- Prior art keywords
- dividing pier
- joint bar
- power house
- underground power
- rock bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/107—Reinforcing elements therefor; Holders for the reinforcing elements
Abstract
本发明提供了一种保证地下厂房机坑隔墩开挖成型的加强支护方法,其将机坑隔墩原设计插筋调整为一部分是砂浆锚杆,另一部分是插筋;砂浆锚杆在机坑隔墩上一层岩体开挖前实施完成,所述插筋在机坑隔墩上一层岩体开挖完成后实施,插筋外露设计开挖线并弯折;所述插筋实施完成后,在机坑隔墩顶面浇筑盖重混凝土。本发明还提供了一种应用上述方法成型的地下厂房机坑隔墩结构。本发明能够保证地下厂房机坑隔墩开挖成型,并且,在工程中用筋量更少,而对地下厂房机坑隔墩的支护性能不降低,且能够防止高地应力对隔墩成型后的影响,保证后续工程质量。
Description
技术领域
本发明公开了一种保证地下厂房机坑隔墩开挖成型的加强支护方法及地下厂房机坑隔墩结构,适用于高地应力或不利地质结构面作用下地下厂房机坑隔墩的开挖成型。
背景技术
地下厂房机组间预留机坑隔墩可约束高边墙变形,改善地下厂房洞室围岩稳定,减少混凝土浇筑量,但在高地应力或不利地质结构面作用下,地下厂房机坑隔墩开挖成型较为困难,对地下厂房围岩稳定不利。
发明内容
本发明要解决的技术问题是:针对上述存在的问题提供一种保证地下厂房机坑隔墩开挖成型的加强支护方法,以保证机坑间隔墩开挖成型,改善地下厂房围岩稳定。为此,本发明所采用以下技术方案:
一种保证地下厂房机坑隔墩开挖成型的加强支护方法,其特征在于将机坑隔墩原设计插筋调整为一部分是砂浆锚杆,另一部分是插筋;
所述砂浆锚杆在机坑隔墩上一层岩体开挖前实施完成,实施方法为利用钻机钻孔,孔深与上层岩体高度和砂浆锚杆长度之和匹配,将砂浆锚杆插入钻孔中,用锚固剂填充钻孔与砂浆锚杆间空隙;砂浆锚杆头部与钻孔底部接触,尾部低于开挖线,使得在所述上一层岩体开挖后,所述砂浆锚杆的尾部是沉入在所述钻孔在隔墩顶部的孔口内;
所述插筋在机坑隔墩上一层岩体开挖完成后实施,插筋外露设计开挖线并弯折;
所述插筋实施完成后,在机坑隔墩顶面浇筑盖重混凝土。
进一步地,所述砂浆锚杆的长度小于插筋的长度,直径小于插筋的直径。
进一步地,原设计插筋的一半左右调整为砂浆锚杆,另一部分是插筋。
进一步地,砂浆锚杆与插筋两者梅花形间隔布置
进一步地,盖重混凝土内配筋,配筋采用网格状布置。
进一步地,所述盖重混凝土浇筑完成并达到龄期要求后,对隔墩从盖重混凝土向下实施有粘结预应力锚索。
本发明另一个所要解决的技术问题是提供一种应用上述方法成型的地下厂房机坑隔墩结构。为此,本发明采用以下技术方案:
一种地下厂房机坑隔墩结构,其特征在于所述隔墩设置有砂浆锚杆和插筋,所述砂浆锚杆设置在自隔墩顶部向下的钻孔中,用锚固剂填充钻孔与砂浆锚杆间空隙;砂浆锚杆头部与钻孔底部接触,尾部沉入在所述钻孔在隔墩顶部的孔口内并低于机坑隔墩上一层岩体的开挖线;
插筋尾部外露在隔墩顶面外并弯折;
隔墩的顶部设置有盖重混凝土。
进一步地,所述砂浆锚杆的长度小于插筋的长度,直径小于插筋的直径。
进一步地,原设计插筋的一半左右调整为砂浆锚杆,另一部分是插筋;砂浆锚杆和插筋两者梅花形间隔布置。
进一步地,盖重混凝土内配筋,配筋采用网格状布置。
进一步地,隔墩从盖重混凝土向下实施有粘结预应力锚索。
由于采用本发明的技术方案,与以往的方法相比较,本发明能够保证地下厂房机坑隔墩在高地应力或不利地质结构面作用下开挖成型,并且,在工程中用筋量更少,而对地下厂房机坑隔墩的支护性能不降低,且能够防止高地应力对隔墩成型后的影响,保证后续工程质量。
附图说明
图1是本发明的整体结构平面布置图。
图2是本发明的整体结构纵剖面图。
具体实施方式
参照附图。本发明的一种保证地下厂房机坑隔墩开挖成型的加强支护方法,包括将机坑隔墩1原设计插筋32、L=6m调整为一半砂浆锚杆2(28,L=4.5m)及一半插筋3(32,L=6m),插筋和锚杆分布均匀,两者以梅花形间隔布置较佳。
所述砂浆锚杆2需在机坑隔墩1上一层岩体(层高h)开挖前实施完成,实施方法为利用钻机钻孔,孔深h+4.5m,将砂浆锚杆2插入钻孔中,砂浆锚杆2头部与钻孔底部接触,并用高强锚固剂填充钻孔与砂浆锚杆间空隙。砂浆锚杆2尾部低于开挖线L,使得在所述上一层岩体开挖后,所述砂浆锚杆的尾部是沉入在所述钻孔在隔墩顶部的孔口内。
所述插筋3在机坑隔墩1上一层岩体开挖完成后实施,插筋3与砂浆锚杆2梅花形间隔布置,插筋3外露设计开挖线1m,弯折0.6m。
所述插筋3实施完成后,在机坑隔墩1顶面浇筑50cm厚盖重混凝土4,盖重混凝土4内可进行上层配筋,配筋采用网格状布置,配筋参数推荐采用25@200mm×200mm,能够进一步从上部约束,确保隔墩1的稳定性。
所述盖重混凝土4浇筑完成并达到龄期要求后,实施有粘结预应力锚索5,锚索吨位、长度、数量及布置间距依现场情况确定。
以上结构应用在我国西南某超大型水电站的施工中,在高地应力和不利地质结构面作用下确保了地下厂房机坑隔墩的开挖成型,并在后期结构混凝土施工之前维持稳定。
以上所述仅为本发明的具体实施例,但本发明的结构特征并不局限于此,任何本领域的技术人员在本发明的领域内,所作的变化或修饰皆涵盖在本发明的保护范围之中。
Claims (10)
1.一种保证地下厂房机坑隔墩开挖成型的加强支护方法,其特征在于将机坑隔墩原设计插筋调整为一部分是砂浆锚杆,另一部分是插筋;
所述砂浆锚杆在机坑隔墩上一层岩体开挖前实施完成,实施方法为利用钻机钻孔,孔深与上层岩体高度和砂浆锚杆长度之和匹配,将砂浆锚杆插入钻孔中,用锚固剂填充钻孔与砂浆锚杆间空隙;砂浆锚杆头部与钻孔底部接触,尾部低于开挖线,使得在所述上一层岩体开挖后,所述砂浆锚杆的尾部是沉入在所述钻孔在隔墩顶部的孔口内;
所述插筋在机坑隔墩上一层岩体开挖完成后实施,插筋外露设计开挖线并弯折;
所述插筋实施完成后,在机坑隔墩顶面浇筑盖重混凝土。
2.如权利要求1所述的一种保证地下厂房机坑隔墩开挖成型的加强支护方法,其特征在于所述砂浆锚杆的长度小于插筋的长度,直径小于插筋的直径。
3.如权利要求1所述的一种保证地下厂房机坑隔墩开挖成型的加强支护方法,其特征在于原设计插筋的一半左右调整为砂浆锚杆,另一部分是插筋。
4.如权利要求1或3所述的一种保证地下厂房机坑隔墩开挖成型的加强支护方法,其特征在于砂浆锚杆与插筋两者梅花形间隔布置。
5.如权利要求1所述的一种保证地下厂房机坑隔墩开挖成型的加强支护方法,其特征在于盖重混凝土内配筋,配筋采用网格状布置。
6.如权利要求1所述的一种保证地下厂房机坑隔墩开挖成型的加强支护方法,其特征在于所述盖重混凝土浇筑完成并达到龄期要求后,对隔墩从盖重混凝土向下实施有粘结预应力锚索。
7.一种地下厂房机坑隔墩结构,其特征在于所述隔墩设置有砂浆锚杆和插筋,所述砂浆锚杆设置在自隔墩顶部向下的钻孔中,用锚固剂填充钻孔与砂浆锚杆间空隙;砂浆锚杆头部与钻孔底部接触,尾部沉入在所述钻孔在隔墩顶部的孔口内并低于机坑隔墩上一层岩体的开挖线;
插筋尾部外露在隔墩顶面外并弯折;
隔墩的顶部设置有盖重混凝土。
8.如权利要求7所述的一种地下厂房机坑隔墩结构,其特征在于所述砂浆锚杆的长度小于插筋的长度,直径小于插筋的直径。
9.如权利要求7所述的一种地下厂房机坑隔墩结构,其特征在于原设计插筋的一半左右调整为砂浆锚杆,另一部分是插筋;砂浆锚杆和插筋两者梅花形间隔布置。
10.如权利要求7所述的一种地下厂房机坑隔墩结构,其特征在于隔墩从盖重混凝土向下实施有粘结预应力锚索。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711126536.8A CN107905805A (zh) | 2017-11-15 | 2017-11-15 | 一种保证地下厂房机坑隔墩开挖成型的加强支护方法及地下厂房机坑隔墩结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711126536.8A CN107905805A (zh) | 2017-11-15 | 2017-11-15 | 一种保证地下厂房机坑隔墩开挖成型的加强支护方法及地下厂房机坑隔墩结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107905805A true CN107905805A (zh) | 2018-04-13 |
Family
ID=61845559
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711126536.8A Pending CN107905805A (zh) | 2017-11-15 | 2017-11-15 | 一种保证地下厂房机坑隔墩开挖成型的加强支护方法及地下厂房机坑隔墩结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107905805A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708362A (zh) * | 2018-07-26 | 2018-10-26 | 中国电建集团成都勘测设计研究院有限公司 | 地下厂房隔墙岩体预支护结构及地下厂房隔墙岩体结构 |
CN109339055A (zh) * | 2018-10-22 | 2019-02-15 | 中国水利水电第七工程局有限公司 | 高地应力、玄武岩地质条件下巨型地下厂房机坑施工方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102337906A (zh) * | 2011-09-09 | 2012-02-01 | 陕西开拓建筑科技有限公司 | 一种在回采与保留巷道间浇筑密闭隔墙的施工方法 |
CN203514310U (zh) * | 2013-10-25 | 2014-04-02 | 中国水电顾问集团中南勘测设计研究院有限公司 | 一种地下厂房围岩 |
CN104631604A (zh) * | 2014-12-25 | 2015-05-20 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种用于水电站厂房中的集水井 |
CN105089023A (zh) * | 2015-04-14 | 2015-11-25 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种水电站厂房混凝土底板改进方法及其结构 |
CN105350503A (zh) * | 2015-10-10 | 2016-02-24 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种水电站地下厂房厂变交通洞结构及其施工方法 |
CN205062839U (zh) * | 2015-10-10 | 2016-03-02 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种缓倾角薄层围岩下地下厂房顶拱支护结构 |
CN107130968A (zh) * | 2017-07-11 | 2017-09-05 | 北京市政建设集团有限责任公司 | 一种隧道建设用中隔墙 |
CN207776878U (zh) * | 2017-11-15 | 2018-08-28 | 中国电建集团华东勘测设计研究院有限公司 | 一种地下厂房机坑隔墩结构 |
-
2017
- 2017-11-15 CN CN201711126536.8A patent/CN107905805A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102337906A (zh) * | 2011-09-09 | 2012-02-01 | 陕西开拓建筑科技有限公司 | 一种在回采与保留巷道间浇筑密闭隔墙的施工方法 |
CN203514310U (zh) * | 2013-10-25 | 2014-04-02 | 中国水电顾问集团中南勘测设计研究院有限公司 | 一种地下厂房围岩 |
CN104631604A (zh) * | 2014-12-25 | 2015-05-20 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种用于水电站厂房中的集水井 |
CN105089023A (zh) * | 2015-04-14 | 2015-11-25 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种水电站厂房混凝土底板改进方法及其结构 |
CN105350503A (zh) * | 2015-10-10 | 2016-02-24 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种水电站地下厂房厂变交通洞结构及其施工方法 |
CN205062839U (zh) * | 2015-10-10 | 2016-03-02 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种缓倾角薄层围岩下地下厂房顶拱支护结构 |
CN107130968A (zh) * | 2017-07-11 | 2017-09-05 | 北京市政建设集团有限责任公司 | 一种隧道建设用中隔墙 |
CN207776878U (zh) * | 2017-11-15 | 2018-08-28 | 中国电建集团华东勘测设计研究院有限公司 | 一种地下厂房机坑隔墩结构 |
Non-Patent Citations (3)
Title |
---|
和孙文: "水利水电大型地下厂房工程施工技术", 南方十三省(区、市)水力发电学会秘, pages 68 - 81 * |
陈浩; 王霄: "水电站大型地下厂房特殊部位开挖支护技术研究", 人民长江, pages 67 - 71 * |
龙鹏伟: "机窝隔离墩对三峡地下厂房开挖的影响", 陕西水利, pages 73 - 74 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708362A (zh) * | 2018-07-26 | 2018-10-26 | 中国电建集团成都勘测设计研究院有限公司 | 地下厂房隔墙岩体预支护结构及地下厂房隔墙岩体结构 |
CN109339055A (zh) * | 2018-10-22 | 2019-02-15 | 中国水利水电第七工程局有限公司 | 高地应力、玄武岩地质条件下巨型地下厂房机坑施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105840207B (zh) | 一种穿越浅埋偏压松散堆积体大跨度隧道综合进洞结构施工方法 | |
CN103603369B (zh) | 一种锚拉桩扶壁式挡土墙施工方法 | |
CN103696784B (zh) | 一种浅埋大跨隧道下穿建构筑物的大直径长管幕施工方法 | |
CN105134269B (zh) | 一种锚索穿棚协同承载的巷道围岩控制方法 | |
CN102444142A (zh) | 一种群桩改柱扩建地下室及其施工工法 | |
CN104763433A (zh) | 上软下硬地层大跨地铁车站暗挖施工方法 | |
CN108518230A (zh) | 一种极高地应力软岩隧道二次衬砌变形控制方法及结构 | |
CN108532586A (zh) | 一种停车库用地下连续墙的施工方法 | |
CN106121675A (zh) | 小型溶洞位于开挖隧道仰拱底时隧道开挖与溶洞处理方法 | |
CN106498950A (zh) | 锚头置于桩身的深基坑桩锚支护体系及其实施方法 | |
CN107965332A (zh) | 煤矿巷道底板防底鼓预应力钢筋支护方法 | |
CN108343068A (zh) | 复合土钉墙与桩锚支护复合支护结构及施工方法 | |
CN108843341A (zh) | 一种桩墙一体式的隧道明洞结构及其施工方法 | |
CN106968692B (zh) | 一种隧道开挖支护结构及该支护结构的施工方法 | |
CN107905805A (zh) | 一种保证地下厂房机坑隔墩开挖成型的加强支护方法及地下厂房机坑隔墩结构 | |
CN105369799A (zh) | 预制桩地下连续墙混凝土预制桩及施工方法 | |
CN110273700A (zh) | 一种控制红页岩巷道强力锚注支护结构及其施工方法 | |
CN209228377U (zh) | 一种用于隧道洞口支护的多级套拱结构及管棚套拱结构 | |
CN207776878U (zh) | 一种地下厂房机坑隔墩结构 | |
CN207987961U (zh) | 一种岩质高边坡锚杆和挡土墙组合结构 | |
CN111593757A (zh) | 适于喀斯特地区的线路杆塔回型桩锚复合基础及其施工方法 | |
CN111236949A (zh) | 一种小角度交叉隧道施工方法 | |
CN110004954A (zh) | 覆盖层内的锚固洞结构及其施工方法 | |
RU2107128C1 (ru) | Способ укрепления земляного откоса и устройство для его осуществления | |
CN110093929A (zh) | 一种地下工程顺作法施工方法及结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |