CN107977774A - A kind of method of electrical network weak link automatic identification after failure - Google Patents

A kind of method of electrical network weak link automatic identification after failure Download PDF

Info

Publication number
CN107977774A
CN107977774A CN201711114960.0A CN201711114960A CN107977774A CN 107977774 A CN107977774 A CN 107977774A CN 201711114960 A CN201711114960 A CN 201711114960A CN 107977774 A CN107977774 A CN 107977774A
Authority
CN
China
Prior art keywords
equipment
section
failure
weak link
electrical network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711114960.0A
Other languages
Chinese (zh)
Inventor
魏可慰
谭迟辛
宋志巍
叶梓
刘基强
汤炳钦
彭文平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN201711114960.0A priority Critical patent/CN107977774A/en
Publication of CN107977774A publication Critical patent/CN107977774A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The present invention relates to electric network fault analysis field, more particularly, to a kind of method of electrical network weak link automatic identification after failure, comprises the following steps:S1:Fault message is obtained, section where obtaining faulty equipment, obtains key equipment information all in section;S2:Generation scanning result is calculated according to fault message;S3:Contrast displaying and weak link are carried out to the section structure data of generation.Risk information before and after failure is carried out contrast to show, allows dispatcher to have visual and clear control to electrical network weak link after failure, is targetedly adjusted so as to make in time.

Description

A kind of method of electrical network weak link automatic identification after failure
Technical field
The present invention relates to electric network fault analysis field, knows automatically more particularly, to electrical network weak link after a kind of failure Method for distinguishing.
Background technology
For now, when electric network fault event is handled, various fault message Statistical Criterias are more messy in China, Standardization and standard system are not formed, and multi-source data information format and information protection system are relatively simple.The risk of power grid still according to Shown by classical pathway, be unfavorable for the weak link that operation maintenance personnel intuitively understands power grid.Therefore, in order to tackle and handle in time Electric network fault event is, it is necessary to establish automatic fault recognition system, the countermeasure that trouble-shooting recovers rapidly, to ensure operation of power networks Security.
Weak link is a relative concept, such as under a kind of method of operation, risk class caused by some equipment fault For three-level event, risk class caused by the equipment fault is secondary event after changing the method for operation, then the equipment is to change A weak link under this method of operation afterwards.
Equipment is more in power grid, while there are substantial amounts of associate device, operational outfit is carried out for weak ring after a failure There are a large amount of repetitions in the identification of section, workload, with high costs and efficiency is very low.
The content of the invention
The present invention is at least one defect overcome described in the above-mentioned prior art, there is provided electrical network weak link after a kind of failure Risk information before and after failure, is carried out contrast and shown, allow dispatcher to electrical network weak link after failure by the method for automatic identification There is visual and clear control, targetedly adjusted so as to make in time.
In order to solve the above technical problems, the technical solution adopted by the present invention is:Electrical network weak link is automatic after a kind of failure Know method for distinguishing, comprise the following steps:
S1:Fault message is obtained, section where obtaining faulty equipment, obtains key equipment information all in section;
S2:Generation scanning result is calculated according to fault message;
S3:Contrast displaying and weak link are carried out to the section structure data of generation.
Further, in step sl, comprise the following steps:
S11:Timing obtains breakdown switch letter to data acquisition and supervisor control early warning system storehouse read failure source message Breath, according to switching information, obtains corresponding switch associate device;
S12:Topological analysis is carried out to the equipment by power grid topology model, judges decompression equipment;
S13:Topological analysis is carried out according to decompression equipment, obtains the section where decompression equipment, and obtain pass all in section Button apparatus;
S14:Whether failure judgement information sets section.
Further, in step S14, whether failure judgement information sets section, if so, S21 is then entered step, if It is no, then enter step S22;
Wherein, step S21 is to set power system operating mode to calculate trend according to faulty equipment;Step S22 is according to fault message Calculate generation incident classification.
Further, in step S22, comprise the following steps:
S221:Traversal sets all devices decompression in section;
S222:According to power grid topology model, decompression equipment subordinate equipment is demanded, obtains all decompression equipment;
S223:All decompression equipment are counted, analyze decompression website;
S224:10kv busbares in decompression equipment are counted, statistics institute lossy load and number of users;
S225:Calculated according to accident event judgment rule, generate grade and the preservation of this accident event;
S226:Judge whether equipment in the section that does not travel through also, if then return to step S222;If nothing, enters step S23。
Further, affiliated step S23 is the scanning result of some section under one section of generation.
Further, in step S224, data acquisition and supervisor control timing push grid measurement data are passed through 10kv bus loads and number of users data are calculated with distribution network systems timing push distribution user data.
Further, in the step s 21, comprise the following steps:
S211:Power system operating mode is set according to faulty equipment program automatically;
S212:Call trend software;
S213:Obtain trend software calculated value;
S214:Update 10kv bus load values;
S215:Return to step S221;
Wherein, the trend software provides the electric network swim value service that calculates, this software is called by remote service and interacted, Invoked procedure is to be passed to user's pseudo operation parameter device mark and equipment state, trend software root to trend software by interface Backward the system, which is calculated, according to parameter returns to the electric network swim value after calculating.
Further, in step s 2, determine whether not travel through section, if so, then return to step S1, if nothing, into Enter step S3.
Further, the common information model data timing of data acquisition and supervisor control push generation power network topology Model, topological analysis is carried out by power grid topology model.
Wherein, data acquisition is that computer-based dcs and electric power are automatic with supervisor control Change monitoring system;In electric system, data acquisition and supervisor control the operational outfit at scene can be carried out monitoring and Control, to realize data acquisition, equipment control, measurement, parameter regulation and various types of signal alarm various functions.Data acquisition with Supervisor control provides data below and supports, common information model model, measurement information, user data, failure source information.
Wherein, common information model is an abstract model, describes all main objects of electric power enterprise, particularly with electricity Power runs related object.Power system resource is represented by providing a kind of relation with object class and attribute and between them Standard method.By defining a kind of common language based on common information model(That is syntax and semantics)So that these application or System can access common data and exchange information to realize independent of the internal representation of information.This method is adopted from data Collection obtains common information model model data with supervisor control, and electric network data is obtained by parsing common information model model And topological structure of electric.
Compared with prior art, beneficial effect is:After electric network fault, this method carries out the risk information before and after failure pair Than display, allow dispatcher to have visual and clear control to electrical network weak link after failure, targetedly adjusted so as to make in time, If do not calculated by software, dispatcher can only calculate section equipment N-1 risk class after failure, efficiency pole one by one manually It is low, while can not be contrasted with the N-1 risk informations of power grid before failure.
Brief description of the drawings
Fig. 1 is present invention overall flow figure in one embodiment;
Fig. 2 is the specific steps in Fig. 1 overall flow figures.
Embodiment
Attached drawing is only for illustration, it is impossible to is interpreted as the limitation to this patent;It is attached in order to more preferably illustrate the present embodiment Scheme some components to have omission, zoom in or out, do not represent the size of actual product;To those skilled in the art, Some known features and its explanation may be omitted and will be understood by attached drawing.Being given for example only property of position relationship described in attached drawing Explanation, it is impossible to be interpreted as the limitation to this patent.
As shown in Figure 1, after a kind of failure electrical network weak link automatic identification method, comprise the following steps:
S1:Fault message is obtained, section where obtaining faulty equipment, obtains key equipment information all in section;
S2:Generation scanning result is calculated according to fault message;
S3:Contrast displaying and weak link are carried out to the section structure data of generation.
As shown in Fig. 2, in the present embodiment, in step sl, comprise the following steps:
S11:Timing obtains breakdown switch letter to data acquisition and supervisor control early warning system storehouse read failure source message Breath, according to switching information, obtains corresponding switch associate device;
S12:Topological analysis is carried out to the equipment by power grid topology model, judges decompression equipment;
S13:Topological analysis is carried out according to decompression equipment, obtains the section where decompression equipment, and obtain pass all in section Button apparatus;
S14:Whether failure judgement information sets section.
In the present embodiment, in step S14, whether failure judgement information sets section, if so, S21 is then entered step, If it is not, then enter step S22;
Wherein, step S21 is to set power system operating mode to calculate trend according to faulty equipment;Step S22 is according to fault message Calculate generation incident classification.
In the present embodiment, in step S22, comprise the following steps:
S221:Traversal sets all devices decompression in section;
S222:According to power grid topology model, decompression equipment subordinate equipment is demanded, obtains all decompression equipment;
S223:All decompression equipment are counted, analyze decompression website;
S224:10kv busbares in decompression equipment are counted, statistics institute lossy load and number of users;
S225:Calculated according to accident event judgment rule, generate grade and the preservation of this accident event;
S226:Judge whether equipment in the section that does not travel through also, if then return to step S222;If nothing, enters step S23。
In the present embodiment, affiliated step S23 is the scanning result of some section under one section of generation.
In the present embodiment, in step S224, data acquisition and supervisor control timing push power grid measurement are passed through 10kv bus loads and number of users data are calculated in data and distribution network systems timing push distribution user data.
In the present embodiment, in the step s 21, comprise the following steps:
S211:Power system operating mode is set according to faulty equipment program automatically;
S212:Call trend software;
S213:Obtain trend software calculated value;
S214:Update 10kv bus load values;
S215:Return to step S221;
Wherein, trend software provides the electric network swim value service that calculates, this software is called by remote service and interacted, called Journey is to be passed to user's pseudo operation parameter device mark and equipment state to trend software by interface, and trend software is according to parameter Calculate backward the system and return to the electric network swim value after calculating.
In the present embodiment, in step s 2, determine whether not travel through section, if so, then return to step S1, if nothing, Then enter step S3.
In the present embodiment, the common information model data timing of data acquisition and supervisor control push generation power grid Topological model, topological analysis is carried out by power grid topology model.
Wherein, data acquisition is that computer-based dcs and electric power are automatic with supervisor control Change monitoring system;In electric system, data acquisition and supervisor control the operational outfit at scene can be carried out monitoring and Control, to realize data acquisition, equipment control, measurement, parameter regulation and various types of signal alarm various functions.Data acquisition with Supervisor control provides data below and supports, common information model model, measurement information, user data, failure source information.
Wherein, common information model is an abstract model, describes all main objects of electric power enterprise, particularly with electricity Power runs related object.Power system resource is represented by providing a kind of relation with object class and attribute and between them Standard method.By defining a kind of common language based on common information model(That is syntax and semantics)So that these application or System can access common data and exchange information to realize independent of the internal representation of information.This method is adopted from data Collection obtains common information model model data with supervisor control, and electric network data is obtained by parsing common information model model And topological structure of electric.
Obviously, the above embodiment of the present invention is only intended to clearly illustrate example of the present invention, and is not pair The restriction of embodiments of the present invention.For those of ordinary skill in the field, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this All any modification, equivalent and improvement made within the spirit and principle of invention etc., should be included in the claims in the present invention Protection domain within.

Claims (9)

1. a kind of method of electrical network weak link automatic identification after failure, it is characterised in that comprise the following steps:
S1:Fault message is obtained, section where obtaining faulty equipment, obtains key equipment information all in section;
S2:Generation scanning result is calculated according to fault message;
S3:Contrast displaying and weak link are carried out to the section structure data of generation.
2. the method for electrical network weak link automatic identification after a kind of failure according to claim 1, it is characterised in that in step In rapid S1, comprise the following steps:
S11:Timing obtains breakdown switch letter to data acquisition and supervisor control early warning system storehouse read failure source message Breath, according to switching information, obtains corresponding switch associate device;
S12:Topological analysis is carried out to the equipment by power grid topology model, judges decompression equipment;
S13:Topological analysis is carried out according to decompression equipment, obtains the section where decompression equipment, and obtain pass all in section Button apparatus;
S14:Whether failure judgement information sets section.
3. the method for electrical network weak link automatic identification after a kind of failure according to claim 2, it is characterised in that in step In rapid S14, whether failure judgement information sets section, if so, S21 is then entered step, if it is not, then entering step S22;
Wherein, step S21 is to set power system operating mode to calculate trend according to faulty equipment;Step S22 is according to fault message Calculate generation incident classification.
4. the method for electrical network weak link automatic identification after a kind of failure according to claim 3, it is characterised in that in step In rapid S22, comprise the following steps:
S221:Traversal sets all devices decompression in section;
S222:According to power grid topology model, decompression equipment subordinate equipment is demanded, obtains all decompression equipment;
S223:All decompression equipment are counted, analyze decompression website;
S224:10kv busbares in decompression equipment are counted, statistics institute lossy load and number of users;
S225:Calculated according to accident event judgment rule, generate grade and the preservation of this accident event;
S226:Judge whether equipment in the section that does not travel through also, if then return to step S222;If nothing, enters step S23。
5. the method for electrical network weak link automatic identification after a kind of failure according to claim 4, it is characterised in that affiliated Step S23 be generation one section under some section scanning result.
6. the method for electrical network weak link automatic identification after a kind of failure according to claim 4, it is characterised in that in step In rapid S224, pass through data acquisition and supervisor control timing push grid measurement data and distribution network systems timing push distribution 10kv bus loads and number of users data are calculated in user data.
7. the method for electrical network weak link automatic identification after a kind of failure according to claim 3, it is characterised in that in step In rapid S21, comprise the following steps:
S211:Power system operating mode is set according to faulty equipment program automatically;
S212:Call trend software;
S213:Obtain trend software calculated value;
S214:Update 10kv bus load values;
S215:Return to step S221;
Wherein, the trend software provides the electric network swim value service that calculates, this software is called by remote service and interacted, Invoked procedure is to be passed to user's pseudo operation parameter device mark and equipment state, trend software root to trend software by interface Backward the system, which is calculated, according to parameter returns to the electric network swim value after calculating.
8. the method for electrical network weak link automatic identification after a kind of failure according to claim 1, it is characterised in that in step In rapid S2, determine whether not travel through section, if so, then return to step S1, if nothing, enters step S3.
9. the method for electrical network weak link automatic identification after a kind of failure according to claim 1, it is characterised in that in step In rapid S1, S2, the common information model data timing push generation power grid topology model of data acquisition and supervisor control, leads to Cross power grid topology model and carry out topological analysis.
CN201711114960.0A 2017-11-13 2017-11-13 A kind of method of electrical network weak link automatic identification after failure Pending CN107977774A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711114960.0A CN107977774A (en) 2017-11-13 2017-11-13 A kind of method of electrical network weak link automatic identification after failure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711114960.0A CN107977774A (en) 2017-11-13 2017-11-13 A kind of method of electrical network weak link automatic identification after failure

Publications (1)

Publication Number Publication Date
CN107977774A true CN107977774A (en) 2018-05-01

Family

ID=62013294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711114960.0A Pending CN107977774A (en) 2017-11-13 2017-11-13 A kind of method of electrical network weak link automatic identification after failure

Country Status (1)

Country Link
CN (1) CN107977774A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111141994A (en) * 2020-01-15 2020-05-12 广东电网有限责任公司 Method and system for rapidly notifying power line fault
CN112186741A (en) * 2020-09-10 2021-01-05 贵州电网有限责任公司 Power grid operation weak point distinguishing method based on BPA (Business Process analysis) simulation calculation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103036245A (en) * 2012-11-30 2013-04-10 中国南方电网有限责任公司 Novel transmission loss reducing method by alternating current or direct current (AC / DC) synergy used in interconnected network and novel transmission loss reducing system by AC / DC synergy used in interconnected network
CN105653764A (en) * 2015-12-22 2016-06-08 中国南方电网有限责任公司 Method for online estimating and pre-warning grid safety accident risk levels

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103036245A (en) * 2012-11-30 2013-04-10 中国南方电网有限责任公司 Novel transmission loss reducing method by alternating current or direct current (AC / DC) synergy used in interconnected network and novel transmission loss reducing system by AC / DC synergy used in interconnected network
CN105653764A (en) * 2015-12-22 2016-06-08 中国南方电网有限责任公司 Method for online estimating and pre-warning grid safety accident risk levels

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
莫祖森 等: "电网事故决策辅助系统的研究", 《城市建设理论研究(电子版)》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111141994A (en) * 2020-01-15 2020-05-12 广东电网有限责任公司 Method and system for rapidly notifying power line fault
CN112186741A (en) * 2020-09-10 2021-01-05 贵州电网有限责任公司 Power grid operation weak point distinguishing method based on BPA (Business Process analysis) simulation calculation

Similar Documents

Publication Publication Date Title
WO2015043441A1 (en) Smart alarm inference method based on multi-scenario analysis
CN109347203A (en) A kind of power equipment intelligence operational system
CN107171293B (en) The system and method for relay protection O&M information multidimensional publication is realized in smart grid
CN106026405B (en) Relay protection in-service monitoring based on EMS system and analysis system
CN101917237B (en) Railway signal monitoring method and system
CN108061841A (en) A kind of method of electric network fault event class automatic identification
CN113283704A (en) Intelligent power grid fault handling system and method based on knowledge graph
CN112910089A (en) Transformer substation secondary equipment fault logic visualization method and system
CN105529831B (en) A kind of secondary equipment of intelligent converting station failure Computer Aided Analysis System
CN103926917A (en) Intelligent transformer substation master control device testing system and method
CN110941918B (en) Intelligent substation fault analysis system
CN115048591B (en) Visual intelligent display analysis system of distribution network holographic data based on artificial intelligence
CN103023695A (en) Master station system monitoring model based on power dispatching automation
CN111768076B (en) Monitoring alarm signal clustering method taking power grid event as center
CN105139158A (en) Power grid abnormal information intelligent alarming and assistant decision-making method
CN111585352B (en) Power monitoring system, equipment and readable storage medium based on PMS2.0 system
CN108683187A (en) A kind of EMS grid monitoring systems based on big data
CN112467724A (en) Low-voltage distribution network fault studying and judging method
CN112834865A (en) Quick finder for secondary circuit fault of power system
CN105867267A (en) Method for automatically reporting instrument readings of distribution station room through image identification technology
CN107977774A (en) A kind of method of electrical network weak link automatic identification after failure
CN108038585A (en) A kind of fast quick-recovery householder method of event of failure based on multi-source data
CN114142614A (en) Highway power distribution room intelligent operation and maintenance management system based on SD-WAN network
CN108683253A (en) A kind of power transmission and transforming equipment panorama monitoring method
CN109191006A (en) A kind of method of 110 kV main transformer N-1 risk automatically scanning of power grid analysis

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180501

RJ01 Rejection of invention patent application after publication