CN107989586B CN201710972985.8A CN201710972985A CN107989586B CN 107989586 B CN107989586 B CN 107989586B CN 201710972985 A CN201710972985 A CN 201710972985A CN 107989586 B CN107989586 B CN 107989586B
Authority
CN
China
Prior art keywords
shock wave
water injection
water
control device
well head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710972985.8A
Other languages
Chinese (zh)
Other versions
CN107989586A (en
Inventor
张永民
汤俊萍
刘美娟
姚伟博
赵有志
邱爱慈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Jiaotong University
Original Assignee
Xian Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Jiaotong University filed Critical Xian Jiaotong University
Priority to CN201710972985.8A priority Critical patent/CN107989586B/en
Priority to PCT/CN2017/116170 priority patent/WO2019075885A1/en
Publication of CN107989586A publication Critical patent/CN107989586A/en
Application granted granted Critical
Publication of CN107989586B publication Critical patent/CN107989586B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane

Abstract

The invention belongs to energy extraction technical field, the coal bed gas well remodeling method based on the compound surge formula pressurized water injection of controllable shock wave is disclosed, its object is to solve the problems, such as that existing coal seam remodeling method damages coal seam and correctional effect is undesirable.The following steps are included: 1) install well head four-way and cable blowout control device, wherein well head four-way lower end is connect with well head, and upper end is connect with cable blowout control device, and the first side port connects high pressure water injection pipeline, and the second side port connects pressure gauge;2) controllable shock wave equipment is generated to pass through in cable blowout control device lower going-into-well;3) cable blowout control device is closed, is filled the water into coal bed gas well, after water injection pressure reaches the compression strength in coal seam, starts controllable shock wave and generates the compound surge formula water filling pressurization operation of equipment progress shock wave;4) after completing all settings, well head four-way and wellhead cable preventer are opened, acts controllable shock wave and generates equipment;5) water pump, water pipe and the bar that draws water under put into mining according to mining technique.

Description

Coal bed gas well remodeling method based on the compound surge formula pressurized water injection of controllable shock wave
Technical field
The invention belongs to energy extraction technical fields, and in particular to based on the compound surge formula pressurized water injection of controllable shock wave Coal bed gas well remodeling method.
Background technique
Coal bed gas cause is the cause of national active support, 10,000,000,000 m of methane output of whole nation planning in 20103, wherein 5,000,000,000 m of ground pump drainage3, 5,000,000,000 m of tunnel pump drainage3.Tunnel pump drainage has reached planning yield, since coal seam transformation and oil/gas well stimulation are arranged Planning yield has not yet been reached in the limitation applied, ground pump drainage.
Since 80% coal bed gas is with adsorbed state there are in coal seam, in order to realize commercial mining and the quickening of coal bed gas The pump drainage speed of coal bed gas, needs to be transformed coal seam in mine.Current coal seam remodeling method has been continued to use oil reservoir substantially and has been changed The traditional handicraft made, using hydraulic fracturing as main method.These traditional methods have the disadvantage in that
Firstly, the method in tradition transformation coal seam is all that need to inject foreign liquid to stratum, coal seam will necessarily be damaged; Secondly, the static pressure because of hydraulic fracturing may be such that coal seam is compacted, coal bed gas well is caused not produce gas;Third, hydraulic fracturing measure It often can be only formed " threadiness " or imperfect " netted " coal seam reservoirs correctional effect, be actually unable to reach area truly Domain anatonosis, it is more difficult to spread the sand of supporting crack into coal seam fracture.
Summary of the invention
The purpose of the present invention is to provide a kind of coal bed gas wells based on the compound surge formula pressurized water injection of controllable shock wave to change Method is made, the shortcomings that overcome above-mentioned conventional method.It proposes a kind of based on the controllable compound surge formula pressurized water injection of shock wave of repetition Ground extraction coal bed gas well remodeling method, this method in the case where not injuring coal seam, improve coal seam percolation ability, parsing Ability and the adsorption capacity again for inhibiting coal seam, it is final to improve coal bed gas well yield and production capacity.
The technical solution of the invention is as follows: the coal bed gas well transformation based on the compound surge formula pressurized water injection of controllable shock wave Method, be characterized in that the following steps are included:
1) well head four-way and cable blowout control device are installed, wherein well head four-way lower end is connect with well head, upper end and cable blowout control Device connection, the first side port connect high pressure water injection pipeline, and the second side port connects pressure gauge;
2) controllable shock wave equipment is generated to pass through in cable blowout control device lower going-into-well;
3) cable blowout control device is closed, is filled the water into coal bed gas well, after water injection pressure reaches the compression strength in coal seam, starting Controllable shock wave generates equipment and carries out the compound surge formula water filling pressurization operation of shock wave;
4) after completing all settings, well head four-way and wellhead cable preventer are opened, acts controllable shock wave generation and sets It is standby;
5) water pump, water pipe and the bar that draws water under put into mining according to mining technique;
Wherein the step 3) is specific as follows:
Close well head cable blowout control device;
3.1) it is filled the water by high pressure water injection pipeline into coal bed gas well, after water injection pressure reaches the compression strength in coal seam, Stop pressurizeing and recording water injection rate, starts shock wave operation;
3.2) stop after every shock wave operation for completing setting number, record a well head pressure every fixed duration, directly Stopping when dropping to setup pressure value or less to well head pressure;
3.3) operation of step 3.1) and step 3.2) is repeated, until accumulative water injection rate reaches setting value, is fulfiled assignment.
Further, the shock wave operations number set in the step 3.2) is greater than 3 times, the intra-record slack byte of the setting Shi Changwei 5min, the setup pressure value are 1MPa;The accumulative water injection rate set in the step 3.3) is 400m3;Controllable punching The shock wave peak pressure for hitting wave generation device generation is greater than 200MPa, and shock wave pulsewidth is greater than 50 μ s, working frequency 120s/ It is secondary.
Further, gauguste cutter drifting is used, before installation well head four-way and cable blowout control device to ensure that equipment is smooth It goes into the well.
Further, all flow strings in underground are played out before installation well head four-way and cable blowout control device, so as to controllable Impacting wave generation device being capable of operation in tripping in coal bed gas well.
Meanwhile the invention also provides another kinds to be changed based on the coal bed gas well of the compound surge formula pressurized water injection of controllable shock wave Make method, it is characterised in that: the following steps are included:
1) well head four-way and cable blowout control device are installed, wherein well head four-way lower end is connect with well head, upper end and cable blowout control Device connection, the first side port connect high pressure water injection pipeline, and the second side port connects pressure gauge;
2) controllable shock wave equipment is generated to pass through in cable blowout control device lower going-into-well;
3) well head cable blowout control device is closed, is filled the water to pit shaft, after liquid level reaches well head, starts shock wave operation, is completed every After the operations number of a setting setting, acts underground shock wave and generate equipment;
4) cable blowout control device is removed, well head is blocked, starts the water filling pressurization of surge formula, after reaching water injection rate, removes water filling Pipe;
5) water pump, water pipe and the bar that draws water are installed, mining is put into according to mining technique;
Wherein the step 4) is specific as follows:
Cable blowout control device is removed, well head is blocked;
4.1) by high pressure water injection pipeline to coal bed gas well fill the water be pressurized, when pressure reach operation coal seam compression strength or Water injection rate of person stops water filling after reaching setting value;
4.2) it when water injection pressure drops to setting value or less naturally, fills the water pressurize to pit shaft again, when pressure reaches work The compression strength in industry coal seam or a water injection rate stop water filling after reaching setting value;
4.3) it repeats step 4.1) and step 4.2) forms surge in coal seam, set when adding up to reach to pit shaft injected water volume When more than definite value, fulfil assignment.
Further, the shock wave operations number set in the step 3) is 5-10 time;One in the step 4.1) Secondary water injection rate setting value is 200m3;Step 4.2) the setup pressure value is 1MPa, and a water injection rate setting value is 200m3;Institute The accumulative water injection rate setting value for stating step 4.3) is 600m3;The shock wave peak pressure that controllable impact wave generation device generates is big In 200MPa, shock wave pulsewidth is greater than 50 μ s, and working frequency is 120s/ times.
Further, gauguste cutter drifting is used, before installation well head four-way and cable blowout control device to ensure that equipment is smooth It goes into the well.
Further, all flow strings in underground are played out before installation well head four-way and cable blowout control device, so as to controllable Impacting wave generation device being capable of operation in tripping in coal bed gas well.
Using the solution of the present invention, have the advantage that
1, controllable shock wave technology of the present invention is pure physical method, does not inject any foreign liquid to coal seam, Therefore coal seam is not injured;
2, the present invention is due to the dynamic pressure for generating controllable shock wave technology and static pressure the characteristics of progress of water filling pressurization It combines, the new crack that shock wave generates can realize the support of fracture under conditions of filling the water pressurization, and may be further extended Crack forms seam net around pit shaft, expands coal-bed gas and desorbs area, avoids the hydrostatic pressure of traditional remodeling method in coal seam When the compaction that may cause.
3, compression strength of the present invention due to used shock wave pressure peak value much larger than coal seam can be made in primary coal Seam and the trace in deformation coal link up the seepage channels such as disconnected hole, microfissure in coal seam, improve the seepage flow energy in coal seam Power.
4, the present invention due to used shock wave can in coal seam wave impedance differ generated on biggish medium interface compared with Strong shearing force removes the sundries that coal petrography surface is attached in the seepage channels such as coal seam hole, crack, plays and releases coal seam blocking Effect improves coal seam percolation ability.
5, the present invention, which does not have to packer, to carry out segment processing to coal seam, not only can carry out fine processing to coal seam, It can also selectively carry out the processing of specific region.
6, while controllable shock wave generates equipment and is transformed to coal bed gas well, pressure water injection can make up the present invention Because strata pressure caused by formation depletion is insufficient, fracture extension may additionally facilitate.
Detailed description of the invention
Fig. 1 is well head connection schematic diagram of the invention;
Fig. 2 is operation process chart of the invention.
In figure: 1-well head four-way, 2-cable blowout control devices, 3-pressure gauges, 4-well heads.
Specific embodiment
It is by traditional statics side based on the coal bed gas well remodeling method of the compound surge formula pressurized water injection of controllable shock wave Method is combined with dynamic method, and the compound surge formula pressurized water injection method of shock wave is divided into shock wave series connection surge formula pressurized water injection Replace two kinds of operation techniques of surge formula pressurized water injection with shock wave.Controllable shock wave generate equipment using wire discharge-induced explosion etc. from Daughter drives energetic material to generate shock wave.Controllable shock wave creates new crack, ditch to part coal seam fracturing in coal seam After logical, extension preexisting crack, these cracks are supported and stretch under the effect of pit shaft hydraulic pressure, to improve the desorption in coal seam, seep Stream ability inhibits the adsorption capacity again in coal seam.It is control mesh with single water injection rate when waterflood injection rate is very fast according to water filling situation Mark, referred to as quantitative surge;It is control target, referred to as level pressure surge with water injection pressure when waterflood injection rate is slower.
Embodiment one
Coal bed gas well remodeling method based on the compound surge formula pressurized water injection of controllable shock wave, comprising the following steps:
1) well head four-way 1 and cable blowout control device 2 are installed, wherein 1 lower end of well head four-way is connect with well head 4, upper end and cable Preventer 2 connects, and the first side port connects high pressure water injection pipeline, and the second side port connects pressure gauge 3;
2) controllable shock wave equipment is generated to pass through in 2 lower going-into-well of cable blowout control device;
3) cable blowout control device 2 is closed, fills the water into coal bed gas well, after water injection pressure reaches the compression strength in coal seam, opens It moves controllable shock wave and generates the compound surge formula water filling pressurization operation of equipment progress shock wave;
3.1) well head cable blowout control device 2 is closed, is filled the water by high pressure water injection pipeline into coal bed gas well, when water injection pressure reaches To after the compression strength in coal seam, stops pressurizeing and recording water injection rate, start shock wave operation;
3.2) stop after 3 Secondary Shocks wave operations of every completion, a well head pressure is recorded every 5min, until 4 pressure of well head Stopping when dropping to following 1MPa;
3.3) operation of step 3.1) and step 3.2) is repeated, until accumulative water injection rate reaches 400m3, fulfil assignment.
4) after completing all settings, well head four-way and wellhead cable preventer 2 are opened, acts controllable shock wave generation and sets It is standby;
5) water pump, water pipe and the bar that draws water under put into mining according to mining technique.
If there is flow string in underground, all flow strings in underground are played out before installation well head four-way and cable blowout control device, So that controllable shock wave generation device being capable of operation in tripping in coal bed gas well.
The internal diameter of general coal bed gas well casing is 118.6mm-127.3mm, and the diameter that controllable shock wave generates equipment is 102mm, since coal bed gas well casing may have the fortuitous events such as deformation, so, before controllable shock wave generation equipment is gone into the well, use Diameter is not less than at the gauguste cutter drifting to most deep setting of 1.5m or less 10m not less than 108mm, length, to ensure that equipment is suitable Benefit is gone into the well.
The shock wave peak pressure that above-mentioned controllable impact wave generation device generates is greater than 200MPa, and shock wave pulsewidth is greater than 50 μ s, working frequency are 120s/ times.
Embodiment two
Coal bed gas well remodeling method based on the compound surge formula pressurized water injection of controllable shock wave, comprising the following steps:
1) well head four-way 1 and cable blowout control device 2 are installed, wherein 1 lower end of well head four-way is connect with well head 4, upper end and cable Preventer 2 connects, and the first side port connects high pressure water injection pipeline, and the second side port connects pressure gauge 3;
2) controllable shock wave equipment is generated to pass through in 2 lower going-into-well of cable blowout control device;
3) well head cable blowout control device 2 is closed, is filled the water to pit shaft, after liquid level reaches well head, starts shock wave operation, is completed every After the operations number of a setting setting, acts underground shock wave and generate equipment;
4) cable blowout control device is removed, well head is blocked, starts the water filling pressurization of surge formula, after reaching water injection rate, removes water filling Pipe;
4.1) cable blowout control device 2 is removed, well head is blocked, is filled the water and is pressurized to coal bed gas well by high pressure water injection pipeline, work as pressure Power reaches the compression strength in operation coal seam or a water injection rate reaches 200m3Stop water filling afterwards;
4.2) it when water injection pressure drops to 1MPa or less naturally, fills the water pressurize to pit shaft again, when pressure reaches operation The compression strength in coal seam or a water injection rate reach 200m3Stop water filling afterwards;
4.3) step 4.1) and step 4.2) are repeated and forms surge in coal seam, when adding up to reach to pit shaft injected water volume 600m3When above, fulfil assignment.
5) water pump, water pipe and the bar that draws water are installed, mining is put into according to mining technique.
If there is flow string in underground, all production pipes in underground are played out before installation well head four-way 1 and cable blowout control device 2 Column, so that controllable shock wave generation device being capable of operation in tripping in coal bed gas well.
The internal diameter of general coal bed gas well casing is 118.6mm-127.3mm, and the diameter that controllable shock wave generates equipment is 102mm, since coal bed gas well casing may have the fortuitous events such as deformation, so, before controllable shock wave generation equipment is gone into the well, use Diameter is not less than at the gauguste cutter drifting to most deep setting of 1.5m or less 10m not less than 108mm, length, to ensure that equipment is suitable Benefit is gone into the well.
The shock wave peak pressure that above-mentioned controllable impact wave generation device generates is greater than 200MPa, and shock wave pulsewidth is greater than 50 μ s, working frequency are 120s/ times.The patent document of Publication No. CN105674818A can be used in the controllable impact wave generation device The controllable impact wave generation device of middle record, specific structure and principle are detailed in specification specific embodiment part, can also make With other devices that can produce controllable shock wave.

Claims (8)

1. the coal bed gas well remodeling method based on the compound surge formula pressurized water injection of controllable shock wave, it is characterised in that: including following Step:
1) well head four-way and cable blowout control device are installed, wherein well head four-way lower end is connect with well head, and upper end and cable blowout control device connect It connects, the first side port connects high pressure water injection pipeline, and the second side port connects pressure gauge;
2) controllable shock wave equipment is generated to pass through in cable blowout control device lower going-into-well;
3) cable blowout control device is closed, is filled the water into coal bed gas well, after water injection pressure reaches the compression strength in coal seam, starting is controllable Shock wave generates equipment and carries out the compound surge formula water filling pressurization operation of shock wave;
4) after completing all settings, well head four-way and wellhead cable preventer are opened, acts controllable shock wave and generates equipment;
5) water pump, water pipe and the bar that draws water under put into mining according to mining technique;
Wherein the step 3) is specific as follows:
Close well head cable blowout control device;
3.1) it is filled the water by high pressure water injection pipeline into coal bed gas well, after water injection pressure reaches the compression strength in coal seam, is stopped It pressurizes and records water injection rate, start shock wave operation;
3.2) stop after every shock wave operation for completing setting number, a well head pressure is recorded every fixed duration, until well Stopping when mouth pressure drops to setup pressure value or less;
3.3) operation of step 3.1) and step 3.2) is repeated, until accumulative water injection rate reaches setting value, is fulfiled assignment.
2. the coal bed gas well remodeling method according to claim 1 based on the compound surge formula pressurized water injection of controllable shock wave, It is characterized by: the shock wave operations number set in the step 3.2) is greater than 3 times, when intra-record slack byte of the setting, is a length of 5min, the setup pressure value are 1MPa;The accumulative water injection rate set in the step 3.3) is 400m3;Controllable shock wave produces The shock wave peak pressure that generating apparatus generates is greater than 200MPa, and shock wave pulsewidth is greater than 50 μ s, and working frequency is 120s/ times.
3. the coal bed gas well transformation side according to claim 1 or 2 based on the compound surge formula pressurized water injection of controllable shock wave Method, it is characterised in that: gauguste cutter drifting is used before installation well head four-way and cable blowout control device.
4. the coal bed gas well transformation side according to claim 1 or 2 based on the compound surge formula pressurized water injection of controllable shock wave Method, it is characterised in that: play out all flow strings in underground before installation well head four-way and cable blowout control device.
5. the coal bed gas well remodeling method based on the compound surge formula pressurized water injection of controllable shock wave, it is characterised in that: including following Step:
1) well head four-way and cable blowout control device are installed, wherein well head four-way lower end is connect with well head, and upper end and cable blowout control device connect It connects, the first side port connects high pressure water injection pipeline, and the second side port connects pressure gauge;
2) controllable shock wave equipment is generated to pass through in cable blowout control device lower going-into-well;
3) well head cable blowout control device is closed, is filled the water to pit shaft, after liquid level reaches well head, starts shock wave operation, completes each work After the operations number of industry point setting, acts underground shock wave and generate equipment;
4) cable blowout control device is removed, well head is blocked, starts the water filling pressurization of surge formula, after reaching water injection rate, removes water injection pipe;
5) water pump, water pipe and the bar that draws water are installed, mining is put into according to mining technique;
Wherein the step 4) is specific as follows:
Cable blowout control device is removed, well head is blocked;
4.1) it is filled the water and is pressurized to coal bed gas well by high pressure water injection pipeline, when pressure reaches the compression strength or one in operation coal seam Secondary water injection rate stops water filling after reaching setting value;
4.2) it when water injection pressure drops to setting value or less naturally, fills the water pressurize to pit shaft again, when pressure reaches operation coal The compression strength or a water injection rate of layer stop water filling after reaching setting value;
4.3) step 4.1) and step 4.2) are repeated and forms surge in coal seam, when adding up to reach setting value to pit shaft injected water volume When above, fulfil assignment.
6. the coal bed gas well remodeling method according to claim 5 based on the compound surge formula pressurized water injection of controllable shock wave, It is characterized by: the shock wave operations number set in the step 3) is 5-10 time;Primary water filling in the step 4.1) Amount setting value is 200m3;Step 4.2) the setup pressure value is 1MPa, and a water injection rate setting value is 200m3;The step 4.3) accumulative water injection rate setting value is 600m3;The shock wave peak pressure that controllable impact wave generation device generates is greater than 200MPa, shock wave pulsewidth are greater than 50 μ s, and working frequency is 120s/ times.
7. the coal bed gas well transformation side according to claim 5 or 6 based on the compound surge formula pressurized water injection of controllable shock wave Method, it is characterised in that: gauguste cutter drifting is used before installation well head four-way and cable blowout control device.
8. the coal bed gas well transformation side according to claim 5 or 6 based on the compound surge formula pressurized water injection of controllable shock wave Method, it is characterised in that: using playing out all flow strings in underground before gauguste cutter drifting.
CN201710972985.8A 2017-10-18 2017-10-18 Coal bed gas well remodeling method based on the compound surge formula pressurized water injection of controllable shock wave Active CN107989586B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710972985.8A CN107989586B (en) 2017-10-18 2017-10-18 Coal bed gas well remodeling method based on the compound surge formula pressurized water injection of controllable shock wave
PCT/CN2017/116170 WO2019075885A1 (en) 2017-10-18 2017-12-14 Method of reforming coal-bed gas well employing controllable shock waves in combination with surge water injection pressurization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710972985.8A CN107989586B (en) 2017-10-18 2017-10-18 Coal bed gas well remodeling method based on the compound surge formula pressurized water injection of controllable shock wave

Publications (2)

Publication Number Publication Date
CN107989586A CN107989586A (en) 2018-05-04
CN107989586B true CN107989586B (en) 2018-12-25

Family

ID=62029847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710972985.8A Active CN107989586B (en) 2017-10-18 2017-10-18 Coal bed gas well remodeling method based on the compound surge formula pressurized water injection of controllable shock wave

Country Status (2)

Country Link
CN (1) CN107989586B (en)
WO (1) WO2019075885A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188603A (en) * 2018-11-14 2020-05-22 西安交通大学 Water injection well augmented injection method based on controllable shock wave
CN110243236A (en) * 2019-05-31 2019-09-17 周子惠 A kind of anti-frogman's device of repetition pulse strong shock wave and working method
CN110344827B (en) * 2019-06-13 2021-01-15 太原理工大学 Method and device for exploiting thick hard roof strong mine pressure by plasma weakening underlying coal seam
CN110439525A (en) * 2019-08-30 2019-11-12 西安闪光能源科技有限公司 Coal bed gas horizontal well de-plugging, anti-reflection completion method
CN110656972A (en) * 2019-10-31 2020-01-07 郑州慧矿智能科技有限公司 Coal roadway stripe coal seam gas extraction method based on controllable shock waves
CN110617103B (en) * 2019-11-05 2021-02-02 西安闪光能源科技有限公司 Coal mine underground gas drainage borehole permeability-increasing transformation method
CN116696272B (en) * 2023-07-13 2024-01-19 河南省许昌新龙矿业有限责任公司 Self-display blowout preventer for continuous closed water pumping level of buffer control spray hole

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155253B (en) * 2011-01-26 2013-02-27 吕晓琳 Ground pumping and mining coal seam gas well reformation method based on recurrence frequency impact waves
CN102889094B (en) * 2011-07-20 2015-02-25 平安煤矿瓦斯治理国家工程研究中心有限责任公司 Coal seam water injection system
CN102852506B (en) * 2012-10-17 2014-05-14 中国矿业大学 High-pressure pneumatic blasting pressure relieving and transmission increasing method
RU2511329C1 (en) * 2012-11-02 2014-04-10 Федеральное государственное бюджетное учреждение науки ИНСТИТУТ ПРОБЛЕМ КОМПЛЕКСНОГО ОСВОЕНИЯ НЕДР РОССИЙСКОЙ АКАДЕМИИ НАУК (ИПКОН РАН) Method of action on coal bed
CN104481574B (en) * 2014-09-29 2016-08-24 中国矿业大学(北京) A kind of method utilizing high energy acoustic-electric complex technique to improve gas permeability of coal seam
CN104832149A (en) * 2015-05-16 2015-08-12 太原理工大学 Electric pulse assisted hydrofracture unconventional gas reservoir permeability increasing method
CN105298462A (en) * 2015-11-06 2016-02-03 中国矿业大学 High-power electric knocking assisted hydrofracture coal seam permeability increase method for end-located drainage roadway
CN105370257B (en) * 2015-11-06 2018-09-14 中国矿业大学 A kind of coal bed gas well high power electric detonation shake auxiliary hydraulic fracturing method for increasing
CN105275443B (en) * 2015-11-06 2018-10-19 中国矿业大学 A kind of underground coal mine high power electric detonation shake auxiliary hydraulic fracturing anti-reflection method

Also Published As

Publication number Publication date
CN107989586A (en) 2018-05-04
WO2019075885A1 (en) 2019-04-25

Similar Documents

Publication Publication Date Title
CN107989586B (en) Coal bed gas well remodeling method based on the compound surge formula pressurized water injection of controllable shock wave
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
US20190249527A1 (en) Simultaneous Fracturing Process
CN107387034A (en) Non- well cementing casing pipe completion coal bed gas horizontal well pumping method
CN101440704B (en) Ground-dipping ore bed continuous high-energy gas fracturing seepage increasing method and specific high-energy gas generator
RU2460876C1 (en) Method for performing pulse hydraulic fracturing of carbonate formation
CN104790951B (en) Weaken the method and device away from the high-order tight roofs of 100 ~ 350m of coal seam
CN103195468A (en) System process for conducting efficient strengthened extraction in surrounding rock
CN104879159B (en) A kind of devices and methods therefor of weak seam stope anti-reflection mash gas extraction
CN106223922A (en) Staged fracturing technique is blocked up in the seam inner shield of shale gas horizontal well proppant temporarily
CN104963671B (en) A kind of fracturing reform method of High angle from formula well reservoir
CN105239984B (en) A kind of coal mine underground fracturing crack extends control method
CN109339855A (en) Continuous pipe perforation staged fracturing method in coal mine gas extraction jumping chisel hole sleeve
CN104594870B (en) A kind of fracturing yield increasing method
RU2420657C1 (en) Procedure for development of water-flooded oil deposits
CN112324337A (en) Whole-process gas extraction method for through-layer top comb-shaped drilling of bottom plate of soft coal seam
CN108661616B (en) Layered fracturing method suitable for sandstone oil and gas reservoir
CN107587529B (en) Gas-water pressure balanced type underground anti-seepage sealing technique and equipment used
CN104213896A (en) Fracturing and cavern integrated completion method for coal-bed gas reservoir
CN110259421A (en) A kind of broken up compact oil reservoir water filling supplement ENERGY METHOD
CN110056353A (en) The method of tight roof horizontal well water-jet staged fracturing in coal mine roadway
CN208330329U (en) A kind of oil/gas well combustion type ultra-positive pressure seam auxiliary device
RU2570157C1 (en) Method for enhanced oil recovery for deposit penetrated by horizontal well
CN105863581A (en) Oil extraction method for water controlling and oil increasing of buried hill oil reservoir high-water-cut oil-producing well
DE102010017154B4 (en) Method for producing a geothermal system and geothermal system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant