 8. pipe gallery according to claim 7, it is characterised in that:The pedestal one (21) and the side of pedestal two (22) Wedge-shaped impression (23) is additionally provided with angle, the wedge-shaped recess (23) forms angle C between horizontal plane.
  9. 9. pipe gallery according to claim 8, it is characterised in that:The angle C is 10-30 degree.
  10. 10. pipe gallery according to claim 1, it is characterised in that:The corner of the glass steel pedestal (2) also sets There is armpit angle (210).
CN201610930010.4A 2016-10-31 2016-10-31 Pipe gallery Pending CN108005108A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610930010.4A CN108005108A (en) 2016-10-31 2016-10-31 Pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610930010.4A CN108005108A (en) 2016-10-31 2016-10-31 Pipe gallery

Publications (1)

Publication Number Publication Date
CN108005108A true CN108005108A (en) 2018-05-08

Family

ID=62047703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610930010.4A Pending CN108005108A (en) 2016-10-31 2016-10-31 Pipe gallery

Country Status (1)

Country Link
CN (1) CN108005108A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1096286A (en) * 1996-09-24 1998-04-14 Asahi Chem Ind Co Ltd Structure of porch or terrace
CN102322077A (en) * 2011-07-19 2012-01-18 中交第一航务工程局有限公司 Construction method of plastic draining plate type diversion reduced pressure impermeable body structure
CN204151824U (en) * 2014-10-14 2015-02-11 四川全丰新材料科技有限公司 A kind of glass reinforced plastic underground comprehensive pipe network common trench
CN104947709A (en) * 2015-04-15 2015-09-30 上海市政工程设计研究总院(集团)有限公司 Pre-assembled single-compartment municipal tunnel and construction method thereof
CN104988947A (en) * 2015-06-11 2015-10-21 华北水利水电大学 Hydraulic engineering retaining wall
CN106049948A (en) * 2016-06-29 2016-10-26 河南工业大学 Insertion groove type underground barn with internally covered plastics and prefabricated barn wall
CN206157767U (en) * 2016-10-31 2017-05-10 储力军 Utility tunnel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1096286A (en) * 1996-09-24 1998-04-14 Asahi Chem Ind Co Ltd Structure of porch or terrace
CN102322077A (en) * 2011-07-19 2012-01-18 中交第一航务工程局有限公司 Construction method of plastic draining plate type diversion reduced pressure impermeable body structure
CN204151824U (en) * 2014-10-14 2015-02-11 四川全丰新材料科技有限公司 A kind of glass reinforced plastic underground comprehensive pipe network common trench
CN104947709A (en) * 2015-04-15 2015-09-30 上海市政工程设计研究总院(集团)有限公司 Pre-assembled single-compartment municipal tunnel and construction method thereof
CN104988947A (en) * 2015-06-11 2015-10-21 华北水利水电大学 Hydraulic engineering retaining wall
CN106049948A (en) * 2016-06-29 2016-10-26 河南工业大学 Insertion groove type underground barn with internally covered plastics and prefabricated barn wall
CN206157767U (en) * 2016-10-31 2017-05-10 储力军 Utility tunnel

Similar Documents

Publication Publication Date Title
CN105756191B (en) The connecting structure of beam column nodes of assembly concrete shaped pile frame
CN205662947U (en) Coincide assembled underground pipe gallery system
CN105839666A (en) Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof
CN205776895U (en) Heat insulation prefabricated body of wall and prefabricated buildings
CN106522391B (en) Overhanging prefabricated sandwich insulation decoration integrated external wall panel
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN105220792A (en) A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof
CN204475529U (en) The syndeton of a kind of assembling type outer wall and beam
CN201972417U (en) Lightweight wood structure roof system
CN206157767U (en) Utility tunnel
CN108756038A (en) Assembly concrete shear wall and floor support plate rigid connection node and construction method
CN202416324U (en) Beam and slab structure superposed through top-down beam and down-top slab construction of foundation pit project
CN104652608A (en) Assembly type exterior wall and beam connecting structure
CN209468856U (en) A kind of assembly concrete column beam connecting node
CN108005108A (en) Pipe gallery
CN103981799B (en) A kind of concrete filled steel tube opens string stiff beam and construction method thereof
CN109296074A (en) A kind of assembly concrete column beam connecting node
CN212248809U (en) Prefabricated formula side fascia of assembly type structure
CN203924476U (en) The complete shock-proof wall plate of the prefabricated tenon joint type of integrated building
CN203361431U (en) Steel bar connection structure for prefabricated parapet wall
CN203795704U (en) Building outer wall cement foaming heat preservation cover plate
CN103498512B (en) A kind of assembled architecture wall beam stablizes syndeton
CN208777555U (en) A kind of prefabricated convex beam
CN206616695U (en) A kind of concrete panel and girt strip floor dry type connecting node
CN207436272U (en) A kind of prefabricated assembled wallboard connecting node

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180508