CN107917912A - A kind of drying testing agency for elevator car ceiling - Google Patents
A kind of drying testing agency for elevator car ceiling Download PDFInfo
- Publication number
- CN107917912A CN107917912A CN201711073452.2A CN201711073452A CN107917912A CN 107917912 A CN107917912 A CN 107917912A CN 201711073452 A CN201711073452 A CN 201711073452A CN 107917912 A CN107917912 A CN 107917912A
- Authority
- CN
- China
- Prior art keywords
- shaped
- plate
- interior plate
- conveyor
- outer panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N21/00—Investigating or analysing materials by the use of optical means, i.e. using sub-millimetre waves, infrared, visible or ultraviolet light
- G01N21/84—Systems specially adapted for particular applications
Abstract
The invention discloses a kind of drying testing agency for elevator car ceiling, including main conveyor, the detection unit that is arranged in the main conveyor and the U-shaped drying unit for being arranged on main conveyor side;The main conveyor includes conveyor and the interior plate and outer panel that are arranged on the conveyor both sides;The U-shaped drying unit includes U-shaped interior plate, U-shaped outer panel, the multiple live-rollers being arranged between the U-shaped interior plate and U-shaped outer panel, the electronics heating tube being arranged in the live-roller and the blowing unit being arranged on U-shaped interior plate, and the blowing unit includes U-shaped mobile stent of the sleeve on U-shaped interior plate, is fixed on the hair-dryer of the U-shaped mobile stent side, the motor for being fixed on U-shaped mobile stent opposite side, the gear being arranged on the machine shaft and the U-shaped rack for being arranged on U-shaped interior plate side wall and being engaged with the gear.The present invention can reduce gel time, improve work efficiency and also with detection function.
Description
Technical field:
The present invention relates to the technical field of elevator detection device, is specifically related to a kind of drying for elevator car ceiling
Testing agency.
Background technology:
For elevator car ceiling on the market in process of manufacture, it is that each parts are passed through glue to have a link at present
Water bonds together, and gel is then carried out by way of fan or natural coagulation, and the time of gel is generally left in half an hour
The right side, thus there are gel time it is longer the shortcomings that.In addition lighting mechanism can be also equipped with elevator car ceiling, after doing well also
To take detection website again and compare bright mechanism and be detected, thus there are production efficiency it is not high the shortcomings that, it is necessary to improved.
In view of the above shortcomings, the designer, is actively subject to research and innovation, to found a kind of being used for for new structure
The drying testing agency of elevator car ceiling, makes it with more the utility value in industry.
The content of the invention:
The purpose of the present invention aims to solve the problem that problem existing in the prior art, there is provided one kind reduces gel time, improves work
Efficiency and the drying testing agency for elevator car ceiling also with detection function.
The present invention relates to a kind of drying testing agency for elevator car ceiling, including main conveyor, be arranged on it is described
Detection unit in main conveyor and the U-shaped drying unit for being arranged on main conveyor side;
The main conveyor includes conveyor and the interior plate and outer panel that are arranged on the conveyor both sides, the detection
Unit include be fixed on the outer panel support plate, be fixed on the support plate side wall industrial camera, be fixed on branch
Lifting cylinder on fagging, the baffle being fixed on the lifting cylinder piston rod, be arranged on the outer panel of support plate side
The first pusher cylinder and the second pusher cylinder for being arranged on the interior plate, the industrial camera be located at the upper of conveyor
Side, the baffle is across in conveyor;
The U-shaped drying unit includes U-shaped interior plate, U-shaped outer panel, is arranged on the U-shaped interior plate and U-shaped outer panel
Between multiple live-rollers, the electronics heating tube being arranged in the live-roller and the blowing list being arranged on U-shaped interior plate
Member, the live-roller is hollow and is made from a material that be thermally conductive, and the electronics heating tube is fixed on the inside of live-roller, and the blowing is single
First U-shaped mobile stent for including sleeve on U-shaped interior plate, be fixed on the hair-dryer of the U-shaped mobile stent side, be fixed on
The motor of U-shaped mobile stent opposite side, the gear being arranged on the machine shaft and be arranged on U-shaped interior plate side wall and with
The U-shaped rack of gear engagement, the hair-dryer is against the top of live-roller, U-shaped interior plate and the interior plate of main conveyor
Between be connected with chamfering plate, the side wall of the chamfering plate is equipped with arc-shaped rack, and the side wall of interior plate is equipped with transition rack, institute
It is end to end to state transition rack, arc-shaped rack and U-shaped rack.
By above-mentioned technical proposal, in the use of the present invention, conveyor will glue the elevator car ceiling transmission combined
Lived under to the industrial camera of detection unit by baffle, industrial camera carries out detection of taking pictures to elevator car ceiling, if detection
Up-to-standard and dried completion, then the piston rod of lifting cylinder drives baffle to rise, qualified elevator car ceiling by after
It is continuous to be transmitted by conveyor;If detection is off quality, elevator car ceiling is pushed away transmission by the piston rod of the second pusher cylinder
The side of band;If detection is up-to-standard but does not dry, elevator car ceiling is pushed into U-shaped baking by the piston rod of the first pusher cylinder
On the live-roller of dry unit, transmitted by live-roller.When live-roller transmits elevator car ceiling, electronics heating tube pair
Elevator car ceiling carries out continuous heating drying, and the motor driven gear of blowing unit rotates, and gear is under the engagement of U-shaped rack
Hair-dryer is driven to be moved along U-shaped interior plate, so as to carry out continuing drying to elevator car ceiling.The elevator car ceiling dried
Moved to from one end of U-shaped drying unit in main conveyor and continue to transmit by conveyor, and arc-shaped rack of the gear on chamfering plate
Engagement under be moved on interior plate, then be displaced downwardly on U-shaped interior plate and reset in the engagement of transition rack and arc-shaped rack, at this time
Motor stops, and blowing unit waits blowing action next time.
Through the above scheme, the drying testing agency for elevator car ceiling of the invention can not only to it is up-to-standard
Drying, off quality, the up-to-standard elevator car ceiling do not dried are sorted, moreover it is possible to the elevator car assembled to gluing
Railway carriage or compartment carries out flash baking processing while sorting, and gel time reduces, and improves the work efficiency of production and processing.
Preferably, the end of the U-shaped interior plate and U-shaped outer panel is interior with main conveyor for one kind as such scheme
Side plate is fixedly connected, and second pusher cylinder is arranged on interior plate by U-shaped interior plate and U-shaped outer panel, the second pusher
The quantity of cylinder is two, and two the second pusher cylinders are separately fixed in the end sidewalls of U-shaped interior plate and U-shaped outer panel,
The piston rod of second pusher cylinder is against conveyor and the first pusher cylinder.
Preferably, the outer panel of the main conveyor is equipped with stock supporting plate, first pusher to one kind as such scheme
Cylinder is fixed on the stock supporting plate, and the stock supporting plate between the piston rod and conveyor of the first pusher cylinder is equipped with material placing area.
Preferably, the industrial camera is between the first pusher cylinder and the second pusher cylinder for one kind as such scheme
Conveyor top.
As such scheme one kind preferably, the upper end of the U-shaped mobile stent be pressed against on the top surface of U-shaped interior plate and
Be equipped with wearing layer between the upper end of U-shaped mobile stent and the top surface of U-shaped interior plate, the biside plate of U-shaped mobile stent not with it is U-shaped interior
Side plane contact.
Preferably, the live-roller is connected one kind as such scheme with driving motor.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention,
And can be practiced according to the content of specification, below with presently preferred embodiments of the present invention and coordinate attached drawing describe in detail as after.
Brief description of the drawings:
The following drawings is only intended to, in doing schematic illustration and explanation to the present invention, not delimit the scope of the invention.Wherein:
Fig. 1 is the structure diagram of the present invention;
Fig. 2 is the partial structural diagram of the present invention;
Fig. 3 is another structure diagram of the present invention;
Fig. 4 is the structure diagram of live-roller in the present invention.
Embodiment:
With reference to the accompanying drawings and examples, the embodiment of the present invention is described in further detail.Implement below
Example is used to illustrate the present invention, but is not limited to the scope of the present invention.
Referring to Fig. 1, a kind of drying testing agency for elevator car ceiling of the present invention, including main conveyor 1,
The detection unit 2 being arranged in the main conveyor 1 and the U-shaped drying unit 3 for being arranged on main 1 side of conveyor.
Referring to Fig. 1, Fig. 3, the main conveyor 1 includes conveyor 11 and the interior plate for being arranged on 11 both sides of conveyor
12 and outer panel 13, the detection unit 2 includes being fixed on the support plate 21 of the outer panel 13, is fixed on the support plate 21
Industrial camera 22 on side wall, the lifting cylinder 23 being fixed in support plate 21, be fixed on 23 piston rod of lifting cylinder
Baffle 24, the first pusher cylinder 25 for being arranged on the outer panel 13 of 21 side of support plate and be arranged on the interior plate 12
The second pusher cylinder 26, the industrial camera 22 is located at the top of conveyor 11, and the baffle 24 is across in conveyor 11.
Referring to Fig. 1, Fig. 2, Fig. 4, the U-shaped drying unit 3 includes U-shaped interior plate 31, U-shaped outer panel 32, is arranged on institute
State multiple live-rollers 33 between U-shaped interior plate 31 and U-shaped outer panel 32, the electronics heating tube being arranged in the live-roller 33
34 and the blowing unit 35 that is arranged on U-shaped interior plate 31, the live-roller 33 be connected with driving motor (not shown), be driven
Roller 33 is hollow and is made from a material that be thermally conductive, and the electronics heating tube 34 is fixed on the inside of live-roller 33, the blowing unit 35
Including U-shaped mobile stent 351 of the sleeve on U-shaped interior plate 31, it is fixed on the hair-dryer of U-shaped mobile 351 side of stent
352nd, the motor 353 of U-shaped 351 opposite side of mobile stent, the gear 354 being arranged in 353 shaft of motor are fixed on and is set
Put the U-shaped rack 355 engaged on U-shaped 31 side wall of interior plate and with the gear 354, the upper end of the U-shaped mobile stent 351
It is pressed against on the top surface of U-shaped interior plate 31 and is equipped between the upper end of U-shaped mobile stent 351 and the top surface of U-shaped interior plate 31 resistance to
Layer 36 is ground, the biside plate of U-shaped mobile stent 351 do not contact with U-shaped interior plate 31, and the hair-dryer 352 is against live-roller 33
Top.
Referring to Fig. 1, be connected with chamfering plate 4 between the U-shaped interior plate 31 and the interior plate 12 of main conveyor 1, it is described fall
4 side wall of gusset is equipped with arc-shaped rack 356, and interior 12 side wall is equipped with transition rack 357, the transition rack 357, arc-shaped gear
Bar 356 and U-shaped rack 355 are end to end.
Referring to Fig. 1, the end of the U-shaped interior plate 31 and U-shaped outer panel 32 is fixed with the interior plate 12 of main transmission 1 to be connected
Connect, second pusher cylinder 26 is arranged on interior plate 12 by U-shaped interior plate 31 and U-shaped outer panel 32, the second pusher gas
The quantity of cylinder 26 is two, and two the second pusher cylinders 26 are separately fixed at the end side of U-shaped interior plate 31 and U-shaped outer panel 32
On wall, the piston rod of the second pusher cylinder 26 is against 11 and first pusher cylinder 25 of conveyor, the outer panel of the main conveyor 1
13 are equipped with stock supporting plate 5, and first pusher cylinder 25 is fixed on the stock supporting plate 5, the piston rod of the first pusher cylinder 25
Stock supporting plate 5 between conveyor 11 is equipped with material placing area 51, and the industrial camera 22 is located at the first pusher cylinder 25 and second
The top of conveyor 22 between pusher cylinder 26.
In the use of the present invention, the elevator car ceiling that gluing combines is sent to the work of detection unit 2 by conveyor 11
Stopped under industry camera 22 by baffle 24, industrial camera 22 carries out detection of taking pictures to elevator car ceiling, if detection is up-to-standard
And dried completion, then lifting cylinder 23 piston rod drive baffle 24 rise, qualified elevator car ceiling by continue by
Conveyor 11 is transmitted;If detection is off quality, elevator car ceiling is pushed away transmission by the piston rod of the second pusher cylinder 26
With 11 side;If detection is up-to-standard but does not dry, elevator car ceiling is pushed into U by the piston rod of the first pusher cylinder 25
On the live-roller 33 of type drying unit 3, transmitted by live-roller 33.When live-roller 33 transmits elevator car ceiling,
Electronics heating tube 34 carries out elevator car ceiling continuous heating drying, and the motor 353 of blowing unit 35 is with 354 turns of moving gear
Dynamic, gear 354 drives hair-dryer 353 to be moved along U-shaped interior plate 31 under the engagement of U-shaped rack 355, so as to be hung to lift car
Jacking row persistently dries up.The elevator car ceiling dried is moved in main conveyor 1 by transmitting from one end of U-shaped drying unit 3
Band 11 continues to transmit, and is moved under the engagement of arc-shaped rack 356 of the gear 354 on chamfering plate 4 on interior plate 12, then in mistake
The engagement for crossing rack 357 and arc-shaped rack 356 is displaced downwardly on U-shaped interior plate 31 and resets, and motor 353 stops at this time, blowing unit
35 wait blowing action next time.
In conclusion the drying testing agency for elevator car ceiling of the present invention can not only dry to up-to-standard
Dry, off quality, the up-to-standard elevator car ceiling do not dried is sorted, moreover it is possible to the lift car assembled to gluing
Flash baking processing is carried out while sorting, gel time reduces, and improves the work efficiency of production and processing.
Drying testing agency provided by the present invention for elevator car ceiling, is only the specific embodiment party of the present invention
Formula, but protection scope of the present invention is not limited thereto, any one skilled in the art the invention discloses
In technical scope, change or replacement can be readily occurred in, should all be covered within the scope of the present invention.Therefore, guarantor of the invention
Shield scope should be based on the protection scope of the described claims.
Claims (6)
- A kind of 1. drying testing agency for elevator car ceiling, it is characterised in that:Including main conveyor (1), the detection unit (2) being arranged in the main conveyor and it is arranged on main conveyor (1) side U-shaped drying unit (3);The main conveyor (1) includes conveyor (11) and the interior plate (12) and outer panel that are arranged on the conveyor both sides (13), the detection unit (2) include be fixed on the outer panel (13) support plate (21), be fixed on the support plate side Industrial camera (22) on wall, the lifting cylinder (23) being fixed in support plate (21), be fixed on the lifting cylinder piston rod On baffle (24), the first pusher cylinder (25) for being arranged on the outer panel (13) of support plate (21) side and be arranged on described The second pusher cylinder (26) on interior plate (12), the industrial camera (22) are located at the top of conveyor (11), the baffle (24) across in conveyor (11);The U-shaped drying unit (3) includes U-shaped interior plate (31), U-shaped outer panel (32), is arranged on the U-shaped interior plate (31) Multiple live-rollers (33) between U-shaped outer panel (32), the electronics heating tube (34) being arranged in the live-roller and set The blowing unit (35) on U-shaped interior plate (31) is put, the live-roller (33) is hollow and is made from a material that be thermally conductive, the electronics Heating tube (34) is fixed on the inside of live-roller (33), and the blowing unit (35) includes sleeve the U on U-shaped interior plate (31) Type movement stent (351), be fixed on the hair-dryer (352) of the U-shaped mobile stent side, be fixed on U-shaped mobile stent (351) The motor (353) of opposite side, the gear (354) being arranged on the machine shaft and it is arranged on U-shaped interior plate (31) side wall And the U-shaped rack (355) engaged with the gear (354), the hair-dryer (352) are U-shaped interior against the top of live-roller (33) Chamfering plate (4) is connected between side plate (31) and the interior plate (12) of main conveyor (1), the side wall of the chamfering plate is equipped with arc Shape rack (356), the side wall of interior plate (12) are equipped with transition rack (357), the transition rack, arc-shaped rack (356) and U Type rack (355) is end to end.
- 2. the drying testing agency according to claim 1 for elevator car ceiling, it is characterised in that:It is described U-shaped interior The end of side plate (31) and U-shaped outer panel (32) is fixedly connected with the interior plate (12) of main conveyor (1), second pusher Cylinder (26) is arranged on interior plate (12) by U-shaped interior plate (31) and U-shaped outer panel (32), the second pusher cylinder (26) Quantity is two, and two the second pusher cylinders (26) are separately fixed at the end side of U-shaped interior plate (31) and U-shaped outer panel (32) On wall, the piston rod of the second pusher cylinder (26) is against conveyor (11) and the first pusher cylinder (25).
- 3. the drying testing agency according to claim 1 for elevator car ceiling, it is characterised in that:The main transmission The outer panel (13) of band (1) is equipped with stock supporting plate (5), and first pusher cylinder (25) is fixed on the stock supporting plate (5), the Stock supporting plate (5) between the piston rod and conveyor (11) of one pusher cylinder (25) is equipped with material placing area (51).
- 4. the drying testing agency according to claim 1 for elevator car ceiling, it is characterised in that:The industry phase The top of conveyor (11) of the machine (22) between the first pusher cylinder (25) and the second pusher cylinder (26).
- 5. the drying testing agency according to claim 1 for elevator car ceiling, it is characterised in that:The U-shaped shifting The upper end of dynamic stent (351) is pressed against on the top surface of U-shaped interior plate (31) and the upper end of U-shaped mobile stent (351) and U-shaped inner side Wearing layer (36) is equipped between the top surface of plate (31), the biside plate of U-shaped mobile stent (351) is not contacted with U-shaped interior plate (31).
- 6. the drying testing agency according to claim 1 for elevator car ceiling, it is characterised in that:The live-roller (33) it is connected with driving motor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711073452.2A CN107917912B (en) | 2017-11-03 | 2017-11-03 | Drying detection mechanism for suspended ceiling of elevator car |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711073452.2A CN107917912B (en) | 2017-11-03 | 2017-11-03 | Drying detection mechanism for suspended ceiling of elevator car |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107917912A true CN107917912A (en) | 2018-04-17 |
CN107917912B CN107917912B (en) | 2021-07-09 |
Family
ID=61896077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711073452.2A Active CN107917912B (en) | 2017-11-03 | 2017-11-03 | Drying detection mechanism for suspended ceiling of elevator car |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107917912B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101700517A (en) * | 2009-11-06 | 2010-05-05 | 长江润发机械股份有限公司 | Process for automatically cleaning, painting and oiling elevator guide rails |
CN204486178U (en) * | 2015-03-30 | 2015-07-22 | 浙江创嘉机电设备有限公司 | The oven dry checkout gear that elevator car ceiling is special |
CN205981104U (en) * | 2016-08-25 | 2017-02-22 | 沙洲职业工学院 | Elevator guide rail automated inspection screening installation |
-
2017
- 2017-11-03 CN CN201711073452.2A patent/CN107917912B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101700517A (en) * | 2009-11-06 | 2010-05-05 | 长江润发机械股份有限公司 | Process for automatically cleaning, painting and oiling elevator guide rails |
CN204486178U (en) * | 2015-03-30 | 2015-07-22 | 浙江创嘉机电设备有限公司 | The oven dry checkout gear that elevator car ceiling is special |
CN205981104U (en) * | 2016-08-25 | 2017-02-22 | 沙洲职业工学院 | Elevator guide rail automated inspection screening installation |
Also Published As
Publication number | Publication date |
---|---|
CN107917912B (en) | 2021-07-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103879728B (en) | A kind of LED lamp tube streamline transmits equipment | |
CN106736074B (en) | Full-automatic pipe feeding, device for discharging | |
CN210357880U (en) | Automatic gumming baking equipment for electronic products | |
CN104003188A (en) | Automatic turnover device | |
CN107640522A (en) | A kind of automatic telescopic conveyer | |
CN107902347A (en) | Rotary express delivery sorting equipment | |
CN107917912A (en) | A kind of drying testing agency for elevator car ceiling | |
CN104280695A (en) | Novel aging platform for LED lamp aging test | |
CN106516682A (en) | Torsion transportation device | |
CN206550843U (en) | A kind of stainless steel thermos cup automatic polishing production line | |
CN102192643A (en) | Energy-saving chromate planar furnace | |
CN204336012U (en) | Round type is dried and is added sulphur sizing all-in-one machine | |
CN107363132B (en) | A kind of semi-automatic bending device of steel pipe | |
CN208014656U (en) | A kind of detection sorter convenient for detection LED component | |
CN102303983A (en) | Dryer for glazing ceramic wine bottle | |
CN206832000U (en) | A kind of three-layer network band conveying device | |
CN201308922Y (en) | Sliding hoisting device of spool of admission machine and paying out machine | |
CN209755857U (en) | lifting and overturning movement device for slush molding die | |
CN206732404U (en) | A kind of fluorescent tube thermal compression welding transfer automatic machine | |
CN209042929U (en) | A kind of woodwork factory lumber plate drying rack | |
CN207235946U (en) | A kind of dried noodle machine with automatic drying function | |
CN205736378U (en) | A kind of red ink paste used for seals machine with drying unit | |
CN205097601U (en) | Barrel -shaped wrapping bag make -up machine | |
CN205989157U (en) | A kind of flat tube supplies switching mechanism | |
CN206967694U (en) | A kind of calciner that brick body is made up of raw bauxite |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210622 Address after: 341000 ZHALIN Industrial Park, Gongjiang Town, Yudu County, Ganzhou City, Jiangxi Province Applicant after: Ganzhou Changda Elevator Sales Co., Ltd Address before: 523000 productivity building 406, high tech Industrial Development Zone, Songshan Lake, Dongguan, Guangdong Applicant before: Dongguan Lianzhou Intellectual Property Operation Management Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |