CN103926917A - Intelligent transformer substation master control device testing system and method - Google Patents

Intelligent transformer substation master control device testing system and method Download PDF

Info

Publication number
CN103926917A
CN103926917A CN201410169324.8A CN201410169324A CN103926917A CN 103926917 A CN103926917 A CN 103926917A CN 201410169324 A CN201410169324 A CN 201410169324A CN 103926917 A CN103926917 A CN 103926917A
Authority
CN
China
Prior art keywords
test
control device
submodule
master control
iec61850
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410169324.8A
Other languages
Chinese (zh)
Inventor
彭志强
张小易
袁宇波
高磊
曾飞
杨明
陈磊
李虎成
樊海峰
卜强生
宋亮亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410169324.8A priority Critical patent/CN103926917A/en
Publication of CN103926917A publication Critical patent/CN103926917A/en
Pending legal-status Critical Current

Links

Landscapes

  • Selective Calling Equipment (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

本发明公开了一种变电站总控装置智能测试系统及其测试方法,包括调控主站仿真系统测试单元和间隔层仿真系统,其特征在于:调控主站仿真系统测试单元包括IEC104规约子模块、IEC61850规约子模块及智能测试子模块,间隔层仿真IED设备与IEC61850规约子模块建立IEC61850通信链接,被测设备总控装置与IEC104规约子模块建立IEC104通信链接,间隔层仿真IED设备与被测设备总控装置建立IEC61850通信链接,智能测试子模块对采集的数据进行匹配比对,给出测试结果形成测试报告。本发明利用模块化思想,实现同时接收不同通道不用规约的实时报文,对解析的数据进行智能比对,实时产生异常事件,快速输出异常信息,给出判断结果,大大提高总控装置测试效率,同时保证测试结果的实时性和有效性。

The invention discloses an intelligent test system and a test method for a general control device of a substation, which includes a control master station simulation system test unit and an interval layer simulation system, and is characterized in that the control master station simulation system test unit includes IEC104 statute sub-modules, IEC61850 The protocol sub-module and the intelligent test sub-module, the interval layer simulates the IED equipment and establishes the IEC61850 communication link with the IEC61850 protocol sub-module, the master control device of the equipment under test establishes the IEC104 communication link with the IEC104 protocol sub-module, and the interval layer simulates the IED equipment and the device under test. The control device establishes an IEC61850 communication link, and the intelligent test sub-module matches and compares the collected data, and gives the test results to form a test report. The invention utilizes the idea of modularization to simultaneously receive real-time messages of different channels without protocols, intelligently compare the analyzed data, generate abnormal events in real time, quickly output abnormal information, and give judgment results, greatly improving the test efficiency of the master control device , while ensuring the real-time and validity of the test results.

Description

一种变电站总控装置智能测试系统及其测试方法An intelligent test system and test method for a substation master control device

技术领域technical field

本发明涉及一种变电站总控装置智能测试的方法,适用于变电站总控装置测试及检验,属于电力系统自动化技术领域。The invention relates to an intelligent testing method for a general control device of a substation, which is suitable for testing and inspection of the general control device of a substation, and belongs to the technical field of power system automation.

背景技术Background technique

随着国家电网公司调控一体化“大运行”的推进,变电站与调度自动化主站系统交互的信息越来越多,交互的形式也越来越丰富。调度自动化系统中的数据正确与否直接关系到电网调度与监控运行人员对电网运行工况的分析、判断、状态估计、调度员潮流、静态安全分析和短路计算及电网远方遥控操作的正确性等。With the advancement of the "big operation" of the integration of regulation and control by the State Grid Corporation of China, more and more information is exchanged between substations and dispatch automation master station systems, and the forms of interaction are becoming more and more abundant. Whether the data in the dispatching automation system is correct or not is directly related to the analysis, judgment, state estimation, dispatcher power flow, static safety analysis and short-circuit calculation of the power grid dispatching and monitoring operators on the operating conditions of the power grid. .

为保证电网通信过程的通信质量和安全性,对变电站每个接入的总控装置都需经过严格的入网测试,及在运行的变电站总控装置异常缺陷也需要一种有效的手段进行检验,本发明旨在研究一种变电站总控装置智能测试的方法,实现对被测设备总控装置上送的遥测、遥信通信数据和主站下发的遥控和遥调命令的正确性和实时性进行智能测试,保证被测子系统通信能力,完成通信质量评估并形成模板化测试报告。In order to ensure the communication quality and security of the power grid communication process, each master control device connected to the substation needs to undergo a strict network access test, and an effective means of inspection is also required for the abnormal defects of the master control device of the substation in operation. The present invention aims to study a method for intelligent testing of a substation master control device, to realize the correctness and real-time performance of telemetry and remote signaling communication data sent by the master control device of the equipment under test and the remote control and remote adjustment commands issued by the master station Carry out intelligent testing to ensure the communication capability of the subsystem under test, complete communication quality assessment and form a templated test report.

发明内容Contents of the invention

本发明的目的是为了解决目前变电站总控装置入网检测问题及有效检测运行总控装置异常缺陷,本发明提出了一种变电站总控装置智能测试系统及其测试方法,即基于IEC104规约和IEC61850标准的协议分析及比对方法,测试总控装置传输数据的正确性与及时性,保证被测子系统通信能力,完成通信质量评估并形成模板化测试报告。The purpose of the present invention is to solve the problem of network access detection of the current substation master control device and effectively detect the abnormal defects of the operation master control device. The present invention proposes an intelligent test system and its test method for the substation master control device, which is based on the IEC104 protocol and the IEC61850 standard The method of protocol analysis and comparison is used to test the correctness and timeliness of the data transmitted by the master control device, to ensure the communication capability of the subsystem under test, to complete the communication quality evaluation and to form a template test report.

为了解决上述问题,本发明所采取的技术方案是:In order to solve the problems referred to above, the technical scheme that the present invention takes is:

一种变电站总控装置智能测试系统,包括调控主站仿真系统测试单元,其特征在于:所述调控主站仿真系统测试单元包括IEC104规约子模块、IEC61850规约子模块及智能测试子模块,所述间隔层仿真IED设备与IEC61850规约子模块建立IEC61850通信链接,所述被测设备总控装置与IEC104规约子模块建立IEC104通信链接,所述间隔层仿真IED设备与被测设备总控装置建立IEC61850通信链接,所述智能测试子模块对分别来自IEC104规约子模块采集的数据与IEC61850规约子模块采集的数据进行匹配比对,给出测试结果形成测试报告。An intelligent test system for a substation general control device, including a control master station simulation system test unit, characterized in that: the control master station simulation system test unit includes an IEC104 protocol sub-module, an IEC61850 protocol sub-module and an intelligent test sub-module, the The bay layer emulates the IED equipment and establishes an IEC61850 communication link with the IEC61850 protocol sub-module, and establishes an IEC104 communication link between the master control device of the tested equipment and the IEC104 protocol sub-module, and establishes an IEC61850 communication between the bay layer simulated IED device and the master control device of the device under test link, the intelligent test sub-module matches and compares the data collected from the IEC104 protocol sub-module and the data collected by the IEC61850 protocol sub-module, and gives the test results to form a test report.

前述的一种变电站总控装置智能测试系统,其特征在于:所述IEC104规约子模块采集被测设备总控装置输送的信息,并实时解析报文,经过详细的规约分析并输出事件信息,将输出的事件信息保存至数据库供自动化测试子模块调用。The aforementioned smart test system for a substation master control device is characterized in that: the IEC104 statute sub-module collects the information delivered by the master control device of the equipment under test, and parses the message in real time, and outputs event information through detailed protocol analysis. The output event information is saved to the database for calling by the automated test sub-module.

前述的一种变电站总控装置智能测试系统,其特征在于:所述IEC61850规约子模块采集间隔层仿真IED设备输送的信息,能够对规约分析并输出事件信息,将输出的事件信息保存至数据库供自动化测试子模块调用。The aforementioned intelligent test system for substation master control device is characterized in that: the IEC61850 protocol sub-module collects the information delivered by the bay layer simulation IED equipment, can analyze the protocol and output event information, and save the output event information to the database for supply Automated test submodule calls.

前述的一种变电站总控装置智能测试系统,其特征在于:所述智能测试子模块将IEC104规约子模块和IEC61850规约子模块输出的事件信息作为输入,比对两次输入的事件信息的异常,并给出测试结果形成测试报告。The aforementioned intelligent test system for substation master control devices is characterized in that: the intelligent test submodule uses the event information output by the IEC104 statute submodule and the IEC61850 statute submodule as input, and compares the abnormality of the event information input twice, And give the test results to form a test report.

一种变电站总控装置智能测试方法,其特征在于:包括以下几个步骤:An intelligent testing method for a substation master control device, characterized in that it includes the following steps:

(1)、利用IEC61850通信协议对间隔层仿真IED设备的开关量与模拟量设值;(1) Use the IEC61850 communication protocol to simulate the switching value and analog value setting of the IED equipment on the bay layer;

(2)、间隔层仿真IED设备通过IEC61850通信协议向仿真系统测试单元的IEC61850规约子模块上数送变化的遥测和变位的遥信数据,IEC61850规约子模块存储上述报文至数据库;(2), the bay layer simulates the IED equipment to send the changed telemetry and displacement telesignaling data to the IEC61850 protocol sub-module of the simulation system test unit through the IEC61850 communication protocol, and the IEC61850 protocol sub-module stores the above-mentioned messages to the database;

(3)、间隔层仿真IED设备与被测设备总控装置通过IEC61850通信协议交互信息;(3) The interval layer simulates the IED equipment and the master control device of the equipment under test to exchange information through the IEC61850 communication protocol;

(4)、被测设备总控装置通过IEC104通信协议转发采集的变化的遥测和变位的遥信等通信数据,调控主站仿真系统测试单元IEC104规约子模块获取被测设备总控装置转发的报文并发送至数据库存储;(4), the master control device of the equipment under test forwards and collects the communication data such as the changed telemetry and the remote signal of displacement through the IEC104 communication protocol, and regulates the master station simulation system test unit IEC104 protocol sub-module to obtain the data forwarded by the master control device of the device under test The message is sent to the database for storage;

(5)、控主站仿真系统测试单元的智能测试子模块对步骤(2)和步骤(4)获取的通信报文,比对两次获取的遥测和遥信属性值,验证测试数据的正确性和实时性,若两次分析的数值在允许数值与时间偏差范围内,则输出测试通过报告,若数值超出偏差范围,则抛出异常事件,输出测试不通过报告。(5), the intelligent test sub-module of the master station simulation system test unit compares the telemetry and telesignal attribute values obtained twice to the communication messages obtained in steps (2) and (4), and verifies that the test data is correct and real-time performance, if the value of the two analyzes is within the allowable value and time deviation range, the output test pass report, if the value exceeds the deviation range, an exception event will be thrown, and the test fail report will be output.

前述的一种变电站总控装置智能测试方法,其特征在于:所述步骤(5)中,测试数据正确性比对:通过数据值比对检验,由于采用不同的数据传输格式,数据允许存在一个较小的转换误差,转换误差由系统设定。The aforementioned intelligent testing method for a substation master control device is characterized in that: in the step (5), the correctness of the test data is compared: through the data value comparison inspection, due to the use of different data transmission formats, the data is allowed to exist one Small conversion error, the conversion error is set by the system.

前述的一种变电站总控装置智能测试方法,其特征在于:所述步骤(5)中,测试数据实时性比对:通过变化数据来测试,用IEC61850通道及IEC104通道得到更新数据的时间差来获取被测设备总控装置的实时性结果。The aforementioned smart test method for a substation master control device is characterized in that: in the step (5), the real-time comparison of the test data: test by changing the data, and obtain the time difference of the updated data with the IEC61850 channel and the IEC104 channel The real-time results of the master control device of the equipment under test.

本发明的有益效果是:本发明提供的一种变电站总控装置智能测试系统及其测试方法,利用模块化思想,同时实现不同通道不用规约的实时报文,保证规约分析实时性,实时产生异常事件,快速输出异常信息,通过智能比对,给出测试结果,大大提高了变电站总控装置的入网测试效率,同时也能快速的检测出有异常缺陷运行中的总控装置,为电网安全运行提高有力的技术保证。The beneficial effect of the present invention is that: the intelligent test system and test method of the substation general control device provided by the present invention utilizes the idea of modularization to simultaneously realize real-time messages of different channels without protocols, ensuring the real-time analysis of protocols and generating abnormalities in real time events, quickly output abnormal information, and provide test results through intelligent comparison, which greatly improves the network access test efficiency of the substation master control device, and can also quickly detect the master control device in operation with abnormal defects, so as to ensure the safe operation of the power grid. Improve strong technical guarantee.

附图说明Description of drawings

图1是本发明变电站总控装置智能测试系统结构框图。Fig. 1 is a structural block diagram of the intelligent test system of the substation master control device of the present invention.

图2是变电站总控装置智能测试方法测试流程示意图;Fig. 2 is a schematic diagram of the testing process of the intelligent testing method of the substation master control device;

图3时本发明测试系统信息交互流程示意图。Fig. 3 is a schematic diagram of the information interaction flow of the testing system of the present invention.

具体实施方式Detailed ways

下面结合附图对本发明做进一步的描述。The present invention will be further described below in conjunction with the accompanying drawings.

如图1所示,一种变电站总控装置智能测试系统,包括调控主站仿真系统测试单元,其特征在于:所述调控主站仿真系统测试单元包括IEC104规约子模块、IEC61850规约子模块及智能测试子模块,所述间隔层仿真IED设备与IEC61850规约子模块建立IEC61850通信链接,所述被测设备总控装置与IEC104规约子模块建立IEC104通信链接,所述间隔层仿真IED设备与被测设备总控装置建立IEC61850通信链接,所述智能测试子模块对分别来自IEC104规约子模块采集的数据与IEC61850规约子模块采集的数据进行匹配比对,给出测试结果形成测试报告。As shown in Figure 1, an intelligent test system for a substation general control device includes a control master station simulation system test unit. The test sub-module, the interval layer emulates the IED equipment and establishes the IEC61850 communication link with the IEC61850 protocol sub-module, the said master control device of the equipment under test establishes the IEC104 communication link with the IEC104 protocol sub-module, and the interval layer simulates the IED equipment and the equipment under test The master control device establishes an IEC61850 communication link, and the intelligent test sub-module matches and compares the data collected by the IEC104 protocol sub-module with the data collected by the IEC61850 protocol sub-module, and provides test results to form a test report.

所述IEC104规约子模块采集被测设备总控装置输送的信息,并实时解析报文,经过详细的规约分析并输出事件信息,将输出的事件信息保存至数据库供自动化测试子模块调用。所述IEC61850规约子模块采集间隔层仿真IED设备输送的信息,能够对规约分析并输出事件信息,将输出的事件信息保存至数据库供自动化测试子模块调用。所述智能测试子模块将IEC104规约子模块和IEC61850规约子模块输出的事件信息作为输入,比对两次输入的事件信息的异常,并给出测试结果形成测试报告。The IEC104 protocol sub-module collects the information sent by the master control device of the equipment under test, and analyzes the message in real time, and outputs event information after detailed protocol analysis, and saves the output event information to the database for the automatic test sub-module to call. The IEC61850 protocol sub-module collects the information delivered by the bay layer simulation IED device, can analyze the protocol and output event information, and save the output event information to the database for the automatic test sub-module to call. The intelligent test sub-module takes the event information output by the IEC104 protocol sub-module and the IEC61850 protocol sub-module as input, compares the abnormality of the two input event information, and gives the test result to form a test report.

本发明变电站总控装置智能测试方法,包括以下几个步骤:The intelligent testing method of the substation master control device of the present invention comprises the following steps:

(1)、利用IEC61850通信协议对间隔层仿真IED设备的开关量与模拟量设值;(1) Use the IEC61850 communication protocol to simulate the switching value and analog value setting of the IED equipment on the bay layer;

(2)、间隔层仿真IED设备通过IEC61850通信协议向仿真系统测试单元的IEC61850规约子模块上数送变化的遥测和变位的遥信数据,IEC61850规约子模块存储上述报文至数据库;(2), the interval layer simulates the IED equipment to send the changed telemetry and displacement telesignaling data to the IEC61850 protocol sub-module of the simulation system test unit through the IEC61850 communication protocol, and the IEC61850 protocol sub-module stores the above-mentioned messages to the database;

(3)、间隔层仿真IED设备与被测设备总控装置通过IEC61850通信协议交互信息;(3) The interval layer simulates the IED equipment and the master control device of the equipment under test to exchange information through the IEC61850 communication protocol;

(4)、被测设备总控装置通过IEC104通信协议转发采集的变化的遥测和变位的遥信等通信数据,调控主站仿真系统测试单元IEC104规约子模块获取被测设备总控装置转发的报文并发送至数据库存储;(4), the master control device of the equipment under test forwards and collects the communication data such as the changed telemetry and the remote signal of displacement through the IEC104 communication protocol, and regulates the master station simulation system test unit IEC104 protocol sub-module to obtain the data forwarded by the master control device of the device under test The message is sent to the database for storage;

(5)、控主站仿真系统测试单元的智能测试子模块对步骤(2)和步骤(4)获取的通信报文,比对两次获取的遥测和遥信属性值,验证测试数据的正确性和实时性,若两次分析的数值在允许数值与时间偏差范围内,则输出测试通过报告,若数值超出偏差范围,则抛出异常事件,输出测试不通过报告。(5), the intelligent test sub-module of the master station simulation system test unit compares the telemetry and telesignal attribute values obtained twice to the communication messages obtained in steps (2) and (4), and verifies that the test data is correct and real-time performance, if the value of the two analyzes is within the allowable value and time deviation range, the output test pass report, if the value exceeds the deviation range, an exception event will be thrown, and the test fail report will be output.

本发明测试系统通过对分别来自IEC104规约子模块采集的数据与IEC61850规约子模块采集的数据进行匹配比对,从而校验被测设备数据处理的正确性及实时性,其中测试原理如下:The test system of the present invention matches and compares the data collected from the IEC104 protocol sub-module and the data collected by the IEC61850 protocol sub-module respectively, thereby verifying the correctness and real-time performance of the data processing of the device under test, wherein the test principle is as follows:

正确性比对:通过数据值比对检验,由于可能采用不同的数据传输格式,数据允许存在一个较小的转换误差,由系统设定。Correctness comparison: through the data value comparison test, due to the possible use of different data transmission formats, the data is allowed to have a small conversion error, which is set by the system.

实时性比对:通过变化数据来测试,用IEC61850通道及IEC104通道得到更新数据的时间差来获取被测设备的实时性的结果。Real-time comparison: test by changing the data, and use the time difference between the IEC61850 channel and the IEC104 channel to obtain the updated data to obtain the real-time results of the device under test.

为实现闭环测试,本方案采用IEC61850通信协议取代服务来实现,这样便于测试各种数值条件下被测设备的功能和性能。以上显示和描述了本发明的基本原理、主要特征及优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界。In order to realize the closed-loop test, this program uses the IEC61850 communication protocol to replace the service, which is convenient for testing the function and performance of the device under test under various numerical conditions. The basic principles, main features and advantages of the present invention have been shown and described above. Those skilled in the art should understand that the present invention is not limited by the above-mentioned embodiments, and that described in the above-mentioned embodiments and the specification only illustrates the principles of the present invention, and the present invention will also have other functions without departing from the spirit and scope of the present invention. Variations and improvements all fall within the scope of the claimed invention. The protection scope of the present invention is defined by the appended claims and their equivalents.

Claims (7)

1. transformer station's master control device intelligent test system, comprise regulation and control main website analogue system test cell, it is characterized in that: described regulation and control main website analogue system test cell comprises IEC104 stipulations submodule, IEC61850 stipulations submodule and intelligent test submodule, described wall emulation IED equipment and IEC61850 stipulations submodule are set up IEC61850 communication linkage, described equipment under test master control device and IEC104 stipulations submodule are set up IEC104 communication linkage, described wall emulation IED equipment and equipment under test master control device are set up IEC61850 communication linkage, described intelligent test submodule is to carrying out matching ratio pair from the data of IEC104 stipulations submodule collection and the data of IEC61850 stipulations submodule collection respectively, provide test result and form test report.
2. a kind of transformer station according to claim 1 master control device intelligent test system, it is characterized in that: described IEC104 stipulations submodule gathers the information that equipment under test master control device is carried, and real time parsing message, through detailed protocol analysis outgoing event information, the event information of output is saved to database and calls for automatic test submodule.
3. a kind of transformer station according to claim 2 master control device intelligent test system, it is characterized in that: the information that described IEC61850 stipulations submodule acquisition interval layer emulation IED equipment is carried, can, to protocol analysis outgoing event information, the event information of output be saved to database and call for automatic test submodule.
4. a kind of transformer station according to claim 3 master control device intelligent test system, it is characterized in that: described intelligent test submodule is using the event information of IEC104 stipulations submodule and the output of IEC61850 stipulations submodule as input, compare event information abnormal of twice input, and provide test result and form test report.
5. transformer station's master control device intelligent test method, is characterized in that: comprise following step:
(1), utilize IEC61850 communication protocol switching value and analog quantity value of establishing to wall emulation IED equipment;
(2), wall emulation IED equipment send the remote signalling data of remote measurement and the displacements of variation to number on the IEC61850 stipulations submodule of analogue system test cell by IEC61850 communication protocol, IEC61850 stipulations submodule is stored above-mentioned message to database;
(3), wall emulation IED equipment and equipment under test master control device are by IEC61850 communication protocol interactive information;
(4), equipment under test master control device forwards the communication data such as the remote measurement of variation and the remote signalling of displacement gathering by IEC104 communication protocol, the regulation and control analogue system test cell IEC104 of main website stipulations submodule obtains the message that equipment under test master control device forwards and is sent to database storage;
(5) communication message that, the intelligent test submodule of control main website analogue system test cell obtains step (2) and step (4), compare the remote measurement and the remote signalling property value that obtain for twice, the correctness of validation test data and real-time, if the numerical value of twice analysis is within the scope of permissible level and time deviation, output test is by report, if numerical value exceeds deviation range, throw exception event, output test is not by report.
6. a kind of transformer station according to claim 5 master control device intelligent test method, it is characterized in that: in described step (5), test data correctness comparison: by data value comparison inspection, owing to adopting different data transmission formats, data allow to have a less transformed error, and transformed error is by default.
7. a kind of transformer station according to claim 6 master control device intelligent test method, it is characterized in that: in described step (5), test data real-time comparison: test by delta data, obtain mistiming of new data more with IEC61850 passage and IEC104 passage and obtain the real-time result of equipment under test master control device.
CN201410169324.8A 2014-04-25 2014-04-25 Intelligent transformer substation master control device testing system and method Pending CN103926917A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410169324.8A CN103926917A (en) 2014-04-25 2014-04-25 Intelligent transformer substation master control device testing system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410169324.8A CN103926917A (en) 2014-04-25 2014-04-25 Intelligent transformer substation master control device testing system and method

Publications (1)

Publication Number Publication Date
CN103926917A true CN103926917A (en) 2014-07-16

Family

ID=51145176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410169324.8A Pending CN103926917A (en) 2014-04-25 2014-04-25 Intelligent transformer substation master control device testing system and method

Country Status (1)

Country Link
CN (1) CN103926917A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104320438A (en) * 2014-10-08 2015-01-28 成都交大许继电气有限责任公司 High reliability data transmission system for traction power supply operation management system and transmission method
CN104579817A (en) * 2014-11-14 2015-04-29 国家电网公司 Communication loop test method based on GOOSE (generic object-oriented substation event) logics
CN104601405A (en) * 2015-01-12 2015-05-06 国家电网公司 System and method for testing information interaction of station level based on configuration strategies
CN105227402A (en) * 2015-09-29 2016-01-06 国网福建省电力有限公司 The integrated method of testing of a kind of intelligent substation many stipulations communication
CN105939062A (en) * 2015-12-10 2016-09-14 广东电网有限责任公司东莞供电局 Intelligent judgment method for judging whether GIS disconnecting link is in place or not
CN106301976A (en) * 2015-05-22 2017-01-04 上海研电电力科技有限公司 A kind of intelligent substation schedule information automated testing method
CN106708742A (en) * 2017-02-20 2017-05-24 许继集团有限公司 Method and device for automated test of communication protocol module test architecture
CN107040522A (en) * 2016-11-14 2017-08-11 许继集团有限公司 A kind of photovoltaic monitoring system and the stipulations conversion method of a large amount of devices access
CN107861000A (en) * 2017-11-01 2018-03-30 南京国电南自电网自动化有限公司 A kind of method of automatic test substation intelligent alarm function
CN107942167A (en) * 2017-11-22 2018-04-20 国网四川省电力公司电力科学研究院 Intelligent substation synchronous phasor measuring device boss, which stands, tests system and method
CN108873735A (en) * 2018-06-29 2018-11-23 许继集团有限公司 A kind of distribution main station system component simulation testing device and method
CN109495499A (en) * 2018-12-13 2019-03-19 南京国电南自电网自动化有限公司 Communication protocol bi-directional verification automated test tool and method based on Encryption Algorithm
CN110286664A (en) * 2019-04-17 2019-09-27 许昌开普检测研究院股份有限公司 A kind of electric system measure and control device telemetering precision Auto-Test System
CN112468362A (en) * 2020-11-20 2021-03-09 广东电网有限责任公司电力科学研究院 Automatic testing method and device for transformer substation
CN115190054A (en) * 2022-06-30 2022-10-14 海南电网有限责任公司电力科学研究院 Double-master-station batch communication protocol analysis method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6795789B2 (en) * 2001-05-21 2004-09-21 Omnicron Electronics Corp. Usa System for testing of intelligent electronic devices with digital communications
KR20070121238A (en) * 2006-06-21 2007-12-27 한전케이디엔 주식회사 IC64-based digital substation system for partial discharge measurement in substations
CN101706816A (en) * 2009-12-22 2010-05-12 广东电网公司电力科学研究院 Method for detecting digitized transformer station model
CN103199624A (en) * 2013-03-29 2013-07-10 国家电网公司 Smart converting station based on international electrotechnical commission (IEC) 61850
CN103414251A (en) * 2013-08-26 2013-11-27 南京匹瑞电气科技有限公司 Substation network communication simulation system based on IEC 61850
CN103412208A (en) * 2013-07-15 2013-11-27 国家电网公司 Intelligent substation electric telecontrol device closed loop test method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6795789B2 (en) * 2001-05-21 2004-09-21 Omnicron Electronics Corp. Usa System for testing of intelligent electronic devices with digital communications
KR20070121238A (en) * 2006-06-21 2007-12-27 한전케이디엔 주식회사 IC64-based digital substation system for partial discharge measurement in substations
CN101706816A (en) * 2009-12-22 2010-05-12 广东电网公司电力科学研究院 Method for detecting digitized transformer station model
CN103199624A (en) * 2013-03-29 2013-07-10 国家电网公司 Smart converting station based on international electrotechnical commission (IEC) 61850
CN103412208A (en) * 2013-07-15 2013-11-27 国家电网公司 Intelligent substation electric telecontrol device closed loop test method
CN103414251A (en) * 2013-08-26 2013-11-27 南京匹瑞电气科技有限公司 Substation network communication simulation system based on IEC 61850

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104320438A (en) * 2014-10-08 2015-01-28 成都交大许继电气有限责任公司 High reliability data transmission system for traction power supply operation management system and transmission method
CN104320438B (en) * 2014-10-08 2018-11-13 成都交大许继电气有限责任公司 The high reliability data transmission system of traction power supply operation management system
CN104579817A (en) * 2014-11-14 2015-04-29 国家电网公司 Communication loop test method based on GOOSE (generic object-oriented substation event) logics
CN104601405A (en) * 2015-01-12 2015-05-06 国家电网公司 System and method for testing information interaction of station level based on configuration strategies
CN104601405B (en) * 2015-01-12 2018-08-03 国家电网公司 A kind of station level information exchange test system and method based on configuration strategy
CN106301976A (en) * 2015-05-22 2017-01-04 上海研电电力科技有限公司 A kind of intelligent substation schedule information automated testing method
CN105227402A (en) * 2015-09-29 2016-01-06 国网福建省电力有限公司 The integrated method of testing of a kind of intelligent substation many stipulations communication
CN105227402B (en) * 2015-09-29 2019-04-26 国网福建省电力有限公司 An integrated test method for multi-protocol communication in smart substations
CN105939062A (en) * 2015-12-10 2016-09-14 广东电网有限责任公司东莞供电局 Intelligent judgment method for judging whether GIS disconnecting link is in place or not
CN107040522A (en) * 2016-11-14 2017-08-11 许继集团有限公司 A kind of photovoltaic monitoring system and the stipulations conversion method of a large amount of devices access
CN107040522B (en) * 2016-11-14 2020-09-25 许继集团有限公司 A photovoltaic monitoring system and a protocol conversion method for connecting a large number of devices
CN106708742A (en) * 2017-02-20 2017-05-24 许继集团有限公司 Method and device for automated test of communication protocol module test architecture
CN106708742B (en) * 2017-02-20 2020-06-23 许继集团有限公司 Automatic testing method and device for communication protocol module testing framework
CN107861000A (en) * 2017-11-01 2018-03-30 南京国电南自电网自动化有限公司 A kind of method of automatic test substation intelligent alarm function
CN107942167A (en) * 2017-11-22 2018-04-20 国网四川省电力公司电力科学研究院 Intelligent substation synchronous phasor measuring device boss, which stands, tests system and method
CN108873735A (en) * 2018-06-29 2018-11-23 许继集团有限公司 A kind of distribution main station system component simulation testing device and method
CN108873735B (en) * 2018-06-29 2021-11-19 许继集团有限公司 Power distribution main station system component simulation test device and method
CN109495499B (en) * 2018-12-13 2021-10-22 南京国电南自电网自动化有限公司 Encryption algorithm-based communication protocol bidirectional verification automatic test tool and method
CN109495499A (en) * 2018-12-13 2019-03-19 南京国电南自电网自动化有限公司 Communication protocol bi-directional verification automated test tool and method based on Encryption Algorithm
CN110286664A (en) * 2019-04-17 2019-09-27 许昌开普检测研究院股份有限公司 A kind of electric system measure and control device telemetering precision Auto-Test System
CN112468362A (en) * 2020-11-20 2021-03-09 广东电网有限责任公司电力科学研究院 Automatic testing method and device for transformer substation
CN115190054A (en) * 2022-06-30 2022-10-14 海南电网有限责任公司电力科学研究院 Double-master-station batch communication protocol analysis method
CN115190054B (en) * 2022-06-30 2024-04-05 海南电网有限责任公司电力科学研究院 Double-master-station batch communication protocol analysis method

Similar Documents

Publication Publication Date Title
CN103926917A (en) Intelligent transformer substation master control device testing system and method
CN106971351B (en) The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method
CN103412208B (en) The method of intelligent substation electric power telemechanical device closed loop test
CN112366818B (en) Automatic checking and accepting method and system for monitoring information of intelligent substation
CN107180314B (en) Operation and maintenance business model modeling method based on primary and secondary system incidence relation
CN107167704B (en) Distribution network fault diagnosis system and method based on CIM model
CN104052633B (en) Intelligent station 61850 and the stipulations integration test method of telemechanical 104
CN106771762A (en) The distribution terminal closed loop detecting system and method with secondary injection are transmitted based on simulation
CN112701790B (en) Intelligent joint debugging platform and joint debugging method for transformer substation and master station
CN102570602A (en) Fault comprehensive processing platform and method of distribution network
CN104979908B (en) Substation network online failure analysis method
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN108923953A (en) A kind of virtual main station system of power remote machine debugging
CN107918340A (en) A kind of power distribution automation adjustment method on the spot based on simulation main website
CN106771760B (en) Distributed FA function diagnosis method based on master station simulation
CN102832707A (en) Misoperation-preventive locking logic automatic test system for intelligent transformer substation
CN104283215A (en) A detection test method and device for an intelligent distributed power distribution terminal
CN103905275A (en) Electric power telecontrol equipment testing method based on IEC61850 replacement services
CN106302019A (en) A kind of substation data communication network shutdown processes the test system and method for time
CN104077934A (en) Integrated training platform for intelligent substation secondary system
CN102999031B (en) Ground county integration subregion statistics, the state monitoring method safeguarded
CN105759150A (en) Test system and method for transformer substation secondary device prefabricated cabin
CN104579817A (en) Communication loop test method based on GOOSE (generic object-oriented substation event) logics
CN109639529B (en) Diagnostic method for abnormal remote control command of intelligent substation
CN107766649A (en) A kind of system protection real-time closed-loop emulation test system and its operation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140716

RJ01 Rejection of invention patent application after publication