CN107988906A - 一种高强度锚碇 - Google Patents

一种高强度锚碇 Download PDF

Info

Publication number
CN107988906A
CN107988906A CN201711322213.6A CN201711322213A CN107988906A CN 107988906 A CN107988906 A CN 107988906A CN 201711322213 A CN201711322213 A CN 201711322213A CN 107988906 A CN107988906 A CN 107988906A
Authority
CN
China
Prior art keywords
buttress
anchor
anchorage
anchor block
room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711322213.6A
Other languages
English (en)
Inventor
周小丽
邢海龙
王东伟
黄永亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201711322213.6A priority Critical patent/CN107988906A/zh
Publication of CN107988906A publication Critical patent/CN107988906A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种锚碇,包括锚块、前锚室、支墩和基础;所述锚块为L型锚块,所述前锚室设置于锚块中部;所述支墩为两个,且两个所述支墩顶端与前锚室连接,底端与基础连接。本发明提供的锚碇,整体抗滑能力强,而且能够很好地控制散索鞍位移量。

Description

一种高强度锚碇
技术领域
本发明涉及桥梁施工技术领域,尤其涉及一种锚碇。
背景技术
建造在深厚覆盖层上的悬索桥,其锚碇基础常常采用大型沉井。为了提高锚碇的稳定性,沉井隔舱内通常充填砂、片石或者素混凝土。锚碇基础的常规施工步骤如下:第一步,制作沉井,该沉井包含由隔板隔开的多个隔仓;第二步,抽取沉井各隔仓底部的土体,使沉井缓慢下沉;第三步,沉井下沉到位后,向沉井各隔仓中充填混凝土,对沉井封底;第四步,向靠近锚碇尾部的沉井中后部隔仓中充填砂、片石或者素混凝土;第五步,浇筑沉井盖板和锚碇;第六步,架设缆索,拼接钢箱梁,铺设桥面。但此种锚碇的整体抗滑能力不足,而且对于控制散索鞍位移量基本不起作用。根据大型桥梁实际监测结果,散索鞍位移量可达到5cm以上。若散索鞍位移量过大,则会引起悬索桥主梁挠度变化、塔顶位移增加和塔根弯矩加大,从而影响桥梁结构安全。
发明内容
本发明解决其技术问题所采用的技术方案是:一种锚碇,其特征在于,包括锚块、前锚室、支墩和基础;
所述锚块为L型锚块,所述前锚室设置于锚块中部;
所述支墩为两个,且两个所述支墩顶端与前锚室连接,底端与基础连接。
进一步改进为,所述支墩向内倾斜。
进一步改进为,所述支墩顶端向内倾斜15°-25°。
进一步改进为,所述支墩底端通过连接脚连接于锚块。
进一步改进为,所述锚块、前锚室、支墩和基础均为混凝土浇筑而成。
本发明的有益效果是:
本发明提供的的锚碇,整体抗滑能力强,而且能够很好地控制散索鞍位移量。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明的锚碇结构示意图;
图2是本发明的锚碇俯视图。
具体实施方式
现在结合附图对本发明作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。
在发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对发明的限制。
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在发明的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。
在发明中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在发明中的具体含义。
如图1和图2所述,本发明提供了一种锚碇,包括锚块1、前锚室2、支墩3和基础4;
所述锚块1为L型锚块,所述前锚室2设置于锚块1中部;
所述支墩3为两个,且两个所述支墩3顶端与前锚室2连接,底端与基础4连接。
进一步改进为,所述支墩3向内倾斜。
进一步改进为,所述支墩3顶端向内倾斜15°-25°。
进一步改进为,所述支墩3底端通过连接脚5连接于锚块1。
进一步改进为,所述锚块1、前锚室2、支墩3和基础4均为混凝土浇筑而成。
本发明提供的的锚碇,整体抗滑能力强,而且能够很好地控制散索鞍位移量。
以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。

Claims (5)

1.一种锚碇,其特征在于,包括锚块、前锚室、支墩和基础;
所述锚块为L型锚块,所述前锚室设置于锚块中部;
所述支墩为两个,且两个所述支墩顶端与前锚室连接,底端与基础连接。
2.根据权利要求1所述的锚碇,其特征在于,所述支墩向内倾斜。
3.根据权利要求2所述的锚碇,其特征在于,所述支墩顶端向内倾斜15°-25°。
4.根据权利要求1所述的锚碇,其特征在于,所述支墩底端通过连接脚连接于锚块。
5.根据权利要求1所述的锚碇,其特征在于,所述锚块、前锚室、支墩和基础均为混凝土浇筑而成。
CN201711322213.6A 2017-12-12 2017-12-12 一种高强度锚碇 Pending CN107988906A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711322213.6A CN107988906A (zh) 2017-12-12 2017-12-12 一种高强度锚碇

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711322213.6A CN107988906A (zh) 2017-12-12 2017-12-12 一种高强度锚碇

Publications (1)

Publication Number Publication Date
CN107988906A true CN107988906A (zh) 2018-05-04

Family

ID=62036039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711322213.6A Pending CN107988906A (zh) 2017-12-12 2017-12-12 一种高强度锚碇

Country Status (1)

Country Link
CN (1) CN107988906A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867378A (zh) * 2018-09-17 2018-11-23 四川省铁路产业投资集团有限责任公司 一种悬索桥隧道式锚碇及施工方法
CN111119221A (zh) * 2020-01-17 2020-05-08 东南大学 浅埋式锚碇基础基底抗滑装置、尺寸确定方法和施工方法
CN111501548A (zh) * 2020-04-22 2020-08-07 中交一公局集团有限公司 锚块结构及其施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3864776A (en) * 1973-11-15 1975-02-11 Parson Brinckerhoff Quade & Do Prestressed post tension suspension bridge cable anchorage
JP2001254318A (ja) * 2000-03-14 2001-09-21 Kajima Corp ケーブルのアンカレッジへの定着構造
CN103510531A (zh) * 2013-09-18 2014-01-15 中交公路长大桥建设国家工程研究中心有限公司 一种分体式沉井加桩复合锚碇基础及其施工方法
CN104196048A (zh) * 2014-09-25 2014-12-10 中交公路规划设计院有限公司 混合式地连墙与重力式锚碇共同受力的复合锚碇基础
CN204849588U (zh) * 2015-06-19 2015-12-09 中交一公局第三工程有限公司 重力式锚碇深基坑支护装置
CN206233258U (zh) * 2016-08-18 2017-06-09 湖南省交通规划勘察设计院 一种应用于悬索桥的葫芦形地下连续墙锚碇基础

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3864776A (en) * 1973-11-15 1975-02-11 Parson Brinckerhoff Quade & Do Prestressed post tension suspension bridge cable anchorage
JP2001254318A (ja) * 2000-03-14 2001-09-21 Kajima Corp ケーブルのアンカレッジへの定着構造
CN103510531A (zh) * 2013-09-18 2014-01-15 中交公路长大桥建设国家工程研究中心有限公司 一种分体式沉井加桩复合锚碇基础及其施工方法
CN104196048A (zh) * 2014-09-25 2014-12-10 中交公路规划设计院有限公司 混合式地连墙与重力式锚碇共同受力的复合锚碇基础
CN204849588U (zh) * 2015-06-19 2015-12-09 中交一公局第三工程有限公司 重力式锚碇深基坑支护装置
CN206233258U (zh) * 2016-08-18 2017-06-09 湖南省交通规划勘察设计院 一种应用于悬索桥的葫芦形地下连续墙锚碇基础

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
涂哲等: "清水河大桥锚碇总体施工技术", 《公路》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867378A (zh) * 2018-09-17 2018-11-23 四川省铁路产业投资集团有限责任公司 一种悬索桥隧道式锚碇及施工方法
CN108867378B (zh) * 2018-09-17 2020-04-21 四川省铁路产业投资集团有限责任公司 一种悬索桥隧道式锚碇及施工方法
CN111119221A (zh) * 2020-01-17 2020-05-08 东南大学 浅埋式锚碇基础基底抗滑装置、尺寸确定方法和施工方法
CN111501548A (zh) * 2020-04-22 2020-08-07 中交一公局集团有限公司 锚块结构及其施工方法
CN111501548B (zh) * 2020-04-22 2021-11-19 中交一公局集团有限公司 锚块结构及其施工方法

Similar Documents

Publication Publication Date Title
CN108049313A (zh) 一种锚体施工方法
CN103452147B (zh) 自平衡锚配重断桩迫降纠倾方法
CN201627180U (zh) 重力坝坝基大断层加固结构
CN109403371A (zh) 一种陡坡路堤支挡结构及施工方法
CN107988906A (zh) 一种高强度锚碇
CN101994325B (zh) 一种加固基础及提高既有建筑刚性基础抗弯剪能力的方法
CN106245526A (zh) 铁路箱梁防护墙、竖墙及遮板的拼装结构及施工方法
CN105839818A (zh) 一种免侧模装配整体式混凝土预制墙板及其拼装结构、拼装方法
CN209368867U (zh) 一种陡坡路堤支挡结构
CN104674863A (zh) 一种对深基坑开挖范围内既有市政管廊的加固方法
CN109386050A (zh) 一种多层组合式房屋结构
CN106638486B (zh) 高心墙堆石坝防渗墙与廊道分期施工方法
CN205712204U (zh) 一种多重止水带及其防水结构
CN105672205B (zh) 一种面板堆石坝防渗结构
CN104612105B (zh) 钢筋混凝结构式防汛墙
CN206829461U (zh) 后浇齿槽连接装配式预制混凝土板
CN109371963A (zh) 水中墩基础预制系梁施工中的倒锥形钢套箱及其施工方法
CN206784327U (zh) 一种浆砌石坝劣质坝体灌浆补强加固结构
CN106917358A (zh) 一种斜拉桥主梁组合施工方法及其配重结构体系
CN206512591U (zh) 一种桩墩一体化结构
CN108252214A (zh) 一种锚碇施工方法
CN108221954A (zh) 一种易拆卸的预制地下连续墙、吊具以及施工方法
CN208039227U (zh) 易拆卸的预制地下连续墙
CN106948315A (zh) 一种浆砌石坝劣质坝体灌浆补强加固结构及方法
CN204059396U (zh) 塔吊底部固定基础结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180504

RJ01 Rejection of invention patent application after publication