CN107960168A - A kind of greening method of high water level strand barged-in fill - Google Patents

A kind of greening method of high water level strand barged-in fill Download PDF

Info

Publication number
CN107960168A
CN107960168A CN201710608611.8A CN201710608611A CN107960168A CN 107960168 A CN107960168 A CN 107960168A CN 201710608611 A CN201710608611 A CN 201710608611A CN 107960168 A CN107960168 A CN 107960168A
Authority
CN
China
Prior art keywords
fill
barged
laid
greening
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710608611.8A
Other languages
Chinese (zh)
Inventor
徐峰
张国刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin City Tak Woo Biological Engineering Technology Co Ltd
Original Assignee
Tianjin City Tak Woo Biological Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin City Tak Woo Biological Engineering Technology Co Ltd filed Critical Tianjin City Tak Woo Biological Engineering Technology Co Ltd
Priority to CN201710608611.8A priority Critical patent/CN107960168A/en
Publication of CN107960168A publication Critical patent/CN107960168A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Botany (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The present invention relates to garden afforestation technology field, there is provided a kind of greening method of high water level strand barged-in fill, includes the following steps:Collect barged-in fill and water is removed in solarization, improve barged-in fill, be laid with isolation bed course, be laid with draining salt discharging pipe, be laid with water drenching layer, stack conditioned soil and plantation is afforested.The beneficial effects of the invention are as follows isolation bed course and salt discharge drainpipe are set in raw water plane, it is high using green belt overall isolation heap, Region control microcirculqtory system, plant suitable environment is built, overcomes the problems such as salt discharge drainage effect that traditional greening technique occurs after high water level barged-in fill use is poor, and the Afforestation Landscape retention time is short, plant survival rate is up to 95%, and facilitate do mechanization operation, greening level can be significantly improved, expands greening scope.

Description

A kind of greening method of high water level strand barged-in fill
Technical field
The present invention relates to garden afforestation technology field, more particularly, to a kind of greening method of high water level strand barged-in fill.
Background technology
In recent years, with coastal cities, the fast development for the port city that especially borders on the sea, urban land wretched insufficiency, mesh It is preceding largely to use sea silt soil land reclamation, to alleviate the land resource needed for urban construction.Sea silt soil is united after land reclamation The soil that drainage is formed, is referred to as barged-in fill on bay work, belongs to the hemipelagic sediment of upper river soil erosion.Possess Some fundamental propertys of soil, such as colloidality, adsorptivity, replacement property etc..Since barged-in fill is not yet by physical weathering, chemical wind Change, biologic weathering, do not form soil also, can only be referred to as matrix in principle, mechanical component be all based on powder, clay, Sand grain content is seldom.Since unreasonable particle forms so that soil is without structure, and hardened consolidation when doing is muddy when wet.Soluble salt Divide content high, generally 1.2-2.5%, can be average also 2.1% more than 8.0%.PH value is generally in 8.31-8.71 Between, the content of organic matter is extremely low, generally 1% or so.This high-alkali low foster soil of high salt, venting and water permeable ability is very poor, directly Connect be washed with water it is saline and alkaline, it is difficult to prove effective, it is thus impossible to the directly plantation greening on barged-in fill.
On the other hand, substantial amounts of municipal sludge is produced during municipal sewage treatment.Municipal sludge mainly have microorganism, Organic debris, inorganic particle, colloid etc. form, and are a kind of complex mixtures based on organic principle, wherein containing The metallic element such as nutrient and iron, magnesium, zinc such as nitrogen, phosphorus, potassium compared with horn of plenty.Organic matter is the master of plant and microorganism growth Nutriment is wanted, the organic principle for biological utilisation that contains in municipal sludge, which includes polysaccharide, fat, nitrogenous, sulphur, phosphorus, to be had Machine compound etc., these substance advantageous then improve the permeability of soil particle, gas permeability and poly- in the formation of agron Collection property.The particularly development of sludge composting technology, sludge are made organic in sludge under the action of microorganism by hot fermentation Thing is mineralization, humification and innoxious and become composting fertilizer, and sludge composting can not only eliminate the pathogenic microorganism in sludge, also The biological effectiveness of heavy metal can be reduced, stabilizes the organic matter in sludge.In addition, the country is more than 85% coal-burning power plant at present Flue gas desulfurization use gypsum, by the SO in flue gas2With desulfurizing agent CaCO3React after forcing to aoxidize, can produce a large amount of Gypsum.Accessory substance caused by this desulfurization at present, does not find good digestion approach yet, is hidden existing for whole technique Suffer from.Its main component is CaSO4·2H2O and CaSO3Mixture, and must or have containing plants such as abundant S, Ca, Si The mineral nutrition of benefit, is a good soil conditioner, soil pH value can be reduced by being mainly manifested in, and improve the granule knot of soil Structure, chesson, there is provided the necessary part nutrient of plant.
To accelerate the needs of urban economy construction, it should improve the ecological environment, increase greenery area, improve afforestation coverage rate, It is extremely urgent to the demand of environmental greening, beautification, brightening.But directly greening is difficult on barged-in fill.At present, on barged-in fill Using the construction method of " soil moved in improve the original ", anthropogenic soil plantation greening is bought from periphery mostly for greening.Now, country has forbidded strictly Ruin and plough bad ground, therefore, large area is difficult to carry out using the method for soil moved in improve the original greening, also, causes the cost of development & construction to increase.Institute With barged-in fill transformation in situ, the meaning of improvement are more great and urgent.
Prior art is concentrated mainly on (less than 1.5 meters) areas of phreatic low at present, is had using soil moved in improve the original or transformation in situ Successful story, but often there is draining in the area of higher level (more than 1.0 meters), traditional technology and method application effect Salt discharge effect is poor, Afforestation Landscape efficiency time is short, and rate is high repeatedly or needs to carry out local moulding for engineering, it is impossible to realizes that machinery is turned into The problems such as industry, perplex and limit local greening level always.
The content of the invention
The object of the present invention is to provide a kind of holding effect it is long, it is easy for construction, can do mechanization operation, maintenance is simple, cost is low, should With the greening method of the wide high water level strand barged-in fill of scope, isolation bed course and salt discharge drainpipe, profit are set in raw water plane High, the Region control microcirculqtory system with green belt overall isolation heap, builds plant suitable environment, overcomes traditional greening technique and exist The problems such as salt discharge drainage effect occurred after high water level barged-in fill use is poor, and the Afforestation Landscape retention time is short, and convenient machinery It is turned into industry, greening level can be significantly improved, expands greening scope.
The technical scheme is that:A kind of greening method of high water level strand barged-in fill, includes the following steps:
1) collect barged-in fill and water is removed in solarization:The earthwork needed according to greening, it is high to collect hydraulic reclamation mound, and solarization is to drain water The moisture to barged-in fill is divided to be down to less than 30%;
2) barged-in fill is improved:Above-mentioned barged-in fill and municipal sludge be mixed to form composite soil according to volume ratio, then to A certain proportion of desulfurated plaster is added in composite soil, is stacked after mixing stand-by;
3) it is laid with isolation bed course:The isolation bed course of 5-10cm is laid with rubble;
4) it is laid with draining salt discharging pipe:The draining salt discharging pipe of a diameter of 10-20cm is rationally laid with according to greening position and direction, Aperture is offered on draining salt discharging pipe and uses non-woven wraps;
5) it is laid with water drenching layer:The rubble of 10-15cm is laid with above draining salt discharging pipe as water drenching layer;
6) conditioned soil is stacked:The conditioned soil mixed in step 2) is deposited on above-mentioned water drenching layer, pour enough water into Alkali drops in row salt discharge;
7) plantation greening:Turf plant or plant landscape tree, pour enough fresh water in time.
Further, municipal sludge described in step 2) is sludge of the municipal wastewater treatment plant after compost fermentation.
Further, the volume mixture ratio of barged-in fill and municipal sludge is 1 in step 2):(0.3-1), desulfurated plaster Adding proportion be 0.5-0.7% (mass percent).
The technical principle of the present invention is as follows:Barged-in fill is fundamentally improved, barged-in fill is transformed into suitable for plant growth Soil;Using sludge and composting production, the content of organic matter of barged-in fill can be improved, promotes the activity of edaphon, improved Soil texture, promotes soil granular to be formed;Add desulfurated plaster, effectively increase soil in calcium ion, promote soil sodium from The exchange capacity of son, contributes to salt discharge to arrange alkali;Since level of ground water is higher, processing is increased using the barged-in fill improved;The bottom of at Portion is laid with rubble as isolation bed course, entirely prevents the immersion of underground moisture and salinity, ensure that the independence of heap high part;Every From water drenching layer is laid with bed course, ensures the unimpeded of bottom discharge salt discharging pipe, excessive moisture in the greening soil body is discharged in time, so that Prevent the waterlogging of subenvironment and the accumulation of salt water, ensure the ventilation capacity of the soil body;And the application of salt discharge drainpipe makes the greening soil body In unnecessary moisture can drain in time, once the soil body has salt damage, also can ensure greening in time by pouring into the fresh water desalinization of soil by flooding or leaching Persistence;Isolate bed course, the application of water drenching layer and draining salt discharging pipe, can make the part facility possess desalinization of soil by flooding or leaching salt discharge function, energy Shorten the time of conditioned soil salt reduction drop alkali, improve efficiency and fresh-water-saving dosage.
The present invention has the advantages and positive effects of:
1st, using sludge and composting production, the content of organic matter of barged-in fill can be improved, promotes the activity of edaphon, Improve soil texture, promote soil granular to be formed;Accessory substance desulfurated plaster after being handled using means of flue gas desulfurization of power plant, is effectively increased Calcium ion in soil, promotes the exchange capacity of soil sodium ion, contributes to salt discharge to arrange alkali;Above-mentioned sludge and desulfurated plaster are Now discarded object in the industrial production, uses the problem of outlet in the improvement of barged-in fill, advantageously accounting for discarded object;
2nd, by the way that the hydraulic reclamation mound after improvement is high, and isolation bed course and salt discharge drainpipe, energy are set in raw water plane Make conditioned soil and original barged-in fill completely separated, and the influence of the height from level of ground water, it can effectively suppress the accumulation of salt in the surface soil, ensure The achievement continuation of afforestation project, plant survival rate is up to 95%;
The 3rd, isolation bed course and salt discharge drainpipe are set in raw water plane, construction is more convenient, is adapted to large area to implement, can machine Tool is turned into industry;
4th, rubble is laid with as water drenching layer, is grown, is ensured every salt and leaching compared to the water drenching layer material such as straw curtain service life The long-term effect of water, and cost is lower;
5th, it is easy for construction without ridging using structural relief of barged-in fill after improvement, it is adapted to large area to implement, just In do mechanization operation, you can be laid with lawn, shrub, arbor etc. can also be planted;
6th, without using covering with new soil, cost is reduced, suitable for the mechanized operation of large area, reduces cost of labor and raising Production efficiency;
7th, high water level region can be not only useful in, more can be suitably used for the afforestation project of relatively low level of ground water.
Brief description of the drawings
Fig. 1 is the construction model figure of the present invention.
In figure:
1st, bed course 2, draining salt discharging pipe 3, water drenching layer are isolated
4th, conditioned soil
Embodiment
Elaborate below in conjunction with the accompanying drawings with specific embodiment to the present invention, embodiments below is merely to illustrate this Invention and not limitation of the present invention.
Embodiment 1
A kind of greening method of high water level strand barged-in fill, includes the following steps:
1) collect barged-in fill and water is removed in solarization:Collect 600m3Hydraulic reclamation mound is high, 4 days drainings of solarization, the moisture drop of barged-in fill To 25%;
2) barged-in fill is improved:By barged-in fill original soil and sludge of the municipal wastewater treatment plant after compost fermentation according to volume ratio 1: 0.3 mixing, while add 18kg desulfurization gypsum powders and be uniformly mixed;
3) it is laid with isolation bed course:It will treat that afforested areas carry out prepartion of land, compacting, with the isolating pad of rubble laying 10cm thickness Layer;
4) it is laid with draining salt discharging pipe:The PVC draining salt discharging pipes of a diameter of 15cm are rationally laid with according to greening position and direction, Gradient offers aperture on 0.3%, draining salt discharging pipe and uses non-woven wraps;
5) it is laid with water drenching layer:The rubble of 10cm thickness is laid with above draining salt discharging pipe as water drenching layer, it is then smooth;
6) conditioned soil is stacked:The conditioned soil mixed in step 2) is deposited on above-mentioned water drenching layer, is poured in conditioned soil Water, is poured per necromancer by 1 ton of water, and pouring divides 3-5 progress, is poured once every 3 days, is poured enough water and is carried out salt discharge drop Alkali;
7) suitable turf is planted, and transplants shrub and arbor.
Embodiment 2
Barged-in fill greening demonstration ground, gross area 2000m near the Gang Hong roads of Binhai New Area in Tianjin Nan Gang industrial parks2, Afforested using the greening method, constructed according to the construction model figure shown in attached drawing 1:
1) collect barged-in fill and water is removed in solarization:Collect 600m3Hydraulic reclamation mound is high, the moisture of 5 days drainings of solarization to barged-in fill It is down to 15%;
2) barged-in fill is improved:By barged-in fill original soil and sludge of the municipal wastewater treatment plant after compost fermentation according to volume ratio 1:1 Mixing, is mixed into 2m3Composite soil, while add 20kg desulfurization gypsum powders and be uniformly mixed;
3) it is laid with isolation bed course 1:It will treat that afforested areas (long 100m, wide 20m) carry out prepartion of land, be compacted, use is a diameter of The rubble of 0.6-1.0cm sizes is laid with the isolation bed course of 5cm thickness;
4) it is laid with draining salt discharging pipe 2:The PVC draining salt discharging pipes of a diameter of 15cm, slope are laid with according to greening position and direction For drop 0.3%, the length of draining salt discharging pipe is 380m, offers aperture on draining salt discharging pipe and uses non-woven wraps;
5) it is laid with water drenching layer 3:The rubble of 15cm is laid with above draining salt discharging pipe as water drenching layer, it is then smooth;
6) conditioned soil 4 is stacked:The conditioned soil mixed in step 2) is deposited on above-mentioned water drenching layer, is poured in conditioned soil Water, is poured per necromancer by 1-1.5 tons of waters, and pouring divides 3-5 progress, is poured once every 3 days, and when pouring for the first time, 1 ton is poured Pour water middle addition 1kg soil conditioners, after when pouring several times, add 0.5kg soil conditioners in 1 ton of watering pours water.Pour every time Afterwards second day, soil is gathered, measures pH value and salt content;
7) plants such as Chinese wax, Chinese scholar tree, Malus spectabilis, silk tree, the rose of Sharon are planted, ground is laid with turf, and plant survival rate is up to 95%. Nutrient change before and after desalting effect and the barged-in fill improvement of barged-in fill is as shown in table 1 below and 2:
The desalting effect of 1 barged-in fill of table
Frequency of irrigation Original barged-in fill After 1 time After 2 times After 3 times After 4 times
Total salt quantity % 3.63 1.52 0.76 0.45 0.38
PH value 8.58 7.92 7.68 7.42 7.50
The front and rear Nutrient change of 2 barged-in fill of table improvement
Index Original barged-in fill Conditioned soil
Total salt quantity % 3.63 0.38
PH value 8.58 7.50
Available nitrogen (mg/kg) 22.8 286
Rapid available phosphorus (mg/kg) 12.1 75
Available potassium (mg/kg) 573 780
Organic matter (g/kg) 5.54 20.1
Two embodiments of the present invention are described in detail above, but the content is only the preferable implementation of the present invention Example, it is impossible to be construed as limiting the practical range of the present invention.All all the changes and improvements made according to the present patent application scope Deng, should all still belong to the present invention patent covering scope within.

Claims (3)

  1. A kind of 1. greening method of high water level strand barged-in fill, it is characterised in that:Include the following steps:
    1) collect barged-in fill and water is removed in solarization:The earthwork needed according to greening, it is high to collect hydraulic reclamation mound, and solarization is to drain moisture extremely The moisture of barged-in fill is down to less than 30%;
    2) barged-in fill is improved:Above-mentioned barged-in fill and municipal sludge be mixed to form composite soil according to volume ratio, then to mixing A certain proportion of desulfurated plaster is added in soil, is stacked after mixing stand-by;
    3) it is laid with isolation bed course:The isolation bed course of 5-10cm is laid with rubble;
    4) it is laid with draining salt discharging pipe:The draining salt discharging pipe of a diameter of 10-20cm, draining salt discharge are laid with according to greening position and direction Aperture is offered on pipe and uses non-woven wraps;
    5) it is laid with water drenching layer:The rubble of 10-15cm is laid with above draining salt discharging pipe as water drenching layer;
    6) conditioned soil is stacked:The conditioned soil mixed in step 2) is deposited on above-mentioned water drenching layer, enough water is poured and is arranged Alkali drops in salt;
    7) plantation greening:Turf plant or plant landscape tree, pour enough fresh water in time.
  2. 2. the greening method of high water level strand according to claim 1 barged-in fill, it is characterised in that:City described in step 2) City's sludge is sludge of the municipal wastewater treatment plant after compost fermentation.
  3. 3. the greening method of high water level strand according to claim 2 barged-in fill, it is characterised in that:Barged-in fill in step 2) Volume mixture ratio with municipal sludge is 1:(0.3-1), the adding proportion of desulfurated plaster is 0.5-0.7% (quality percentages Than).
CN201710608611.8A 2017-07-24 2017-07-24 A kind of greening method of high water level strand barged-in fill Pending CN107960168A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710608611.8A CN107960168A (en) 2017-07-24 2017-07-24 A kind of greening method of high water level strand barged-in fill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710608611.8A CN107960168A (en) 2017-07-24 2017-07-24 A kind of greening method of high water level strand barged-in fill

Publications (1)

Publication Number Publication Date
CN107960168A true CN107960168A (en) 2018-04-27

Family

ID=61997448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710608611.8A Pending CN107960168A (en) 2017-07-24 2017-07-24 A kind of greening method of high water level strand barged-in fill

Country Status (1)

Country Link
CN (1) CN107960168A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110679226A (en) * 2019-10-23 2020-01-14 上海园林绿化建设有限公司 Construction method combining dredger fill improvement and planting hole improvement
CN111149602A (en) * 2020-01-19 2020-05-15 中交天航环保工程有限公司 Coral reef sand tree and shrub planting and greening method in high-temperature high-salt strong wind environment
CN113711724A (en) * 2021-07-16 2021-11-30 中铁十六局集团置业投资有限公司 Method for removing salt, controlling water and increasing fertilizer of saline-alkali soil in hydraulic filling area and application thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101138294A (en) * 2006-09-08 2008-03-12 沧州市农林科学院 High-water level halomorphic soil region selective controlling and greening technique
CN103828506A (en) * 2012-11-27 2014-06-04 天津港环保卫生管理中心 Method for improving dredger fill into greening soil
CN104206064A (en) * 2013-06-04 2014-12-17 河南山水园林绿化工程有限公司 Underground salt elimination method for saline and alkali land
CN105432409A (en) * 2015-12-02 2016-03-30 天津创世生态景观建设股份有限公司 Method for improving planting patch forest of saline-alkali soil original soil
CN105917787A (en) * 2016-06-12 2016-09-07 天津泰达绿化集团有限公司 Method for fast and efficient improvement greening of coastal saline soil
CN106069531A (en) * 2016-06-30 2016-11-09 深圳市东华园林股份有限公司 Beach saline land seedling growth method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101138294A (en) * 2006-09-08 2008-03-12 沧州市农林科学院 High-water level halomorphic soil region selective controlling and greening technique
CN103828506A (en) * 2012-11-27 2014-06-04 天津港环保卫生管理中心 Method for improving dredger fill into greening soil
CN104206064A (en) * 2013-06-04 2014-12-17 河南山水园林绿化工程有限公司 Underground salt elimination method for saline and alkali land
CN105432409A (en) * 2015-12-02 2016-03-30 天津创世生态景观建设股份有限公司 Method for improving planting patch forest of saline-alkali soil original soil
CN105917787A (en) * 2016-06-12 2016-09-07 天津泰达绿化集团有限公司 Method for fast and efficient improvement greening of coastal saline soil
CN106069531A (en) * 2016-06-30 2016-11-09 深圳市东华园林股份有限公司 Beach saline land seedling growth method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110679226A (en) * 2019-10-23 2020-01-14 上海园林绿化建设有限公司 Construction method combining dredger fill improvement and planting hole improvement
CN111149602A (en) * 2020-01-19 2020-05-15 中交天航环保工程有限公司 Coral reef sand tree and shrub planting and greening method in high-temperature high-salt strong wind environment
CN113711724A (en) * 2021-07-16 2021-11-30 中铁十六局集团置业投资有限公司 Method for removing salt, controlling water and increasing fertilizer of saline-alkali soil in hydraulic filling area and application thereof

Similar Documents

Publication Publication Date Title
CN109526523B (en) Method for carrying out ecological restoration on acid tailing pond
CN105230167B (en) A kind of heavy salinized land soil in strand and vegetation construction system
CN105359663B (en) Saline-alkali soil improvement method
CN103362132B (en) A kind of construction method of cast-in-place greening concrete protective slope
CN108532580A (en) A kind of hillock eco-environment restoration comprehensive processing method
CN107466512B (en) Structure and method for comprehensively treating saline-alkali soil by adopting solid wastes
CN105917787B (en) A kind of beach saline land rapidly and efficiently improves greening method
CN110454165B (en) Repair matrix for abandoned mine pits of limestone quarry and preparation method and landfill method thereof
CN102577687A (en) Comprehensive improving method for coastal saline soil
CN101683033A (en) Method for quickly desalting dredgerfill by using desulfurization gypsum (DSG)
CN101897289A (en) Plant-growing type eco-concrete and preparation method thereof
CN112897972A (en) Solid waste based porous material, preparation and ecological restoration method for coal gangue dump
CN110366986A (en) The plant generating layer structure and restoration methods of mine pollution barren rock stockyard slope vegetation restoration
CN111771670B (en) Method for improving river sediment into planting soil
CN107960168A (en) A kind of greening method of high water level strand barged-in fill
CN111903467A (en) Process for improving marine silt for planting soil
CN111018418B (en) Method for recycling waste phosphorite on site
CN109354313B (en) Method for constructing near-natural complex water bank ecological zone by combining sludge/waste residues
CN103828506A (en) Method for improving dredger fill into greening soil
CN113396795B (en) Foreign soil and soil layer structure based on river and lake bottom mud and phosphorite solid waste and preparation method
CN104148377A (en) Method for producing greened structure soil from silt
CN104969681A (en) Method for rapidly improving clay solonchak by using sediment from Yellow River water transferring
CN211922648U (en) Ecological restoration type rare earth tailings
CN109258252A (en) A kind of raw substrate of plant for concrete for plant growth and its application method
KR20040093832A (en) Method for manufacture and nature type plant life block

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180427

RJ01 Rejection of invention patent application after publication