CN102999820A - Asset management method and system for electrical power system - Google Patents

Asset management method and system for electrical power system Download PDF

Info

Publication number
CN102999820A
CN102999820A CN2012105538721A CN201210553872A CN102999820A CN 102999820 A CN102999820 A CN 102999820A CN 2012105538721 A CN2012105538721 A CN 2012105538721A CN 201210553872 A CN201210553872 A CN 201210553872A CN 102999820 A CN102999820 A CN 102999820A
Authority
CN
China
Prior art keywords
assets
equipment
bom
information
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105538721A
Other languages
Chinese (zh)
Other versions
CN102999820B (en
Inventor
黄海潮
李建刚
蒋锦霞
钟一俊
褚大可
张弛
李晓慧
杨自强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU YIHE ELECTRIC POWER TECHNOLOGY INFORMATION Co Ltd
State Grid Corp of China SGCC
Zhejiang Electric Power Co
Original Assignee
HANGZHOU YIHE ELECTRIC POWER TECHNOLOGY INFORMATION Co Ltd
State Grid Corp of China SGCC
Zhejiang Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU YIHE ELECTRIC POWER TECHNOLOGY INFORMATION Co Ltd, State Grid Corp of China SGCC, Zhejiang Electric Power Co filed Critical HANGZHOU YIHE ELECTRIC POWER TECHNOLOGY INFORMATION Co Ltd
Priority to CN201210553872.1A priority Critical patent/CN102999820B/en
Publication of CN102999820A publication Critical patent/CN102999820A/en
Application granted granted Critical
Publication of CN102999820B publication Critical patent/CN102999820B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an asset management method and system for an electrical power system and belongs to the field of power grid information management. The asset management device comprises a PS module for providing project information, an MM module for providing material information, an equipment transaction module for building an equipment account, a PM module for building an equipment card, an AM module for building an asset card and an asset BOM management module for building a material, equipment and device linkage relationship. By adopting a 'mateiral-equipment-asset' three-code linkage mechanism, an asset BOM is built according to the corresponding rules among the material classification, equipment type and asset directory and a BOM laddered model, and automatic corresponding rate of programs, materials and equipments is improved; a large amount of checking work of workers is reduced; and the traditional manual account maintenance is replaced by the maintenance type referring to the account information of the asset BOM through uninterrupted consumption and information improvement on the equipment and the equipment laddered information.

Description

A kind of assets management method and system for electric system
Technical field
The present invention relates to a kind of assets management method for electric system and system, belong to the electric network information management field.
Background technology
Power grid enterprises belong to typical capital-intensive enterprise, there are the characteristics such as asset equipment quantity is various, multi-point and wide-ranging, assets class is complicated, while is along with the fast development of national economy, the asset size of enterprise increases day by day, asset transition speed is also accelerated along with the reinforcement of technological transformation dynamics, the complicacy that huge asset equipment itself has has been brought managerial difficulty.In field of power, assets BOM refers to the set of relationship of power grid enterprises' each staple (project, material, assets, main equipment and important composition equipment) in the equipment resource management process, and this pass ties up to the evolution process in the practical business management process.
There is at present following deficiency in the asset management process of power grid enterprises:
The maintenance of Unit account of plant is collected by operation department and is safeguarded, lacks the equipment alteration flow process take project as foundation; The project such as capital construction, technological transformation turns money and adopts manual type, fails to realize automatically turning money by project information; Lack joint-action mechanism and method between material, equipment and the assets.
[0004]In view of this, the inventor studies this, develops specially a kind of assets management method for electric system and system, and this case produces thus.
Summary of the invention
The purpose of this invention is to provide a kind of assets management method for electric system and system, can realize trigram linkage management between material, equipment and assets, from before afterwards manual corresponding mode realized logistics, monetary value flow, information flow three stream unifications to the in advance transformation of the mode of dynamic management.
To achieve these goals, solution of the present invention is:
A kind of assets management method for electric system comprises the steps:
1) material information of at first receiving according to project, determine transformation rule, device type by the clear and definite unique correspondence of transformation rule, search BOM level model according to device type, if transformation rule, BOM level model all exist, then automatically generate initial assets BOM, if transformation rule does not exist, then determine device type according to material, manually set up initial wealth BOM;
2) according to the situation of waste material more than the engineering, and existing material and equipment room corresponding relation, adjust assets BOM, if the corresponding a plurality of equipment of material, then determine the corresponding equipment of the material of returning by the equipment factory number, thereby guarantee that logistics, information flow are consistent;
3) be completed according to project after the device context situation of checking and accepting again adjust assets BOM, thereby determine the quantity of equipment among the assets BOM, and whether the set membership of assets BOM and relevant information and field erected equipment are consistent;
4) according to the final assets BOM Automatic generation of information Unit account of plant of confirming after checking and accepting, and declaring, examining and examining, interlock generation equipment card by the equipment alteration flow process;
5) take project or position as querying condition, the tabulating equipment card image is carried out the normalized verification of information according to the result who gathers, in batches if check information is correct, the equipment card then links and generates the assets card, thereby sets up " material-equipment-assets " trigram interaction relation.
Wherein, in step 1) in, create initial wealth BOM according to material information and comprise the steps:
1. the relevant information of synchronizing project from the PS module comprises project definition, item description, item types, electric pressure etc.;
2. the synchronous information of materiel warehouse-out voucher from the MM module comprises delivery order number, thing item number, material description, material unit, material group, materiel warehouse-out quantity, materiel warehouse-out value etc.;
3. the material of receiving according to project is determined the device type of unique correspondence by transformation rule, sets up initial assets BOM, concerns between set up item, material, equipment and subset; Initial wealth BOM information comprises project definition, item description, delivery order number, thing item number, material description, material unit, material group, materiel warehouse-out quantity, materiel warehouse-out value, device numbering, device description, assets class etc.; Described transformation rule comprises the mapping relations such as device class, Classification of materials, material characteristic.
In step 2) in, adjust assets BOM according to waste material more than the engineering and comprise the steps:
1. the synchronous information of material refund vouchers from the MM module comprises refund vouchers number, thing item number, material description, material unit, material group, material cancelling stocks quantity etc.;
2. according to the engineering material returned, and existing material and equipment room corresponding relation, adjust assets BOM, the information of adjustment comprises the kind of the engineering material returned, corresponding equipment etc.
In step 3) in, checking and accepting more according to device context, new assets BOM comprises the steps:
1. equipment leading out acceptance list from assets BOM management, the information of derivation comprises: item description, device numbering, device description, device type, factory number, equipment and technology parameter etc.;
2. carry out the scene and check, improve assets BOM information, and above-mentioned information is imported the asset management system, the information of importing comprises: device numbering, device description, device type, factory number, equipment and technology parameter etc.
In step 4) in, generate Unit account of plant according to assets BOM and comprise the steps:
1. adopt Asynchronous Transfer Mode that facility information is synchronized to the equipment alteration administration module from assets BOM module;
2. cross the response mechanism of resource and assets according to the synchronous information exchange of assets BOM at the equipment alteration administration module, comprise by interval and device type and automatically generate Unit account of plant, and the relevant information of adjustment, Improving Equipment machine account, comprise device description, affiliated station institute/circuit, equipment and technology parameter etc.;
3. adopt Asynchronous Transfer Mode that the facility information of adjusting is synchronized to assets BOM administration module from the equipment alteration administration module;
4. automatically create the equipment card of PM module by interface according to the assets BOM relevant information of assets BOM administration module.
In step 5) in, produce the assets card according to the equipment card and comprise the steps:
1. according to the information of the querying condition tabulating equipment cards such as project or electric substation, system believes the equipment card
Breath carries out submitting to after the verification;
2. after receiving the equipment card image, the information of carrying out is perfect, and the errorless rear batch of confirmation creates assets
Card turns back to the asset number field of the assets BOM of the equipment card asset number field of PM module and assets BOM administration module with asset number information, thereby sets up interaction relation between material, equipment and assets.
A kind of asset management system for electric system comprises be used to the PS module that project information is provided, the process management of finished item; Be used for providing the MM module of material information, be the information source of materiel warehouse-out voucher and material refund vouchers; The equipment alteration module that is used for the apparatus for establishing machine account is examining of Unit account of plant establishment and equipment alteration process; The PM module that is used for the apparatus for establishing card is the tie of equipment and assets interlock; Be used for setting up the AM module of assets card; And the assets BOM administration module that is used for setting up material, equipment, assets interaction relation, be the interlock of material code, device coding, assets coding and corresponding important bridge.Wherein, the PS module is connected output terminal and is connected the input end of assets BOM administration module with the MM module, and the equipment alteration module is connected with the PM module and is connected connection with assets BOM administration module, and the AM module is connected with device management module is two-way.
Method and system of the present invention adopts " material-equipment-assets " trigram joint-action mechanism, set up assets BOM according to the rule of correspondence between Classification of materials, device type and statement of assets and BOM level model, improved project, material, the automatic corresponding rate of equipment; The clear and definite equipment vein structure of equipment with important composition equipment realized the fine-grained management of apparatus value, improved accuracy and convenience that financial automatic (assisting) turns money, reduced a large amount of artificial checking works; Perfect by to the continuous consumption of equipment and equipment hierarchical information and information changes by the maintenance of the traditional-handwork machine account maintenance mode to the machine account information of reference assets BOM.
Below in conjunction with drawings and the specific embodiments the present invention is done and to describe in further detail.
Description of drawings
Fig. 1 is the assets management method process flow diagram that is used for electric system of present embodiment;
Fig. 2 is the asset management system's module frame chart that is used for electric system of present embodiment.
Embodiment
As shown in Figure 1, a kind of assets management method for electric system comprises the steps:
1) material information of at first receiving according to project, determine transformation rule, transformation rule comprises the mapping relations such as device class, Classification of materials, material characteristic, by the device type of the clear and definite unique correspondence of transformation rule, search BOM level model according to device type, if transformation rule, BOM level model all exist, then automatically generate initial assets BOM, if transformation rule does not exist, then determine device type according to material, manually set up initial wealth BOM;
Receiving material according to project automatically creates initial wealth BOM and comprises the steps:
1. the relevant information of synchronizing project from PS module 2 comprises project definition, item description, item types, electric pressure etc.;
2. the synchronous information of materiel warehouse-out voucher from MM module 3 comprises delivery order number, thing item number, material description, material unit, material group, materiel warehouse-out quantity, materiel warehouse-out value etc.;
3. the material of receiving according to project is determined the device type of unique correspondence by transformation rule, sets up initial assets BOM, concerns between set up item, material, equipment and subset; Initial wealth BOM information comprises project definition, item description, delivery order number, thing item number, material description, material unit, material group, materiel warehouse-out quantity, materiel warehouse-out value, device numbering, device description, assets class etc.; Described transformation rule comprises the mapping relations such as device class, Classification of materials, material characteristic.
2) according to the situation of waste material more than the engineering, and existing material and equipment room corresponding relation, adjust assets BOM, if the corresponding a plurality of equipment of material, then determine the corresponding equipment of the material of returning by the equipment factory number, thereby guarantee that logistics, information flow are consistent;
Adjusting assets BOM according to waste material more than the engineering comprises the steps:
1. the synchronous information of material refund vouchers from the MM module comprises refund vouchers number, thing item number, material description, material unit, material group, material cancelling stocks quantity etc.;
2. according to the engineering material returned, and existing material and equipment room corresponding relation, adjust assets BOM, the information of adjustment comprises the kind of the engineering material returned, corresponding equipment etc.
3) be completed according to project after the device context situation of checking and accepting again adjust assets BOM, thereby determine the quantity of equipment among the assets BOM, and whether the set membership of assets BOM and relevant information and field erected equipment are consistent;
According to device context check and accept situation more new assets BOM comprise the steps:
1. equipment leading out acceptance list from assets BOM management, the information of derivation comprises: item description, device numbering, device description, device type, factory number, equipment and technology parameter etc.;
2. carry out the scene and check, improve assets BOM information, import system from assets BOM administration module, the information of importing comprises: device numbering, device description, device type, factory number, equipment and technology parameter etc.
4) according to the final assets BOM Automatic generation of information Unit account of plant of confirming after checking and accepting, and declaring, examining and examining, interlock generation equipment card by the equipment alteration flow process;
Generating Unit account of plant according to assets BOM comprises the steps:
1. adopt Asynchronous Transfer Mode that facility information is synchronized to the equipment alteration administration module from assets BOM module;
2. cross the response mechanism of resource and assets according to the synchronous information exchange of assets BOM at the equipment alteration administration module, comprise by interval and device type and automatically generate Unit account of plant, and the relevant information of adjustment, Improving Equipment machine account, comprise device description, affiliated station institute/circuit, equipment and technology parameter etc.;
3. adopt Asynchronous Transfer Mode that the facility information of adjusting is synchronized to assets BOM administration module from the equipment alteration administration module;
4. automatically create the equipment card of PM module by interface according to the assets BOM relevant information of assets BOM administration module.
5) take project or position as querying condition, the tabulating equipment card image is carried out the normalized verification of information according to the result who gathers, in batches if check information is correct, the equipment card then links and generates the assets card, thereby sets up " material-equipment-assets " trigram interaction relation.
Producing the assets card according to the equipment card comprises the steps:
1. according to the information of the querying condition tabulating equipment cards such as project or electric substation, system believes the equipment card
Breath carries out submitting to after the verification;
2. carry out the perfect of information after receiving the equipment card image, the errorless rear batch of confirmation creates assets
Card, and return asset number to the equipment card of PM module and the assets BOM of assets BOM administration module, thus set up the interaction relation between material, equipment and assets.
As shown in Figure 2, a kind of asset management system for electric system comprises be used to the PS module 2 that project information is provided, the process management of finished item; Be used for providing the MM module 3 of material information, be configured to the materiel warehouse-out voucher, the information source of material refund vouchers; The equipment alteration module 4 that is used for the apparatus for establishing machine account is configured to examining of Unit account of plant establishment and equipment alteration process; The PM module 5 that is used for the apparatus for establishing card is configured to the tie that equipment and assets link; Be used for setting up the AM module 6 of assets card; And the assets BOM administration module 1 that is used for setting up material, equipment, assets interaction relation, be configured to the interlock of material code, device coding, assets coding and corresponding important bridge.Wherein, output terminal that PS module 2 is connected with the MM module connects the input end of assets BOM administration module 1, and equipment alteration module 4 is connected with the PM module and is connected respectively 1 two-way connection of mould with assets BOM, AM module 6 and 5 two-way connections of PM module.
Above-described embodiment and graphic and non-limiting product form of the present invention and style, any person of an ordinary skill in the technical field all should be considered as not breaking away from patent category of the present invention to its suitable variation or modification of doing.

Claims (7)

1. an assets management method that is used for electric system is characterized in that comprising the steps:
1) material information of at first receiving according to project, determine transformation rule, device type by the clear and definite unique correspondence of transformation rule, search BOM level model according to device type, if transformation rule, BOM level model all exist, then automatically generate initial assets BOM, if transformation rule does not exist, then determine device type according to material, manually set up initial wealth BOM;
2) according to the situation of waste material more than the engineering, and existing material and equipment room corresponding relation, adjust assets BOM, if the corresponding a plurality of equipment of material, then determine the corresponding equipment of the material of returning by the equipment factory number, thereby guarantee that logistics, information flow are consistent;
3) be completed according to project after the device context situation of checking and accepting again adjust assets BOM, thereby determine the quantity of equipment among the assets BOM, and whether the set membership of assets BOM and relevant information and field erected equipment are consistent;
4) according to the final assets BOM Automatic generation of information Unit account of plant of confirming after checking and accepting, and declaring, examining and examining, interlock generation equipment card by the equipment alteration flow process;
5) take project or position as querying condition, the tabulating equipment card image is carried out the normalized verification of information according to the result who gathers, in batches if check information is correct, the equipment card then links and generates the assets card, thereby sets up " material-equipment-assets " trigram interaction relation.
2. a kind of assets management method for electric system as claimed in claim 1 is characterized in that in step 1) in, create initial wealth BOM according to material and comprise the steps:
1. the relevant information of synchronizing project from the PS module comprises project definition, item description, item types, electric pressure etc.;
2. the synchronous information of materiel warehouse-out voucher from the MM module comprises delivery order number, thing item number, material description, material unit, material group, materiel warehouse-out quantity, materiel warehouse-out value etc.;
3. the material of receiving according to project is determined the device type of unique correspondence by transformation rule, sets up initial assets BOM, concerns between set up item, material, equipment and subset; Information comprises project definition, item description, delivery order number, thing item number, material description, material unit, material group, materiel warehouse-out quantity, materiel warehouse-out value, device numbering, device description, assets class etc., and described transformation rule comprises the mapping relations such as device class, Classification of materials, material characteristic.
3. a kind of assets management method for electric system as claimed in claim 1 is characterized in that in step 2) in, adjust assets BOM according to waste material more than the engineering and comprise the steps:
1. the synchronous information of material refund vouchers from the MM module comprises refund vouchers number, thing item number, material description, material unit, material group, material cancelling stocks quantity etc.;
2. according to the engineering material returned, and existing material and equipment room corresponding relation, adjust assets BOM, the information of adjustment comprises the kind of the engineering material returned, corresponding equipment etc.
4. a kind of assets management method for electric system as claimed in claim 1 is characterized in that in step 3) in, checking and accepting more according to device context, new assets BOM comprises the steps:
1. equipment leading out acceptance list from assets BOM management, the information of derivation comprises: item description, device numbering, device description, device type, factory number, equipment and technology parameter etc.;
2. carry out the scene and check, improve assets BOM information, import system from assets BOM administration module, the information of importing comprises: device numbering, device description, device type, factory number, equipment and technology parameter etc.
5. a kind of assets management method for electric system as claimed in claim 1 is characterized in that in step 4) in, generate Unit account of plant according to assets BOM and comprise the steps:
1. adopt Asynchronous Transfer Mode that facility information is synchronized to the equipment alteration administration module from assets BOM module;
2. cross the response mechanism of resource and assets according to the synchronous information exchange of assets BOM at the equipment alteration administration module, comprise by interval and device type and automatically generate Unit account of plant, and the relevant information of adjustment, Improving Equipment machine account, comprise device description, affiliated station institute/circuit, equipment and technology parameter etc.;
3. adopt Asynchronous Transfer Mode that the facility information of adjusting is synchronized to assets BOM administration module from the equipment alteration administration module;
4. automatically create the equipment card of PM module by interface according to the assets BOM relevant information of assets BOM administration module.
6. a kind of assets management method for electric system as claimed in claim 1 is characterized in that: in step 5) in, produce the assets card according to the equipment card and comprise the steps:
1. according to the information of the querying condition tabulating equipment cards such as project or electric substation, system carries out submitting to after the verification to the equipment card image;
2. after receiving the equipment card image, the information of carrying out is perfect, the errorless rear batch of confirmation creates the assets card, asset number information is turned back to the asset number field of the assets BOM of the equipment card asset number field of PM module and assets BOM administration module, thereby set up interaction relation between material, equipment and assets.
7. asset management system that is used for electric system, it is characterized in that: comprise be used to the PS module that project information is provided, be used for providing the MM module of material information, the equipment alteration module that is used for the apparatus for establishing machine account, the PM module that is used for the apparatus for establishing card is for the AM module of setting up the assets card; And the assets BOM administration module that is used for setting up material, equipment, assets interaction relation, wherein, the PS module is connected output terminal and is connected the input end of assets BOM administration module with the MM module, the equipment alteration module is connected with the PM module and is connected connection with assets BOM administration module, and the AM module is connected with device management module is two-way.
CN201210553872.1A 2012-12-19 2012-12-19 A kind of assets management method for electric system and system Active CN102999820B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210553872.1A CN102999820B (en) 2012-12-19 2012-12-19 A kind of assets management method for electric system and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210553872.1A CN102999820B (en) 2012-12-19 2012-12-19 A kind of assets management method for electric system and system

Publications (2)

Publication Number Publication Date
CN102999820A true CN102999820A (en) 2013-03-27
CN102999820B CN102999820B (en) 2015-11-25

Family

ID=47928364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210553872.1A Active CN102999820B (en) 2012-12-19 2012-12-19 A kind of assets management method for electric system and system

Country Status (1)

Country Link
CN (1) CN102999820B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104077727A (en) * 2014-06-27 2014-10-01 中国能源建设集团广东省电力设计研究院 Substation electric equipment machine account intelligent type-in method and system
CN104182835A (en) * 2014-08-22 2014-12-03 国家电网公司 Three-dimensional material goods classification model based on entire life-cycle management and type determination method
CN104331426A (en) * 2014-10-20 2015-02-04 国电南瑞科技股份有限公司 Quick retrieving method of power system retriever based on browser
CN105160458A (en) * 2015-08-12 2015-12-16 中国南方电网有限责任公司 Information processing system and method supporting seven-dimensional ledger equipment management
CN105487498A (en) * 2014-10-04 2016-04-13 布里斯托公司商用名远程自动化解决方案 Device hierarchy building for a remote terminal unit
CN105590173A (en) * 2015-12-29 2016-05-18 国网浙江省电力公司 Association relation modeling method between power grid main network device and productive material
CN105631563A (en) * 2014-10-29 2016-06-01 北京临近空间飞行器系统工程研究所 Informationized management method for measuring and control system products
CN106599203A (en) * 2016-12-15 2017-04-26 中国南方电网有限责任公司超高压输电公司 Data quality improvement method for full life cycle of asset
CN107274098A (en) * 2017-06-20 2017-10-20 国网江苏省电力公司无锡供电公司 A kind of method of the grid equipment information intelligent storage based on dispatching of power netwoks technology
CN111597777A (en) * 2020-05-15 2020-08-28 上海电机系统节能工程技术研究中心有限公司 Material data processing method and device and electronic equipment
CN113095686A (en) * 2021-04-15 2021-07-09 广联达科技股份有限公司 Multi-standard-section cost adjusting method and device for power engineering

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102142108A (en) * 2010-02-03 2011-08-03 上海市电力公司 Information processing method of corresponding relationship among materials and equipment suitable for power system
CN102142109A (en) * 2010-02-03 2011-08-03 上海市电力公司 Decommissioning equipment recycling information data processing method suitable for power system
CN102184473A (en) * 2011-05-03 2011-09-14 中国南方电网有限责任公司 Comprehensive supervisory system for secondary power system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102142108A (en) * 2010-02-03 2011-08-03 上海市电力公司 Information processing method of corresponding relationship among materials and equipment suitable for power system
CN102142109A (en) * 2010-02-03 2011-08-03 上海市电力公司 Decommissioning equipment recycling information data processing method suitable for power system
CN102184473A (en) * 2011-05-03 2011-09-14 中国南方电网有限责任公司 Comprehensive supervisory system for secondary power system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104077727A (en) * 2014-06-27 2014-10-01 中国能源建设集团广东省电力设计研究院 Substation electric equipment machine account intelligent type-in method and system
CN104182835A (en) * 2014-08-22 2014-12-03 国家电网公司 Three-dimensional material goods classification model based on entire life-cycle management and type determination method
CN105487498A (en) * 2014-10-04 2016-04-13 布里斯托公司商用名远程自动化解决方案 Device hierarchy building for a remote terminal unit
CN104331426A (en) * 2014-10-20 2015-02-04 国电南瑞科技股份有限公司 Quick retrieving method of power system retriever based on browser
CN104331426B (en) * 2014-10-20 2018-06-19 国电南瑞科技股份有限公司 A kind of method for quickly retrieving of the electric system searcher based on browser
CN105631563A (en) * 2014-10-29 2016-06-01 北京临近空间飞行器系统工程研究所 Informationized management method for measuring and control system products
CN105160458A (en) * 2015-08-12 2015-12-16 中国南方电网有限责任公司 Information processing system and method supporting seven-dimensional ledger equipment management
CN105590173A (en) * 2015-12-29 2016-05-18 国网浙江省电力公司 Association relation modeling method between power grid main network device and productive material
CN106599203A (en) * 2016-12-15 2017-04-26 中国南方电网有限责任公司超高压输电公司 Data quality improvement method for full life cycle of asset
CN106599203B (en) * 2016-12-15 2021-01-01 中国南方电网有限责任公司超高压输电公司 Data quality improvement method for asset full life cycle
CN107274098A (en) * 2017-06-20 2017-10-20 国网江苏省电力公司无锡供电公司 A kind of method of the grid equipment information intelligent storage based on dispatching of power netwoks technology
CN111597777A (en) * 2020-05-15 2020-08-28 上海电机系统节能工程技术研究中心有限公司 Material data processing method and device and electronic equipment
CN111597777B (en) * 2020-05-15 2023-06-02 上海电机系统节能工程技术研究中心有限公司 Material data processing method and device and electronic equipment
CN113095686A (en) * 2021-04-15 2021-07-09 广联达科技股份有限公司 Multi-standard-section cost adjusting method and device for power engineering

Also Published As

Publication number Publication date
CN102999820B (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN102999820B (en) A kind of assets management method for electric system and system
CN104850940B (en) Budget needed for the completion of projects preparation method and system based on engineering Whole Course Management
CN103020873B (en) A kind of turn money method and system automatically for electric system
CN206209852U (en) A kind of control system for Power Material field management
CN112270550A (en) New energy electric power source tracing method and system based on block chain
CN104574002B (en) Asset management information processing method and processing device based on big data analysis
CN107480987A (en) Green electric power supply certificate core hair based on block chain technology subscribes method and system
CN110335017A (en) One kind being based on BIM project amount charging Informatization Cooperative working method
CN102496083B (en) Credit rating report manuscript manufacturing method
CN103065215A (en) Power grid dispatching method
CN102289742A (en) Property management system
CN106600416A (en) Artificial intelligence (AI) mutual sharing system
CN101364284A (en) Production management system for electrical power system
CN111598496A (en) Reinforcing steel bar processing management system and processing management method
CN107203955A (en) A kind of poverty alleviation relocation project management system of changing places based on big data
CN107103528A (en) A kind of finance turnover bill reponse system
Quitzow The co-evolution of policy, market and industry in the solar energy sector: a dynamic analysis of technological innovation systems for solar photovoltaics in Germany and China
CN113240380A (en) System and method for distributed power management
CN112446683A (en) Contract performance information management and control system
CN104331779A (en) Development area construction project management system and method
CN102013080A (en) Credit analysis and grading method based on credit rating work system
CN108898473A (en) A kind of project transferring method and device
Zhao et al. The impact of international forces on the Chinese wind power industry
CN109740850A (en) Industrial design work management method, platform and the system quickly delivered
CN108876577A (en) The system that multilingual mobile visualization collects processing information

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant