CN107938453A - Using construction technology of the Extra-fine sand as roadbed filling - Google Patents

Using construction technology of the Extra-fine sand as roadbed filling Download PDF

Info

Publication number
CN107938453A
CN107938453A CN201610888258.9A CN201610888258A CN107938453A CN 107938453 A CN107938453 A CN 107938453A CN 201610888258 A CN201610888258 A CN 201610888258A CN 107938453 A CN107938453 A CN 107938453A
Authority
CN
China
Prior art keywords
roll
roadbed
fine sand
extra
vibrated roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610888258.9A
Other languages
Chinese (zh)
Inventor
丁录胜
李景贤
郭韫武
孙杰
吴玉明
韦朝
杨旭
庄新玉
刘亚兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG RAILROAD PROSPECTING DESIGN INSTITUTE CO LTD
Original Assignee
XINJIANG RAILROAD PROSPECTING DESIGN INSTITUTE CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG RAILROAD PROSPECTING DESIGN INSTITUTE CO LTD filed Critical XINJIANG RAILROAD PROSPECTING DESIGN INSTITUTE CO LTD
Priority to CN201610888258.9A priority Critical patent/CN107938453A/en
Publication of CN107938453A publication Critical patent/CN107938453A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention be using construction technology of the Extra-fine sand as roadbed filling, step 1, optimum moisture content it is definite;Step 2, spread out determining for auxiliary thickness;The selection of step 3, construction equipment;Step 4, roller compaction process control:(1) it is divided into three phases to roll:Bull-dozer or vibrated roller static pressure 1 time, vibrated roller shake pressure 46 times, roll Shi Yingxian it is slow after it is fast, vibroroller cmpacting is carried out using strong shake, wheelmark overlapping widths be not less than 1/3m, and wheelmark is covered with whole work surface, roll and are controlled when travel speed starts within 4km/h;Roll from roadbed both sides to centre on straight line road section surface, rolled on curve road section surface by roadbed Inside To Outside, carried out with longitudinal advance and retreat formula, front and rear adjacent two section is answered more than longitudinal overlap 20m, is reached without leakage pressure, without dead angle, it is ensured that grind uniform;(2) vibrated roller rolls section using 50m 80m as unit, by behind vibration, first side after first static pressure, it is first slow after fast order roll 45 times.The present invention is simpler, quick, feasible, reduces cost.

Description

Using construction technology of the Extra-fine sand as roadbed filling
Technical field
The invention belongs to construction technology of paving the way, especially with construction technology of the Extra-fine sand as roadbed filling.
Background technology
Existing construction technology of paving the way is quickly grown, and the technique that roadbed material is served as by Extra-fine sand is left to be desired, and is allowed to more For it is feasible, efficiently pave the way.
The content of the invention
It is simpler, fast it is an object of the invention to provide a kind of using construction technology of the Extra-fine sand as roadbed filling It is fast, feasible, reduce cost.
The object of the present invention is achieved like this:It is a kind of using construction technology of the Extra-fine sand as roadbed filling, step 1, Optimum moisture content determines:According to soil test, Extra-fine sand indoor standard compaction test, water content test section for 11% to 14%, optimum moisture content 13.6%, maximum dry density 1.74g/m3;Coefficient of compaction K is used for the compacting criteria of aeolian accumulation fine sand With ground coefficient K30 as Con trolling index;Step 2, spread out determining for auxiliary thickness:Determine that maximum compacted thickness is 30cm-35cm;Step Rapid 3, the selection of construction equipment:Using the bull-dozer of more than T120, using 8T-15T dumpers, using 8m3-15m3Sprinkling truck, Select the vibrated roller of more than 14T front and rear wheels driving;Step 4, roller compaction process control:(1) it is divided into three phases to roll:Push away Native machine or vibrated roller static pressure 1 time, vibrated roller shake pressure 4-6 times, roll Shi Yingxian it is slow after it is fast, using being vibrated by force Roll, wheelmark overlapping widths are not less than 1/3m, and wheelmark is covered with whole work surface, roll and are controlled when travel speed starts in 4km/h Within;Roll from roadbed both sides to centre on straight line road section surface, rolled on curve road section surface by roadbed Inside To Outside, with Longitudinal advance and retreat formula carries out, and front and rear adjacent two section is answered more than longitudinal overlap 20m, reaches without leakage pressure, without dead angle, it is ensured that grind uniform; (2) vibrated roller rolls section using 50m-80m as unit, by behind vibration, first side after first static pressure, it is first slow after fast order grind Pressure 4-5 times.
When railway passes through desert area, using the filling roadbed reduction project cost not only shown of local Extra-fine sand material, and And the water stability of Extra-fine sand is good, settle small after compacting, therefore, answer prioritizing selection Extra-fine sand to do filler in desert area.Early in two The fifties in tenth century, packet header to Lanzhou railway do filler using Extra-fine sand, successively in Gan Tang to Wuwei railway, Kuerle to Keshen Railway and 21st century have built more than ten thousand kilometers in the Northwests such as Inner Mongol, Ningxia, Shaanxi, Xinjiang, Qinghai.In recent years by In the raising of railway standard, become new problem using Extra-fine sand as filler.The present invention is bordering on the river to Ejina Banner railway, Wu Lu Wood is used as roadbed filling to Jinghe railway, Urumchi to quasi- Northeast Railway Bureau road by the use of Extra-fine sand together, it was demonstrated that its is simpler, quick, It is feasible, reduce cost.
Embodiment
It is a kind of using construction technology of the Extra-fine sand as roadbed filling, step 1, optimum moisture content determine:According to geotechnique Experiment, Extra-fine sand indoor standard compaction test, water content test section are 11% to 14%, and optimum moisture content 13.6% is maximum Dry density 1.74g/m3;Coefficient of compaction K and ground coefficient K30 are used as Con trolling index for the compacting criteria of aeolian accumulation fine sand; Step 2, spread out determining for auxiliary thickness:Extra-fine sand paving thickness is carried out from 20cm-60cm every 10cm different-thickness to roll contrast Experiment, Extra-fine sand paving thickness is best in every layer of control effect between 30-35cm, determines that maximum compacted thickness is 30cm- 35cm;The selection of step 3, construction equipment:Using the bull-dozer of more than T120, using 8T-15T dumpers, using 8m3-15m3's Sprinkling truck, selects the vibrated roller of more than 14T front and rear wheels driving;Step 4, roller compaction process control:(1) it is divided into three phases Roll:Bull-dozer or vibrated roller static pressure 1 time, vibrated roller shake pressure 4-6 times, roll Shi Yingxian it is slow after it is fast, using shaking by force Vibroroller cmpacting is carried out, wheelmark overlapping widths are not less than 1/3m, and wheelmark is covered with whole work surface, rolls control when travel speed starts Within 4km/h;Rolled on straight line road section surface from roadbed both sides to centre, by roadbed Inside To Outside on curve road section surface Roll, carried out with longitudinal advance and retreat formula, front and rear adjacent two section is answered more than longitudinal overlap 20m, is reached without leakage pressure, without dead angle, it is ensured that Grind uniform;(2) vibrated roller rolls section using 50m-80m as unit, by behind vibration, first side after first static pressure, it is first slow after it is fast Order roll 4-5 times.Through practice test, for Extra-fine sand compactness when being close to or up to maximum dry density, internalfrictionangleφ is most Its big shearing strength is also maximum, and motor vehicles and machines can more freely traveling or the work on soil layer.
According to the climatic characteristic of desert region and the special process of Extra-fine sand subgrade construction, unit in charge of construction is by following during construction Points for attention are constructed:(1) scorching temperature and dust and sand weather at noon are avoided as far as possible, and the temperature on average of desert summer is at 35 DEG C More than, personnel and machinery are difficult to bear, and the construction time considered at early, evening and night as far as possible.In dust and sand weather, machinery is unsuitable Go to work, sand and dust have mechanical equipment larger destruction.(2) paragraph division of constructing is unsuitable long, is advisable with 300m-500m, It should concentrate strength on being promoted from route one end, and each construction paragraph is joined together as early as possible, easy to all mechanical equipments especially It is the unified allocation of resources of rubber tire, vibrated roller, improves the utilization rate of equipment.Meanwhile by the use of molded roadbed as builder's road, It is greatly improved the conevying efficiency of vehicle.(3) during roadbed testing, since top layer disturbs, influence to detect quality, generally at detection Detected after first rooting out 5cm thickness disturbed soils, detection result is more preferable.
Effect inspection:In construction, repeatedly filling roadbed to test section Extra-fine sand to be detected, subgrade compaction coefficient is more than Target set point 0.90 is 0.93, and ground coefficient K30 (MPa/m) reaches 90, more than target set point 90.Therefore, it is thin using powder Sand is filling roadbed, and construction follows the principle of above construction technology, reaches preferable consolidation effect, subgrade compaction coefficient (K) and ground Base system number (K30) can meet design requirement.It is to resolve construction water, once spread out first for desert subgrade Paving eluvium layer thickness, spill the problems such as frequency of water rate control and number of rolling, vibroroller cmpacting, should follow short, fast original Then, that is, constructing, paragraph is preferably short, and speed of application is fast, and each operation construction is compact;Layer is being filled to the machinery such as haulage vehicle, road roller There are sufficient mental preparation and necessary measure during upper operation, overcome construction machinery to skid on Extra-fine sand roadbed, fall into car, this The characteristics of being Extra-fine sand subgrade construction a bit and the key different from the construction of other soil subgrades.
Technical standard:According to《Railway bed design specification》(TB10001-2005J447-2005), roadbed top layer filler is equal For A, B group filler.Bottom layer of subgrade and its underpart are to Extra-fine sand to be compacted coefficient and coefficient of subgrade reaction as Con trolling index, such as table 1 and table 2 described in.The I level railways of once-paving gapless track, embankment and abutment, embankment and the junction transition of ragstone cutting The compacting criteria of section filler should meet the regulation of 7.5.3 bars.
The compacting criteria tables of data of 1 bottom layer of subgrade of table
Note:In fine grained soil, flour sand, one column of conditioned soil, have bracket is only the compacting criteria of conditioned soil, no bracket for particulate Soil, flour sand, the compacting criteria of conditioned soil.
2 levee foundation bed of table is with the compacting criteria tables of data of lower portion filler
Note:It is sandy soil (except flour sand) in bracket, the compacting criteria for the native filler that seeps water in gravel class, rubble class, block stone class.

Claims (1)

  1. It is 1. a kind of using construction technology of the Extra-fine sand as roadbed filling, it is characterised in that:Step 1, optimum moisture content determine: According to soil test, Extra-fine sand indoor standard compaction test, water content test section is 11% to 14%, optimum moisture content 13.6%, Maximum dry density 1.74g/m3;Referred to for the compacting criteria of aeolian accumulation fine sand using coefficient of compaction K and ground coefficient K30 as control Mark;Step 2, spread out determining for auxiliary thickness:Determine that maximum compacted thickness is 30cm -35cm;The selection of step 3, construction equipment:Adopt With the bull-dozer of more than T120, using 8T-15T dumpers, using the sprinkling truck of 8m3-15m3, more than 14T front and rear wheels are selected to drive Dynamic vibrated roller;Step 4, roller compaction process control:(1) it is divided into three phases to roll:Bull-dozer or vibrated roller static pressure 1 Time, vibrated roller, which shakes, presses 4-6 times, fast after rolling Shi Yingxian slowly, not small using the strong progress vibroroller cmpacting that shakes, wheelmark overlapping widths In 1/3m, wheelmark is covered with whole work surface, rolls and is controlled when travel speed starts within 4km/h;On straight line road section surface by Roadbed both sides are rolled to centre, are rolled on curve road section surface by roadbed Inside To Outside, are carried out with longitudinal advance and retreat formula, front and rear phase Adjacent two sections are answered more than longitudinal overlap 20m, are reached without leakage pressure, without dead angle, it is ensured that grind uniform;(2) vibrated roller is with 50m-80m Roll section as unit, by behind vibration, first side after first static pressure, it is first slow after fast order roll 4-5 times.
CN201610888258.9A 2016-10-12 2016-10-12 Using construction technology of the Extra-fine sand as roadbed filling Pending CN107938453A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610888258.9A CN107938453A (en) 2016-10-12 2016-10-12 Using construction technology of the Extra-fine sand as roadbed filling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610888258.9A CN107938453A (en) 2016-10-12 2016-10-12 Using construction technology of the Extra-fine sand as roadbed filling

Publications (1)

Publication Number Publication Date
CN107938453A true CN107938453A (en) 2018-04-20

Family

ID=61928780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610888258.9A Pending CN107938453A (en) 2016-10-12 2016-10-12 Using construction technology of the Extra-fine sand as roadbed filling

Country Status (1)

Country Link
CN (1) CN107938453A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108570909A (en) * 2018-05-15 2018-09-25 西南交通大学 A kind of Extra-fine sand roadbed fills debulking methods
CN109610244A (en) * 2018-12-25 2019-04-12 四川天鑫达建筑工程有限公司 The physically improved roadbed filling method of fine silt

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2179609C1 (en) * 2000-06-15 2002-02-20 Строительное научно-техническое малое предприятие "ЭЗИП" Road pavement laying method
CN101503871A (en) * 2009-03-19 2009-08-12 中铁十一局集团有限公司 Dry-method construction method for drift-sand roadbed
CN101962928A (en) * 2010-08-12 2011-02-02 中铁二十二局集团第一工程有限公司 Construction method for processing aeolian sand roadbed base through impacting and grinding
CN104047214A (en) * 2014-07-10 2014-09-17 中国二十二冶集团有限公司 Roadbed construction method adopting aeolian sand filling
CN105544335A (en) * 2016-02-03 2016-05-04 中交第一公路勘察设计研究院有限公司 Construction method for filling and compacting thick-layer aeolian sand subgrade

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2179609C1 (en) * 2000-06-15 2002-02-20 Строительное научно-техническое малое предприятие "ЭЗИП" Road pavement laying method
CN101503871A (en) * 2009-03-19 2009-08-12 中铁十一局集团有限公司 Dry-method construction method for drift-sand roadbed
CN101962928A (en) * 2010-08-12 2011-02-02 中铁二十二局集团第一工程有限公司 Construction method for processing aeolian sand roadbed base through impacting and grinding
CN104047214A (en) * 2014-07-10 2014-09-17 中国二十二冶集团有限公司 Roadbed construction method adopting aeolian sand filling
CN105544335A (en) * 2016-02-03 2016-05-04 中交第一公路勘察设计研究院有限公司 Construction method for filling and compacting thick-layer aeolian sand subgrade

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108570909A (en) * 2018-05-15 2018-09-25 西南交通大学 A kind of Extra-fine sand roadbed fills debulking methods
CN109610244A (en) * 2018-12-25 2019-04-12 四川天鑫达建筑工程有限公司 The physically improved roadbed filling method of fine silt

Similar Documents

Publication Publication Date Title
AU2013346824B2 (en) Rail-bound transportation system for a track building machine
CN107012755B (en) Aeolian sand subgrade construction method
US9982402B2 (en) Paving construction method, pavement structure, and longitudinal groove forming instrument for pavement
CN104358188A (en) Filling construction method for collapsible loess subgrade
RU2632834C2 (en) Method of road construction broadening
CN107938453A (en) Using construction technology of the Extra-fine sand as roadbed filling
CN103161109A (en) Method for subgrade filling of peat soil subgrade by sea sand
CN102433814A (en) Permafrost region expressway flaky and blocky stone ventilation roadbed and construction method thereof
CN107022936A (en) A kind of method that super large-size rock fragment fills high-filled embankment
CN107805989A (en) Temporary road rolling compacted concrete pavement reconstruction structure and its construction method
EP2744942B1 (en) Railway track support system
CN104762859B (en) Mountain skin stone processes soft soil roadbed method
CN102031743A (en) Construction method of mudstone-filled embankment
CN211227977U (en) Road surface rolling machine is used in highway construction
CN202401363U (en) Flaky or blocky stone ventilated roadbed of expressway in frozen soil region
CN206376186U (en) A kind of Sliding Structures for the opposite pushing tow frame bridge of driving across underneath highway
CN213267424U (en) Municipal administration asphalt road surface vehicle clout that paves retrieves mechanism
CN105603842B (en) The big thickness back-up sand construction technology of embankment
CN107262488A (en) A kind of the soot platform and its application method, building method of subregion unloading
CN113403914A (en) Municipal road asphalt concrete pavement construction detection method
CN100365210C (en) Construction method for positioning and compacting subgrade
JP3824988B2 (en) Vibration reduction type asphalt pavement
CN217460175U (en) Road bed laying leveling machine for highway construction
CN204825595U (en) Anti -spillage device that falls of rubble class base material is stabilized to bayonet cement of hydraulic drive
CN102839595A (en) Method for treating bump at bridge-head

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180420

WD01 Invention patent application deemed withdrawn after publication