CN107993054A - A kind of data management system and management method of combination SDM, SY and BIM - Google Patents
A kind of data management system and management method of combination SDM, SY and BIM Download PDFInfo
- Publication number
- CN107993054A CN107993054A CN201711271645.9A CN201711271645A CN107993054A CN 107993054 A CN107993054 A CN 107993054A CN 201711271645 A CN201711271645 A CN 201711271645A CN 107993054 A CN107993054 A CN 107993054A
- Authority
- CN
- China
- Prior art keywords
- data
- sdm
- bim
- autodesk revit
- design
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 15
- 238000013523 data management Methods 0.000 title claims abstract description 14
- 238000013461 design Methods 0.000 claims description 24
- 238000010276 construction Methods 0.000 claims description 12
- 230000033772 system development Effects 0.000 claims description 9
- 230000000007 visual effect Effects 0.000 claims description 9
- 238000011161 development Methods 0.000 claims description 7
- 230000018109 developmental process Effects 0.000 claims description 7
- 238000012986 modification Methods 0.000 claims description 7
- 230000004048 modification Effects 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 6
- 238000012423 maintenance Methods 0.000 claims description 5
- 230000010354 integration Effects 0.000 claims description 3
- 230000008520 organization Effects 0.000 claims description 3
- 238000000819 phase cycle Methods 0.000 claims description 3
- 238000012772 sequence design Methods 0.000 claims description 3
- 238000000605 extraction Methods 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 4
- 238000011144 upstream manufacturing Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/28—Databases characterised by their database models, e.g. relational or object models
- G06F16/284—Relational databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Databases & Information Systems (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Data Mining & Analysis (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- User Interface Of Digital Computer (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Stored Programmes (AREA)
Abstract
The present invention discloses a kind of data management system and management method of combination SDM, SY and BIM, the backstage of input or output data using SDM background data bases as SY, innovatively SDM and BIM softwares are combined by Building Information Model sorting code number, realize the two-way mutual conductance of data, easy to the input of data, extraction, exchange and share.
Description
Technical field
The present invention relates to architectural engineering BIM technology application field, and in particular, to the data management of BIM.
Background technology
BIM is that physical features, functional characteristic and management essentials of total life cycle engineering project or its part etc. are shared
The digital expression of Information application.BIM promote the architectural engineering industrial application of information technology move towards higher level, make planning, design, construction,
The information sharing of facilities management and the efficiency of coordinated management significantly improve.
But the but problematic in actual application process.Relatively distinct issues are that construction-engineering project is each at present
Participant is difficult input, extraction, exchange and shared data in BIM softwares.As construction-engineering project promotes, staff couple
Successively decreasing in the geological information demand of building element because of phase change, substantial amounts of non-geometry information needs to be loaded into BIM models,
Thereby produce the problem of some important:What need that information inputted;When information is being inputted;How convenient and efficient it is past
Information is inputted in BIM models;How information is extracted;How data and shared data exchanged.Due to no design and construction O&M BIM
Data exchange standard, has isolated the contact of the information and target in engineering project each stage, result in construction-engineering project and respectively participate in
Data Data exchange can not be carried out between square upstream and downstream.In addition, along with clear convenient, system high efficiency the data pipe of long-term lacking
Reason method, it is not high to result in application value of the BIM technology in Life cycle is built.
One kind combines design and construction operation/maintenance data management system(Operation/maintenance data management system of designing and constructing in text uses SDM
Represent), data exchange software(Data exchange software is represented with SY in text)Lead to the data management system and management method of BIM
Cross independent development a whole set of application software and normal process, successfully solve in BIM softwares when, who, what letter
The problem of breath should be transfused to, extracts, exchanges and share, with efficient system, clear easily management method, realizes building work
Complete data transfer between each participant upstream and downstream of journey project.
The content of the invention
It is an object of the invention to provide a kind of data management system and management method of combination SDM, SY and BIM, with SDM
Background data base is inputted as SY or the backstage of output data, innovatively by Building Information Model sorting code number by SDM
Combined with BIM softwares, realize the two-way mutual conductance of data, easy to the input of data, extraction, exchange and shared.
To achieve these goals, technical scheme is as follows:
A kind of data management system of combination SDM, SY and BIM, including:
SDM is a kind of to data organization, management and the design and construction of access operation/maintenance data management system, and the system is with owner's project
The angle of management is starting point, and BIM data exchange tables are designed according to the phase sequence of design, production and supply, construction, O&M,
In relevant database SQL Server 2012 according to the BIM data exchanges of all kinds of building elements based on, design database close
The logical layer and E-R models of system(Entity Relationship Model, E-R models), existed using C# System Development Language
The SDM of C/S frameworks is developed in Microsoft Visual Studio 2015.
SY is a kind of data exchange software, it is the API provided according to Autodesk Revit 2016(Application
Interface)In Autodesk Revit 2016, Autodesk Revit SDK and Microsoft Visual Studio
In the environment of 2015 secondary development, developed using C# System Development Language, realize SDM and 2016 data of Autodesk Revit
Two-way mutual conductance.
A kind of data managing method of combination SDM, SY and BIM, including implemented below step:
S1. according to engineering project Component Category classify according to design, production and supply, construction, O&M sequence design building element
BIM data exchange tables;
S2. according to building element BIM data exchanges table in relational database SQL Server 2012 design database entity
Relational model;
S3. the relation of all kinds of components and main outer code are designed;
S4. C# language exploitation C/S frameworks are utilized in 2015 system development platforms of Microsoft Visual Studio
SDM;
S5. secondary development is carried out to Autodesk Revit 2016 using Autodesk Revit SDK platforms, used
Order is expanded outside IExternal Command, SDM background data bases is carried out API companies with Autodesk Revit 2016
Connect;
S6. the sorting code number of building element object is obtained using Element classes, building for external data base is connected by api interface
Build component classification to encode, the structure sorting code number in SDM and the building element sorting code number one of Autodesk Revit are a pair of
Should, by the feature data association of the two;
S7. debugging, test software, complete the exploitation of SY;
S8. start Autodesk Revit 2016 and carry out three dimensional design;
S9. each component Building Information Model coding is assigned in type attribute, wherein, Building Information Model coding using
Shanghai City Building Information Model application standard;
S10. project administration data input person according in SDM design and construct O&M BIM data exchanges content typing is each successively
The data in component each stage;
S11. Autodesk Revit 2016 and SY are started, the data in SDM and the structure attribute of Autodesk Revit
Then data integration utilizes the mode Selection.Elements.Add (Element for adding choice set in figure model
Elem checking, change, exchange and sharing for data) is realized;
S12. user is imported into SDM in Autodesk Revit 2016 if necessary to modification component data, it is only necessary to
Data are changed in Autodesk Revit 2016, filter out the component of needs, SY is opened, passes through the filter export component of SY
Data, the back-end data of the component parameter of modification i.e. renewable SDM after importing.
Brief description of the drawings
Fig. 1 and Fig. 2 is the principle of the present invention figure.Wherein, Fig. 1 is imported data to from SDM to Autodesk Revit
2016, Fig. 2 be to imported into data in SDM from Autodesk Revit 2016.
Embodiment
As shown in the figure, the data management system for a kind of combination SDM, SY and BIM that the present invention discloses, including:
SDM is a kind of to data organization, management and the design and construction of access operation/maintenance data management system, and the system is with owner's project
The angle of management is starting point, and BIM data exchange tables are designed according to the phase sequence of design, production and supply, construction, O&M,
In relevant database SQL Server 2012 according to the BIM data exchanges of all kinds of building elements based on, design database close
The logical layer and E-R models of system(Entity Relationship Model, E-R models), existed using C# System Development Language
The SDM of C/S frameworks is developed in Microsoft Visual Studio 2015.
SY is a kind of data exchange software, it is the API provided according to Autodesk Revit 2016(Application
Interface)In Autodesk Revit 2016, Autodesk Revit SDK and Microsoft Visual Studio
In the environment of 2015 secondary development, developed using C# System Development Language, realize SDM and 2016 data of Autodesk Revit
Two-way mutual conductance.
A kind of data managing method of combination SDM, SY and BIM, including implemented below step:
S1. according to engineering project Component Category classify according to design, production and supply, construction, O&M sequence design building element
BIM data exchange tables;
S2. according to building element BIM data exchanges table in relational database SQL Server 2012 design database entity
Relational model;
S3. the relation of all kinds of components and main outer code are designed;
S4. C# language exploitation C/S frameworks are utilized in 2015 system development platforms of Microsoft Visual Studio
SDM;
S5. secondary development is carried out to Autodesk Revit 2016 using Autodesk Revit SDK platforms, used
Order is expanded outside IExternal Command, SDM background data bases is carried out API companies with Autodesk Revit 2016
Connect;
S6. the sorting code number of building element object is obtained using Element classes, building for external data base is connected by api interface
Build component classification to encode, the structure sorting code number in SDM and the building element sorting code number one of Autodesk Revit are a pair of
Should, by the feature data association of the two;
S7. debugging, test software, complete the exploitation of SY;
S8. start Autodesk Revit 2016 and carry out three dimensional design;
S9. each component Building Information Model coding is assigned in type attribute, wherein, Building Information Model coding using
Shanghai City Building Information Model application standard;
S10. project administration data input person according in SDM design and construct O&M BIM data exchanges content typing is each successively
The data in component each stage;
S11. Autodesk Revit 2016 and SY are started, the data in SDM and the structure attribute of Autodesk Revit
Then data integration utilizes the mode Selection.Elements.Add (Element for adding choice set in figure model
Elem checking, change, exchange and sharing for data) is realized;
S12. user is imported into SDM in Autodesk Revit 2016 if necessary to modification component data, it is only necessary to
Data are changed in Autodesk Revit 2016, filter out the component of needs, SY is opened, passes through the filter export component of SY
Data, the back-end data of the component parameter of modification i.e. renewable SDM after importing.
The partial content not illustrated in specification is the prior art or knowledge.This embodiment is merely to illustrate this
Invention, rather than limit the scope of the invention, the modification such as equivalent replacement that those skilled in the art are made for the present invention is equal
It is deemed to fall within the scope that the invention claims are protected.
Claims (2)
- A kind of 1. data management system of combination SDM, SY and BIM, it is characterised in that including:SDM is a kind of to data organization, management and the design and construction of access operation/maintenance data management system, and the system is with owner's project The angle of management is starting point, and BIM data exchange tables are designed according to the phase sequence of design, production and supply, construction, O&M, In relevant database SQL Server 2012 according to the BIM data exchanges of all kinds of building elements based on, design database close The logical layer and E-R models of system(Entity Relationship Model, E-R models), existed using C# System Development Language The SDM of C/S frameworks is developed in Microsoft Visual Studio 2015;SY is a kind of data exchange software, it is the API provided according to Autodesk Revit 2016(Application Interface)In Autodesk Revit 2016, Autodesk Revit SDK and Microsoft Visual Studio In the environment of 2015 secondary development, developed using C# System Development Language, realize SDM and 2016 data of Autodesk Revit Two-way mutual conductance.
- 2. a kind of data managing method of combination SDM, SY and BIM, it is characterised in that including implemented below step:S1. according to engineering project Component Category classify according to design, production and supply, construction, O&M sequence design building element BIM data exchange tables;S2. according to building element BIM data exchanges table in relational database SQL Server 2012 design database entity Relational model;S3. the relation of all kinds of components and main outer code are designed;S4. C# language exploitation C/S frameworks are utilized in 2015 system development platforms of Microsoft Visual Studio SDM;S5. secondary development is carried out to Autodesk Revit 2016 using Autodesk Revit SDK platforms, used Order is expanded outside IExternal Command, SDM background data bases is carried out API companies with Autodesk Revit 2016 Connect;S6. the sorting code number of building element object is obtained using Element classes, building for external data base is connected by api interface Build component classification to encode, the structure sorting code number in SDM and the building element sorting code number one of Autodesk Revit are a pair of Should, by the feature data association of the two;S7. debugging, test software, complete the exploitation of SY;S8. start Autodesk Revit 2016 and carry out three dimensional design;S9. each component Building Information Model coding is assigned in type attribute, wherein, Building Information Model coding using Shanghai City Building Information Model application standard;S10. project administration data input person according in SDM design and construct O&M BIM data exchanges content typing is each successively The data in component each stage;S11. Autodesk Revit 2016 and SY are started, the data in SDM and the structure attribute of Autodesk Revit Then data integration utilizes the mode Selection.Elements.Add (Element for adding choice set in figure model Elem checking, change, exchange and sharing for data) is realized;S12. user is imported into SDM in Autodesk Revit 2016 if necessary to modification component data, it is only necessary to Data are changed in Autodesk Revit 2016, filter out the component of needs, SY is opened, passes through the filter export component of SY Data, the back-end data of the component parameter of modification i.e. renewable SDM after importing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711271645.9A CN107993054A (en) | 2017-12-05 | 2017-12-05 | A kind of data management system and management method of combination SDM, SY and BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711271645.9A CN107993054A (en) | 2017-12-05 | 2017-12-05 | A kind of data management system and management method of combination SDM, SY and BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107993054A true CN107993054A (en) | 2018-05-04 |
Family
ID=62036176
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711271645.9A Pending CN107993054A (en) | 2017-12-05 | 2017-12-05 | A kind of data management system and management method of combination SDM, SY and BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107993054A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108763700A (en) * | 2018-05-18 | 2018-11-06 | 深圳大学 | A kind of assembled architecture information switching method and device based on P-BIM |
CN110543530A (en) * | 2019-09-06 | 2019-12-06 | 中国电建集团昆明勘测设计研究院有限公司 | Method for realizing rapid coding of pumped storage power station model component by utilizing Dynamo |
CN112348453A (en) * | 2020-07-13 | 2021-02-09 | 南通四建集团有限公司 | Material purchasing management method, management platform and management system based on BIM |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150278402A1 (en) * | 2014-03-31 | 2015-10-01 | National Taiwan University | Building information modeling feedback system, method, and computer readable medium |
CN105426572A (en) * | 2015-10-28 | 2016-03-23 | 上海同筑信息科技有限公司 | BIM based multidimensional data and P6 database interaction method and system |
CN106095989A (en) * | 2016-06-21 | 2016-11-09 | 上海市建筑科学研究院(集团)有限公司 | A kind of architectural engineering information switching method based on BIM |
CN107180069A (en) * | 2017-03-27 | 2017-09-19 | 徐照 | Engineering project information based on IFC data interactions delivers integrated management system |
-
2017
- 2017-12-05 CN CN201711271645.9A patent/CN107993054A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150278402A1 (en) * | 2014-03-31 | 2015-10-01 | National Taiwan University | Building information modeling feedback system, method, and computer readable medium |
CN105426572A (en) * | 2015-10-28 | 2016-03-23 | 上海同筑信息科技有限公司 | BIM based multidimensional data and P6 database interaction method and system |
CN106095989A (en) * | 2016-06-21 | 2016-11-09 | 上海市建筑科学研究院(集团)有限公司 | A kind of architectural engineering information switching method based on BIM |
CN107180069A (en) * | 2017-03-27 | 2017-09-19 | 徐照 | Engineering project information based on IFC data interactions delivers integrated management system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108763700A (en) * | 2018-05-18 | 2018-11-06 | 深圳大学 | A kind of assembled architecture information switching method and device based on P-BIM |
CN110543530A (en) * | 2019-09-06 | 2019-12-06 | 中国电建集团昆明勘测设计研究院有限公司 | Method for realizing rapid coding of pumped storage power station model component by utilizing Dynamo |
CN112348453A (en) * | 2020-07-13 | 2021-02-09 | 南通四建集团有限公司 | Material purchasing management method, management platform and management system based on BIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107563628B (en) | Method and system for establishing association relationship between BIM component and construction task | |
CN107993054A (en) | A kind of data management system and management method of combination SDM, SY and BIM | |
CN102156776B (en) | Method for establishing cable bridge network by using relational database | |
CN104049957A (en) | Rapid modeling frame of general business model based on star structure | |
CN103345478A (en) | Universal identification coding system for smart city construction | |
CN103400228A (en) | Method for creating post engineering information model for railway and urban railway traffic station | |
CN105574667A (en) | Nuclear power design data integration method and system | |
CN103093007A (en) | Power transmission iron tower three-dimensional virtual assembly method | |
CN108763753A (en) | A kind of architectural working drawing based on BIM designs a model construction method | |
CN102999820A (en) | Asset management method and system for electrical power system | |
CN109408906A (en) | The method of engineering quantity expression and statistics based on BIM model | |
CN108509198B (en) | Neutral BOM-based product electronic album construction method | |
CN104899401A (en) | Aircraft research & development process and adjoint acknowledge combined method | |
CN108694260A (en) | Application process of the BIM technology in Steel Bridge processing and manufacturing | |
WO2023193577A1 (en) | Automatic building design computing method and system | |
CN111427869A (en) | Log system based on block chain | |
CN102508971A (en) | Method for establishing product function model in concept design stage | |
WO2021003843A1 (en) | Method for hierarchical and distributed coordinated control of time sequence for integrated energy system in industrial complex | |
CN105224629A (en) | The implementation method of a kind of XBRL application platform operation flow integration | |
CN109559085A (en) | The measures and procedures for the examination and approval and terminal device based on BIM light weighed model | |
CN101458786A (en) | Material bracket altering method and system of material manifest | |
CN105956346A (en) | Aluminum alloy template design system and aluminum alloy template design method | |
CN105512895A (en) | Power transaction management method based on multi-factor combination modeling and power transaction management system thereof | |
CN107992995A (en) | A kind of method and system for creating technological process title | |
CN103488649B (en) | A kind of method that architectural model is converted to emulation component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 200335, 4, Tianshun West building, 799 Tianshan West Road, Changning District, Shanghai. Applicant after: Sunyoung Construction Group Co., Ltd. Address before: 200050 Shun Yuan construction, 3 building, A building, 398 Jiangsu Road, Changning District, Shanghai. Applicant before: Sunyoung Construction Group Co., Ltd. |
|
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180504 |