CN104579817A - Communication loop test method based on GOOSE (generic object-oriented substation event) logics - Google Patents

Communication loop test method based on GOOSE (generic object-oriented substation event) logics Download PDF

Info

Publication number
CN104579817A
CN104579817A CN201410646227.3A CN201410646227A CN104579817A CN 104579817 A CN104579817 A CN 104579817A CN 201410646227 A CN201410646227 A CN 201410646227A CN 104579817 A CN104579817 A CN 104579817A
Authority
CN
China
Prior art keywords
data
iec61850
equipment
test
real
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410646227.3A
Other languages
Chinese (zh)
Inventor
王康
王吉文
梅杰
曹菜平
胡广梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Bozhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Bozhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Bozhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410646227.3A priority Critical patent/CN104579817A/en
Publication of CN104579817A publication Critical patent/CN104579817A/en
Pending legal-status Critical Current

Links

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

The invention relates to a communication loop test method based on GOOSE (generic object-oriented substation event) logics in a power dispatching system. The communication loop test method is characterized by comprising the following steps: (1) a test system creates IEC61850 communication connection with IED (intelligent electronic device) simulation equipment and creates IEC104 communication connection with a power telecontrol device of tested equipment, the tested equipment also creates IEC61850 communication connection with the IED simulation equipment, and data of the tested equipment is kept consistent with data of corresponding points of the IED simulation equipment; (2) the data acquired by IEC104 is compared with data acquired by IEC61850 to check the data processing correctness and real-time property of the tested equipment; (3) outputting a test result and forming a test report. According to the method, the correctness and real-time property of remote metering and remote signaling communication data sent to the tested equipment and remote control and remote regulating commands sent by a main station can be automatically detected.

Description

Based on the communication loop method of testing of GOOSE logic
Technical field
The present invention relates in electric power dispatching system, based on the implementation method of GOOSE logic to IED device command automatic detection technology of parameter, especially a kind of communication loop method of testing based on GOOSE logic.
Background technology
Along with IEC61850 technology is in the successful Application of transformer station, the test job of intelligent substation is become more and more important.For a transformer station, except the test to its allomeric function, be also necessary to access in the test of the telemechanical apparatus etc. of substation field, this can play important effect to the daily operation and maintenance of transformer station.
For ensureing communication quality and the fail safe of communication system of power grids process, need to detect through strict networking to the electric power telemechanical device of each access.
Summary of the invention
The object of this invention is to provide a kind of communication loop method of testing based on GOOSE logic, the telemechanical apparatus testing time can be shortened, ensure real-time and the validity of test result.
Based on a communication loop method of testing for GOOSE logic, its special feature is, comprises the steps:
(1) test macro sets up IEC61850 communication connection to emulation IED equipment, sets up IEC104 communication connection to equipment under test electric power telemechanical device; Equipment under test also sets up the communication connection of IEC61850 with emulation IED equipment, and the data of equipment under test should be consistent with the data of emulation IED equipment corresponding points;
(2) data by gathering the data gathered from IEC104 and IEC61850 are compared, to verify correctness, the real-time of equipment under test data processing;
(3) output test result, form test report.
In step (2), the correctness verification of data processing is specific as follows: tested by the comparison of data value, and preset transformed error, is judged to be correct otherwise is judged to be mistake when result is in error range.
In step (2), the real-time verification of data processing is specific as follows: tested by delta data, namely whether be less than or equal to the time difference of the more new data obtained from IEC61850 passage and IEC104 passage the real-time that preset value obtains equipment under test, if met, be judged to be in real time otherwise be judged to exist delayed.
Present approach provides a kind of communication loop method of testing based on GOOSE logic, the correctness and the real-time that achieve remote control and the remote regulating order issued the remote measurement that equipment under test send, remote signalling communication data and main website carry out Aulomatizeted Detect, ensure tested subsystem communication ability, complete Round Card and form templating test report.Compared with prior art the present invention also has following beneficial effect: utilize Module Division mode, realize monitoring the real-time packet of different passage without stipulations simultaneously, ensure protocol analysis real-time, real-time generation anomalous event, quick output abnormality information, provide judged result, shorten the telemechanical apparatus testing time.Ensure real-time and the validity of test result.The protocol analysis technology that the present invention adopts can be applied in protocol analysis software, ensure that the correctness of protocol analysis.
Accompanying drawing explanation
Accompanying drawing 1 is test philosophy figure of the present invention;
Accompanying drawing 2 is the value and time of occurrence schematic diagram that in embodiment 1, IEC61850 stipulations passage is resolved on axle at one time.
Embodiment
In order to solve current intelligent substation telemechanical apparatus networking test problems, the present invention proposes the communication loop method of testing based on GOOSE logic, namely based on communications analysis and the comparison method of IEC104 stipulations and IEC61850GOOSE logic, correctness and the promptness of telemechanical apparatus transmission data is detected.
Technical scheme of the present invention is, the present invention adopts multimode compound mode, realizes testing process.Mainly comprise 104 stipulations submodules, 61850 stipulations submodules and automatic test submodule, send instructions under being respectively used to collection communication message and execution, check the correctness of message and the promptness of command execution.
In 104 stipulations submodules, monitor communication message by network switch mirror port, through detailed protocol analysis and outgoing event information, the event information of output is saved to database and calls for automatic test submodule; Main station system issues remote control and remote regulating order by 104 submodules to substation device, and command execution process is embodied by the message that substation is sent.
In 61850 stipulations submodules, monitor communication message by network switch mirror port, through detailed protocol analysis and outgoing event information, the event information of output is saved to database and calls for automatic test submodule; Main station system is by 61850 submodules, and utilize substitution value function to establish value to remote control, the remote measurement of remote regulating association, remote signalling, command execution process is embodied by the message that substation is sent.
In automatic test submodule, using the event information that exports in 104 stipulations submodules and 61850 stipulations submodules as input, by automatic test alignment algorithm, the exception of the event information of comparison twice input, provides test judged result.
Embodiment 1:
(1) test macro sets up IEC61850 communication connection to emulation IED equipment, sets up IEC104 communication connection to equipment under test electric power telemechanical device; Equipment under test also sets up the communication connection of IEC61850 with emulation IED equipment, and the data of equipment under test should be consistent with the data of emulation IED equipment corresponding points;
Such as first formulate data to a mapping table as following table example:
Table one:
Separately showed the addressing system of IEC104 stipulations and IEC61850 stipulations in table one, content measurement is unique sign, the parameters value of the identical information body address of the two groups of stipulations obtained after comparing analytic message.Concrete manner of comparison is with reference to step (2).
(2) data by gathering the data gathered from IEC104 and IEC61850 are compared, to verify correctness, the real-time of equipment under test data processing;
Wherein the correctness verification of data processing is specific as follows: tested by the comparison of data value, and preset transformed error, is judged to be correct otherwise is judged to be mistake when result is in error range.
Such as in (1), resolving in 104 stipulations passages and obtaining imformosome address in table one is the value of 4001, in adjacent time window (2 seconds), obtains 1,2,3,4 four position of four values at time shaft as shown in Figure 2:
Relatively, on same time shaft, X is value and the time of occurrence of the parsing of IEC61850 stipulations passage, this method is about to the value judging X, is in 0.001 scope, if X equals any one in 1,2,3,4 in error range, namely judge that the value of the performance of 4001 addresses in two groups of passages is equal, by that analogy.
Wherein the real-time verification of data processing is specific as follows: tested by delta data, namely whether be less than or equal to the time difference of the more new data obtained from IEC61850 passage and IEC104 passage the real-time that preset value obtains equipment under test, if met, be judged to be in real time otherwise be judged to exist delayed.
(3) output test result, form test report.
Test result report is obtained, as following table two by the result arranged in table one and compare in step (2):
Table two:
For realizing loop-around test, need the data of comparison automatically can be set by test macro, this programme can also adopt the substitution value model realization of IEC61850, is convenient to like this test various value conditions
The function of lower equipment under test and performance.

Claims (3)

1., based on a communication loop method of testing for GOOSE logic, it is characterized in that, comprise the steps:
(1) test macro sets up IEC61850 communication connection to emulation IED equipment, sets up IEC104 communication connection to equipment under test electric power telemechanical device; Equipment under test also sets up the communication connection of IEC61850 with emulation IED equipment, and the data of equipment under test should be consistent with the data of emulation IED equipment corresponding points;
(2) data by gathering the data gathered from IEC104 and IEC61850 are compared, to verify correctness, the real-time of equipment under test data processing;
(3) output test result, form test report.
2. as claimed in claim 1 based on the communication loop method of testing of GOOSE logic, it is characterized in that: in step (2), the correctness verification of data processing is specific as follows: tested by the comparison of data value, and preset transformed error, be judged to be when result is in error range correct otherwise be judged to be mistake.
3. as claimed in claim 1 based on the communication loop method of testing of GOOSE logic, it is characterized in that: in step (2), the real-time verification of data processing is specific as follows: tested by delta data, namely whether be less than or equal to the time difference of the more new data obtained from IEC61850 passage and IEC104 passage the real-time that preset value obtains equipment under test, if met, be judged to be in real time otherwise be judged to exist delayed.
CN201410646227.3A 2014-11-14 2014-11-14 Communication loop test method based on GOOSE (generic object-oriented substation event) logics Pending CN104579817A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410646227.3A CN104579817A (en) 2014-11-14 2014-11-14 Communication loop test method based on GOOSE (generic object-oriented substation event) logics

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410646227.3A CN104579817A (en) 2014-11-14 2014-11-14 Communication loop test method based on GOOSE (generic object-oriented substation event) logics

Publications (1)

Publication Number Publication Date
CN104579817A true CN104579817A (en) 2015-04-29

Family

ID=53095081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410646227.3A Pending CN104579817A (en) 2014-11-14 2014-11-14 Communication loop test method based on GOOSE (generic object-oriented substation event) logics

Country Status (1)

Country Link
CN (1) CN104579817A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105162649A (en) * 2015-08-04 2015-12-16 北京广利核系统工程有限公司 Testing method and system for nuclear power station safety level network performance index
CN106302019A (en) * 2016-08-17 2017-01-04 国网江苏省电力公司电力科学研究院 A kind of substation data communication network shutdown processes the test system and method for time
CN108197017A (en) * 2017-11-27 2018-06-22 国电南瑞科技股份有限公司 The automatization test system and method for a kind of communication control unit
CN108919004A (en) * 2018-07-09 2018-11-30 宝鸡文理学院 A kind of distribution power automation terminal protection Model test Method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202735834U (en) * 2012-01-30 2013-02-13 广东电网公司茂名供电局 Test system for double measurement and control device in intelligent substation of power system
CN103905275A (en) * 2014-03-27 2014-07-02 国家电网公司 Electric power telecontrol equipment testing method based on IEC61850 replacement services
CN103926917A (en) * 2014-04-25 2014-07-16 国家电网公司 Intelligent transformer substation master control device testing system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202735834U (en) * 2012-01-30 2013-02-13 广东电网公司茂名供电局 Test system for double measurement and control device in intelligent substation of power system
CN103905275A (en) * 2014-03-27 2014-07-02 国家电网公司 Electric power telecontrol equipment testing method based on IEC61850 replacement services
CN103926917A (en) * 2014-04-25 2014-07-16 国家电网公司 Intelligent transformer substation master control device testing system and method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105162649A (en) * 2015-08-04 2015-12-16 北京广利核系统工程有限公司 Testing method and system for nuclear power station safety level network performance index
CN105162649B (en) * 2015-08-04 2018-08-28 北京广利核系统工程有限公司 For the test method and its system of npp safety grade network performance index
CN106302019A (en) * 2016-08-17 2017-01-04 国网江苏省电力公司电力科学研究院 A kind of substation data communication network shutdown processes the test system and method for time
CN106302019B (en) * 2016-08-17 2019-06-11 国网江苏省电力公司电力科学研究院 A kind of test macro and method of substation data communication network shutdown processing time
CN108197017A (en) * 2017-11-27 2018-06-22 国电南瑞科技股份有限公司 The automatization test system and method for a kind of communication control unit
CN108919004A (en) * 2018-07-09 2018-11-30 宝鸡文理学院 A kind of distribution power automation terminal protection Model test Method

Similar Documents

Publication Publication Date Title
CN105978152B (en) A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging
CN104052633B (en) Intelligent station 61850 and the stipulations integration test method of telemechanical 104
CN103033703B (en) A kind of online, intelligent substation analysis test method of off-line integral type
CN104122474B (en) A kind of intelligent distribution type feeder automation logic testing system
CN103312037B (en) Device and method for testing pressure of intelligent substation
CN104539473B (en) Intelligent substation network virtual secondary circuit whole group of method of calibration and system
CN108923953A (en) A kind of virtual main station system of power remote machine debugging
CN103926917A (en) Intelligent transformer substation master control device testing system and method
CN105978159A (en) Telecontrol testing online execution-free check method for transformer station
CN105426454A (en) Method for detecting consistency of intelligent electronic equipment loop information and SCD file loop information
CN104579817A (en) Communication loop test method based on GOOSE (generic object-oriented substation event) logics
WO2014153764A1 (en) Method and device for automatic test of relay protection function of intelligent substation
CN103095524B (en) A kind of response formula electric power communication protocol automatic test approach based on configuration
CN105403793A (en) Automatic transformer station digital relay protection tester
CN113014517B (en) Switchboard forwarding information real-time comparison method based on CSD file
WO2015149594A1 (en) Iec61850-based communication simulation method for partial discharge on-line monitoring device
CN106329720A (en) Detecting and debugging method for reconstruction and extension project secondary system for intelligent substation
CN103905275A (en) Electric power telecontrol equipment testing method based on IEC61850 replacement services
CN104601415A (en) Smart substation steady state data closed-loop testing method and testing system thereof
CN104574204B (en) Intelligent measuring and control device ICD models automatic identification system and method
CN104076807A (en) Method of debugging automation system of intelligent substation
CN104730397B (en) Interoperability test system and method between a kind of distribution power automation terminal
CN104599481A (en) Optical fiber network based high speed meter reading system and method
CN104184215B (en) Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method
CN112187582B (en) Intelligent substation process layer switch port flow monitoring pre-warning system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150429

RJ01 Rejection of invention patent application after publication